Detail Letting Schedule for Denton County (FY 2018)
Denton County (FY 2018) |
CCSJ: 0081-03-061 |
|||
District: | DALLAS | Let Date: | Jun 2018 |
Highway: | US 377 | Let Status: | Actual |
Project ID: | NH 1802(179) | CSJ: | 0081-03-061 |
Description: | INSTALLATION OF TRAFFIC SIGNALS | Handling Code: | |
Limits From: | AT MARSHALL CREEK | Fund Cat: | 1 |
Limits To: | IN THE CITY OF ROANOKE | ESTIMATE: | $224,368 |
Length: | 0.0 | Actual | $241,405 |
District: | DALLAS | Let Date: | Jun 2018 |
Highway: | BI 45-G | Let Status: | Actual |
Project ID: | STP 1802(180) | CSJ: | 0092-08-018 |
Description: | INSTALLATION OF TRAFFIC SIGNALS | Handling Code: | |
Limits From: | MARTIN LUTHER KING DR | Fund Cat: | 1 |
Limits To: | FM 1181 (CREECHVILLE RD) | ESTIMATE: | $200,714 |
Length: | 1.3 | Actual | $205,161 |
District: | DALLAS | Let Date: | Jun 2018 |
Highway: | BU 287R | Let Status: | Actual |
Project ID: | STP 1802(180) | CSJ: | 0172-11-013 |
Description: | INSTALLATION OF TRAFFIC SIGNALS | Handling Code: | |
Limits From: | GRAND AVE | Fund Cat: | 1 |
Limits To: | COLLEGE ST | ESTIMATE: | $203,356 |
Length: | 1.2 | Actual | $227,114 |
District: | DALLAS | Let Date: | Jun 2018 |
Highway: | BU 287S | Let Status: | Actual |
Project ID: | NH 1802(179) | CSJ: | 0172-12-006 |
Description: | INSTALLATION OF TRAFFIC SIGNALS | Handling Code: | |
Limits From: | YORKSTOWN DR | Fund Cat: | 1 |
Limits To: | S.E. MAIN ST | ESTIMATE: | $136,696 |
Length: | 1.6 | Actual | $138,791 |
District: | DALLAS | Let Date: | Jun 2018 |
Highway: | SH 205 | Let Status: | Actual |
Project ID: | STP 1802(180) | CSJ: | 0451-04-023 |
Description: | INSTALLATION OF TRAFFIC SIGNALS | Handling Code: | |
Limits From: | AT FM 552 | Fund Cat: | 1 |
Limits To: | IN THE CITY OF ROCKWALL | ESTIMATE: | $207,437 |
Length: | 0.0 | Actual | $210,158 |
District: | DALLAS | Let Date: | Jun 2018 |
Highway: | FM 1378 | Let Status: | Actual |
Project ID: | STP 1802(180) | CSJ: | 1392-01-043 |
Description: | INSTALLATION OF TRAFFIC SIGNALS | Handling Code: | |
Limits From: | FM 2170/COUNTRY CLUB RD | Fund Cat: | 1 |
Limits To: | LUCAS RD/COUNTRY CLUB RD | ESTIMATE: | $311,051 |
Length: | 1.1 | Actual | $308,473 |
Proposal Request Bid List List Showing Order Bid Tabulations Award Status Back... | Totals for 0081-03-061 | ||
---|---|---|---|
Length: | 5.2 | ||
Estimate: | $1,283,621 | ||
Actual: | $1,331,102 | ||
CCSJ: 0081-04-025 |
|||
District: | DALLAS | Let Date: | Jul 2018 |
Highway: | US 377 | Let Status: | Actual |
Project ID: | NH 1802(372) | CSJ: | 0081-04-025 |
Description: | WIDEN 2 LANE TO 6 LANE DIVIDED URBAN SECTION | Handling Code: | |
Limits From: | IH 35E | Fund Cat: | 1 |
Limits To: | SOUTH OF FM 1830 | ESTIMATE: | $23,825,971 |
Length: | 1.7 | Actual | $18,441,508 |
District: | DALLAS | Let Date: | Jul 2018 |
Highway: | US 377 | Let Status: | Actual |
Project ID: | NH 1802(372) | CSJ: | 0081-04-035 |
Description: | REPLACE RAILROAD OVERPASS | Handling Code: | |
Limits From: | AT UNION PACIFIC RR OVERPASS | Fund Cat: | 1 |
Limits To: | (0.4 MI S OF IH 35E) | ESTIMATE: | $10,540,721 |
Length: | 0.0 | Actual | $10,207,204 |
District: | DALLAS | Let Date: | Jul 2018 |
Highway: | US 377 | Let Status: | Actual |
Project ID: | ROW 81-4-36 | CSJ: | 0081-04-036 |
Description: | ROW ACQUISITION, RELOCATION & UTILITIES | Handling Code: | |
Limits From: | IH 35E | Fund Cat: | ROW |
Limits To: | SOUTH OF FM 1830 | ESTIMATE: | |
Length: | 1.6 | Actual | $6,348,046 |
Proposal Request Bid List List Showing Order Addenda Bid Tabulations Award Status Back... | Totals for 0081-04-025 | ||
Length: | 3.3 | ||
Estimate: | $34,366,691 | ||
Actual: | $34,996,757 | ||
CCSJ: 0081-05-044 |
|||
District: | DALLAS | Let Date: | Aug 2018 |
Highway: | FM 3524 | Let Status: | Actual |
Project ID: | SSW 81-5-44 | CSJ: | 0081-05-044 |
Description: | PROVIDE ADDITIONAL PAVED SURFACE WIDTH, MILLED EDGELINE | Handling Code: | |
Limits From: | FM 428 | Fund Cat: | 8 |
Limits To: | US 377 | ESTIMATE: | $1,027,755 |
Length: | 1.8 | Actual | $1,182,555 |
District: | DALLAS | Let Date: | Aug 2018 |
Highway: | FM 3524 | Let Status: | Actual |
Project ID: | C 81-5-45 | CSJ: | 0081-05-045 |
Description: | REHABILITATE EXISTING ROADWAY | Handling Code: | |
Limits From: | FM 428 | Fund Cat: | 1 |
Limits To: | US 377 | ESTIMATE: | $744,757 |
Length: | 1.8 | Actual | $484,952 |
Proposal Request List Showing Order Bid List Bid Tabulations Back... | Totals for 0081-05-044 | ||
Length: | 3.6 | ||
Estimate: | $1,772,512 | ||
Actual: | $1,667,507 | ||
CCSJ: 0081-13-063 |
|||
District: | DALLAS | Let Date: | Jan 2018 |
Highway: | IH 35W | Let Status: | Actual |
Project ID: | NH 2018(616) | CSJ: | 0081-13-063 |
Description: | FULL DEPTH PAVEMENT REPAIR, OVERLAY, AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | TARRANT COUNTY LINE | Fund Cat: | 11 |
Limits To: | IH 35E | ESTIMATE: | $13,657,467 |
Length: | 17.1 | Actual | $11,361,086 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0081-13-063 | ||
Length: | 17.1 | ||
Estimate: | $13,657,467 | ||
Actual: | $11,361,086 | ||
CCSJ: 0816-02-079 |
|||
District: | DALLAS | Let Date: | Mar 2018 |
Highway: | FM 455 | Let Status: | Actual |
Project ID: | CC 816-2-79 | CSJ: | 0816-02-079 |
Description: | INTERSECTION IMPROVEMENTS | Handling Code: | |
Limits From: | AT FM 2164 AND UNION HILL ROAD | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $1,401,542 |
Length: | 0.4 | Actual | $1,190,540 |
District: | DALLAS | Let Date: | Mar 2018 |
Highway: | FM 455 | Let Status: | Actual |
Project ID: | ROW 816-2-80 | CSJ: | 0816-02-080 |
Description: | ROW ACQUISITION & UTILITY ADJUSTMENTS | Handling Code: | |
Limits From: | AT FM 2164 AND UNION HILL ROAD | Fund Cat: | ROW |
Limits To: | . | ESTIMATE: | $580,273 |
Length: | 0.4 | Actual | $89,637 |
List Showing Order Proposal Request Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0816-02-079 | ||
Length: | 0.8 | ||
Estimate: | $1,981,815 | ||
Actual: | $1,280,177 | ||
CCSJ: 0918-46-284 |
|||
District: | DALLAS | Let Date: | Jan 2018 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 1602(368) | CSJ: | 0918-46-284 |
Description: | BRENT ELEMENTARY SCHOOL TRAIL CONNECTION: CONSTRUCT SIDEWALK | Handling Code: | LC |
Limits From: | SOUTH OF BRENT ELEMENTARY | Fund Cat: | 3 |
Limits To: | NORTH OF BRENT ELEMENTARY | ESTIMATE: | $253,058 |
Length: | 0.5 | Actual | $371,958 |
Back... | Totals for 0918-46-284 | ||
Length: | 0.5 | ||
Estimate: | $253,058 | ||
Actual: | $371,958 | ||
CCSJ: 0918-46-285 |
|||
District: | DALLAS | Let Date: | Jan 2018 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 1602(369)TP | CSJ: | 0918-46-285 |
Description: | HARTS BRANCH TRAIL - CONSTRUCT HIKE AND BIKE TRAIL | Handling Code: | LC |
Limits From: | ELDORADO PKWY BRIDGE | Fund Cat: | 3 |
Limits To: | WALKER LANE | ESTIMATE: | $2,748,285 |
Length: | 1.5 | Actual | $2,484,331 |
Back... | Totals for 0918-46-285 | ||
Length: | 1.5 | ||
Estimate: | $2,748,285 | ||
Actual: | $2,484,331 | ||
CCSJ: 0918-46-291 |
|||
District: | DALLAS | Let Date: | Oct 2017 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2018(120)HES | CSJ: | 0918-46-291 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | FRANKFORD RD AT MARSH LN | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $312,221 |
Length: | 0.2 | Actual | $309,595 |
District: | DALLAS | Let Date: | Oct 2017 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2018(121)HES | CSJ: | 0918-47-153 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | COCKRELL HILL AT RED BIRD LN | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $149,873 |
Length: | 0.2 | Actual | $152,253 |
District: | DALLAS | Let Date: | Oct 2017 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2018(122)HES | CSJ: | 0918-47-155 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | FERGUSON RD AT PEAVY RD | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $185,169 |
Length: | 0.2 | Actual | $187,874 |
District: | DALLAS | Let Date: | Oct 2017 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2018(123)HES | CSJ: | 0918-47-157 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | GREENVILLE AVE AT LOVERS LN | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $210,892 |
Length: | 0.2 | Actual | $212,912 |
District: | DALLAS | Let Date: | Oct 2017 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2018(124)HES | CSJ: | 0918-47-160 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | ILLINOIS AT MARSALIS | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $200,256 |
Length: | 0.2 | Actual | $205,779 |
District: | DALLAS | Let Date: | Oct 2017 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2018(125)HES | CSJ: | 0918-47-161 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | LAKE JUNE RD_AT PRAIRIE CREEK | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $184,631 |
Length: | 0.2 | Actual | $185,213 |
District: | DALLAS | Let Date: | Oct 2017 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2018(126)HES | CSJ: | 0918-47-164 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | SIMPSON STUART RD AT BONNIE VIEW RD | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $217,310 |
Length: | 0.2 | Actual | $224,376 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0918-46-291 | ||
Length: | 1.4 | ||
Estimate: | $1,460,352 | ||
Actual: | $1,478,000 | ||
CCSJ: 0918-46-292 |
|||
District: | DALLAS | Let Date: | Aug 2018 |
Highway: | CS | Let Status: | Approved |
Project ID: | STP 2017(300)TAPS | CSJ: | 0918-46-292 |
Description: | DCTA A-TRAIN BIKE AND PEDESTRIAN TRAIL - EAGLE POINT SECTION | Handling Code: | LC |
Limits From: | DCTA RAIL CORRIDOR FROM MILL ST | Fund Cat: | 3 |
Limits To: | HIGHLAND VILLAGE/LEWISVILLE LK STA. | ESTIMATE: | $2,605,107 |
Length: | 2.5 | Actual | $0 |
Back... | Totals for 0918-46-292 | ||
Length: | 2.5 | ||
Estimate: | $2,605,107 | ||
Actual: | |||
CCSJ: 0918-46-304 |
|||
District: | DALLAS | Let Date: | Aug 2018 |
Highway: | CR | Let Status: | Tentative |
Project ID: | STP ( )FRS1 | CSJ: | 0918-46-304 |
Description: | INSTALL GRADE CROSSING WARNING DEVICES | Handling Code: | XX |
Limits From: | CRAWFORD RD IN ARGYLE | Fund Cat: | 8 |
Limits To: | AT UPRR DOT #795330B | ESTIMATE: | $250,000 |
Length: | 0.1 | Actual | $0 |
Back... | Totals for 0918-46-304 | ||
Length: | 0.1 | ||
Estimate: | $250,000 | ||
Actual: | |||
CCSJ: 0918-46-308 |
|||
District: | DALLAS | Let Date: | Aug 2018 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 1802(734)MM | CSJ: | 0918-46-308 |
Description: | VANPOOL SUBSIDY INITIATIVE FOR COMMUTERS TRAVELING LONG DIST | Handling Code: | TR |
Limits From: | DCTA REGIONAL VANPOOL PROGRAM | Fund Cat: | 3 |
Limits To: | FUNDING FOR FY 2018 | ESTIMATE: | $480,090 |
Length: | 0.0 | Actual | $480,090 |
Back... | Totals for 0918-46-308 | ||
Length: | 0 | ||
Estimate: | $480,090 | ||
Actual: | $480,090 | ||
CCSJ: 1567-01-037 |
|||
District: | DALLAS | Let Date: | Mar 2018 |
Highway: | FM 720 | Let Status: | Actual |
Project ID: | C 1567-1-37 | CSJ: | 1567-01-037 |
Description: | WIDEN TWO LANE RURAL TO SIX LANES URBAN DIVIDED | Handling Code: | |
Limits From: | SOUTH OF MARTOP | Fund Cat: | 1 |
Limits To: | US 380 | ESTIMATE: | $15,258,078 |
Length: | 2.1 | Actual | $15,011,511 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 1567-01-037 | ||
Length: | 2.1 | ||
Estimate: | $15,258,078 | ||
Actual: | $15,011,511 | ||
CCSJ: 1567-02-031 |
|||
District: | DALLAS | Let Date: | Jan 2018 |
Highway: | FM 423 | Let Status: | Actual |
Project ID: | STP 2018(451) | CSJ: | 1567-02-031 |
Description: | LANDSCAPE HIGHWAY | Handling Code: | |
Limits From: | SH 121 | Fund Cat: | 10 |
Limits To: | STEWARTS CREEK ROAD | ESTIMATE: | $915,355 |
Length: | 3.8 | Actual | $746,681 |
List Showing Order Bid List Proposal Request Bid Tabulations Award Status Back... | Totals for 1567-02-031 | ||
Length: | 3.8 | ||
Estimate: | $915,355 | ||
Actual: | $746,681 | ||
CCSJ: 1950-01-039 |
|||
District: | DALLAS | Let Date: | Apr 2018 |
Highway: | FM 407 | Let Status: | Actual |
Project ID: | STP 2018(741) | CSJ: | 1950-01-039 |
Description: | LANDSCAPE TREATMENT OF MEDIANS AND ROW | Handling Code: | |
Limits From: | LANTANA TRAIL | Fund Cat: | 10 |
Limits To: | 450' EAST OF EAST CARUTH LANE | ESTIMATE: | $1,017 |
Length: | 0.3 | Actual | $670 |
District: | DALLAS | Let Date: | Apr 2018 |
Highway: | FM 424 | Let Status: | Actual |
Project ID: | STP 2018(741) | CSJ: | 0815-03-013 |
Description: | LANDSCAPE TREATMENTS OF RIGHTS OF WAY | Handling Code: | |
Limits From: | AT FISHTRAP ROAD | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $143,258 |
Length: | 0.0 | Actual | $113,822 |
District: | DALLAS | Let Date: | Apr 2018 |
Highway: | FM 1171 | Let Status: | Actual |
Project ID: | NH 2018(742) | CSJ: | 1311-01-056 |
Description: | LANDSCAPE TREATMENTS OF RIGHTS OF WAY | Handling Code: | |
Limits From: | EAST OF OLD CROSS TIMBERS RD | Fund Cat: | 10 |
Limits To: | SHILOH ROAD | ESTIMATE: | $493,084 |
Length: | 3.3 | Actual | $570,956 |
District: | DALLAS | Let Date: | Apr 2018 |
Highway: | FM 720 | Let Status: | Actual |
Project ID: | STP 2018(741) | CSJ: | 1567-01-041 |
Description: | LANDSCAPE TREATMENT OF MEDIANS AND RIGHTS OF WAY | Handling Code: | |
Limits From: | COTTONWOOD TRAIL | Fund Cat: | 10 |
Limits To: | ELDORADO PARKWAY | ESTIMATE: | $225,761 |
Length: | 1.2 | Actual | $170,715 |
List Showing Order Proposal Request Bid List Addenda Bid Tabulations Award Status Back... | Totals for 1950-01-039 | ||
Length: | 4.8 | ||
Estimate: | $863,120 | ||
Actual: | $856,163 | ||
CCSJ: 2980-01-013 |
|||
District: | DALLAS | Let Date: | Apr 2018 |
Highway: | FM 2934 | Let Status: | Actual |
Project ID: | STP 2018(743) | CSJ: | 2980-01-013 |
Description: | CONCRETE FULL DEPTH REPAIR AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | FM 423 (ELDORADO PKWY) | Fund Cat: | 1 |
Limits To: | COLLIN COUNTY LINE | ESTIMATE: | $1,802,461 |
Length: | 2.8 | Actual | $1,493,859 |
District: | DALLAS | Let Date: | Apr 2018 |
Highway: | FM 2449 | Let Status: | Actual |
Project ID: | C 2352-2-22 | CSJ: | 2352-02-022 |
Description: | FULL DEPTH CONCRETE REPAIR | Handling Code: | |
Limits From: | WEST OF DENTON CREEK | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $730,385 |
Length: | 0.3 | Actual | $709,152 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 2980-01-013 | ||
Length: | 3.1 | ||
Estimate: | $2,532,846 | ||
Actual: | $2,203,011 |
Handling Code | Definition |
---|---|
XX | Project not processed through statewide letting |
TR | Transfer of funds |
LC | Project let through local entity |
LC | Project not charged against district apportionment |
Let Status | Definition |
---|---|
Tentative | Estimated letting date for this project |
Approved | Project has administrative approval to be let |
Actual | Project was let to contract |