Detail Letting Schedule for Collin County (FY 2018)
Collin County (FY 2018) |
CCSJ: 0047-06-162 |
|||
District: | DALLAS | Let Date: | Mar 2018 |
Highway: | US 75 | Let Status: | Actual |
Project ID: | NH 2018(576) | CSJ: | 0047-06-162 |
Description: | FULL DEPTH CONCRETE REPAIR | Handling Code: | |
Limits From: | SH 121 | Fund Cat: | 1 |
Limits To: | PGBT | ESTIMATE: | $347,102 |
Length: | 11.4 | Actual | $466,526 |
District: | DALLAS | Let Date: | Mar 2018 |
Highway: | SH 289 | Let Status: | Actual |
Project ID: | NH 2018(576) | CSJ: | 0091-05-075 |
Description: | FULL DEPTH CONCRETE REPAIR | Handling Code: | |
Limits From: | SH 121 | Fund Cat: | 1 |
Limits To: | PGBT | ESTIMATE: | $166,425 |
Length: | 6.1 | Actual | $172,953 |
District: | DALLAS | Let Date: | Mar 2018 |
Highway: | US 380 | Let Status: | Actual |
Project ID: | NH 2018(576) | CSJ: | 0135-02-060 |
Description: | FULL DEPTH CONCRETE REPAIR | Handling Code: | |
Limits From: | LAKE FOREST DR | Fund Cat: | 1 |
Limits To: | SH 5 | ESTIMATE: | $120,925 |
Length: | 4.0 | Actual | $128,953 |
District: | DALLAS | Let Date: | Mar 2018 |
Highway: | US 380 | Let Status: | Actual |
Project ID: | NH 2018(576) | CSJ: | 0135-03-049 |
Description: | FULL DEPTH CONCRETE REPAIR | Handling Code: | |
Limits From: | SH 5 | Fund Cat: | 1 |
Limits To: | AIRPORT DR | ESTIMATE: | $38,300 |
Length: | 0.9 | Actual | $46,828 |
District: | DALLAS | Let Date: | Mar 2018 |
Highway: | FM 544 | Let Status: | Actual |
Project ID: | STP 2018(577) | CSJ: | 0619-03-060 |
Description: | FULL DEPTH CONCRETE REPAIR | Handling Code: | |
Limits From: | PLANO CITY LIMIT | Fund Cat: | 1 |
Limits To: | SH 78 | ESTIMATE: | $342,050 |
Length: | 4.6 | Actual | $321,052 |
District: | DALLAS | Let Date: | Mar 2018 |
Highway: | FM 2551 | Let Status: | Actual |
Project ID: | STP 2018(577) | CSJ: | 2056-01-049 |
Description: | FULL DEPTH CONCRETE REPAIR | Handling Code: | |
Limits From: | FM 2514 | Fund Cat: | 1 |
Limits To: | FM 544 | ESTIMATE: | $105,825 |
Length: | 3.0 | Actual | $93,893 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0047-06-162 | ||
---|---|---|---|
Length: | 30 | ||
Estimate: | $1,120,627 | ||
Actual: | $1,230,203 | ||
CCSJ: 0047-14-084 |
|||
District: | DALLAS | Let Date: | Jan 2018 |
Highway: | US 75 | Let Status: | Actual |
Project ID: | NH 2018(448) | CSJ: | 0047-14-084 |
Description: | CONSTRUCT INTERCHANGE | Handling Code: | |
Limits From: | NORTH OF FM 455 | Fund Cat: | 2M |
Limits To: | CR 370 | ESTIMATE: | $22,213,808 |
Length: | 1.7 | Actual | $19,863,387 |
District: | DALLAS | Let Date: | Jan 2018 |
Highway: | US 75 | Let Status: | Actual |
Project ID: | STP 2018(449) | CSJ: | 0047-14-085 |
Description: | ONE COURSE SURFACE TREATMENT, BACK FILLING, SIGNING AND | Handling Code: | |
Limits From: | FRONTAGE RDS NORTH OF MANTUA RD | Fund Cat: | 1 |
Limits To: | CR 375 (GRAYSON C/L) | ESTIMATE: | $226,871 |
Length: | 1.3 | Actual | $243,541 |
List Showing Order Bid List Proposal Request Addenda Bid Tabulations Award Status Back... | Totals for 0047-14-084 | ||
Length: | 3 | ||
Estimate: | $22,440,679 | ||
Actual: | $20,106,927 | ||
CCSJ: 0091-03-027 |
|||
District: | DALLAS | Let Date: | May 2018 |
Highway: | SH 289 | Let Status: | Actual |
Project ID: | C 91-3-27 | CSJ: | 0091-03-027 |
Description: | INSTALLATION OF TRAFFIC SIGNALS | Handling Code: | |
Limits From: | AT CR 93 / CR 94 INTERSECTION | Fund Cat: | 1 |
Limits To: | IN THE CITY OF CELINA | ESTIMATE: | $198,912 |
Length: | 0.0 | Actual | $187,001 |
District: | DALLAS | Let Date: | May 2018 |
Highway: | SH 289 | Let Status: | Actual |
Project ID: | C 91-4-63 | CSJ: | 0091-04-063 |
Description: | INSTALLATION OF TRAFFIC SIGNALS | Handling Code: | |
Limits From: | AT GLENDENNING PKWY | Fund Cat: | 1 |
Limits To: | IN THE CITY OF CELINA | ESTIMATE: | $195,626 |
Length: | 0.0 | Actual | $185,405 |
District: | DALLAS | Let Date: | May 2018 |
Highway: | SH 205 | Let Status: | Actual |
Project ID: | C 451-1-56 | CSJ: | 0451-01-056 |
Description: | INSTALLATION OF TRAFFIC SIGNALS | Handling Code: | |
Limits From: | AT DAMASCUS/JUSTIN INTERSECTION | Fund Cat: | 1 |
Limits To: | IN THE CITY OF ROCKWALL | ESTIMATE: | $235,468 |
Length: | 0.0 | Actual | $243,809 |
District: | DALLAS | Let Date: | May 2018 |
Highway: | FM 552 | Let Status: | Actual |
Project ID: | C 1017-1-16 | CSJ: | 1017-01-016 |
Description: | INSTALLATION OF TRAFFIC SIGNALS | Handling Code: | |
Limits From: | AT JOHN KING BLVD | Fund Cat: | 1 |
Limits To: | IN THE CITY OF ROCKWALL | ESTIMATE: | $208,770 |
Length: | 0.1 | Actual | $185,031 |
District: | DALLAS | Let Date: | May 2018 |
Highway: | FM 1141 | Let Status: | Actual |
Project ID: | C 1290-1-13 | CSJ: | 1290-01-013 |
Description: | INSTALLATION OF TRAFFIC SIGNALS | Handling Code: | |
Limits From: | AT JOHN KING BLVD | Fund Cat: | 1 |
Limits To: | IN THE CITY OF ROCKWALL | ESTIMATE: | $190,088 |
Length: | 0.1 | Actual | $179,120 |
District: | DALLAS | Let Date: | May 2018 |
Highway: | FM 1461 | Let Status: | Actual |
Project ID: | C 1973-1-17 | CSJ: | 1973-01-017 |
Description: | INSTALLATION OF TRAFFIC SIGNALS | Handling Code: | |
Limits From: | COIT RD TO FM 2478 (WEST) | Fund Cat: | 1 |
Limits To: | IN THE TOWN OF PROSPER | ESTIMATE: | $345,768 |
Length: | 2.1 | Actual | $307,635 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0091-03-027 | ||
Length: | 2.3 | ||
Estimate: | $1,374,631 | ||
Actual: | $1,288,000 | ||
CCSJ: 0091-05-053 |
|||
District: | DALLAS | Let Date: | Oct 2017 |
Highway: | SH 289 | Let Status: | Actual |
Project ID: | STP 2007(737)MM | CSJ: | 0091-05-053 |
Description: | INT IMPROVEMENTS TO RMV DBL INT,ADD DUAL LFT TURN LNS& RGHT | Handling Code: | LC |
Limits From: | ALLIANCE BLVD TO DEXTER DR AND ON | Fund Cat: | 3 |
Limits To: | PLANO PKWY FROM VENTURA TO BURNHAM | ESTIMATE: | $4,776,566 |
Length: | 0.3 | Actual | $5,059,268 |
Back... | Totals for 0091-05-053 | ||
Length: | 0.3 | ||
Estimate: | $4,776,566 | ||
Actual: | $5,059,268 | ||
CCSJ: 0091-05-060 |
|||
District: | DALLAS | Let Date: | Jan 2018 |
Highway: | SH 289 | Let Status: | Actual |
Project ID: | CM 2018(238) | CSJ: | 0091-05-060 |
Description: | INTERSECTION IMPROVEMENTS @ MAIN, STONEBRIAR/ROLATER, WADE, | Handling Code: | LC |
Limits From: | WARREN PARKWAY | Fund Cat: | 3 |
Limits To: | FM 3537 | ESTIMATE: | $2,415,118 |
Length: | 3.0 | Actual | $3,018,001 |
District: | DALLAS | Let Date: | Jan 2018 |
Highway: | SH 121 | Let Status: | Actual |
Project ID: | C 364-4-48 | CSJ: | 0364-04-048 |
Description: | CONSTRUCT RIGHT TURN LANE | Handling Code: | LC |
Limits From: | ON SOUTHBOUND FRTG RD AT OHIO DRIVE | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $168,299 |
Length: | 0.1 | Actual | $120,701 |
Back... | Totals for 0091-05-060 | ||
Length: | 3.1 | ||
Estimate: | $2,583,417 | ||
Actual: | $3,138,701 | ||
CCSJ: 0135-03-050 |
|||
District: | DALLAS | Let Date: | Aug 2018 |
Highway: | US 380 | Let Status: | Actual |
Project ID: | STP 1802(749)HES | CSJ: | 0135-03-050 |
Description: | INSTALL RAISED MEDIAN | Handling Code: | |
Limits From: | FM 1827 | Fund Cat: | 8 |
Limits To: | SOUTH 4TH ST | ESTIMATE: | $3,758,445 |
Length: | 5.1 | Actual | $3,622,098 |
District: | DALLAS | Let Date: | Aug 2018 |
Highway: | US 380 | Let Status: | Actual |
Project ID: | STP 1802(749)HES | CSJ: | 0135-04-034 |
Description: | INSTALL RAISED MEDIAN | Handling Code: | |
Limits From: | SOUTH 4TH ST | Fund Cat: | 8 |
Limits To: | CR 985 | ESTIMATE: | $1,754,135 |
Length: | 3.3 | Actual | $1,638,382 |
Proposal Request List Showing Order Bid List Bid Tabulations Back... | Totals for 0135-03-050 | ||
Length: | 8.4 | ||
Estimate: | $5,512,580 | ||
Actual: | $5,260,480 | ||
CCSJ: 0918-24-099 |
|||
District: | DALLAS | Let Date: | Oct 2017 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2004(438) | CSJ: | 0918-24-099 |
Description: | PLANO TRANSIT VILLAGE; VELOWEB - CONTINUOUS BICYCLE AND | Handling Code: | LC |
Limits From: | PLANO TRANSIT VILLAGE; FROM 12TH PL | Fund Cat: | 3 |
Limits To: | SH 190 / BUSH TURNPIKE | ESTIMATE: | $2,697,572 |
Length: | 1.0 | Actual | $2,310,212 |
Back... | Totals for 0918-24-099 | ||
Length: | 1 | ||
Estimate: | $2,697,572 | ||
Actual: | $2,310,212 | ||
CCSJ: 0918-24-127 |
|||
District: | DALLAS | Let Date: | Feb 2018 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 2005(985) | CSJ: | 0918-24-127 |
Description: | EXPAND INTERSECTION TO ADD RIGHT AND LEFT TURN LANES | Handling Code: | LC |
Limits From: | ON SPRING CREEK PARKWAY | Fund Cat: | 3 |
Limits To: | AT COIT ROAD IN THE CITY OF PLANO | ESTIMATE: | $1,592,905 |
Length: | 0.0 | Actual | $1,771,283 |
Back... | Totals for 0918-24-127 | ||
Length: | 0 | ||
Estimate: | $1,592,905 | ||
Actual: | $1,771,283 | ||
CCSJ: 0918-24-182 |
|||
District: | DALLAS | Let Date: | Oct 2017 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2018(311) | CSJ: | 0918-24-182 |
Description: | CONSTRUCT A COMM LINK BETWEEN FRISCO & NTTA,TRAFFIC SIGNAL | Handling Code: | XX |
Limits From: | FRISCO/NTTA FIBER OPTIC CONNECTION | Fund Cat: | 3 |
Limits To: | FRISCO TMC TO NTTA - DNT | ESTIMATE: | $326,098 |
Length: | 0.0 | Actual | $327,098 |
Back... | Totals for 0918-24-182 | ||
Length: | 0 | ||
Estimate: | $326,098 | ||
Actual: | $327,098 | ||
CCSJ: 0918-24-213 |
|||
District: | DALLAS | Let Date: | Nov 2017 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 1602(237)TP | CSJ: | 0918-24-213 |
Description: | SCHOOL PEDESTRIAN SAFETY ENHANCEMENT - SIDEWALK IMPROVEMENTS | Handling Code: | LC |
Limits From: | VARIOUS SCHOOLS IN MCKINNEY | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $354,169 |
Length: | 1.0 | Actual | $410,969 |
Back... | Totals for 0918-24-213 | ||
Length: | 1 | ||
Estimate: | $354,169 | ||
Actual: | $410,969 | ||
CCSJ: 0918-24-214 |
|||
District: | DALLAS | Let Date: | Mar 2018 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 1602(592)TP | CSJ: | 0918-24-214 |
Description: | COTTONWOOD CREEK TRAIL EXTENSION - CONSTRUCT HIKE AND BIKE | Handling Code: | LC |
Limits From: | OAK POINT PARK AND NATURE PRESERVE | Fund Cat: | 3 |
Limits To: | CHAPARRAL ROAD | ESTIMATE: | $2,115,509 |
Length: | 2.3 | Actual | $1,691,639 |
Back... | Totals for 0918-24-214 | ||
Length: | 2.3 | ||
Estimate: | $2,115,509 | ||
Actual: | $1,691,639 | ||
CCSJ: 0918-24-216 |
|||
District: | DALLAS | Let Date: | Feb 2018 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 1602(144) | CSJ: | 0918-24-216 |
Description: | UNIVERSITY TRAIL PHASE II - CONSTRUCT HIKE AND BIKE TRAIL | Handling Code: | LC |
Limits From: | WATERVIEW PKWY & UNIVERSITY TRAIL I | Fund Cat: | 3 |
Limits To: | SYNERGY PARK DR & FLOYD RD | ESTIMATE: | $648,772 |
Length: | 1.0 | Actual | $589,689 |
Back... | Totals for 0918-24-216 | ||
Length: | 1 | ||
Estimate: | $648,772 | ||
Actual: | $589,689 | ||
CCSJ: 0918-24-235 |
|||
District: | DALLAS | Let Date: | Jun 2018 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2017(292) | CSJ: | 0918-24-235 |
Description: | IMPLEMENT ADAPTIVE TRAFFIC SIGNAL SYSTEMS ON PRESTON RD, | Handling Code: | XX |
Limits From: | VARIOUS LOCATIONS ON | Fund Cat: | 3 |
Limits To: | SH 289,GAYLORD PKWY,AND WARREN PKWY | ESTIMATE: | $320,000 |
Length: | 0.0 | Actual | $320,000 |
Back... | Totals for 0918-24-235 | ||
Length: | 0 | ||
Estimate: | $320,000 | ||
Actual: | $320,000 | ||
CCSJ: 0918-24-236 |
|||
District: | DALLAS | Let Date: | Jun 2018 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 1802(178) | CSJ: | 0918-24-236 |
Description: | INTERSECTION IMPROVEMENTS TO CONVERT EXISTING FOUR-WAY STOP | Handling Code: | LC |
Limits From: | OHIO DRIVE AT WARREN PARKWAY | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $1,784,566 |
Length: | 0.1 | Actual | $1,809,182 |
Back... | Totals for 0918-24-236 | ||
Length: | 0.1 | ||
Estimate: | $1,784,566 | ||
Actual: | $1,809,182 | ||
CCSJ: 0918-24-238 |
|||
District: | DALLAS | Let Date: | Oct 2017 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2018(309) | CSJ: | 0918-24-238 |
Description: | CITYWIDE CCTV, TRAFFIC SIGNAL AND COMMUNICATION UPGRADES | Handling Code: | XX |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 3 |
Limits To: | IN CITY OF FRISCO | ESTIMATE: | $1,400,000 |
Length: | 0.0 | Actual | $1,400,000 |
Back... | Totals for 0918-24-238 | ||
Length: | 0 | ||
Estimate: | $1,400,000 | ||
Actual: | $1,400,000 | ||
CCSJ: 0918-24-240 |
|||
District: | DALLAS | Let Date: | Aug 2018 |
Highway: | CR | Let Status: | Tentative |
Project ID: | STP ( )FRS1 | CSJ: | 0918-24-240 |
Description: | INSTALL GRADE CROSSING WARNING DEVICES | Handling Code: | XX |
Limits From: | CR99 NEAR CELINA | Fund Cat: | 8 |
Limits To: | AT BNSF DOT #672101R | ESTIMATE: | $250,000 |
Length: | 0.2 | Actual | $0 |
Back... | Totals for 0918-24-240 | ||
Length: | 0.2 | ||
Estimate: | $250,000 | ||
Actual: | |||
CCSJ: 1012-03-018 |
|||
District: | DALLAS | Let Date: | Feb 2018 |
Highway: | FM 981 | Let Status: | Actual |
Project ID: | BR 2018(683) | CSJ: | 1012-03-018 |
Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: | |
Limits From: | AT BEAR CREEK | Fund Cat: | 6 |
Limits To: | . | ESTIMATE: | $1,620,329 |
Length: | 0.2 | Actual | $986,705 |
District: | DALLAS | Let Date: | Feb 2018 |
Highway: | FM 981 | Let Status: | Actual |
Project ID: | BR 2018(684) | CSJ: | 1012-03-021 |
Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: | |
Limits From: | AT BEAR CREEK RELIEF | Fund Cat: | 6 |
Limits To: | . | ESTIMATE: | $1,214,253 |
Length: | 0.2 | Actual | $898,832 |
List Showing Order Proposal Request Bid List Bid Tabulations Award Status Back... | Totals for 1012-03-018 | ||
Length: | 0.4 | ||
Estimate: | $2,834,582 | ||
Actual: | $1,885,537 | ||
CCSJ: 1746-01-027 |
|||
District: | DALLAS | Let Date: | Jul 2018 |
Highway: | FM 1827 | Let Status: | Actual |
Project ID: | STP 1802(377)HESG | CSJ: | 1746-01-027 |
Description: | PROVIDE ADDITIONAL PAVED SURFACE WIDTH AND PROFILE EDGELINE | Handling Code: | |
Limits From: | US 380 | Fund Cat: | 8 |
Limits To: | FM 75 | ESTIMATE: | $4,829,057 |
Length: | 5.6 | Actual | $5,152,892 |
District: | DALLAS | Let Date: | Jul 2018 |
Highway: | FM 1827 | Let Status: | Actual |
Project ID: | STP 1802(378) | CSJ: | 1746-01-026 |
Description: | BASE REPAIR, MILL AND OVERLAY | Handling Code: | |
Limits From: | WEST OF FM 75 | Fund Cat: | 1 |
Limits To: | FM 75 | ESTIMATE: | $535,140 |
Length: | 0.7 | Actual | $287,959 |
Proposal Request Bid List List Showing Order Bid Tabulations Award Status Back... | Totals for 1746-01-027 | ||
Length: | 6.3 | ||
Estimate: | $5,364,198 | ||
Actual: | $5,440,852 | ||
CCSJ: 2679-02-008 |
|||
District: | DALLAS | Let Date: | Jun 2018 |
Highway: | FM 2514 | Let Status: | Actual |
Project ID: | STP 1802(470) | CSJ: | 2679-02-008 |
Description: | RECONSTRUCT 2 LANE RURAL TO 4 LANE (ULTIMATE 6 LANE) URBAN | Handling Code: | |
Limits From: | FM 2551 | Fund Cat: | 3 |
Limits To: | WEST OF FM 1378 | ESTIMATE: | $17,220,349 |
Length: | 2.4 | Actual | $16,867,792 |
District: | DALLAS | Let Date: | Jun 2018 |
Highway: | FM 2514 | Let Status: | Actual |
Project ID: | STP 2015(430) | CSJ: | 2679-02-009 |
Description: | RIGHT OF WAY ACQUISITION AND UTILITY ADJUSTMENTS | Handling Code: | |
Limits From: | FM 2551 | Fund Cat: | ROW |
Limits To: | WEST OF FM 1378 | ESTIMATE: | |
Length: | 2.5 | Actual | $2,213,398 |
Proposal Request Bid List List Showing Order Bid Tabulations Award Status Back... | Totals for 2679-02-008 | ||
Length: | 4.9 | ||
Estimate: | $17,220,349 | ||
Actual: | $19,081,190 | ||
CCSJ: 2745-01-008 |
|||
District: | DALLAS | Let Date: | Mar 2018 |
Highway: | FM 2755 | Let Status: | Actual |
Project ID: | STP 2018(581) | CSJ: | 2745-01-008 |
Description: | BASE REPAIR AND OVERLAY | Handling Code: | |
Limits From: | BUS 78G | Fund Cat: | 1 |
Limits To: | FM 1138 | ESTIMATE: | $1,672,085 |
Length: | 5.5 | Actual | $1,442,158 |
List Showing Order Proposal Request Bid List Addenda Bid Tabulations Award Status Back... | Totals for 2745-01-008 | ||
Length: | 5.5 | ||
Estimate: | $1,672,085 | ||
Actual: | $1,442,158 |
Handling Code | Definition |
---|---|
XX | Project not processed through statewide letting |
TR | Transfer of funds |
LC | Project let through local entity |
LC | Project not charged against district apportionment |
Let Status | Definition |
---|---|
Tentative | Estimated letting date for this project |
Approved | Project has administrative approval to be let |
Actual | Project was let to contract |