0265-13-022SL 230ActualJan 2018$471,7763ADA SIDEWALKS0.0
2991-01-012FM 1441ActualDec 2017$201,41210REMOVE RIPRAP,REMOVE STR, CONC BOX CULV, WINGWALL0.0
0471-05-047SH 21ActualAug 2018$1,895,2368IMPROVE GUARDRAIL TO DESIGN STANDARDS0.0
0322-01-049SH 95ActualAug 2018$1,215,2181MILL, SEAL & TOM OVERLAY0.0
2991-01-011FM 1441ActualDec 2017$130,36710RIPRAP, BACKFILL,EXCAVATION AND SHORING0.0

Burnet County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
1349-03-013RM 1174ActualAug 2018$5,713,3411PROVIDE ADDITIONAL PAVED SURFACE0.0
0150-05-048SH 29ActualDec 2017$5,310,0301EDGE MILL, REPAIR & TOM0.0
1198-01-022RM 963ActualJun 2018$7,455,6751PROVIDE ADDITIONAL PAVED SURFACE0.0
0252-02-054US 281ActualAug 2018$7,420,1791ADD CENTER LEFT TURN LANE AND SHOULDERS4.0
3005-02-006RM 690ActualJul 2018$2,447,8951PROVIDE ADDITIONAL PAVED SURFACE4.5
0533-01-020PR 4ActualJul 2018$2,254,3411LEVEL-UP AND SEAL COAT0.0
0151-01-051SH 29ActualOct 2017$779,9491CONSTRUCTION OF CONTINUOUS LEFT TURN LANE0.0

Caldwell County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0153-01-014US 183ActualAug 2018$449,5311PAVEMENT REPAIR AND RESURFACING1.0
0286-03-017SH 80ActualAug 2018$5,597,0861LEVEL-UP, FULL DEPTH REPAIR AND TOM0.0
0153-01-013US 183ActualDec 2017$2,032,8851INTERSECTION IMPROVEMENTS4.0
0535-03-025IH 10ActualJun 2018$3,586,5811BASE REPAIR, SEALCOAT, OVERLAY AND PAVEMENT MARKINGS ON0.0
0914-22-070VAActualAug 2018$225,0003LULING RELIEF ROUTE STUDY0.0

Gillespie County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0112-03-035US 290ActualAug 2018$4,251,8768IMPROVE GUARDRAIL TO DESIGN STANDARDS2.0
0072-01-053US 87ActualNov 2017$1,115,1881MILL, SEAL & TOM0.0

Hays County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0285-03-059RM 12TentativeAug 2018$400,0023ENGINEERING, DESIGN, AND ROW PURCHASE TO ADD TURN LANES AND0.0
2293-01-030FM 2439ActualAug 2018$532,4101RESURFACE ROADWAY0.0
0016-03-103IH 35ActualAug 2018$32,502,4791REPLACE BRIDGE & APPROACHES7.5
0471-02-071SH 21ActualNov 2017$922,2501REPAIR LEVEL UP AND SEAL COAT0.0
0016-02-160IH 35ActualJan 2018$3,697,1921RESURFACE MAIN LANES0.0

Lee County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0211-02-026US 77ActualFeb 2018$6,505,8461LEVEL-UP, FULL DEPTH REPAIR AND TOM0.0
0114-07-080US 290ActualNov 2017$908,7566REHABILITATE BRIDGE FOR THE BRIDGE MAINTENANCE AND3.0
0334-05-032FM 141ActualMay 2018$1,265,8051LEVEL-UP & SEAL COAT0.0
0116-01-039SH 21ActualAug 2018$11,629,9651LEVEL-UP, FULL DEPTH REPAIR AND TOM0.0
0914-21-031CRActualJan 2018$368,1096REPLACE BRIDGE & APPROACHES0.0

Llano County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0150-02-040SH 29ActualDec 2017$1,911,1141LEVEL-UP AND SEAL COAT0.0
0150-02-039SH 29ActualOct 2017$873,9806BRIDGE REHABILITATION- EROSION REPAIR. REHABILITATE BRIDGE0.0
0396-09-021RM 152ActualSep 2017$978,6043PEDESTRAIN TRAIL- SIDEWALKS3.5

Mason County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0071-05-031US 87ActualMay 2018$3,081,5541REPAIR, LEVEL-UP & SEAL COAT0.0

Travis County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
2100-01-054RM 2222ActualJul 2018$17,766,5741RECONSTRUCT 4-LANE ROADWAY TO 6-LANE DIVIDED ROADWAY7.0
0914-00-393VAActualOct 2017$518,6353INSTALL SIDEWALKS4.5
1186-01-098FM 969ActualJul 2018$243,6428SAFETY LIGHTING0.0
0914-04-302VAActualNov 2017$3,441,0303INSTALL PEDESTRIAN SAFETY DEVICES CITYWIDE0.0
0914-04-229CSActualJul 2018$632,6366REPLACE BRIDGE AND APPROACHES0.0
0914-04-300VAActualDec 2017$2,066,4373WIDEN TRAIL,INSTALL NEW BRIDGE, IMPROVE CROSSING FOR BIKE0.0
1200-03-055FM 973ActualMay 2018$420,7633CONSTRUCT RIGHT AND LEFT TURN LANES0.0
1378-01-040RM 1431TentativeAug 2018$856,5501CONSTRUCT LEFT & RIGHT TURN LANES @ BALCONES CANYONLANDS NWR0.0
1200-02-032FM 973ActualSep 2017$938,2781INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT1.0
3417-01-029FM 734ActualAug 2018$2,769,8781PAVEMENT REPAIR, UNDERSEAL & OVERLAY0.0
0113-13-175SH 71ActualAug 2018$4,561,5761MILL & INLAY0.0
3417-03-024FM 734ActualJul 2018$461,6603ADDING 2ND LEFT TURN LANES TO TWO INTERSECTIONS TO CREATE0.0
0914-00-413VAActualAug 2018$2,480,8721RESTRIPING & REPLACEMENT OF RAISED PAVEMENT MARKINGS ON0.0
0914-00-412VATentativeAug 2018$1,000,0001FY 2018 NON-SITE SPECIFIC ITS IMPROVEMENTS_ON SL 1, IH 35 &0.0
0114-20-011SL 212ActualFeb 2018$1,493,8121MILL AND INLAY0.0
0700-03-142SH 71ActualJun 2018$4,146,0791TOM AND PFC OVERLAY0.0
0914-00-397VAActualMar 2018$1,621,2961FY 2018 NON-SITE SPECIFIC SIGNALS0.0
0265-02-035SH 71ActualJul 2018$222,5483EXTEND WESTBOUND LEFT TURN LANE0.0
0914-04-301VAActualJun 2018$566,6933CONSTRUCT SIDEWALKS AND TRAFFIC CALMING0.0
0914-04-305CRActualApr 2018$453,2546REPLACE BRIDGE AND APPROACHES0.0
0914-00-410VAActualJun 2018$2,179,2581INSTALL OR REBUILD TRAFFIC SIGNALS0.0
0914-04-283VAActualJan 2018$2,168,0463CONSTRUCT SABINE STREET PEDESTRIAN & BICYCLE PROMENADE IN0.0
0440-06-018SH 130ActualJun 2018$59,530,7473ADD ONE LANE IN EACH DIRECTION0.0
0440-06-017SH 130ActualDec 2017$40,221,0633ADD ONE LANE IN EACH DIRECTION0.0
0683-07-008SH 45ActualJul 2018$2,859,86910LANDSCAPING AND IRRIGATION0.0
0914-00-398VAActualMay 2018$1,940,4881FY 2018 SITE SPECIFIC SIGNALS0.0
0914-00-382VAActualJan 2018$773,12710CONSTRUCT CURB RAMPS AT VARIOUS LOCATIONS ALONG US 281,0.0
0914-00-403VAActualMar 2018$2,625,0007PURCHASE 6 BUSES FOR CARTS0.0
3417-03-023FM 734ActualDec 2017$271,6743CONSTRUCTION OF MEDIAN AND LEFT TURN LANE0.0

Williamson County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0015-17-028SS 158ActualAug 2018$963,4938IMPROVE GUARDRAIL TO DESIGN STANDARDS0.0
0015-08-153IH 35ActualJun 2018$1,672,18210LANDSCAPING AND IRRIGATION0.0
1202-01-020FM 972ActualJun 2018$9,621,4911REHAB, ADD SHOULDER & SAFETY TREAT0.0
1566-01-011FM 1660ActualMay 2018$2,446,7551DEPTH REPAIR, UNDERSEAL & THIN OV0.0
1378-02-053RM 1431ActualMay 2018$988,63511INSTALLATION OF A SOUND WALL ALONG THE NORTH RIGHT OF WAY0.0
0015-08-140IH 35ActualJul 2018$7,123,8102MBRIDGE REPLACEMENT3.0
1566-02-019FM 1660ActualAug 2018$9,192,1901REHAB RDWY0.0
1202-03-014FM 1063ActualDec 2017$1,291,5538UPGRADE METAL BEAM GUARD FENCE & SAFETY TREAT FIXED OBJECTS6.0
0683-01-094RM 620ActualOct 2017$566,6361MILL, OVERLAY, RESTRIPE FROM 4 LN DIVIDED TO 6 LN DIVIDED0.0
0683-01-095RM 620ActualJan 2018$1,728,1461MILL,SEAL & INLAY0.0
1200-01-027FM 973ActualFeb 2018$1,260,3011ONE COURSE SURFACE TREATMENT0.0
0914-05-189CRActualJan 2018$1,570,9523CONSTRUCT SIDEWALKS0.0
0320-03-099SH 95ActualMay 2018$858,4186REPLACE DECK AND STRUCTURAL REPAIRS0.0
0320-03-092SH 95ActualMay 2018$404,9156BRIDGE WIDENING & REPLACE APPROACHES0.0
0204-01-070US 79ActualApr 2018$150,9173LENGTHEN LEFT TURN LANE0.0