Letting Schedule for April, 2018 County (FY 2018)
April, 2018 (FY 2018) | (see Links) |
SEP 2017 | OCT 2017 | NOV 2017 | DEC 2017 | JAN 2018 | FEB 2018 | MAR 2018 | APR 2018 | MAY 2018 | JUN 2018 | JUL 2018 | AUG 2018 | | |||||||
CCSJ | County/ District | Highway | Let Status | Contract Cost | Fund Cat | Description | DBE Goal |
---|---|---|---|---|---|---|---|
0176-03-135 | Angelina/ Lufkin | US 59 | Actual | $8,390,438 | 1 | PLANE, HMA, OCST, PFC | 0.0 |
0903-29-026 | Archer/ Wichita Falls | CR | Actual | $357,278 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
0073-05-070 | Atascosa/ San Antonio | IH 37 | Actual | $6,016,894 | 1 | BASE REPAIR, SEALCOAT, OVERLAY AND PAVEMENT MARKINGS ON NB | 1.0 |
0915-12-577 | Bexar/ San Antonio | VA | Actual | $4,900,623 | 1 | INSTALL ITS DYNAMIC GUIDE SIGNS/DYNAMIC MESSAGE BOARDS | 0.0 |
0915-00-205 | Bexar/ San Antonio | VA | Actual | $1,516,445 | 1 | DISTRICTWIDE NON-SITE SPECIFIC TRAFFIC SIGNALS-FY 2018 | 2.0 |
0915-00-182 | Bexar/ San Antonio | VA | Actual | $1,961,791 | 1 | DISTRICTWIDE GUIDESIGNS FY18 | 2.5 |
0017-10-267 | Bexar/ San Antonio | IH 35 | Actual | $5,642,970 | 1 | REPAIR / REPLACE BRIDGE EXPANSION JOINTS | 0.0 |
0917-29-120 | Brazos/ Bryan | CR | Actual | $884,222 | 6 | REPLACEMENT OF AN EXISTING BRIDGE FACILITY CONSISTING OF | 3.0 |
0303-02-019 | Briscoe/ Childress | SH 86 | Actual | $429,741 | 8 | MILLED EDGELINE RUMBLE STRIPS | 0.0 |
2013-01-012 | Brown/ Brownwood | FM 2125 | Actual | $1,248,957 | 1 | SAFETY TREAT FIXED OBJECTS | 5.5 |
0226-06-032 | Castro/ Lubbock | US 385 | Actual | $15,214,807 | 1 | REHABILITATION OF EXISTING ROAD | 5.5 |
1420-02-012 | Chambers/ Beaumont | FM 1410 | Actual | $388,199 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | 0.0 |
0508-02-122 | Chambers/ Beaumont | IH 10 | Actual | $1,888,971 | 5 | INSTALL ITS EQUIPMENT & INFRASTRUCTURE - 144-STRAND FIBER | 0.0 |
0253-03-072 | Comal/ San Antonio | US 281 | Actual | $781,253 | 11 | EXPAND 2 LANES TO 4 LANES DIVIDED RURAL | 0.0 |
0044-07-070 | Cooke/ Wichita Falls | US 82 | Actual | $99,569 | 1 | LANDSCAPING | 0.0 |
0196-07-033 | Dallas/ Dallas | SS 366 | Actual | $1,223,158 | 1 | INSTALL GUIDE SIGNS | 0.0 |
0918-47-128 | Dallas/ Dallas | CS | Actual | $1,313,417 | 3 | IMPROVE TRAFFIC SIGNALS | 3.0 |
0009-11-244 | Dallas/ Dallas | IH 30 | Actual | $2,699,848 | 1 | FULL DEPTH CONCRETE PAVEMENT MAIN LANES | 0.0 |
0090-01-032 | Deaf Smith/ Amarillo | IH 40 | Actual | $7,911,943 | 6 | INSTALL CRASHWALLS AT VARIOUS LOCATIONS ON IH 40 | 1.5 |
2980-01-013 | Denton/ Dallas | FM 2934 | Actual | $2,532,846 | 1 | CONCRETE FULL DEPTH REPAIR AND PAVEMENT MARKINGS | 0.0 |
1950-01-039 | Denton/ Dallas | FM 407 | Actual | $863,120 | 10 | LANDSCAPE TREATMENT OF MEDIANS AND ROW | 0.0 |
0127-01-031 | Eastland/ Brownwood | US 183 | Actual | $3,574,358 | 1 | REHABILITATE EXISTING ROADWAY | 0.0 |
0127-02-043 | Eastland/ Brownwood | US 183 | Actual | $4,923,750 | 1 | ADD PASSING LANES | 0.0 |
3570-01-009 | Ector/ Odessa | FM 3503 | Actual | $2,375,451 | 1 | REALIGN EXISTING ROADWAY AND APPROACHES | 1.0 |
0267-05-018 | Fayette/ Yoakum | FM 609 | Actual | $7,564,073 | 1 | PAVEMENT REPAIR AND RESURFACING | 0.0 |
0675-01-070 | Freestone/ Bryan | IH 45 | Actual | $3,546,517 | 8 | SAFETY TREAT FIXED OBJECTS | 0.0 |
0913-22-047 | Gonzales/ Yoakum | CR | Actual | $829,776 | 6 | REHABILITATE EXISTING BRIDGE | 0.0 |
0287-03-031 | Gonzales/ Yoakum | SH 80 | Actual | $1,316,127 | 8 | SAFETY TREAT FIXED OBJECTS | 5.0 |
0045-02-034 | Grayson/ Paris | SH 56 | Actual | $124,480 | 10 | LANDSCAPE DEVELOPMENT | 0.0 |
0271-17-173 | Harris/ Houston | IH 610 | Actual | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0177-06-086 | Harris/ Houston | IH 69 | Actual | $8,052,624 | 10 | SHORE UP BENTS, REPAIR ACP PAV FAILURES AND REESTABLISH | 0.0 |
0500-03-620 | Harris/ Houston | IH 45 | Actual | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0028-02-092 | Harris/ Houston | US 90 | Actual | $1,932,541 | 5 | INSTALL ITS EQUIPMENT & INFRSTRUCTURE (FIBER TRUNK LINE, CLO | 0.0 |
0508-01-356 | Harris/ Houston | IH 10 | Actual | $3,605,275 | 5 | INSTALL ITS EQUIPMENT & INFRASTRUCTURE - 144-STRAND FIBER | 0.0 |
0912-72-487 | Harris/ Houston | CS | Actual | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-486 | Harris/ Houston | CS | Actual | $24,963 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-485 | Harris/ Houston | CS | Actual | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-481 | Harris/ Houston | CS | Actual | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-413 | Harris/ Houston | VA | Actual | $1,989,760 | 1 | CONSTRUCT 10' SHARED USE PATH | 5.5 |
0912-72-482 | Harris/ Houston | CS | Actual | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-484 | Harris/ Houston | CS | Actual | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-483 | Harris/ Houston | CS | Actual | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
1429-01-033 | Hidalgo/ Pharr | FM 2557 | Actual | $5,338,576 | 3 | REHABILITATE ROADWAY | 0.0 |
0227-06-024 | Hockley/ Lubbock | US 385 | Actual | $6,889,582 | 11 | REHABILITATION OF EXISTING ROAD | 4.5 |
0173-06-043 | Hunt/ Paris | SH 34 | Actual | $1,965,177 | 8 | SAFETY TREAT FIXED OBJECTS | 5.5 |
0902-40-027 | Jack/ Ft Worth | CR | Actual | $487,447 | 6 | REPLACE BRIDGE | 0.0 |
0508-04-162 | Jefferson/ Beaumont | SH 73 | Actual | $18,157,570 | 1 | GRADE SEPARATION & CLOSE CROSSOVER | 6.0 |
0018-01-091 | La Salle/ Laredo | IH 35 | Actual | $11,875,085 | 1 | REHABILITATION OF EXISTING HIGHWAY | 6.0 |
0813-01-101 | Liberty/ Beaumont | FM 787 | Actual | $648,519 | 8 | SAFETY TREAT FIXED OBJECTS, MODERNIZE BRIDGE RAIL AND | 0.0 |
0179-04-097 | Matagorda/ Yoakum | SH 35 | Actual | $5,977,930 | 1 | ACP OVERLAY AND ADD ACCELERATION LANE | 0.0 |
0909-22-175 | Mclennan/ Waco | CR | Actual | $620,209 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
0833-03-036 | Mclennan/ Waco | FM 1637 | Actual | $13,474,546 | 1 | WIDEN TO FOUR LANES WITH RAISED MEDIAN | 6.0 |
0055-08-119 | Mclennan/ Waco | US 84 | Actual | $5,822,174 | 1 | MILL AND PFC OVERLAY | 0.0 |
1717-02-022 | Midland/ Odessa | FM 1787 | Actual | $4,103,449 | 1 | ROADWAY RESTORATION | 0.0 |
0332-02-026 | Mitchell/ Abilene | BS 208B | Actual | $1,232,689 | 11 | 2 MILL , SPOT BASE REPAIR, 1-COURSE SURFACE TREATMENT | 0.0 |
0903-28-064 | Montague/ Wichita Falls | CR | Actual | $382,718 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
1400-04-037 | Montgomery/ Houston | FM 1774 | Actual | $19,008,460 | 2M | WIDEN TO 4-LANE DIVIDED RURAL | 5.5 |
3538-01-045 | Montgomery/ Houston | SH 242 | Actual | $24,580,775 | 2M | CONSTRUCT GRADE SEPARATION | 6.5 |
0066-05-066 | Moore/ Amarillo | US 87 | Actual | $12,496,003 | 1 | THICK OVERLAY, PAV REPAIR, SIGNS, BMGF | 0.0 |
0916-00-214 | Nueces/ Corpus Christi | VA | Actual | $1,956,951 | 1 | DISTRICT WIDE PAVEMENT MARKINGS AND MARKERS 2018 PLAN CSJ | 0.0 |
0916-00-219 | Nueces/ Corpus Christi | VA | Actual | $138,463 | 3 | RESILIENCE AND DURABILITY TO EXTREME WEATHER STUDY | 0.0 |
0305-07-062 | Orange/ Beaumont | SH 87 | Actual | $4,516,425 | 1 | OVERLAY EXISTING ROADWAY | 0.0 |
0063-10-017 | Panola/ Atlanta | US 59 | Actual | $5,079,229 | 11 | RESURFACE EXISTING 4-LANE HIGHWAY | 1.0 |
0008-03-116 | Parker/ Ft Worth | US 180 | Actual | $4,758,016 | 1 | REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS | 0.0 |
0365-01-046 | Parker/ Ft Worth | SH 171 | Actual | $908,316 | 1 | REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS | 0.0 |
0171-03-067 | Parker/ Ft Worth | SH 199 | Actual | $3,990,407 | 1 | REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS | 0.0 |
1179-03-010 | Parker/ Ft Worth | FM 2552 | Actual | $1,877,940 | 1 | REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS | 0.0 |
0911-04-046 | Polk/ Lufkin | CR | Actual | $509,909 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
1194-01-022 | Polk/ Lufkin | FM 943 | Actual | $9,885 | 10 | EMERGENCY ROADWAY REPAIRS | 0.0 |
0139-02-025 | Reeves/ Odessa | US 285 | Actual | $32,439,200 | 1 | ROADWAY WIDENING TO A MODIFIED SUPER 2 | 2.0 |
0009-12-211 | Rockwall/ Dallas | IH 30 | Actual | $3,586,779 | 1 | FLEXIBLE PAVEMENT REPAIR, OVERLAY AND PAVEMENT MARKINGS | 0.0 |
1290-01-012 | Rockwall/ Dallas | FM 1141 | Actual | $2,721,303 | 1 | RESTORE EXISTING PAVEMENT AND ADD SHOULDERS | 0.0 |
1290-02-017 | Rockwall/ Dallas | SH 276 | Actual | $16,088,761 | 1 | RECONSTRUCT AND WIDEN 2 LANE RURAL TO 4 LANE DIVIDED URBAN | 7.0 |
2668-01-010 | San Jacinto/ Lufkin | FM 2666 | Actual | $8,408 | 10 | EMERGENCY ROADWAY REPAIRS | 0.0 |
0923-25-025 | San Saba/ Brownwood | VA | Actual | $111,140 | 11 | LANDSCAPE DEVELOPMENT | 0.0 |
0160-01-040 | Sutton/ San Angelo | US 277 | Actual | $1,800,000 | 1 | HOT ASPHALT RUBBER SURFACE TREATMENT | 0.0 |
0172-06-092 | Tarrant/ Ft Worth | US 287 | Actual | $857,747 | 3 | INT IMPROV; UPGRADE TRAFFIC SIGNAL; VEHICLE & PED ILLUM & | 0.0 |
0010-06-043 | Titus/ Atlanta | US 67 | Actual | $1,396,926 | 8 | PROFILE CENTERLINE MARKINGS | 0.0 |
3404-01-016 | Titus/ Atlanta | FM 3417 | Actual | $3,929,961 | 1 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH, MILLED EDGELINE | 0.0 |
0070-02-090 | Tom Green/ San Angelo | US 87 | Actual | $2,868,855 | 1 | MILL AND INLAY TRAVEL LANES | 0.0 |
0914-04-305 | Travis/ Austin | CR | Actual | $453,254 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
0245-02-031 | Van Zandt/ Tyler | SH 64 | Actual | $11,151,486 | 1 | WIDEN 2 LN ROADWAY FOR PASSING LANES-SUPER2 | 0.0 |
0088-04-070 | Victoria/ Yoakum | US 59 | Actual | $4,346,409 | 11 | ACP OVERLAY | 0.0 |
0514-01-041 | Wichita/ Wichita Falls | SH 240 | Actual | $801,834 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
0204-01-070 | Williamson/ Austin | US 79 | Actual | $150,917 | 3 | LENGTHEN LEFT TURN LANE | 0.0 |
|