CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
---|---|---|---|---|---|---|---|
2938-02-022 | FM 2917 | Actual | Jun 2018 | $3,438,978 | 1 | PAVEMENT REPAIR, SEAL COAT AND 1.5 IN ACP OVERLAY | 0.0 |
0178-02-089 | SH 35 | Actual | Jul 2018 | $3,516,302 | 1 | DIAMOND GRINDING MAINLANES AND 1.5" ACP OVERLAY ON SHOULDERS | 0.0 |
1524-01-082 | SH 288 | Actual | Jan 2018 | $14,310,258 | 1 | REMOVE AND REPLACE CONCRETE PAVEMENT | 4.0 |
2938-02-023 | FM 2917 | Actual | Aug 2018 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0586-01-066 | SH 332 | Actual | Mar 2018 | $3,248,212 | 1 | SEAL COAT,LEVEL-UP,WITH LOOP DETECTORS AND 1.5" ACP OVERLAY | 0.0 |
0178-04-005 | FM 523 | Actual | Mar 2018 | $1,033,120 | 8 | IMPROVE TRAFFIC SIGNALS | 0.0 |
0192-03-017 | SH 6 | Actual | Feb 2018 | $1,872,006 | 1 | PAVEMENT REPAIR AND ASPHALTIC CONCRETE PAVEMENT OVERLAY | 0.0 |
0598-03-059 | SH 288 | Actual | Feb 2018 | $1,967,000 | 3 | CONSTRUCT TRUCK WEIGH FACILITY | 0.0 |
1004-01-063 | FM 524 | Actual | Jan 2018 | $441,919 | 8 | SAFETY TREAT FIXED OBJECTS | 0.0 |
0912-31-273 | CR | Actual | Oct 2017 | $7,117,707 | 3 | WIDEN FROM 2 TO 4-LANES DIVIDED WITH CURB AND GUTTER | 0.0 |
Fort Bend County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
1414-05-014 | FM 1462 | Actual | Oct 2017 | $967,451 | 1 | BASE REPAIR AND 1.5" ACP OVERLAY | 0.0 |
0912-34-194 | VA | Tentative | Aug 2018 | $3,500,000 | 5 | REIMBURSEMENT FOR FORT BEND COUNTY TRANSNIT ADMINISTRATION | 0.0 |
0912-34-198 | CR | Tentative | Aug 2018 | $250,000 | 8 | FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 743731H) | 0.0 |
1258-02-040 | FM 1093 | Actual | Aug 2018 | $26,125 | 10 | REMOVED AND REPLACE ASPHALT ROADWAY | 0.0 |
0111-03-031 | FM 521 | Actual | Oct 2017 | $36,714,183 | 2M | WIDEN TO 4-LANE DIVIDED SECTION | 6.0 |
1257-01-049 | FM 1092 | Actual | May 2018 | $2,554,182 | 7 | CONSTRUCT DEDICATED TURN LANES, UPGRADE TRAFFIC SIGNALS AND | 5.5 |
0192-01-093 | SH 6 | Actual | Jun 2018 | $7,095,420 | 3 | WIDEN FROM 6 TO 8 LANES | 6.0 |
0543-02-065 | FM 359 | Actual | Jul 2018 | $19,001,772 | 2M | WIDEN TO 4 LANES ARTERIAL, NON TOLL | 0.0 |
0543-02-063 | FM 359 | Actual | Oct 2017 | $17,156,147 | 3 | CONSTRUCT TWO 2-LANE FRONTAGE ROADS | 0.0 |
0271-05-047 | IH 10 | Actual | Jul 2018 | $11,000 | 10 | REMOVED DAMAGED CABINET AND INSTALLED NEW CABINET | 0.0 |
0027-06-051 | US 90A | Actual | Jul 2018 | $15,843,992 | 1 | ADD 10-FOOT SHOULDERS, OVERLAY AND REPLACE BRIDGE CULVERTS | 3.0 |
0271-10-010 | US 90 | Actual | Jul 2018 | $11,000 | 10 | REMOVED DAMAGED CABINET AND INSTALLED NEW CABINET | 0.0 |
0543-03-067 | FM 762 | Actual | Jan 2018 | $36,101,675 | 1 | WIDEN TO 4 LANES DIVIDED | 8.5 |
1258-02-037 | FM 1093 | Actual | Feb 2018 | $954,290 | 1 | BASE REPAIR AND 1.5" ACP OVERLAY | 0.0 |
0089-18-003 | SL 540 | Actual | Jul 2018 | $1,743,083 | 1 | CONSTRUCTUION OF MICELLANEOUS WORK CONSISTING OF BASE REPAIR | 0.0 |
Galveston County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
0912-73-214 | CS | Actual | Aug 2018 | $445,819 | 3 | CONSTRUCT SHARED USE PATH AND ENHANCE EXISTING PATH | 0.0 |
0978-02-078 | FM 3436 | Actual | Mar 2018 | $658,313 | 1 | REPLACE MBGF, 1 IN LEVEL UP AND 1 IN TOM | 0.0 |
0192-04-106 | SH 6 | Actual | Aug 2018 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0500-01-145 | IH 45 | Actual | Mar 2018 | $1,613,566 | 1 | BASE REPAIR, MILLING, SEAL COAT, 1 IN TOM C AND 3/4 IN TOM F | 0.0 |
0912-73-204 | CR | Actual | Aug 2018 | $3,626,860 | 6 | BRIDGE REPAIR/PREVENTATIVE MAINTENANCE (NBI# 12085B00790001) | 0.0 |
0912-73-208 | VA | Tentative | Aug 2018 | $2,454,000 | 3 | CONSTRUCT PARK AND RIDE WITH 400 AUTO AND 40 BUS PARKING | 0.0 |
0389-06-107 | SH 146 | Actual | Dec 2017 | $221,153 | 1 | RAISE APPROACH AT BRIDGE | 0.0 |
0367-02-075 | SH 87 | Actual | May 2018 | $18,290,225 | 11 | REHABILITATE AND RAISE ROADWAY | 2.5 |
0500-04-106 | IH 45 | Actual | Jun 2018 | $215,461,466 | 2M | RECONSTRUCT PAVEMENT TO 8 MAIN LANES AND 2 2-LANE FRONTAGE | 8.0 |
0978-02-079 | FM 517 | Actual | Aug 2018 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0051-03-116 | SH 3 | Actual | Aug 2018 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0051-03-113 | SH 3 | Actual | Aug 2018 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0500-04-143 | IH 45 | Actual | Aug 2018 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0500-04-142 | IH 45 | Actual | Aug 2018 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0912-73-195 | CR | Actual | Aug 2018 | $1,551,233 | 6 | REPLACE BRIDGE AND APPROACHES (NBI# 12085C00138048) | 4.5 |
Harris County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
0912-00-464 | VA | Actual | Jan 2018 | $2,500,000 | 3 | COMMUTE SOLUTIONS PROGRAM IMPLEMENTATION (COMMUTER AND | 0.0 |
0177-07-115 | US 59 | Actual | Jul 2018 | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-70-136 | CS | Actual | Jul 2018 | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0177-07-117 | IH 69 | Actual | Jul 2018 | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-00-523 | VA | Actual | Dec 2017 | $1,543,446 | 1 | INSTALL TRAFFIC SIGNALS (SITE SPECIFIC) | 0.0 |
0912-72-446 | CR | Actual | Jul 2018 | $16,880 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0271-17-163 | IH 610 | Actual | Dec 2017 | $55,609,728 | 2M | DEDICATED BUS LANE | 7.5 |
0114-12-011 | US 290 | Actual | Jul 2018 | $2,267,392 | 10 | LANDSCAPE DEVELOPMENT | 0.0 |
0976-01-039 | FM 865 | Actual | Feb 2018 | $3,521,469 | 1 | BASE REPAIR, MILLING, SEAL COAT, TOM OVERLAY, STRIPING, CURB | 0.0 |
0028-02-095 | US 90 | Actual | Jul 2018 | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0178-01-036 | SH 35 | Actual | Mar 2018 | $1,742,028 | 1 | CONCRETE REPAIR, PLANING, SEAL COAT, 1" TOM & PAV MARKINGS | 0.0 |
1062-02-026 | FM 2100 | Actual | Feb 2018 | $260,251 | 1 | PROP LEFT & RIGHT TURN LANES,SHOULDER WIDENING,MILLING, | 0.0 |
0271-16-149 | IH 610 | Actual | Jul 2018 | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0110-06-142 | IH 45 | Actual | Jul 2018 | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0027-13-231 | IH 69 | Actual | Jul 2018 | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
1685-05-108 | SH 6 | Actual | Jan 2018 | $1,840,958 | 8 | INSTALL SAFETY LIGHTING | 3.5 |
0912-70-140 | CS | Actual | Jul 2018 | $24,963 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-70-141 | CS | Actual | Jul 2018 | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0508-01-360 | IH 10 | Actual | Sep 2017 | $595,049 | 10 | LANDSCAPING ENHANCEMENT | 0.0 |
0912-00-522 | VA | Actual | Oct 2017 | $2,035,411 | 1 | TRAFFIC SIGNAL UPGRADES (SITE SPECIFFIC) | 0.0 |
0027-10-071 | US 90A | Actual | Oct 2017 | $3,457,358 | 6 | REPLACE BRIDGE AND APPROACHES (NBI# 12102002710037) | 5.0 |
0912-70-142 | CS | Actual | Jul 2018 | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-72-075 | CS | Actual | Jul 2018 | $22,397,920 | 3 | RECONSTRUCT CLINTON DRIVE | 7.5 |
0912-72-444 | CR | Actual | Jul 2018 | $29,753 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-70-146 | CS | Actual | Jul 2018 | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-70-143 | CS | Actual | Jul 2018 | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-70-144 | CS | Actual | Jul 2018 | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-71-386 | MH | Actual | Nov 2017 | $20,207,014 | 11 | CONSTRUCT 4-LN DIVIDED (RAISED MEDIAN) URBAN STREET FACILITY | 8.0 |
0912-00-551 | VA | Actual | Nov 2017 | $3,875,000 | 3 | CLEAN CITIES/CLEAN VEHICLES PROGRAM (ENGINE/VEHICLE | 0.0 |
0912-71-799 | CS | Actual | Nov 2017 | $2,846,488 | 11 | SHARED USE PATH AND BRIDGE RESTORATION | 3.5 |
0912-70-137 | CS | Actual | Jul 2018 | $22,463 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
3256-01-109 | SL 8 | Actual | Nov 2017 | $597,080 | 11 | CONSTRUCT 6 TO 8 FT SIDEWALK | 4.0 |
0912-70-138 | CS | Actual | Jul 2018 | $24,963 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-00-553 | VA | Actual | Oct 2017 | $2,400,000 | 3 | METRO STAR VANPOOL PROGRAM (FY 2017) | 0.0 |
0912-00-527 | VA | Actual | Oct 2017 | $400,000 | 1 | FREEWAY FLOW SIGNAL CONTROLLER UPGRADE | 0.0 |
0912-00-571 | VA | Actual | Oct 2017 | $100,000 | 10 | SHRP2 RELIABILITY AND DATA ANALYSIS TOOLS IMPLEMENTATION | 0.0 |
0912-72-419 | CR | Actual | Oct 2017 | $18,557 | 10 | EROSION REPAIR | 0.0 |
0912-70-139 | CS | Actual | Jul 2018 | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0271-17-172 | IH 610 | Actual | Jul 2018 | $18,890 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0500-03-583 | IH 45 | Actual | May 2018 | $2,091,866 | 1 | RESTORATION OF FRONTAGE ROADS | 0.0 |
0389-05-116 | SH 146 | Actual | May 2018 | $192,651,736 | 2M | WIDEN TO 6-LANES WITH 4-LANE EXPRESS LANES | 7.0 |
0508-01-362 | IH 10 | Actual | Jul 2018 | $24,963 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0508-01-364 | IH 10 | Actual | Jul 2018 | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0508-01-363 | IH 10 | Actual | Jul 2018 | $18,536 | 10 | REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0502-01-214 | SH 225 | Actual | Jun 2018 | $3,679,007 | 1 | UPGRADE ILLUMINATION | 0.0 |
0500-03-623 | IH 45 | Actual | Jul 2018 | $18,536 | 10 | REPLACED THE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, | 0.0 |
0912-70-133 | CS | Actual | Jul 2018 | $18,371 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0502-01-225 | IH 610 | Actual | Jul 2018 | $20,866 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-70-130 | CS | Actual | Jul 2018 | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-70-086 | CR | Actual | Jun 2018 | $232,781 | 8 | IMPROVE TRAFFIC SIGNAL AT INTERSECTION | 0.0 |
0271-16-145 | IH 610 | Actual | Jun 2018 | $552,450 | 6 | CONCRETE DECK REPAIR, CONCRETE STRUCTURE REPAIR ON RAIL, | 0.0 |
3256-01-111 | SL 8 | Actual | May 2018 | $473,750 | 10 | LANDSCAPE DEVELOPMENT | 0.0 |
0912-70-128 | CS | Actual | Jul 2018 | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
1005-02-001 | FM 525 | Actual | May 2018 | $1,905,026 | 1 | REMOVE BOTTLENECK BY WIDENING FROM 2 TO 4 LANES DIVIDED | 4.0 |
0912-72-333 | CS | Actual | May 2018 | $948,218 | 6 | REPLACE BRIDGE AND APPROACHES (NBI #12102B36609271) | 4.5 |
0912-72-366 | CR | Actual | May 2018 | $5,097,000 | 3 | CONSTRUCT GEOMETRIC IMPROVEMENTS AND ITS/TRAFFIC SIGNAL | 0.0 |
0912-00-581 | VA | Actual | Jul 2018 | $17,878,124 | 10 | HOUSTON CONNECTSMART | 0.0 |
0912-70-132 | CS | Actual | Jul 2018 | $22,463 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0508-01-365 | IH 10 | Actual | Jul 2018 | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0720-03-133 | SH 249 | Actual | Jul 2018 | $450,495 | 1 | RESTRIPE TO 8 MAIN LANES AND RE-ALIGN CTB | 0.0 |
3510-06-015 | SH 99 | Actual | May 2018 | $2,359,260 | 1 | CONSTRUCT SOUNDWALL | 0.0 |
0912-00-531 | VA | Actual | Jul 2018 | $2,024,380 | 1 | INSTALL NEW TRAFFIC SIGNALS | 0.0 |
0912-72-420 | VA | Actual | Jun 2018 | $910,620 | 6 | RECONSTRUCT APPROACH SLAB, RECONSTRUCT ABUTMENT BACKWALL | 0.0 |
0271-17-173 | IH 610 | Actual | Apr 2018 | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0177-06-086 | IH 69 | Actual | Apr 2018 | $8,052,624 | 10 | SHORE UP BENTS, REPAIR ACP PAV FAILURES AND REESTABLISH | 0.0 |
0500-03-588 | IH 45 | Actual | Jul 2018 | $5,245,979 | 1 | RECONSTRUCT FRONTAGE ROADS (IH 45 NB TO EB IH 610; DETROIT | 1.5 |
0912-70-129 | CS | Actual | Jul 2018 | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0500-03-620 | IH 45 | Actual | Apr 2018 | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0028-02-092 | US 90 | Actual | Apr 2018 | $1,932,541 | 5 | INSTALL ITS EQUIPMENT & INFRSTRUCTURE (FIBER TRUNK LINE, CLO | 0.0 |
0912-00-521 | VA | Actual | Mar 2018 | $4,000,000 | 1 | ITS SUPPORT (TRANSTAR) (NON-LET) | 0.0 |
3050-03-021 | FM 2978 | Actual | Jun 2018 | $7,143,764 | 2M | REPLACE BRIDGE AND APPROACHES | 3.5 |
0912-00-524 | VA | Actual | Mar 2018 | $1,500,000 | 1 | UPGRADE DMS BOARDS (NON LETTING) | 0.0 |
0912-70-135 | CS | Actual | Jul 2018 | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0271-17-174 | IH 610 | Actual | Jul 2018 | $22,463 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0508-01-356 | IH 10 | Actual | Apr 2018 | $3,605,275 | 5 | INSTALL ITS EQUIPMENT & INFRASTRUCTURE - 144-STRAND FIBER | 0.0 |
0912-72-487 | CS | Actual | Apr 2018 | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-486 | CS | Actual | Apr 2018 | $24,963 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-70-134 | CS | Actual | Jul 2018 | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0500-03-622 | IH 45 | Actual | Jul 2018 | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0976-01-042 | FM 865 | Actual | Jun 2018 | $250,000 | 8 | INSTALL GRADE CROSSING WARNING DEVICES | 0.0 |
0912-72-485 | CS | Actual | Apr 2018 | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-481 | CS | Actual | Apr 2018 | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-413 | VA | Actual | Apr 2018 | $1,989,760 | 1 | CONSTRUCT 10' SHARED USE PATH | 5.5 |
0912-72-482 | CS | Actual | Apr 2018 | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-484 | CS | Actual | Apr 2018 | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-483 | CS | Actual | Apr 2018 | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0271-14-236 | IH 610 | Actual | Aug 2018 | $577,928 | 10 | LANDSCAPE DEVELOPMENT | 0.0 |
0271-16-144 | IH 610 | Actual | Aug 2018 | $500,517 | 10 | LANDSCAPE DEVELOPMENT | 0.0 |
0177-11-154 | IH 69 | Actual | Aug 2018 | $2,441,487 | 1 | HIGH FRICTION SURFACE TREATMENT ON CURVE | 0.0 |
0271-06-120 | IH 10 | Actual | Aug 2018 | $2,126,850 | 1 | EROSION REPAIR AND CHANNEL PROTECTION | 0.0 |
0912-00-541 | VA | Tentative | Aug 2018 | $2,000,000 | 7 | REGIONAL ITS INFRASTRUCTURE - HARDWARE/SOFTWARE, UTILITIES | 0.0 |
0912-00-546 | VA | Tentative | Aug 2018 | $3,750,000 | 3 | METRO STAR VANPOOL PROGRAM (FY 2017) | 0.0 |
0720-03-143 | SH 249 | Actual | Aug 2018 | $4,030,081 | 8 | INTERCONNECT SIGNALS | 0.0 |
0912-00-539 | VA | Tentative | Aug 2018 | $8,000,000 | 7 | REGIONAL FREEWAY INCIDENT MANAGEMENT-TOWINIG (FY2017/2018) | 0.0 |
0912-72-502 | CS | Actual | Jul 2018 | $18,536 | 10 | REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-503 | CS | Actual | Jul 2018 | $21,036 | 10 | REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-495 | CS | Actual | Jul 2018 | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-496 | CS | Actual | Jul 2018 | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0050-06-090 | US 290 | Actual | Aug 2018 | $1,398,781 | 10 | LANDSCAPE DEVELOPMENT | 0.0 |
0110-05-128 | IH 45 | Actual | Aug 2018 | $365,229 | 6 | REPLACE/RESET BEARING PADS | 0.0 |
0912-72-504 | CS | Actual | Jul 2018 | $21,036 | 10 | REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
1685-05-118 | SH 6 | Actual | Jul 2018 | $2,743,366 | 10 | CURB RAMPS, SIDEWALK, AND MISC PEDESTRIAN ELEMENTS ALONG | 6.5 |
0912-00-549 | VA | Tentative | Aug 2018 | $4,438,000 | 3 | TRAVEL DEMAND MANAGEMENT, MARKETING, OUTREACH AND PUBLIC | 0.0 |
0912-72-370 | CS | Actual | Aug 2018 | $3,523,000 | 3 | RECONSTRUCT & WIDEN SIDEWALKS AND ADA RAMPS AND INSTALLATION | 0.0 |
0912-72-387 | CS | Actual | Aug 2018 | $1,989,000 | 3 | RECONSTRUCT BACK OF CURB INFRASTRUCTURE - SIDEWALKS, CURBS, | 0.0 |
0912-70-126 | CR | Tentative | Aug 2018 | $250,000 | 8 | FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 758192R) | 0.0 |
0912-70-147 | CR | Tentative | Aug 2018 | $21,185 | 10 | INSTALL NEW CMP (NBI#121020A49377001) | 0.0 |
1844-01-028 | FM 2351 | Actual | Aug 2018 | $11,455 | 10 | REMOVE AND INSTALL NEW CABINET AND RISER | 0.0 |
0271-07-318 | IH 10 | Actual | Jun 2018 | $536,493 | 10 | LANDSCAPE DEVELOPMENT | 0.0 |
0912-72-531 | CR | Tentative | Aug 2018 | $55,801 | 3 | EROSION REPAIR (NBI #121020AA2430001 & 121020AA2430002) | 0.0 |
1685-05-119 | SH 6 | Actual | Aug 2018 | $18,536 | 10 | REMOVED DAMAGED CABINET, INSTALLED NEW CABINET | 0.0 |
0912-00-584 | VA | Actual | Aug 2018 | $1,742,000 | 3 | CONDUCT PUBLIC OUTREACH FOR TRANSPORTATION SAFETY IN THE | 0.0 |
0912-70-120 | CS | Tentative | Aug 2018 | $622,802 | 8 | FY 2016 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 758 517X) | 0.0 |
0912-00-552 | VA | Tentative | Aug 2018 | $15,000,000 | 3 | CLEAN CITIES/CLEAN VEHICLES PROGRAM (ENGINE/VEHICLE | 0.0 |
0912-00-583 | VA | Actual | Aug 2018 | $375,000 | 3 | RESILIENCE AND DURABILITY TO EXTREME WEATHER STUDY | 0.0 |
0912-70-124 | CR | Tentative | Aug 2018 | $250,000 | 8 | FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755622N) | 0.0 |
0912-70-125 | CR | Tentative | Aug 2018 | $250,000 | 8 | FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755624C) | 0.0 |
0912-70-122 | CS | Tentative | Aug 2018 | $583,590 | 8 | FY 2016 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 758 518E) | 0.0 |
0912-70-123 | CR | Tentative | Aug 2018 | $250,000 | 8 | FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 089370C) | 0.0 |
0912-72-466 | CR | Actual | Jul 2018 | $17,201 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-467 | CR | Actual | Jul 2018 | $28,268 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-464 | CR | Actual | Jul 2018 | $28,268 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-465 | CR | Actual | Jul 2018 | $17,252 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-470 | CR | Actual | Jul 2018 | $15,434 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-471 | CR | Actual | Jul 2018 | $18,987 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-468 | CR | Actual | Jul 2018 | $28,817 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-469 | CR | Actual | Jul 2018 | $31,760 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-455 | CR | Actual | Jul 2018 | $30,402 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-456 | CR | Actual | Jul 2018 | $28,268 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-447 | CR | Actual | Jul 2018 | $17,201 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-454 | CR | Actual | Jul 2018 | $15,434 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-462 | CR | Actual | Jul 2018 | $27,150 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-463 | CR | Actual | Jul 2018 | $28,788 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-457 | CR | Actual | Jul 2018 | $27,150 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-461 | CR | Actual | Jul 2018 | $28,788 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-472 | CR | Actual | Jul 2018 | $28,268 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-489 | CS | Actual | Jul 2018 | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-490 | CS | Actual | Jul 2018 | $21,036 | 10 | REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-480 | CS | Actual | Jul 2018 | $24,963 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-488 | CS | Actual | Jul 2018 | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-493 | CS | Actual | Jul 2018 | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-494 | CS | Actual | Jul 2018 | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-491 | CS | Actual | Jul 2018 | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-492 | CS | Actual | Jul 2018 | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-475 | CR | Actual | Jul 2018 | $29,048 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-473 | CR | Actual | Jul 2018 | $17,252 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-474 | CR | Actual | Jul 2018 | $17,252 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-476 | CR | Actual | Jul 2018 | $17,201 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-479 | CS | Actual | Jul 2018 | $22,463 | 10 | REPLACED THE TRAFFIC SIGNAL CABINET AND ITS EQUIPMENT | 0.0 |
0912-72-478 | CR | Actual | Jul 2018 | $19,900 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-477 | CR | Actual | Jul 2018 | $15,434 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
Montgomery County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
0177-14-010 | SL 494 | Actual | Aug 2018 | $15,003,930 | 2M | RECONSTRUCT AND WIDEN TO 4 LANE DIVIDED URBAN SECTION | 7.5 |
0523-08-014 | FM 1488 | Actual | Aug 2018 | $3,901,245 | 1 | BASE REPAIR, OCST, 2IN HMA LEVEL-UP, 2IN HMA OVERLAY | 0.0 |
3635-01-001 | SH 249 | Actual | Nov 2017 | $299,257,180 | 3 | CONSTRUCT 4 LANE TOLLWAY IN SECTIONS | 0.0 |
1400-04-037 | FM 1774 | Actual | Apr 2018 | $19,008,460 | 2M | WIDEN TO 4-LANE DIVIDED RURAL | 5.5 |
0177-05-116 | IH 69 | Actual | Aug 2018 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0912-37-236 | CR | Tentative | Aug 2018 | $250,000 | 8 | FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755882G) | 0.0 |
0912-37-229 | CR | Actual | Oct 2017 | $1,534,574 | 6 | REPLACE BRIDGE AND APPROACHES (NBI #12170AA0435002) | 5.0 |
0912-37-234 | CR | Tentative | Aug 2018 | $250,000 | 8 | FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755879Y) | 0.0 |
0912-37-235 | CR | Tentative | Aug 2018 | $250,000 | 8 | FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755892M) | 0.0 |
0720-02-086 | SH 249 | Actual | Nov 2017 | $238,265 | 1 | INSTALL PAVEMENT MARKINGS | 0.0 |
1259-01-042 | FM 1097 | Actual | Jun 2018 | $14,992,979 | 2M | WIDEN FROM 2 TO 4 LANES WITH CONTINUOUS LEFT TURN LANE | 6.0 |
3158-01-032 | FM 3083 | Actual | Aug 2018 | $8,378,456 | 2M | WIDEN TO 4-LANE DIVIDED URBAN | 7.5 |
1986-01-063 | FM 1314 | Actual | Jul 2018 | $2,193,840 | 1 | BASE REPAIR, OCST, 2IN HMA LEVEL-UP, 2IN HMA OVERLAY | 0.0 |
0912-37-228 | CR | Actual | Jun 2018 | $1,165,898 | 6 | REPLACE BRIDGE AND APPROACHES (NBI #12170AA0495001) | 4.5 |
0110-04-199 | IH 45 | Actual | Aug 2018 | $1,140,720 | 6 | REPLACE/RESET BEARING PADS, REPLACE BRIDGE DECK | 0.0 |
2744-01-011 | FM 2854 | Actual | Mar 2018 | $22,853,755 | 1 | RECONSTRUCT TO 4 LANE DIVIDED CURB AND GUTTER | 6.5 |
3538-01-045 | SH 242 | Actual | Apr 2018 | $24,580,775 | 2M | CONSTRUCT GRADE SEPARATION | 6.5 |
Waller County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
0523-01-030 | FM 1098 | Actual | Jan 2018 | $570,004 | 3 | TRANSPORTATION & ACCESS MANAGEMENT | 0.0 |
|