0079-05-057US 67ActualDec 2017$9,554,9091SEAL COAT MAIN LANES
2578-01-023FM 2481ActualOct 2017$78,36610REBUILD CHANNEL EMBANKMENT W/ ROCK RIP RAP & CONCRETE
0343-03-028SH 108ApprovedMar 2018$7,962,5391WIDEN PAVEMENT, EXTEND CULVERTS, SEAL COAT, PAVEMENT MARKING

Hood County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0385-02-029FM 4ActualOct 2017$2,657,8851WIDEN PAVEMENT AND ADD SHOULDERS
3123-01-015FM 4ActualOct 2017$57,76610FLOW-ABLE FILL MATERIAL TO ADD STRUCTURAL CAPACITY UNDER THE
0080-11-001US 377TentativeAug 2018$61,623,9971CONSTRUCT 0 TO 4 LANE DIVIDED ROADWAY WITH GRADE SEPARATION

Jack County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0902-40-027CRApprovedApr 2018$487,4476REPLACE BRIDGE
1309-01-033US 380ApprovedFeb 2018$4,142,1191REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS

Johnson County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0902-50-104CSTentativeJun 2018$5,000,0003CONSTRUCTION OF AN EXTENSION OF ALSBURY BOULEVARD
3207-01-011FM 3136ApprovedMay 2018$5,400,0001WIDEN PAVEMENT, EXTEND CULVERTS, PAVEMENT MARKING
3372-01-016FM 3391ApprovedMay 2018$2,000,0001REPAIR BASE FAILURES, HMAC OVERLAY, PAVEMENT MARKINGS
0014-03-095IH 35WApprovedMay 2018$8,428,1711REPAIR CONCRETE FAILURES, MILL, HMAC OVERLAY, PAVEMENT
0014-03-096IH 35WApprovedMay 2018$542,5148SAFETY LIGHTING

Palo Pinto County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0902-39-021CRApprovedMar 2018$855,1226REPLACE BRIDGE AND APPROACHES

Parker County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0171-03-067SH 199ApprovedApr 2018$4,366,7001REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS
1601-02-032FM 1884ApprovedMay 2018$150,0003INSTALLATION OF TRAFFIC ACTUATED SIGNAL
0313-02-060FM 51TentativeAug 2018$1,658,8003PAVEMENT WIDENING, DRAINAGE, & INTERSECTION IMPROVEMENTS
0008-03-116US 180ApprovedApr 2018$5,730,0001REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS
0008-03-107IH 20ApprovedFeb 2018$2,800,8031FRONTAGE ROADS - REPAIR BASE FAILURES, MILL, HMAC OVERLAY,
0008-09-036FM 5ApprovedMay 2018$5,203,6721REPAIR BASE FAILURES, HMAC OVERLAY, PAVEMENT MARKINGS
1179-03-010FM 2552ApprovedApr 2018$1,720,0001REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS
0365-01-046SH 171ApprovedApr 2018$1,468,0001REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS

Tarrant County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0902-90-053VATentativeAug 2018$1,000,0005DEVELOP AND IMPLEMENT TRAFFIC SIGNAL COORDINATION IN 9
0902-90-052VATentativeAug 2018$300,0005ITS EQUIPMENT UPGRADE FOR TECHNOLOGY ADVANCES
0902-90-086VATentativeAug 2018$20,000,0005CONSTRUCTION OF NEW COMMUTER RAIL LINE
0902-90-091CSTentativeAug 2018$082018 FEDERAL RR SIGNAL PROGRAM
0902-90-090CSTentativeAug 2018$082018 FEDERAL RR SIGNAL PROGRAM
0902-90-092CSTentativeAug 2018$082018 FEDERAL RR SIGNAL PROGRAM
0902-90-093CSTentativeAug 2018$082018 FEDERAL RR SIGNAL PROGRAM
0902-90-055VATentativeAug 2018$50,0005ITS QUALITY IMPLEMENTATION - ENSURE EFFECTIVE USE OF ITS
0902-90-056VATentativeAug 2018$50,0005ITS QUALITY IMPLEMENTATION - ENSURE EFFECTIVE USE OF ITS
1068-02-137IH 30TentativeAug 2018$265,0003LANDSCAPE MONUMENT ON NORTHSIDE
0902-90-074VATentativeAug 2018$3,100,0007COMPLETION OF THE DFW CORE EXPRESS HIGH SPEED RAIL PROJECT
0902-90-054VATentativeAug 2018$1,000,0005DEVELOP AND IMPLEMENT TRAFFIC SIGNAL COORDINATION IN 9
0902-90-094CSTentativeAug 2018$082018 FEDERAL RR SIGNAL PROGRAM
0902-00-184VAActualOct 2017$750,0003REVENUE & PROJECT TRACKING, SOFTWARE DEVELOPMENT, & FISCAL
2681-02-008FM 2499TentativeJul 2018$1,399,0553LANDSCAPE ENHANCEMENT
0902-90-024VAActualOct 2017$889,5623BIKE AND PEDESTRIAN TRAIL EXTENSION
0008-07-034SH 180TentativeAug 2018$305,7751CONSTRUCT DIVISION BIKE/PEDESTRIAN PROJECT
0902-90-042VATentativeAug 2018$25,0003DIRECT STATE CHARGES FOR TEX RAIL CONNECTION_PROJECTS
0902-90-051VATentativeAug 2018$300,0005ITS EQUIPMENT UPGRADES FOR TECHNOLOGY ADVANCES
0902-00-182VAActualOct 2017$1,175,0003DEVELOP AND IMPLEMENT 511 TRAVELER INFORMATION SYSTEM
0902-90-058VAActualOct 2017$2,462,4747MOBILITY ASST PATROL THAT PROVIDES ASST TO STRANDED MOTORIST
0008-13-221IH 820ActualDec 2017$210,561,6631RM TO TRIN:RECON TO 6 LNS + AUX,&CONST IH 820/SH 121 DIR CON
0172-02-074BU 287PActualDec 2017$1,180,4573PEDESTRIAN AND BIKE TRAIL
0902-00-159VAActualDec 2017$1,740,0003SCHOOL BUS, CLEAN TECHNOLOGY REVOLVING LOAN PROGRAM,
0902-90-031VAActualNov 2017$2,494,6863PEDESTRIAN AND BIKE TRAIL
2374-05-082IH 20ActualOct 2017$1,036,2323CONSTRUCT NEW TEXAS UTURN
0902-90-026VATentativeJul 2018$1,785,0003INTERSECTION/SIGNAL IMPROVEMENTS; TRAIL; PEDESTRIAN
0353-03-099SH 114ActualNov 2017$1,819,2093LANDSCAPE ENHANCEMENT
0902-00-179VATentativeAug 2018$825,0007PROGRAM OVERSIGHT COORDINATION, INCLUDING DEPT STREAMLINING
0902-00-178VATentativeAug 2018$312,5007PROGRAM OVERSIGHT COORDINATION, INCLUDING DEPT STREAMLINING
0902-00-175VATentativeAug 2018$291,3507CONGESTION MGMT OPERATIONS & DATA ARCHIVING, REG ITS ARCH,
0902-00-180VATentativeAug 2018$100,0007BOTTLENECK REMOVAL THROUGH USE OF FREEWAY SHOULDERS
0902-00-187VATentativeAug 2018$400,0007M&O CORRIDOR STUDIES & CAPITAL ASSET MANAGEMENT
0902-00-186VATentativeAug 2018$650,0007LAND USE/TRANS & BIKE/PED INIT INCL BIKE/PED PLANNING,
0902-00-205VATentativeAug 2018$2,500,00010CONSTRUCT CURB RAMS AT VARIOUS LOCATIONS ALONG BU 67-M IN
0902-00-174VATentativeAug 2018$186,1007CONGESTION MGMT OPERATIONS & DATA ARCHIVING, REG ITS ARCH,
0364-01-148SH 121TentativeAug 2018$27,760,8112MRECONSTRUCT SHOULDER FOR PEAK HOUR UTILIZATION
0172-09-036US 287TentativeAug 2018$2,228,0005INSTALLATION OF ITS FIBER & EQUIPMENT
0172-09-034US 287ActualOct 2017$2,190,4743SUBLETT EXIT RAMP RELOCATION (US 287 SB TO SUBLETT RD)
0718-02-045FM 156TentativeAug 2018$40,008,8121WIDEN 2 TO 4 LANE DIVIDED
0902-00-172VATentativeAug 2018$3,000,0005REGIONAL MINOR INTERSECTION EQUIP PRGRAM POOL FOR FUTURE
0902-90-034VATentativeAug 2018$20,000,0003CONSTRUCTION OF EAST-WEST CONNECTOR 0 TO 4 LANES DIVIDED
0902-00-168VATentativeAug 2018$400,0005EMISSIONS REDUCTION STRATEGIES FOR OZONE PRECURSORS INCL VOC
0902-90-045VAApprovedApr 2018$1,241,2983CONSTRUCT ALTERNATE TRANSPORTATION ROUTE CONSISTING OF
0008-05-027SH 180ApprovedMay 2018$7,532,0761REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS
0363-01-146SH 26ApprovedMay 2018$250,00010INSTALLATION OF LANDSCAPING AND IRRIGATION WITHIN MEDIANS OF
0902-48-688VATentativeJul 2018$1,302,3003CLOSE EAST 1ST XING @ UPRR; INSTALL MEDIAN @ PEACH @ BNSF;
1330-01-063FM 1187ApprovedMar 2018$2,543,2791REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS
1978-01-056FM 1938ApprovedMar 2018$2,714,2241REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS
0353-03-102SH 114TentativeAug 2018$62,3343RELOCATE ITS FIBER OPTIC CABLE DUE TO CONFLICT WITH TEX RAIL
0902-90-019CSTentativeJun 2018$1,892,4476REHABILITATE BRIDGE
1068-01-219IH 30TentativeJun 2018$400,00010LANDSCAPE ENHANCEMENT
0081-02-069US 377TentativeJul 2018$350,00010LANDSCAPING IMPROVEMENTS
0902-00-209VATentativeJun 2018$1,000,0001BRIDGE MAINTENANCE
0902-48-744CRApprovedMay 2018$1,441,6846REPLACE BRIDGE
0014-16-276IH 35WTentativeJun 2018$1,125,6236REPLACE BRIDGE & APPROACH RAILING/ADD SAFETY END
0094-02-133SH 10TentativeJun 2018$400,00010INSTALLATION OF LANDSCAPING AND IRRIGATION WITHIN MEDIANS OF
0902-90-025VAApprovedMar 2018$1,558,6743LYNN CREEK LINEAR PARK TRAIL EXTENSION FROM END POINT OF
0172-06-092US 287ApprovedFeb 2018$857,7473INT IMPROV; UPGRADE TRAFFIC SIGNAL; VEHICLE & PED ILLUM &
2266-02-086SH 360ApprovedFeb 2018$60,126,1482MWIDEN & RECONSTRUCT 6 TO 8 LANES
0902-90-035VAApprovedJan 2018$735,8083CONSTRUCT NEW HIKE/BIKE TRAIL WITH AMENITIES
0747-04-073FM 157ApprovedFeb 2018$340,0003INSTALLATION OF FULL TRAFFIC SIGNAL & CROSSWALK
2266-02-139SH 360ApprovedMar 2018$2,063,8131REPAIR CONCRETE PAVEMENT FAILURES, DIAMOND GRIND, PAVEMENT

Wise County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0902-20-111CRTentativeJul 2018$584,0866REPLACE BRIDGE AND APPROACHES
0134-07-074US 380TentativeAug 2018$3,1873INSTALL MEMORIAL HIGHWAY SIGNS (JAMES BENNETT)
0134-12-005BU 380FTentativeAug 2018$1,380,00011REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS
1179-01-043FM 920TentativeJun 2018$2,738,1091REPAIR BASE FAILURES, HMAC OVERLAY, PAVEMENT MARKINGS
0902-20-099CRTentativeAug 2018$617,9276REPLACE BRIDGE AND APPROACHES


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract