Letting Schedule for Beaumont District (FY 2018)

Last Update: Monday, August 27, 2018
Beaumont District (FY 2018)
Chambers | Hardin | Jasper | Jefferson | Liberty | Newton | Orange | Tyler |

Chambers County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
1420-02-012FM 1410ActualApr 2018$388,1998PROVIDE ADDITIONAL PAVED SURFACE WIDTH0.0
0508-02-122IH 10ActualApr 2018$1,888,9715INSTALL ITS EQUIPMENT & INFRASTRUCTURE - 144-STRAND FIBER0.0
0508-02-121IH 10ActualMar 2018$263,5021EXTEND WB LEFT TURN LANE AND CONSTRUCT MEDIAN IMPROVEMENTS0.0
1024-01-074FM 565ActualMay 2018$1,939,1391WIDEN PAVED SURFACE WIDTH, INSTALL CONTINUOUS TURN LANE5.5
0242-03-076SH 61ActualAug 2018$210,22110REPLACE CROSS CULVERT0.0

Hardin County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0920-03-034CRActualAug 2018$718,1366REPLACE BRIDGE0.0
0065-05-145US 96ActualJul 2018$7,712,7531OVERLAY EXISTING ROADWAY0.0
0703-02-059FM 92ActualMar 2018$63,5108MILLED EDGELINE RUMBLE STRIPS0.0
1096-01-061FM 770ActualOct 2017$268,5088SAFETY TREAT FIXED OBJECTS0.0
0065-05-146US 96ActualSep 2017$322,8548INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT0.0
0065-06-065US 69ActualOct 2017$406,1801IMPROVE ROADWAY DRAINAGE0.0

Jasper County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0064-08-057US 96ActualJul 2018$11,114,99211OVERLAY EXISTING ROADWAY0.0

Jefferson County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0920-00-121VAActualJul 2018$272,91010INSTALL LANDSCAPING0.0
0932-01-090FM 365ActualJun 2018$11,009,9306REPLACE BRIDGE AND APPROACHES2.0
0200-14-085US 69ActualJun 2018$7,083,4616REPAINT STEEL MEMBERS, REPLACE BACK WALLS AND APPROACH SLABS0.0
0200-11-095US 69ActualJul 2018$25,678,1912UWIDEN FREEWAY FROM 4 TO 6 LANES6.5
0739-02-162IH 10ActualJul 2018$131,964,0091WIDEN FREEWAY FROM 4 TO 6 LANES7.0
0920-38-259CSTentativeAug 2018$250,0008PROTECTIVE DEVICES0.0
0786-01-083FM 364ActualDec 2017$3,319,92811WIDEN TO FOUR LANES WITH A CENTER LEFT TURN LANE4.5
0920-00-120VATentativeAug 2018$1,200,0005REPLACE 15 TRANSIT BUSES WITH ALTERNATELY FUELED VEHICLES0.0
0601-02-024SH 326TentativeAug 2018$250,0008PROTECTIVE DEVICES0.0
0028-07-052US 90ActualMay 2018$277,6786UPGRADE BRIDGE AND APPROACH RAILING0.0
0508-04-162SH 73ActualApr 2018$18,157,5701GRADE SEPARATION & CLOSE CROSSOVER6.0
0920-38-189CSActualJan 2018$3,171,8023CONSTRUCT ACP OVERLAY, SIDEWALKS, AND TURN LANE EXTENSIONS0.0
0200-16-019US 69ActualOct 2017$2,451,2948SAFETY LIGHTING0.0

Liberty County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0813-01-101FM 787ActualApr 2018$648,5198SAFETY TREAT FIXED OBJECTS, MODERNIZE BRIDGE RAIL AND0.0
0952-01-059FM 1008ActualAug 2018$5,7368TS HARVEY EMERGENCY REPAIRS DONE W/ 47Y002790.0
0338-05-031BS 105TActualAug 2018$336,99310EMERGENCY REPAIRS TO ADDRESS DAMAGE CAUSED BY TROPICAL STORM0.0
0593-01-123SH 321ActualMar 2018$1,289,7491RESURFACE ROADWAY0.0
0593-01-120SH 321ActualFeb 2018$6,073,5248INSTALL CONTINUOUS TURN LANE, PASSING LANES & RUMBLE STRIPS3.0
0028-03-106US 90ActualSep 2017$9,119,5111SEAL COAT0.0
0028-03-105US 90ActualJun 2018$862,4998IMPROVE TRAFFIC SIGNALS0.0

Newton County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0214-03-036SH 63ActualAug 2018$3,778,0533RETROFIT BRIDGE BENTS0.0

Orange County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0920-30-083CRActualFeb 2018$550,6183WIDEN EXISTING ROADWAY0.0
0305-07-062SH 87ActualApr 2018$4,516,4251OVERLAY EXISTING ROADWAY0.0
0883-02-086FM 105ActualMay 2018$1,372,4191PROVIDE ADDITIONAL PAVED SURFACE WIDTH, MILLED EDGELINE0.0
0499-03-058SH 12ActualFeb 2018$7,695,4308INSTALL CONTINUOUS TURN LANE , PASSING LANES, & RUMBLE1.0
0920-30-084CSTentativeAug 2018$250,0008PROTECTIVE DEVICES0.0
0028-09-116IH 10ActualJul 2018$15,162,9248006507057IGH MAST LIGHTING1.0

Tyler County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
1237-01-035FM 1013ActualAug 2018$6,93010TS HARVEY EMERGENCY REPAIRS DONE WITH 47Y002790.0
1238-02-009FM 92ActualAug 2018$9,60110TS HARVEY EMERGENCY REPAIR DONE WITH 47Y002790.0
3043-01-011FM 2992ActualMar 2018$499,6391PROVIDE ADDITIONAL PAVED SURFACE WIDTH0.0
0703-03-024FM 256ActualAug 2018$5,05110TS HARVEY EMERGENCY REPAIR DONE WITH 47Y002790.0
3043-01-014FM 2992ActualAug 2018$5,94910TS HARVEY EMERGENCY REPAIR DONE WITH 47Y002790.0
0877-03-025FM 256ActualMay 2018$598,9116REPLACE BRIDGE AND APPROACHES0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract