District: | ATLANTA | Let Date: | Oct 2017 |
Highway: | US 67 | Let Status: | Actual |
Project ID: | STP 2018(188) | CSJ: | 0010-11-070 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | 0.1 MI W OF SH 8 | Fund Cat: | 1 |
Limits To: | ANDERSON CREEK | ESTIMATE: | $477,399 |
Length: | 4.5 | Actual | $390,904 |
District: | ATLANTA | Let Date: | Oct 2017 |
Highway: | US 82 | Let Status: | Actual |
Project ID: | NH 2018(189) | CSJ: | 0046-03-042 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | 0.4 MI W OF US 259 | Fund Cat: | 1 |
Limits To: | FM 992 W | ESTIMATE: | $135,680 |
Length: | 1.7 | Actual | $125,802 |
District: | ATLANTA | Let Date: | Oct 2017 |
Highway: | US 82 | Let Status: | Actual |
Project ID: | NH 2018(189) | CSJ: | 0046-04-066 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | FM 992 W | Fund Cat: | 1 |
Limits To: | FM 1840 | ESTIMATE: | $31,670 |
Length: | 0.4 | Actual | $30,926 |
District: | ATLANTA | Let Date: | Oct 2017 |
Highway: | US 82 | Let Status: | Actual |
Project ID: | STP 2018(188) | CSJ: | 0046-04-067 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | SH 98 | Fund Cat: | 1 |
Limits To: | 0.5 MI W OF SH 8 | ESTIMATE: | $186,241 |
Length: | 3.0 | Actual | $184,823 |
District: | ATLANTA | Let Date: | Oct 2017 |
Highway: | SH 8 | Let Status: | Actual |
Project ID: | STP 2018(188) | CSJ: | 0062-03-043 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | FM 995 | Fund Cat: | 1 |
Limits To: | SH 155 | ESTIMATE: | $342,461 |
Length: | 7.9 | Actual | $344,608 |
District: | ATLANTA | Let Date: | Oct 2017 |
Highway: | US 271 | Let Status: | Actual |
Project ID: | STP 2018(188) | CSJ: | 0248-01-078 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | ROBERT NANCE ROAD | Fund Cat: | 1 |
Limits To: | US 271 | ESTIMATE: | $82,418 |
Length: | 1.0 | Actual | $83,077 |
District: | ATLANTA | Let Date: | Oct 2017 |
Highway: | US 259 | Let Status: | Actual |
Project ID: | STP 2018(188) | CSJ: | 0392-01-070 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | 1.5 MI N OF FM 250 | Fund Cat: | 1 |
Limits To: | FM 250 | ESTIMATE: | $107,789 |
Length: | 1.5 | Actual | $107,242 |
District: | ATLANTA | Let Date: | Oct 2017 |
Highway: | FM 699 | Let Status: | Actual |
Project ID: | STP 2018(188) | CSJ: | 0394-03-041 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | FM 2517 | Fund Cat: | 1 |
Limits To: | SHELBY C/L | ESTIMATE: | $326,726 |
Length: | 11.6 | Actual | $328,051 |
District: | ATLANTA | Let Date: | Oct 2017 |
Highway: | SH 155 | Let Status: | Actual |
Project ID: | STP 2018(188) | CSJ: | 0520-05-048 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | 1.0 MI S OF FM 2796 | Fund Cat: | 1 |
Limits To: | US 271 | ESTIMATE: | $405,705 |
Length: | 6.0 | Actual | $409,547 |
District: | ATLANTA | Let Date: | Oct 2017 |
Highway: | SS 86 | Let Status: | Actual |
Project ID: | STP 2018(188) | CSJ: | 0610-08-008 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | IH 30 | Fund Cat: | 1 |
Limits To: | US 82 | ESTIMATE: | $21,409 |
Length: | 0.3 | Actual | $20,682 |
District: | ATLANTA | Let Date: | Oct 2017 |
Highway: | FM 134 | Let Status: | Actual |
Project ID: | STP 2018(188) | CSJ: | 0632-03-048 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | SH 43 | Fund Cat: | 1 |
Limits To: | FM 1999 | ESTIMATE: | $182,052 |
Length: | 5.7 | Actual | $182,683 |
District: | ATLANTA | Let Date: | Oct 2017 |
Highway: | FM 9 | Let Status: | Actual |
Project ID: | STP 2018(188) | CSJ: | 0632-04-033 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | FM 2625 | Fund Cat: | 1 |
Limits To: | FM 451 | ESTIMATE: | $161,072 |
Length: | 6.2 | Actual | $161,698 |
District: | ATLANTA | Let Date: | Oct 2017 |
Highway: | FM 1650 | Let Status: | Actual |
Project ID: | STP 2018(188) | CSJ: | 0640-04-014 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | SH 154 | Fund Cat: | 1 |
Limits To: | GREGG C/L | ESTIMATE: | $221,630 |
Length: | 8.5 | Actual | $222,449 |
District: | ATLANTA | Let Date: | Oct 2017 |
Highway: | FM 31 | Let Status: | Actual |
Project ID: | STP 2018(188) | CSJ: | 0731-01-053 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | FM 123 | Fund Cat: | 1 |
Limits To: | 5.1 MI S OF FM 2517 | ESTIMATE: | $323,201 |
Length: | 12.6 | Actual | $324,162 |
District: | ATLANTA | Let Date: | Oct 2017 |
Highway: | FM 555 | Let Status: | Actual |
Project ID: | STP 2018(188) | CSJ: | 1018-02-020 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | SH 155 | Fund Cat: | 1 |
Limits To: | SH 154 | ESTIMATE: | $278,471 |
Length: | 10.5 | Actual | $279,433 |
District: | ATLANTA | Let Date: | Oct 2017 |
Highway: | FM 989 | Let Status: | Actual |
Project ID: | STP 2018(188) | CSJ: | 1231-01-070 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | FM 559 | Fund Cat: | 1 |
Limits To: | IH 30 | ESTIMATE: | $122,569 |
Length: | 4.0 | Actual | $123,107 |
District: | ATLANTA | Let Date: | Oct 2017 |
Highway: | FM 9 | Let Status: | Actual |
Project ID: | STP 2018(188) | CSJ: | 1576-01-011 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | FM 451 | Fund Cat: | 1 |
Limits To: | PANOLA C/L | ESTIMATE: | $8,628 |
Length: | 0.3 | Actual | $8,662 |
District: | ATLANTA | Let Date: | Oct 2017 |
Highway: | FM 2348 | Let Status: | Actual |
Project ID: | STP 2018(188) | CSJ: | 2240-01-019 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | US 67 | Fund Cat: | 1 |
Limits To: | SH 49 | ESTIMATE: | $156,883 |
Length: | 3.0 | Actual | $153,586 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0010-11-070 | ||
---|---|---|---|
Length: | 88.7 | ||
Estimate: | $3,572,000 | ||
Actual: | $3,481,443 | ||
CCSJ: 0010-13-094 |
|||
District: | ATLANTA | Let Date: | Mar 2018 |
Highway: | US 67 | Let Status: | Actual |
Project ID: | STP 2018(644)HESG | CSJ: | 0010-13-094 |
Description: | INSTALL CONTINUOUS TURN LANE, MILLED EDGELINE RUMBLE STRIPS | Handling Code: | |
Limits From: | FM 989 | Fund Cat: | 8 |
Limits To: | FM 2148 | ESTIMATE: | $1,101,251 |
Length: | 2.0 | Actual | $1,149,722 |
List Showing Order Proposal Request Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0010-13-094 | ||
Length: | 2 | ||
Estimate: | $1,101,251 | ||
Actual: | $1,149,722 | ||
CCSJ: 0010-19-010 |
|||
District: | ATLANTA | Let Date: | Sep 2017 |
Highway: | FM 991 | Let Status: | Actual |
Project ID: | STP 2018(037)HESG | CSJ: | 0010-19-010 |
Description: | PROFILE CENTERLINE & EDGELINE MARKINGS | Handling Code: | |
Limits From: | US 67 W | Fund Cat: | 8 |
Limits To: | US 67 E | ESTIMATE: | $250,479 |
Length: | 6.8 | Actual | $124,043 |
District: | ATLANTA | Let Date: | Sep 2017 |
Highway: | SH 8 | Let Status: | Actual |
Project ID: | STP 2018(057)HESG | CSJ: | 0060-01-017 |
Description: | PROFILE EDGELINE & CENTERLINE MARKINGS | Handling Code: | |
Limits From: | ARKANSAS STATE LINE | Fund Cat: | 8 |
Limits To: | 2.8 MI. S. OF ARKANSAS STATE LINE | ESTIMATE: | $62,607 |
Length: | 2.9 | Actual | $47,608 |
District: | ATLANTA | Let Date: | Sep 2017 |
Highway: | SH 8 | Let Status: | Actual |
Project ID: | STP 2018(056)HESG | CSJ: | 0060-02-032 |
Description: | PROFILE EDGELINE & CENTERLINE MARKINGS | Handling Code: | |
Limits From: | 2.8 MI. S. OF ARKANSAS STATE LINE | Fund Cat: | 8 |
Limits To: | US 82 | ESTIMATE: | $129,108 |
Length: | 4.9 | Actual | $116,843 |
District: | ATLANTA | Let Date: | Sep 2017 |
Highway: | SH 8 | Let Status: | Actual |
Project ID: | STP 2018(055)HESG | CSJ: | 0061-01-023 |
Description: | PROFILE EDGELINE & CENTERLINE MARKINGS | Handling Code: | |
Limits From: | US 82 | Fund Cat: | 8 |
Limits To: | FM 1840 | ESTIMATE: | $25,296 |
Length: | 1.3 | Actual | $22,459 |
District: | ATLANTA | Let Date: | Sep 2017 |
Highway: | SH 8 | Let Status: | Actual |
Project ID: | STP 2018(054)HESG | CSJ: | 0061-02-031 |
Description: | PROFILE EDGELINE & CENTERLINE MARKINGS | Handling Code: | |
Limits From: | FM 1840 | Fund Cat: | 8 |
Limits To: | US 67 | ESTIMATE: | $166,783 |
Length: | 8.3 | Actual | $147,594 |
District: | ATLANTA | Let Date: | Sep 2017 |
Highway: | SH 49 | Let Status: | Actual |
Project ID: | STP 2018(042)HESG | CSJ: | 0222-05-046 |
Description: | TEXTURIZE SHOULDERS & CL TEXTURING | Handling Code: | |
Limits From: | CASS C/L | Fund Cat: | 8 |
Limits To: | 0.036 MI. W. OF FM 881 | ESTIMATE: | $421,979 |
Length: | 13.2 | Actual | $255,858 |
District: | ATLANTA | Let Date: | Sep 2017 |
Highway: | SH 155 | Let Status: | Actual |
Project ID: | STP 2018(053)HESG | CSJ: | 0520-03-034 |
Description: | PROFILE EDGELINE & CENTERLINE MARKINGS | Handling Code: | |
Limits From: | US 59 | Fund Cat: | 8 |
Limits To: | MARION C/L | ESTIMATE: | $371,282 |
Length: | 17.5 | Actual | $329,103 |
District: | ATLANTA | Let Date: | Sep 2017 |
Highway: | SH 155 | Let Status: | Actual |
Project ID: | STP 2018(052)HESG | CSJ: | 0520-04-033 |
Description: | PROFILE EDGELINE & CENTERLINE MARKINGS | Handling Code: | |
Limits From: | CASS C/L | Fund Cat: | 8 |
Limits To: | UPSHUR C/L | ESTIMATE: | $135,952 |
Length: | 5.5 | Actual | $121,319 |
District: | ATLANTA | Let Date: | Sep 2017 |
Highway: | FM 450 | Let Status: | Actual |
Project ID: | STP 2018(043)HESG | CSJ: | 0843-02-024 |
Description: | PROFILE CENTERLINE & EDGELINE MARKINGS | Handling Code: | |
Limits From: | FM 1968 | Fund Cat: | 8 |
Limits To: | FM 449 | ESTIMATE: | $121,476 |
Length: | 6.2 | Actual | $95,419 |
District: | ATLANTA | Let Date: | Sep 2017 |
Highway: | FM 1968 | Let Status: | Actual |
Project ID: | STP 2018(051)HESG | CSJ: | 0843-04-016 |
Description: | PROFILE EDGELINE & CENTERLINE MARKINGS | Handling Code: | |
Limits From: | FM 726 | Fund Cat: | 8 |
Limits To: | HARRISON C/L | ESTIMATE: | $6,424 |
Length: | 0.3 | Actual | $5,233 |
District: | ATLANTA | Let Date: | Sep 2017 |
Highway: | FM 1968 | Let Status: | Actual |
Project ID: | STP 2018(050)HESG | CSJ: | 0843-05-014 |
Description: | PROFILE EDGELINE & CENTERLINE MARKINGS | Handling Code: | |
Limits From: | MARION C/L | Fund Cat: | 8 |
Limits To: | FM 450 | ESTIMATE: | $81,212 |
Length: | 3.9 | Actual | $63,835 |
District: | ATLANTA | Let Date: | Sep 2017 |
Highway: | FM 1397 | Let Status: | Actual |
Project ID: | STP 2018(038)HESG | CSJ: | 0945-01-038 |
Description: | TEXTURIZE SHOULDERS & CL TEXTURING | Handling Code: | |
Limits From: | 6.418 MI.N. OF IH 30 | Fund Cat: | 8 |
Limits To: | 0.840 MI.N. OF IH 30 | ESTIMATE: | $117,040 |
Length: | 5.7 | Actual | $103,505 |
District: | ATLANTA | Let Date: | Sep 2017 |
Highway: | FM 450 | Let Status: | Actual |
Project ID: | STP 2018(044)HESG | CSJ: | 1382-01-013 |
Description: | PROFILE CENTERLINE & EDGELINE MARKINGS | Handling Code: | |
Limits From: | US 259 | Fund Cat: | 8 |
Limits To: | MARION C/L | ESTIMATE: | $16,991 |
Length: | 1.3 | Actual | $12,891 |
District: | ATLANTA | Let Date: | Sep 2017 |
Highway: | FM 450 | Let Status: | Actual |
Project ID: | STP 2018(045)HESG | CSJ: | 1382-02-014 |
Description: | PROFILE CENTERLINE & EDGELINE MARKINGS | Handling Code: | |
Limits From: | MARION C/L | Fund Cat: | 8 |
Limits To: | HARRISON C/L | ESTIMATE: | $45,235 |
Length: | 2.0 | Actual | $35,479 |
District: | ATLANTA | Let Date: | Sep 2017 |
Highway: | FM 450 | Let Status: | Actual |
Project ID: | STP 2018(046)HESG | CSJ: | 1382-03-015 |
Description: | PROFILE CENTERLINE & EDGELINE MARKINGS | Handling Code: | |
Limits From: | HARRISON C/L | Fund Cat: | 8 |
Limits To: | FM 726 | ESTIMATE: | $57,415 |
Length: | 2.7 | Actual | $45,048 |
District: | ATLANTA | Let Date: | Sep 2017 |
Highway: | FM 1404 | Let Status: | Actual |
Project ID: | STP 2018(049)HESG | CSJ: | 1386-01-022 |
Description: | PROFILE CENTERLINE MARKINGS | Handling Code: | |
Limits From: | SH 155 | Fund Cat: | 8 |
Limits To: | FM 2685 | ESTIMATE: | $48,387 |
Length: | 6.7 | Actual | $44,972 |
District: | ATLANTA | Let Date: | Sep 2017 |
Highway: | FM 968 | Let Status: | Actual |
Project ID: | STP 2018(040)HESG | CSJ: | 1575-02-034 |
Description: | TEXTURIZE SHOULDERS & CL TEXTURING | Handling Code: | |
Limits From: | GREGG C/L | Fund Cat: | 8 |
Limits To: | US 80 | ESTIMATE: | $412,066 |
Length: | 18.5 | Actual | $325,321 |
District: | ATLANTA | Let Date: | Sep 2017 |
Highway: | FM 1734 | Let Status: | Actual |
Project ID: | STP 2018(048)HESG | CSJ: | 1578-02-029 |
Description: | PROFILE CENTERLINE MARKINGS | Handling Code: | |
Limits From: | US 67(W) | Fund Cat: | 8 |
Limits To: | US 67(E) | ESTIMATE: | $49,825 |
Length: | 8.9 | Actual | $46,025 |
District: | ATLANTA | Let Date: | Sep 2017 |
Highway: | FM 726 | Let Status: | Actual |
Project ID: | STP 2018(039)HESG | CSJ: | 1895-03-022 |
Description: | TEXTURIZE SHOULDERS & CL TEXTURING | Handling Code: | |
Limits From: | HARRISON C/L | Fund Cat: | 8 |
Limits To: | FM 729 | ESTIMATE: | $196,204 |
Length: | 9.2 | Actual | $153,949 |
District: | ATLANTA | Let Date: | Sep 2017 |
Highway: | FM 726 | Let Status: | Actual |
Project ID: | STP 2018(047)HESG | CSJ: | 1896-03-018 |
Description: | PROFILE EDGELINE & CENTERLINE MARKINGS | Handling Code: | |
Limits From: | SH 300 | Fund Cat: | 8 |
Limits To: | FM 1650 | ESTIMATE: | $85,467 |
Length: | 4.1 | Actual | $67,221 |
District: | ATLANTA | Let Date: | Sep 2017 |
Highway: | FM 2516 | Let Status: | Actual |
Project ID: | STP 2018(041)HESG | CSJ: | 2422-01-010 |
Description: | TEXTURIZE SHOULDERS & CL TEXTURING | Handling Code: | |
Limits From: | US 59 | Fund Cat: | 8 |
Limits To: | FM 558 | ESTIMATE: | $134,441 |
Length: | 6.5 | Actual | $118,723 |
Proposal Request Bid List List Showing Order Addenda Bid Tabulations Award Status Back... | Totals for 0010-19-010 | ||
Length: | 136.4 | ||
Estimate: | $2,935,668 | ||
Actual: | $2,282,447 | ||
CCSJ: 0010-19-012 |
|||
District: | ATLANTA | Let Date: | Mar 2018 |
Highway: | FM 991 | Let Status: | Actual |
Project ID: | STP 2018(645)HES | CSJ: | 0010-19-012 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: | |
Limits From: | US 67 W | Fund Cat: | 8 |
Limits To: | US 67 E | ESTIMATE: | $216,074 |
Length: | 6.8 | Actual | $145,555 |
District: | ATLANTA | Let Date: | Mar 2018 |
Highway: | SH 49 | Let Status: | Actual |
Project ID: | STP 2018(676)HES | CSJ: | 0222-04-060 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: | |
Limits From: | SH 11 | Fund Cat: | 8 |
Limits To: | SH 155 | ESTIMATE: | $72,088 |
Length: | 6.9 | Actual | $57,280 |
District: | ATLANTA | Let Date: | Mar 2018 |
Highway: | SH 98 | Let Status: | Actual |
Project ID: | STP 2018(678)HES | CSJ: | 0330-01-036 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: | |
Limits From: | FM 1840 | Fund Cat: | 8 |
Limits To: | US 67 | ESTIMATE: | $118,676 |
Length: | 6.3 | Actual | $84,145 |
District: | ATLANTA | Let Date: | Mar 2018 |
Highway: | FM 44 | Let Status: | Actual |
Project ID: | STP 2018(670)HES | CSJ: | 0330-02-017 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: | |
Limits From: | RED RIVER C/L | Fund Cat: | 8 |
Limits To: | US 259 | ESTIMATE: | $321,496 |
Length: | 7.6 | Actual | $239,566 |
District: | ATLANTA | Let Date: | Mar 2018 |
Highway: | FM 990 | Let Status: | Actual |
Project ID: | STP 2018(673)HES | CSJ: | 1213-01-013 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: | |
Limits From: | FM 561 | Fund Cat: | 8 |
Limits To: | US 67 | ESTIMATE: | $97,164 |
Length: | 3.3 | Actual | $75,589 |
District: | ATLANTA | Let Date: | Mar 2018 |
Highway: | FM 161 | Let Status: | Actual |
Project ID: | STP 2018(671)HES | CSJ: | 1574-02-021 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: | |
Limits From: | MORRIS C/L | Fund Cat: | 8 |
Limits To: | FM 130 | ESTIMATE: | $150,642 |
Length: | 7.8 | Actual | $116,617 |
District: | ATLANTA | Let Date: | Mar 2018 |
Highway: | SH 98 | Let Status: | Actual |
Project ID: | STP 2018(677)HES | CSJ: | 2526-01-009 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: | |
Limits From: | US 82 | Fund Cat: | 8 |
Limits To: | FM 1840 | ESTIMATE: | $201,482 |
Length: | 2.6 | Actual | $150,275 |
District: | ATLANTA | Let Date: | Mar 2018 |
Highway: | FM 990 | Let Status: | Actual |
Project ID: | STP 2018(672)HES | CSJ: | 2527-01-015 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: | |
Limits From: | FM 1840 | Fund Cat: | 8 |
Limits To: | FM 561 | ESTIMATE: | $386,085 |
Length: | 10.7 | Actual | $286,087 |
District: | ATLANTA | Let Date: | Mar 2018 |
Highway: | FM 2791 | Let Status: | Actual |
Project ID: | STP 2018(674)HES | CSJ: | 2773-01-010 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: | |
Limits From: | SH 77 | Fund Cat: | 8 |
Limits To: | FM 96 | ESTIMATE: | $86,867 |
Length: | 3.3 | Actual | $66,376 |
District: | ATLANTA | Let Date: | Mar 2018 |
Highway: | FM 991 | Let Status: | Actual |
Project ID: | STP 2018(669)HES | CSJ: | 2776-01-013 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: | |
Limits From: | 1.887 MI. S. OF US 67 | Fund Cat: | 8 |
Limits To: | US 67 | ESTIMATE: | $128,149 |
Length: | 1.9 | Actual | $97,187 |
District: | ATLANTA | Let Date: | Mar 2018 |
Highway: | FM 3098 | Let Status: | Actual |
Project ID: | STP 2018(675)HES | CSJ: | 2776-02-013 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: | |
Limits From: | 3.673 MI N OF US 67 | Fund Cat: | 8 |
Limits To: | US 67 | ESTIMATE: | $196,899 |
Length: | 3.7 | Actual | $144,874 |
List Showing Order Proposal Request Bid List Bid Tabulations Award Status Back... | Totals for 0010-19-012 | ||
Length: | 60.9 | ||
Estimate: | $1,975,619 | ||
Actual: | $1,463,551 | ||
CCSJ: 0217-02-035 |
|||
District: | ATLANTA | Let Date: | Nov 2017 |
Highway: | US 71 | Let Status: | Actual |
Project ID: | STP 1702(446)HES | CSJ: | 0217-02-035 |
Description: | IMPROVE TRAFFIC SIGNAL, INSTALL ADVANCE WARNING SIGNS, | Handling Code: | |
Limits From: | AT US 67 INTERSECTION | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $276,027 |
Length: | 0.0 | Actual | $308,289 |
District: | ATLANTA | Let Date: | Nov 2017 |
Highway: | US 71 | Let Status: | Actual |
Project ID: | STP 1702(447)HES | CSJ: | 0217-02-036 |
Description: | IMPROVE TRAFFIC SIGNALS, INSTALL PEDESTRIAN CROSSWALK | Handling Code: | |
Limits From: | AT 19TH STREET | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $121,181 |
Length: | 0.2 | Actual | $127,566 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0217-02-035 | ||
Length: | 0.2 | ||
Estimate: | $397,209 | ||
Actual: | $435,855 | ||
CCSJ: 0218-01-095 |
|||
District: | ATLANTA | Let Date: | Dec 2017 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | STP 2018(352)HES | CSJ: | 0218-01-095 |
Description: | INSTALL ADVANCE INTERSECTION WARNING SIGNALS AND SIGNS, | Handling Code: | |
Limits From: | AT FM 989 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $159,951 |
Length: | 0.5 | Actual | $137,945 |
District: | ATLANTA | Let Date: | Dec 2017 |
Highway: | FM 989 | Let Status: | Actual |
Project ID: | STP 2018(352)HES | CSJ: | 1231-01-068 |
Description: | INSTALL ADVANCE INTERSECTION WARNING SIGNALS AND SIGNS, | Handling Code: | |
Limits From: | AT FM 3287 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $25,789 |
Length: | 0.5 | Actual | $37,840 |
Proposal Request Bid List List Showing Order Bid Tabulations Award Status Back... | Totals for 0218-01-095 | ||
Length: | 1 | ||
Estimate: | $185,740 | ||
Actual: | $175,785 | ||
CCSJ: 0919-19-081 |
|||
District: | ATLANTA | Let Date: | Aug 2018 |
Highway: | CS | Let Status: | Tentative |
Project ID: | STP ( )FRS1 | CSJ: | 0919-19-081 |
Description: | RAILROAD CROSSING UPGRADES | Handling Code: | XX |
Limits From: | ROBISON ROAD | Fund Cat: | 8 |
Limits To: | UPRR - DOT NO. 789578Y | ESTIMATE: | $250,000 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0919-19-081 | ||
Length: | 0 | ||
Estimate: | $250,000 | ||
Actual: | |||
CCSJ: 1231-01-071 |
|||
District: | ATLANTA | Let Date: | Aug 2018 |
Highway: | FM 989 | Let Status: | Tentative |
Project ID: | STP ( )FRS1 | CSJ: | 1231-01-071 |
Description: | RAILROAD CROSSING UPGRADES | Handling Code: | XX |
Limits From: | KINGS HIGHWAY | Fund Cat: | 8 |
Limits To: | UPRR - DOT NO. 789584C | ESTIMATE: | $250,000 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 1231-01-071 | ||
Length: | 0 | ||
Estimate: | $250,000 | ||
Actual: |
Handling Code | Definition |
---|---|
XX | Project not processed through statewide letting |
TR | Transfer of funds |
LC | Project let through local entity |
LC | Project not charged against district apportionment |
Let Status | Definition |
---|---|
Tentative | Estimated letting date for this project |
Approved | Project has administrative approval to be let |
Actual | Project was let to contract |