Letting Schedule for Abilene District (FY 2018)

Last Update: Monday, August 27, 2018
Abilene District (FY 2018)
Callahan | Fisher | Howard | Jones | Mitchell | Nolan | Taylor |

Callahan County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0006-11-022FM 18ActualFeb 2018$2,256,1258PROFILE EDGELINE MARKINGS0.0
0437-02-014US 283ActualDec 2017$3,807,03211REHABILITATION0.0
0006-07-079IH 20ActualJun 2018$7,402,1951MILL AND OVERLAY0.0

Fisher County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0296-02-033US 180ActualJun 2018$2,066,2146BRIDGE REPLACEMENT0.0

Howard County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0005-05-109IH 20ActualDec 2017$7,524,1761SPOT BASE REPAIR, 1-COURSE SURFACE TREATMENT, 2 SMA-D0.0
1503-02-011FM 1584ActualAug 2018$3,157,5918PAVEMENT WIDENING3.5
0005-06-120IH 20ActualFeb 2018$1,870,8141INSTALLATION OF PAVEMENT MARKINGS AND RAISED REFLECTIVE0.0
0068-08-065US 87ActualAug 2018$6,974,4296BRIDGE REHAB0.0
0005-05-111IH 20ActualMay 2018$573,3228INSTALL MEDIAN BARRIER0.0
0005-06-116IH 20ActualNov 2017$1,097,9731INSTALL INTERSECTION FLASHING BEACON, ADVANCE WARNINING0.0

Jones County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0033-05-092US 83ActualDec 2017$11,060,9191SEAL COAT MAINLANES AND FRONTAGE ROADS0.0
0033-05-091US 83ActualJan 2018$6,078,8821SPOT BASE REPAIR, MILL & FILL DRIVING LANES WITH 1-CST AND0.0
0157-05-060US 277ActualJan 2018$7,663,1791SPOT BASE REPAIR,MILL & FILL DRIVING LANES,1-COURSE SURFACE0.0
0484-01-023FM 707ActualAug 2018$15,279,9658WIDEN ROADWAY4.0

Mitchell County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0332-02-026BS 208BActualApr 2018$1,232,689112 MILL , SPOT BASE REPAIR, 1-COURSE SURFACE TREATMENT0.0

Nolan County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0053-12-064US 84ActualFeb 2018$949,7688TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS0.0
0006-03-134IH 20ActualMar 2018$2,154,0981REHABILITATE ROADWAY,1-CST, OVERLAY2.5
0053-12-065US 84ActualFeb 2018$3,428,9051ROADWAY REHABILITATION / ARMORING0.0
0006-15-034BI 20-MActualJan 2018$4,799,1286REPLACE BRIDGE & APPROACHES2.0

Taylor County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0908-00-087VAActualJun 2018$1,065,69811SPOT PAVEMENT REPAIR0.0
0908-00-086VAActualAug 2018$4,150,0008RXR CROSSINGS AND INTERSECTION IMPROVEMENTS0.0
0006-04-072IH 20ActualMay 2018$697,9096REPLACE BRIDGE AND APPROACH RAILING OR0.0
0908-00-085VAActualMar 2018$514,1451BRIDGE REPAIR0.0
2398-01-051SL 322ActualJan 2018$769,6941EXIT RAMP RELOCATION0.0
0006-18-058BI 20-RActualMay 2018$6,206,4821OVERLAY AND TRAFFIC SIGNAL UPGRADES0.0
0033-06-114US 83ActualJul 2018$445,5011ILLUMINATION UPGRADE0.0
0011-01-036SH 351ActualMar 2018$1,832,8521MILL,SPOT REPAIR & OVERLAY0.0
0034-01-126US 83ActualAug 2018$32,308,1151CONSTRUCT OVERPASS AND RELOCATE RAMPS7.0
0908-33-097CRTentativeAug 2018$250,0008UPGRADE/INSTALL RR XING PROTECTION0.0
0733-03-054FM 126ActualMar 2018$1,259,8391OVERLAY0.0
0908-00-083VAActualJan 2018$542,2811JOINT REPAIR, DECK REPAIR, AND SPALL REPAIR0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract