Letting Schedule for January, 2018 County (FY 2018)
January, 2018 (FY 2018) | (see Links) |
SEP 2017 | OCT 2017 | NOV 2017 | DEC 2017 | JAN 2018 | FEB 2018 | MAR 2018 | APR 2018 | MAY 2018 | JUN 2018 | JUL 2018 | AUG 2018 | | |||||||
CCSJ | County/ District | Highway | Let Status | Contract Cost | Fund Cat | Description | DBE Goal |
---|---|---|---|---|---|---|---|
0265-13-022 | Bastrop/ Austin | SL 230 | Actual | $471,776 | 3 | ADA SIDEWALKS | 0.0 |
0909-36-155 | Bell/ Waco | CS | Actual | $6,480,000 | 3 | WIDEN PRAIRIE VIEW ROAD, INSTALL CONTROLLED INTERSECTION, | 0.0 |
0909-36-159 | Bell/ Waco | CS | Actual | $467,037 | 3 | CONSTRUCT SIDEWALKS; ROADWAY IMPROVEMENTS TO INCLUDE CURB | 0.0 |
0915-12-533 | Bexar/ San Antonio | CS | Actual | $1,159,061 | 6 | REPLACE BRIDGE AND APPROACHES | 3.0 |
1524-01-082 | Brazoria/ Houston | SH 288 | Actual | $14,310,258 | 1 | REMOVE AND REPLACE CONCRETE PAVEMENT | 4.0 |
1004-01-063 | Brazoria/ Houston | FM 524 | Actual | $441,919 | 8 | SAFETY TREAT FIXED OBJECTS | 0.0 |
0179-10-108 | Calhoun/ Yoakum | SH 35 | Actual | $2,660,715 | 1 | ACP OVERLAY AND INSTALLING TRAFFIC SIGNALS | 0.0 |
0925-00-067 | Childress/ Childress | VA | Actual | $824,300 | 1 | DISTRICT WIDE STRIPING | 0.0 |
0091-05-060 | Collin/ Dallas | SH 289 | Actual | $2,583,417 | 3 | INTERSECTION IMPROVEMENTS @ MAIN, STONEBRIAR/ROLATER, WADE, | 0.0 |
0047-14-084 | Collin/ Dallas | US 75 | Actual | $22,440,679 | 2M | CONSTRUCT INTERCHANGE | 8.0 |
0915-17-063 | Comal/ San Antonio | VA | Actual | $1,216,815 | 3 | CONSTRUCTION OF SIDEWALK IMPROVEMENTS, PEDESTRIAN RAMPS, | 0.0 |
0923-17-077 | Comanche/ Brownwood | CR | Actual | $771,715 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
3623-01-003 | Coryell/ Waco | SH 9 | Actual | $588,069 | 1 | SLOPE REPAIR | 0.0 |
0146-08-053 | Cottle/ Childress | FM 1037 | Actual | $184,517 | 1 | REPAIR SIDEWALK/INSTALL ILLUMINATION | 0.0 |
0918-47-197 | Dallas/ Dallas | CS | Actual | $5,609 | 10 | PATCH AND SEAL THE DAMAGE SECTION OF ROADWAY | 0.0 |
0918-45-884 | Dallas/ Dallas | CS | Actual | $21,042,452 | 3 | RECONSTRUCT AND WIDEN FROM 4-LANE TO 6-LANE DIVDED | 0.0 |
0918-00-283 | Dallas/ Dallas | VA | Actual | $1,795,682 | 1 | INSTALLATION OF TRAFFIC SIGNALS | 4.5 |
0918-46-285 | Denton/ Dallas | CS | Actual | $2,748,285 | 3 | HARTS BRANCH TRAIL - CONSTRUCT HIKE AND BIKE TRAIL | 0.0 |
0918-46-284 | Denton/ Dallas | CS | Actual | $253,058 | 3 | BRENT ELEMENTARY SCHOOL TRAIL CONNECTION: CONSTRUCT SIDEWALK | 0.0 |
0081-13-063 | Denton/ Dallas | IH 35W | Actual | $13,657,467 | 11 | FULL DEPTH PAVEMENT REPAIR, OVERLAY, AND PAVEMENT MARKINGS | 1.0 |
1567-02-031 | Denton/ Dallas | FM 423 | Actual | $915,355 | 10 | LANDSCAPE HIGHWAY | 0.0 |
0382-01-044 | Falls/ Waco | SH 7 | Actual | $3,381,183 | 1 | SEAL AND OVERLAY | 0.0 |
0909-38-076 | Falls/ Waco | CR | Actual | $1,202,137 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
1077-01-025 | Falls/ Waco | FM 434 | Actual | $1,326,686 | 6 | REPLACE BRIDGE AND APPROACHES | 2.0 |
0543-03-067 | Fort Bend/ Houston | FM 762 | Actual | $36,101,675 | 1 | WIDEN TO 4 LANES DIVIDED | 8.5 |
0294-01-040 | Gaines/ Lubbock | US 62 | Actual | $11,030,468 | 1 | RESTORATION OF ROADWAY | 0.0 |
0806-04-019 | Garza/ Lubbock | FM 651 | Actual | $3,067,536 | 6 | BRIDGE MAINTENANCE | 0.0 |
0047-02-138 | Grayson/ Paris | US 75 | Actual | $7,148,806 | 1 | MILL AND INLAY | 0.0 |
0535-02-048 | Guadalupe/ San Antonio | IH 10 | Actual | $3,614,844 | 1 | CONSTRUCT WEIGH STATION WEIGH IN MOTION RAMPS | 4.0 |
0912-00-464 | Harris/ Houston | VA | Actual | $2,500,000 | 3 | COMMUTE SOLUTIONS PROGRAM IMPLEMENTATION (COMMUTER AND | 0.0 |
1685-05-108 | Harris/ Houston | SH 6 | Actual | $1,840,958 | 8 | INSTALL SAFETY LIGHTING | 3.5 |
0919-03-053 | Harrison/ Atlanta | VA | Actual | $1,461,074 | 10 | REHABILITATE ROADS,PARKING LOTS & CAMPSITES PULLOUTS IN | 0.0 |
0063-01-095 | Harrison/ Atlanta | US 59 | Actual | $2,928,520 | 1 | RESURFACE EXISTING 4-LANE HIGHWAY | 0.0 |
1108-01-020 | Hartley/ Amarillo | FM 767 | Actual | $5,241,495 | 6 | REPLACE EXISTING BRIDGE | 0.0 |
0016-02-160 | Hays/ Austin | IH 35 | Actual | $3,697,192 | 1 | RESURFACE MAIN LANES | 0.0 |
0173-06-048 | Hunt/ Paris | SH 34 | Actual | $74,602 | 10 | LANDSCAPE AND SCENIC ENHANCEMENT | 0.0 |
0515-01-068 | Jackson/ Yoakum | FM 234 | Actual | $6,620,300 | 8 | SAFETY TREAT FIXED OBJECTS,PROVIDE ADDITIONAL PAVED SURFACE | 5.5 |
0920-38-189 | Jefferson/ Beaumont | CS | Actual | $3,171,802 | 3 | CONSTRUCT ACP OVERLAY, SIDEWALKS, AND TURN LANE EXTENSIONS | 0.0 |
0033-05-091 | Jones/ Abilene | US 83 | Actual | $6,078,882 | 1 | SPOT BASE REPAIR, MILL & FILL DRIVING LANES WITH 1-CST AND | 0.0 |
0157-05-060 | Jones/ Abilene | US 277 | Actual | $7,663,179 | 1 | SPOT BASE REPAIR,MILL & FILL DRIVING LANES,1-COURSE SURFACE | 0.0 |
0197-11-013 | Kaufman/ Dallas | FM 1390 | Actual | $5,246,230 | 1 | RESTORE EXISTING PAVEMENT AND ADD SHOULDERS | 0.0 |
0072-14-028 | Kendall/ San Antonio | US 87 | Actual | $2,530,992 | 1 | OVERLAY AND PAVEMENT MARKINGS | 0.0 |
0142-14-061 | Kerr/ San Antonio | IH 10 | Actual | $5,581,640 | 1 | OVERLAY & PAVEMENT MARKINGS ON MAINLANES | 2.0 |
0914-21-031 | Lee/ Austin | CR | Actual | $368,109 | 6 | REPLACE BRIDGE & APPROACHES | 0.0 |
1191-03-030 | Limestone/ Waco | FM 1245 | Actual | $4,330,083 | 1 | REHABILITATE ROADWAY | 0.0 |
0254-02-042 | Live Oak/ Corpus Christi | US 281 | Actual | $10,404,800 | 1 | BASE REPAIR AND OVERLAY | 3.0 |
0905-00-098 | Lubbock/ Lubbock | VA | Actual | $574,509 | 1 | TRAFFIC CONTROL DEVICES | 0.0 |
0905-00-097 | Lubbock/ Lubbock | VA | Actual | $712,962 | 1 | TRAFFIC CONTROL DEVICES | 0.0 |
0128-04-035 | Mcculloch/ Brownwood | US 190 | Actual | $8,490,480 | 1 | RECONSTRUCT URBAN ROAD | 6.0 |
0706-04-019 | Nacogdoches/ Lufkin | FM 95 | Actual | $1,436,386 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
0006-15-034 | Nolan/ Abilene | BI 20-M | Actual | $4,799,128 | 6 | REPLACE BRIDGE & APPROACHES | 2.0 |
0916-35-201 | Nueces/ Corpus Christi | CS | Actual | $330,000 | 3 | CONSTRUCT HIKE AND BIKE TRAIL | 0.0 |
0207-04-036 | Panola/ Atlanta | SH 43 | Actual | $2,624,887 | 1 | RESURFACE EXISTING 2-LANE HIGHWAY | 0.0 |
0169-02-065 | Potter/ Amarillo | US 60 | Actual | $7,810,488 | 1 | OVERLAY | 3.0 |
0275-01-180 | Potter/ Amarillo | IH 40 | Actual | $50,906,953 | 1 | REPLACE EXISTING BRIDGE AND APPROACHES WB LANES | 7.0 |
0041-05-050 | Potter/ Amarillo | US 87 | Actual | $17,587,020 | 1 | PRESERVATION AND SAFETY IMPROVEMENTS ON A FREIGHT CORRIDOR | 1.0 |
0049-06-078 | Robertson/ Bryan | SH 6 | Actual | $2,503,584 | 1 | ASPHALT RUBBER SEAL | 0.0 |
1680-01-016 | San Augustine/ Lufkin | FM 711 | Actual | $5,524,106 | 1 | RECONSTRUCT AND WIDEN PAVEMENT (24 FT) | 1.5 |
1208-02-012 | San Patricio/ Corpus Christi | FM 1945 | Actual | $512,371 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
2558-01-017 | Smith/ Tyler | SS 248 | Actual | $82,400 | 10 | PLANT TREES & SHRUBS, PROVIDE IRRIGATION IN ST ROW | 0.0 |
0910-00-104 | Smith/ Tyler | VA | Actual | $229,120 | 1 | FY 2018 DISTRICT-WIDE THERMO PROGRAM | 0.0 |
0008-15-046 | Tarrant/ Ft Worth | IH 820 | Actual | $3,826,691 | 1 | DIAMOND GRIND MAINLANES,SURFACE TREATMENT BRIDGES | 0.0 |
0902-90-018 | Tarrant/ Ft Worth | CS | Actual | $918,324 | 3 | REAL TIME TRAVELER INFORMATION WITH HIGH SPEED COMMUNICATION | 0.0 |
1068-02-146 | Tarrant/ Ft Worth | IH 30 | Actual | $2,720,777 | 11 | INSTALLATION OF ITS FIBER, ITS EQUIPMENT, SATELLITE BUILDING | 0.0 |
0902-48-827 | Tarrant/ Ft Worth | VA | Actual | $832,942 | 3 | CITY OF FORT WORTH CORRIDOR REDEVELOPMENT PROGRAM | 0.0 |
0014-02-051 | Tarrant/ Ft Worth | IH 35W | Actual | $2,809,156 | 11 | INSTALLATION OF ITS FIBER AND EQUIPMENT | 0.0 |
0902-00-147 | Tarrant/ Ft Worth | VA | Actual | $1,514,097 | 1 | NON-SITE SPECIFIC TRAFFIC SIGNAL INSTALLATION | 0.0 |
2398-01-051 | Taylor/ Abilene | SL 322 | Actual | $769,694 | 1 | EXIT RAMP RELOCATION | 0.0 |
0908-00-083 | Taylor/ Abilene | VA | Actual | $542,281 | 1 | JOINT REPAIR, DECK REPAIR, AND SPALL REPAIR | 0.0 |
0610-03-085 | Titus/ Atlanta | IH 30 | Actual | $64,890 | 6 | BRIDGE PREVENTATIVE MAINTENANCE | 0.0 |
0069-06-034 | Tom Green/ San Angelo | US 87 | Actual | $4,034,479 | 11 | ACP OVERLAY | 0.0 |
0914-04-283 | Travis/ Austin | VA | Actual | $2,168,046 | 3 | CONSTRUCT SABINE STREET PEDESTRIAN & BICYCLE PROMENADE IN | 0.0 |
0914-00-382 | Travis/ Austin | VA | Actual | $773,127 | 10 | CONSTRUCT CURB RAMPS AT VARIOUS LOCATIONS ALONG US 281, | 0.0 |
0523-01-030 | Waller/ Houston | FM 1098 | Actual | $570,004 | 3 | TRANSPORTATION & ACCESS MANAGEMENT | 0.0 |
0709-03-008 | Wharton/ Yoakum | FM 3012 | Actual | $4,694,415 | 8 | SAFETY TREAT FIXED OBJECTS | 3.0 |
0683-01-095 | Williamson/ Austin | RM 620 | Actual | $1,728,146 | 1 | MILL,SEAL & INLAY | 0.0 |
0914-05-189 | Williamson/ Austin | CR | Actual | $1,570,952 | 3 | CONSTRUCT SIDEWALKS | 0.0 |
0915-14-031 | Wilson/ San Antonio | CR | Actual | $328,427 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
|