Letting Schedule for Houston District (FY 2018)

Last Update: Monday, August 27, 2018
Houston District (FY 2018)
Brazoria | Fort Bend | Galveston | Harris | Montgomery | Waller |

Brazoria County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
2938-02-022FM 2917ActualJun 2018$3,438,9781PAVEMENT REPAIR, SEAL COAT AND 1.5 IN ACP OVERLAY0.0
0178-02-089SH 35ActualJul 2018$3,516,3021DIAMOND GRINDING MAINLANES AND 1.5" ACP OVERLAY ON SHOULDERS0.0
1524-01-082SH 288ActualJan 2018$14,310,2581REMOVE AND REPLACE CONCRETE PAVEMENT4.0
2938-02-023FM 2917ActualAug 2018$11,00010REMOVE AND INSTALL NEW CABINET0.0
0586-01-066SH 332ActualMar 2018$3,248,2121SEAL COAT,LEVEL-UP,WITH LOOP DETECTORS AND 1.5" ACP OVERLAY0.0
0178-04-005FM 523ActualMar 2018$1,033,1208IMPROVE TRAFFIC SIGNALS0.0
0192-03-017SH 6ActualFeb 2018$1,872,0061PAVEMENT REPAIR AND ASPHALTIC CONCRETE PAVEMENT OVERLAY0.0
0598-03-059SH 288ActualFeb 2018$1,967,0003CONSTRUCT TRUCK WEIGH FACILITY0.0
1004-01-063FM 524ActualJan 2018$441,9198SAFETY TREAT FIXED OBJECTS0.0
0912-31-273CRActualOct 2017$7,117,7073WIDEN FROM 2 TO 4-LANES DIVIDED WITH CURB AND GUTTER0.0

Fort Bend County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
1414-05-014FM 1462ActualOct 2017$967,4511BASE REPAIR AND 1.5" ACP OVERLAY0.0
0912-34-194VATentativeAug 2018$3,500,0005REIMBURSEMENT FOR FORT BEND COUNTY TRANSNIT ADMINISTRATION0.0
0912-34-198CRTentativeAug 2018$250,0008FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 743731H)0.0
1258-02-040FM 1093ActualAug 2018$26,12510REMOVED AND REPLACE ASPHALT ROADWAY0.0
0111-03-031FM 521ActualOct 2017$36,714,1832MWIDEN TO 4-LANE DIVIDED SECTION6.0
1257-01-049FM 1092ActualMay 2018$2,554,1827CONSTRUCT DEDICATED TURN LANES, UPGRADE TRAFFIC SIGNALS AND5.5
0192-01-093SH 6ActualJun 2018$7,095,4203WIDEN FROM 6 TO 8 LANES6.0
0543-02-065FM 359ActualJul 2018$19,001,7722MWIDEN TO 4 LANES ARTERIAL, NON TOLL0.0
0543-02-063FM 359ActualOct 2017$17,156,1473CONSTRUCT TWO 2-LANE FRONTAGE ROADS0.0
0271-05-047IH 10ActualJul 2018$11,00010REMOVED DAMAGED CABINET AND INSTALLED NEW CABINET0.0
0027-06-051US 90AActualJul 2018$15,843,9921ADD 10-FOOT SHOULDERS, OVERLAY AND REPLACE BRIDGE CULVERTS3.0
0271-10-010US 90ActualJul 2018$11,00010REMOVED DAMAGED CABINET AND INSTALLED NEW CABINET0.0
0543-03-067FM 762ActualJan 2018$36,101,6751WIDEN TO 4 LANES DIVIDED8.5
1258-02-037FM 1093ActualFeb 2018$954,2901BASE REPAIR AND 1.5" ACP OVERLAY0.0
0089-18-003SL 540ActualJul 2018$1,743,0831CONSTRUCTUION OF MICELLANEOUS WORK CONSISTING OF BASE REPAIR0.0

Galveston County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0912-73-214CSActualAug 2018$445,8193CONSTRUCT SHARED USE PATH AND ENHANCE EXISTING PATH0.0
0978-02-078FM 3436ActualMar 2018$658,3131REPLACE MBGF, 1 IN LEVEL UP AND 1 IN TOM0.0
0192-04-106SH 6ActualAug 2018$11,00010REMOVE AND INSTALL NEW CABINET0.0
0500-01-145IH 45ActualMar 2018$1,613,5661BASE REPAIR, MILLING, SEAL COAT, 1 IN TOM C AND 3/4 IN TOM F0.0
0912-73-204CRActualAug 2018$3,626,8606BRIDGE REPAIR/PREVENTATIVE MAINTENANCE (NBI# 12085B00790001)0.0
0912-73-208VATentativeAug 2018$2,454,0003CONSTRUCT PARK AND RIDE WITH 400 AUTO AND 40 BUS PARKING0.0
0389-06-107SH 146ActualDec 2017$221,1531RAISE APPROACH AT BRIDGE0.0
0367-02-075SH 87ActualMay 2018$18,290,22511REHABILITATE AND RAISE ROADWAY2.5
0500-04-106IH 45ActualJun 2018$215,461,4662MRECONSTRUCT PAVEMENT TO 8 MAIN LANES AND 2 2-LANE FRONTAGE8.0
0978-02-079FM 517ActualAug 2018$11,00010REMOVE AND INSTALL NEW CABINET0.0
0051-03-116SH 3ActualAug 2018$11,00010REMOVE AND INSTALL NEW CABINET0.0
0051-03-113SH 3ActualAug 2018$11,00010REMOVE AND INSTALL NEW CABINET0.0
0500-04-143IH 45ActualAug 2018$11,00010REMOVE AND INSTALL NEW CABINET0.0
0500-04-142IH 45ActualAug 2018$11,00010REMOVE AND INSTALL NEW CABINET0.0
0912-73-195CRActualAug 2018$1,551,2336REPLACE BRIDGE AND APPROACHES (NBI# 12085C00138048)4.5

Harris County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0912-00-464VAActualJan 2018$2,500,0003COMMUTE SOLUTIONS PROGRAM IMPLEMENTATION (COMMUTER AND0.0
0177-07-115US 59ActualJul 2018$18,53610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0912-70-136CSActualJul 2018$21,03610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0177-07-117IH 69ActualJul 2018$18,53610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0912-00-523VAActualDec 2017$1,543,4461INSTALL TRAFFIC SIGNALS (SITE SPECIFIC)0.0
0912-72-446CRActualJul 2018$16,88010REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0271-17-163IH 610ActualDec 2017$55,609,7282MDEDICATED BUS LANE7.5
0114-12-011US 290ActualJul 2018$2,267,39210LANDSCAPE DEVELOPMENT0.0
0976-01-039FM 865ActualFeb 2018$3,521,4691BASE REPAIR, MILLING, SEAL COAT, TOM OVERLAY, STRIPING, CURB0.0
0028-02-095US 90ActualJul 2018$18,53610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0178-01-036SH 35ActualMar 2018$1,742,0281CONCRETE REPAIR, PLANING, SEAL COAT, 1" TOM & PAV MARKINGS0.0
1062-02-026FM 2100ActualFeb 2018$260,2511PROP LEFT & RIGHT TURN LANES,SHOULDER WIDENING,MILLING,0.0
0271-16-149IH 610ActualJul 2018$21,03610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0110-06-142IH 45ActualJul 2018$18,53610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0027-13-231IH 69ActualJul 2018$18,53610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
1685-05-108SH 6ActualJan 2018$1,840,9588INSTALL SAFETY LIGHTING3.5
0912-70-140CSActualJul 2018$24,96310REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0912-70-141CSActualJul 2018$21,03610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0508-01-360IH 10ActualSep 2017$595,04910LANDSCAPING ENHANCEMENT0.0
0912-00-522VAActualOct 2017$2,035,4111TRAFFIC SIGNAL UPGRADES (SITE SPECIFFIC)0.0
0027-10-071US 90AActualOct 2017$3,457,3586REPLACE BRIDGE AND APPROACHES (NBI# 12102002710037)5.0
0912-70-142CSActualJul 2018$21,03610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0912-72-075CSActualJul 2018$22,397,9203RECONSTRUCT CLINTON DRIVE7.5
0912-72-444CRActualJul 2018$29,75310REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-70-146CSActualJul 2018$18,53610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0912-70-143CSActualJul 2018$18,53610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0912-70-144CSActualJul 2018$18,53610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0912-71-386MHActualNov 2017$20,207,01411CONSTRUCT 4-LN DIVIDED (RAISED MEDIAN) URBAN STREET FACILITY8.0
0912-00-551VAActualNov 2017$3,875,0003CLEAN CITIES/CLEAN VEHICLES PROGRAM (ENGINE/VEHICLE0.0
0912-71-799CSActualNov 2017$2,846,48811SHARED USE PATH AND BRIDGE RESTORATION3.5
0912-70-137CSActualJul 2018$22,46310REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
3256-01-109SL 8ActualNov 2017$597,08011CONSTRUCT 6 TO 8 FT SIDEWALK4.0
0912-70-138CSActualJul 2018$24,96310REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0912-00-553VAActualOct 2017$2,400,0003METRO STAR VANPOOL PROGRAM (FY 2017)0.0
0912-00-527VAActualOct 2017$400,0001FREEWAY FLOW SIGNAL CONTROLLER UPGRADE0.0
0912-00-571VAActualOct 2017$100,00010SHRP2 RELIABILITY AND DATA ANALYSIS TOOLS IMPLEMENTATION0.0
0912-72-419CRActualOct 2017$18,55710EROSION REPAIR0.0
0912-70-139CSActualJul 2018$21,03610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0271-17-172IH 610ActualJul 2018$18,89010REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0500-03-583IH 45ActualMay 2018$2,091,8661RESTORATION OF FRONTAGE ROADS0.0
0389-05-116SH 146ActualMay 2018$192,651,7362MWIDEN TO 6-LANES WITH 4-LANE EXPRESS LANES7.0
0508-01-362IH 10ActualJul 2018$24,96310REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0508-01-364IH 10ActualJul 2018$21,03610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0508-01-363IH 10ActualJul 2018$18,53610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0502-01-214SH 225ActualJun 2018$3,679,0071UPGRADE ILLUMINATION0.0
0500-03-623IH 45ActualJul 2018$18,53610REPLACED THE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS,0.0
0912-70-133CSActualJul 2018$18,37110REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0502-01-225IH 610ActualJul 2018$20,86610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0912-70-130CSActualJul 2018$18,53610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0912-70-086CRActualJun 2018$232,7818IMPROVE TRAFFIC SIGNAL AT INTERSECTION0.0
0271-16-145IH 610ActualJun 2018$552,4506CONCRETE DECK REPAIR, CONCRETE STRUCTURE REPAIR ON RAIL,0.0
3256-01-111SL 8ActualMay 2018$473,75010LANDSCAPE DEVELOPMENT0.0
0912-70-128CSActualJul 2018$18,53610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
1005-02-001FM 525ActualMay 2018$1,905,0261REMOVE BOTTLENECK BY WIDENING FROM 2 TO 4 LANES DIVIDED4.0
0912-72-333CSActualMay 2018$948,2186REPLACE BRIDGE AND APPROACHES (NBI #12102B36609271)4.5
0912-72-366CRActualMay 2018$5,097,0003CONSTRUCT GEOMETRIC IMPROVEMENTS AND ITS/TRAFFIC SIGNAL0.0
0912-00-581VAActualJul 2018$17,878,12410HOUSTON CONNECTSMART0.0
0912-70-132CSActualJul 2018$22,46310REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0508-01-365IH 10ActualJul 2018$21,03610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0720-03-133SH 249ActualJul 2018$450,4951RESTRIPE TO 8 MAIN LANES AND RE-ALIGN CTB0.0
3510-06-015SH 99ActualMay 2018$2,359,2601CONSTRUCT SOUNDWALL0.0
0912-00-531VAActualJul 2018$2,024,3801INSTALL NEW TRAFFIC SIGNALS0.0
0912-72-420VAActualJun 2018$910,6206RECONSTRUCT APPROACH SLAB, RECONSTRUCT ABUTMENT BACKWALL0.0
0271-17-173IH 610ActualApr 2018$18,53610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0177-06-086IH 69ActualApr 2018$8,052,62410SHORE UP BENTS, REPAIR ACP PAV FAILURES AND REESTABLISH0.0
0500-03-588IH 45ActualJul 2018$5,245,9791RECONSTRUCT FRONTAGE ROADS (IH 45 NB TO EB IH 610; DETROIT1.5
0912-70-129CSActualJul 2018$18,53610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0500-03-620IH 45ActualApr 2018$18,53610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0028-02-092US 90ActualApr 2018$1,932,5415INSTALL ITS EQUIPMENT & INFRSTRUCTURE (FIBER TRUNK LINE, CLO0.0
0912-00-521VAActualMar 2018$4,000,0001ITS SUPPORT (TRANSTAR) (NON-LET)0.0
3050-03-021FM 2978ActualJun 2018$7,143,7642MREPLACE BRIDGE AND APPROACHES3.5
0912-00-524VAActualMar 2018$1,500,0001UPGRADE DMS BOARDS (NON LETTING)0.0
0912-70-135CSActualJul 2018$21,03610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0271-17-174IH 610ActualJul 2018$22,46310REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0508-01-356IH 10ActualApr 2018$3,605,2755INSTALL ITS EQUIPMENT & INFRASTRUCTURE - 144-STRAND FIBER0.0
0912-72-487CSActualApr 2018$21,03610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-486CSActualApr 2018$24,96310REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-70-134CSActualJul 2018$18,53610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0500-03-622IH 45ActualJul 2018$21,03610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0976-01-042FM 865ActualJun 2018$250,0008INSTALL GRADE CROSSING WARNING DEVICES0.0
0912-72-485CSActualApr 2018$18,53610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-481CSActualApr 2018$21,03610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-413VAActualApr 2018$1,989,7601CONSTRUCT 10' SHARED USE PATH5.5
0912-72-482CSActualApr 2018$18,53610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-484CSActualApr 2018$18,53610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-483CSActualApr 2018$21,03610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0271-14-236IH 610ActualAug 2018$577,92810LANDSCAPE DEVELOPMENT0.0
0271-16-144IH 610ActualAug 2018$500,51710LANDSCAPE DEVELOPMENT0.0
0177-11-154IH 69ActualAug 2018$2,441,4871HIGH FRICTION SURFACE TREATMENT ON CURVE0.0
0271-06-120IH 10ActualAug 2018$2,126,8501EROSION REPAIR AND CHANNEL PROTECTION0.0
0912-00-541VATentativeAug 2018$2,000,0007REGIONAL ITS INFRASTRUCTURE - HARDWARE/SOFTWARE, UTILITIES0.0
0912-00-546VATentativeAug 2018$3,750,0003METRO STAR VANPOOL PROGRAM (FY 2017)0.0
0720-03-143SH 249ActualAug 2018$4,030,0818INTERCONNECT SIGNALS0.0
0912-00-539VATentativeAug 2018$8,000,0007REGIONAL FREEWAY INCIDENT MANAGEMENT-TOWINIG (FY2017/2018)0.0
0912-72-502CSActualJul 2018$18,53610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-503CSActualJul 2018$21,03610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-495CSActualJul 2018$21,03610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-496CSActualJul 2018$21,03610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0050-06-090US 290ActualAug 2018$1,398,78110LANDSCAPE DEVELOPMENT0.0
0110-05-128IH 45ActualAug 2018$365,2296REPLACE/RESET BEARING PADS0.0
0912-72-504CSActualJul 2018$21,03610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
1685-05-118SH 6ActualJul 2018$2,743,36610CURB RAMPS, SIDEWALK, AND MISC PEDESTRIAN ELEMENTS ALONG6.5
0912-00-549VATentativeAug 2018$4,438,0003TRAVEL DEMAND MANAGEMENT, MARKETING, OUTREACH AND PUBLIC0.0
0912-72-370CSActualAug 2018$3,523,0003RECONSTRUCT & WIDEN SIDEWALKS AND ADA RAMPS AND INSTALLATION0.0
0912-72-387CSActualAug 2018$1,989,0003RECONSTRUCT BACK OF CURB INFRASTRUCTURE - SIDEWALKS, CURBS,0.0
0912-70-126CRTentativeAug 2018$250,0008FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 758192R)0.0
0912-70-147CRTentativeAug 2018$21,18510INSTALL NEW CMP (NBI#121020A49377001)0.0
1844-01-028FM 2351ActualAug 2018$11,45510REMOVE AND INSTALL NEW CABINET AND RISER0.0
0271-07-318IH 10ActualJun 2018$536,49310LANDSCAPE DEVELOPMENT0.0
0912-72-531CRTentativeAug 2018$55,8013EROSION REPAIR (NBI #121020AA2430001 & 121020AA2430002)0.0
1685-05-119SH 6ActualAug 2018$18,53610REMOVED DAMAGED CABINET, INSTALLED NEW CABINET0.0
0912-00-584VAActualAug 2018$1,742,0003CONDUCT PUBLIC OUTREACH FOR TRANSPORTATION SAFETY IN THE0.0
0912-70-120CSTentativeAug 2018$622,8028FY 2016 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 758 517X)0.0
0912-00-552VATentativeAug 2018$15,000,0003CLEAN CITIES/CLEAN VEHICLES PROGRAM (ENGINE/VEHICLE0.0
0912-00-583VAActualAug 2018$375,0003RESILIENCE AND DURABILITY TO EXTREME WEATHER STUDY0.0
0912-70-124CRTentativeAug 2018$250,0008FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755622N)0.0
0912-70-125CRTentativeAug 2018$250,0008FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755624C)0.0
0912-70-122CSTentativeAug 2018$583,5908FY 2016 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 758 518E)0.0
0912-70-123CRTentativeAug 2018$250,0008FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 089370C)0.0
0912-72-466CRActualJul 2018$17,20110REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-467CRActualJul 2018$28,26810REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-464CRActualJul 2018$28,26810REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-465CRActualJul 2018$17,25210REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-470CRActualJul 2018$15,43410REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-471CRActualJul 2018$18,98710REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-468CRActualJul 2018$28,81710REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-469CRActualJul 2018$31,76010REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-455CRActualJul 2018$30,40210REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-456CRActualJul 2018$28,26810REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-447CRActualJul 2018$17,20110REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-454CRActualJul 2018$15,43410REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-462CRActualJul 2018$27,15010REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-463CRActualJul 2018$28,78810REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-457CRActualJul 2018$27,15010REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-461CRActualJul 2018$28,78810REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-472CRActualJul 2018$28,26810REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-489CSActualJul 2018$21,03610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-490CSActualJul 2018$21,03610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-480CSActualJul 2018$24,96310REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-488CSActualJul 2018$18,53610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-493CSActualJul 2018$21,03610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-494CSActualJul 2018$21,03610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-491CSActualJul 2018$18,53610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-492CSActualJul 2018$21,03610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-475CRActualJul 2018$29,04810REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-473CRActualJul 2018$17,25210REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-474CRActualJul 2018$17,25210REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-476CRActualJul 2018$17,20110REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-479CSActualJul 2018$22,46310REPLACED THE TRAFFIC SIGNAL CABINET AND ITS EQUIPMENT0.0
0912-72-478CRActualJul 2018$19,90010REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-477CRActualJul 2018$15,43410REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0

Montgomery County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0177-14-010SL 494ActualAug 2018$15,003,9302MRECONSTRUCT AND WIDEN TO 4 LANE DIVIDED URBAN SECTION7.5
0523-08-014FM 1488ActualAug 2018$3,901,2451BASE REPAIR, OCST, 2IN HMA LEVEL-UP, 2IN HMA OVERLAY0.0
3635-01-001SH 249ActualNov 2017$299,257,1803CONSTRUCT 4 LANE TOLLWAY IN SECTIONS0.0
1400-04-037FM 1774ActualApr 2018$19,008,4602MWIDEN TO 4-LANE DIVIDED RURAL5.5
0177-05-116IH 69ActualAug 2018$11,00010REMOVE AND INSTALL NEW CABINET0.0
0912-37-236CRTentativeAug 2018$250,0008FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755882G)0.0
0912-37-229CRActualOct 2017$1,534,5746REPLACE BRIDGE AND APPROACHES (NBI #12170AA0435002)5.0
0912-37-234CRTentativeAug 2018$250,0008FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755879Y)0.0
0912-37-235CRTentativeAug 2018$250,0008FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755892M)0.0
0720-02-086SH 249ActualNov 2017$238,2651INSTALL PAVEMENT MARKINGS0.0
1259-01-042FM 1097ActualJun 2018$14,992,9792MWIDEN FROM 2 TO 4 LANES WITH CONTINUOUS LEFT TURN LANE6.0
3158-01-032FM 3083ActualAug 2018$8,378,4562MWIDEN TO 4-LANE DIVIDED URBAN7.5
1986-01-063FM 1314ActualJul 2018$2,193,8401BASE REPAIR, OCST, 2IN HMA LEVEL-UP, 2IN HMA OVERLAY0.0
0912-37-228CRActualJun 2018$1,165,8986REPLACE BRIDGE AND APPROACHES (NBI #12170AA0495001)4.5
0110-04-199IH 45ActualAug 2018$1,140,7206REPLACE/RESET BEARING PADS, REPLACE BRIDGE DECK0.0
2744-01-011FM 2854ActualMar 2018$22,853,7551RECONSTRUCT TO 4 LANE DIVIDED CURB AND GUTTER6.5
3538-01-045SH 242ActualApr 2018$24,580,7752MCONSTRUCT GRADE SEPARATION6.5

Waller County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0523-01-030FM 1098ActualJan 2018$570,0043TRANSPORTATION & ACCESS MANAGEMENT0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract