Letting Schedule for July, 2018 County (FY 2018)
July, 2018 (FY 2018) | (see Links) |
SEP 2017 | OCT 2017 | NOV 2017 | DEC 2017 | JAN 2018 | FEB 2018 | MAR 2018 | APR 2018 | MAY 2018 | JUN 2018 | JUL 2018 | AUG 2018 | | |||||||
CCSJ | County/ District | Highway | Let Status | Contract Cost | Fund Cat | Description | DBE Goal |
---|---|---|---|---|---|---|---|
3199-01-008 | Anderson/ Tyler | FM 2054 | Actual | $2,856,016 | 1 | WIDEN TO 26' FOR SAFETY,W/MILLED CENTER & EDGELINE RMBLESTRP | 0.0 |
1794-01-025 | Angelina/ Lufkin | FM 1818 | Actual | $11,414 | 10 | EMERGENCY ROADWAY REPAIRS | 0.0 |
0176-08-024 | Angelina/ Lufkin | FM 324 | Actual | $566,358 | 8 | IMPROVE GUARDRAIL TO DESIGN STANDARDS, SAFETY TREAT FIXED | 4.0 |
0176-03-131 | Angelina/ Lufkin | US 59 | Actual | $1,676,068 | 1 | IMPROVE GUARDRAIL TO DESIGN STANDARDS | 5.0 |
0357-05-025 | Armstrong/ Amarillo | SH 207 | Actual | $2,358,864 | 8 | GUARDRAIL IMPROVEMENTS | 0.0 |
0913-20-090 | Austin/ Yoakum | CR | Actual | $417,854 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
0320-05-015 | Bell/ Waco | SL 363 | Actual | $3,097,993 | 1 | MILL, SEAL AND OVERLAY | 0.0 |
0184-04-050 | Bell/ Waco | SH 36 | Actual | $2,978,269 | 1 | MISC SPOT PAVEMENT REPAIRS | 0.0 |
0909-36-162 | Bell/ Waco | VA | Actual | $1,615,000 | 3 | PURCHASE BUSES TO PROVIDE TRANSPORTATION | 0.0 |
0909-36-153 | Bell/ Waco | CS | Actual | $489,249 | 3 | CONSTRUCT ROUNDABOUT IN HARKER HEIGHTS | 0.0 |
0017-10-286 | Bexar/ San Antonio | IH 35 | Actual | $553,222 | 10 | LANDSCAPE PLANTING AND IRRIGATION | 0.0 |
0915-00-206 | Bexar/ San Antonio | VA | Actual | $1,547,528 | 1 | DISTRICTWIDE NON-SITE SPECIFIC TRAFFIC SIGNALS-FY 2018 | 0.0 |
0253-04-138 | Bexar/ San Antonio | US 281 | Actual | $177,790,871 | 2M | EXPAND TO 6 LANE EXPRESSWAY WITH FRONTAGE RDS -4 GENERAL | 7.5 |
0072-07-070 | Bexar/ San Antonio | IH 10 | Actual | $31,975,600 | 1 | CONSTRUCT GRADE SEPARATION AT BALCONES CREEK ROAD | 7.5 |
0025-02-216 | Bexar/ San Antonio | IH 10 | Actual | $6,373,823 | 1 | UPGRADE ILLUMINATION | 0.0 |
0178-02-089 | Brazoria/ Houston | SH 35 | Actual | $3,516,302 | 1 | DIAMOND GRINDING MAINLANES AND 1.5" ACP OVERLAY ON SHOULDERS | 0.0 |
0050-01-080 | Brazos/ Bryan | BS 6-R | Actual | $941,727 | 11 | MISCELLANEOUS CONSTRUCTION CONSISTING OF INSTALLATION OF A | 3.0 |
3005-02-006 | Burnet/ Austin | RM 690 | Actual | $2,447,895 | 1 | PROVIDE ADDITIONAL PAVED SURFACE | 4.5 |
0533-01-020 | Burnet/ Austin | PR 4 | Actual | $2,254,341 | 1 | LEVEL-UP AND SEAL COAT | 0.0 |
0039-16-066 | Cameron/ Pharr | IH 69E | Actual | $4,011,852 | 1 | OVERLAY_(FRONTAGE ROADS) | 0.0 |
0919-00-078 | Cass/ Atlanta | VA | Actual | $356,000 | 1 | 2018 DISTRICT SEAL COAT PAVEMENT MARKINGS | 0.0 |
0925-08-019 | Childress/ Childress | CR | Actual | $1,530,129 | 6 | REPLACEMENT OF EXISTING BRIDGE FACILITY | 0.0 |
1746-01-027 | Collin/ Dallas | FM 1827 | Actual | $5,364,198 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH AND PROFILE EDGELINE | 6.5 |
0194-01-014 | Cooke/ Wichita Falls | IH 35 | Actual | $1,792,213 | 8 | INCREASE SUPERELEVATION, MILLED EDGELINE RUMBLE STRIPS | 0.0 |
0909-39-127 | Coryell/ Waco | CR | Actual | $985,729 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
0184-01-063 | Coryell/ Waco | SH 36 | Actual | $12,527,719 | 1 | WIDEN ROADWAY AND ADD PASSING LANES | 0.0 |
2374-02-147 | Dallas/ Dallas | IH 635 | Actual | $8,108,991 | 6 | REPLACE BRIDGE DECK | 4.0 |
0918-00-281 | Dallas/ Dallas | VA | Actual | $1,327,593 | 3 | DART VANPOOL PROGRAM | 0.0 |
0009-03-047 | Dallas/ Dallas | SH 66 | Actual | $471,458 | 8 | TRAFFIC SIGNAL IMPROVEMENT | 0.0 |
0918-47-238 | Dallas/ Dallas | VA | Actual | $1,000,000 | 3 | CONDUCT A FEASIBILITY STUDY FOR M-LINE TROLLEY EXTENSION | 0.0 |
0081-04-025 | Denton/ Dallas | US 377 | Actual | $34,366,691 | 1 | WIDEN 2 LANE TO 6 LANE DIVIDED URBAN SECTION | 7.0 |
3572-01-006 | El Paso/ El Paso | SS 6 | Actual | $860,824 | 1 | MILL AND OVERLAY | 0.0 |
0924-06-578 | El Paso/ El Paso | VA | Actual | $508,337 | 10 | FY 2018 GREEN RIBBON PROJECT (LANDSCAPING IN THE TOWN OF ANT | 0.0 |
2121-02-159 | El Paso/ El Paso | IH 10 | Actual | $536,747 | 6 | REPLACE BRIDGE AND APPROACH RAILING | 0.0 |
2121-04-086 | El Paso/ El Paso | IH 10 | Actual | $2,446,973 | 1 | FRONTAGE ROAD MILL AND OVERLAY | 0.0 |
0167-02-051 | El Paso/ El Paso | BU 54-A | Actual | $2,332,063 | 1 | OVERLAY | 0.0 |
0924-06-561 | El Paso/ El Paso | VA | Actual | $2,174,640 | 5 | OPERATING ASSISTANCE FOR FIRST YEAR OF NEW STREETCAR RELATED | 0.0 |
1656-03-012 | Falls/ Waco | FM 413 | Actual | $891,744 | 8 | SAFETY TREAT FIXED OBJECTS | 5.0 |
0045-20-018 | Fannin/ Paris | US 82 | Actual | $73,802,411 | 1 | ADD TWO LANES WITH SHOULDERS | 5.0 |
0114-08-035 | Fayette/ Yoakum | US 290 | Actual | $2,022,453 | 8 | SAFETY TREAT FIXED OBJECTS | 4.5 |
0543-02-065 | Fort Bend/ Houston | FM 359 | Actual | $19,001,772 | 2M | WIDEN TO 4 LANES ARTERIAL, NON TOLL | 0.0 |
0271-05-047 | Fort Bend/ Houston | IH 10 | Actual | $11,000 | 10 | REMOVED DAMAGED CABINET AND INSTALLED NEW CABINET | 0.0 |
0027-06-051 | Fort Bend/ Houston | US 90A | Actual | $15,843,992 | 1 | ADD 10-FOOT SHOULDERS, OVERLAY AND REPLACE BRIDGE CULVERTS | 3.0 |
0271-10-010 | Fort Bend/ Houston | US 90 | Actual | $11,000 | 10 | REMOVED DAMAGED CABINET AND INSTALLED NEW CABINET | 0.0 |
0089-18-003 | Fort Bend/ Houston | SL 540 | Actual | $1,743,083 | 1 | CONSTRUCTUION OF MICELLANEOUS WORK CONSISTING OF BASE REPAIR | 0.0 |
0463-04-026 | Glasscock/ San Angelo | SH 158 | Actual | $19,684,228 | 11 | ACP OVERLAY | 0.0 |
0050-03-100 | Grimes/ Bryan | SH 6 | Actual | $6,549,921 | 1 | MILLING, HMA OVERLAY, PAVEMENT MARKINGS AND MARKERS | 0.0 |
0120-01-019 | Hamilton/ Waco | SH 22 | Actual | $1,726,935 | 1 | MISC SPOT PAVEMENT REPAIR | 0.0 |
0065-05-145 | Hardin/ Beaumont | US 96 | Actual | $7,712,753 | 1 | OVERLAY EXISTING ROADWAY | 0.0 |
0177-07-115 | Harris/ Houston | US 59 | Actual | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-70-136 | Harris/ Houston | CS | Actual | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0177-07-117 | Harris/ Houston | IH 69 | Actual | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-72-446 | Harris/ Houston | CR | Actual | $16,880 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0114-12-011 | Harris/ Houston | US 290 | Actual | $2,267,392 | 10 | LANDSCAPE DEVELOPMENT | 0.0 |
0028-02-095 | Harris/ Houston | US 90 | Actual | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0271-16-149 | Harris/ Houston | IH 610 | Actual | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0110-06-142 | Harris/ Houston | IH 45 | Actual | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0027-13-231 | Harris/ Houston | IH 69 | Actual | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-70-140 | Harris/ Houston | CS | Actual | $24,963 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-70-141 | Harris/ Houston | CS | Actual | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-70-142 | Harris/ Houston | CS | Actual | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-72-075 | Harris/ Houston | CS | Actual | $22,397,920 | 3 | RECONSTRUCT CLINTON DRIVE | 7.5 |
0912-72-444 | Harris/ Houston | CR | Actual | $29,753 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-70-146 | Harris/ Houston | CS | Actual | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-70-143 | Harris/ Houston | CS | Actual | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-70-144 | Harris/ Houston | CS | Actual | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-70-137 | Harris/ Houston | CS | Actual | $22,463 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-70-138 | Harris/ Houston | CS | Actual | $24,963 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-70-139 | Harris/ Houston | CS | Actual | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0271-17-172 | Harris/ Houston | IH 610 | Actual | $18,890 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0508-01-362 | Harris/ Houston | IH 10 | Actual | $24,963 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0508-01-364 | Harris/ Houston | IH 10 | Actual | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0508-01-363 | Harris/ Houston | IH 10 | Actual | $18,536 | 10 | REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0500-03-623 | Harris/ Houston | IH 45 | Actual | $18,536 | 10 | REPLACED THE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, | 0.0 |
0912-70-133 | Harris/ Houston | CS | Actual | $18,371 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0502-01-225 | Harris/ Houston | IH 610 | Actual | $20,866 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-70-130 | Harris/ Houston | CS | Actual | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-70-128 | Harris/ Houston | CS | Actual | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-00-581 | Harris/ Houston | VA | Actual | $17,878,124 | 10 | HOUSTON CONNECTSMART | 0.0 |
0912-70-132 | Harris/ Houston | CS | Actual | $22,463 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0508-01-365 | Harris/ Houston | IH 10 | Actual | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0720-03-133 | Harris/ Houston | SH 249 | Actual | $450,495 | 1 | RESTRIPE TO 8 MAIN LANES AND RE-ALIGN CTB | 0.0 |
0912-00-531 | Harris/ Houston | VA | Actual | $2,024,380 | 1 | INSTALL NEW TRAFFIC SIGNALS | 0.0 |
0500-03-588 | Harris/ Houston | IH 45 | Actual | $5,245,979 | 1 | RECONSTRUCT FRONTAGE ROADS (IH 45 NB TO EB IH 610; DETROIT | 1.5 |
0912-70-129 | Harris/ Houston | CS | Actual | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-70-135 | Harris/ Houston | CS | Actual | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0271-17-174 | Harris/ Houston | IH 610 | Actual | $22,463 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-70-134 | Harris/ Houston | CS | Actual | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0500-03-622 | Harris/ Houston | IH 45 | Actual | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-72-502 | Harris/ Houston | CS | Actual | $18,536 | 10 | REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-503 | Harris/ Houston | CS | Actual | $21,036 | 10 | REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-495 | Harris/ Houston | CS | Actual | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-496 | Harris/ Houston | CS | Actual | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-504 | Harris/ Houston | CS | Actual | $21,036 | 10 | REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
1685-05-118 | Harris/ Houston | SH 6 | Actual | $2,743,366 | 10 | CURB RAMPS, SIDEWALK, AND MISC PEDESTRIAN ELEMENTS ALONG | 6.5 |
0912-72-466 | Harris/ Houston | CR | Actual | $17,201 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-467 | Harris/ Houston | CR | Actual | $28,268 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-464 | Harris/ Houston | CR | Actual | $28,268 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-465 | Harris/ Houston | CR | Actual | $17,252 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-470 | Harris/ Houston | CR | Actual | $15,434 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-471 | Harris/ Houston | CR | Actual | $18,987 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-468 | Harris/ Houston | CR | Actual | $28,817 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-469 | Harris/ Houston | CR | Actual | $31,760 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-455 | Harris/ Houston | CR | Actual | $30,402 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-456 | Harris/ Houston | CR | Actual | $28,268 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-447 | Harris/ Houston | CR | Actual | $17,201 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-454 | Harris/ Houston | CR | Actual | $15,434 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-462 | Harris/ Houston | CR | Actual | $27,150 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-463 | Harris/ Houston | CR | Actual | $28,788 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-457 | Harris/ Houston | CR | Actual | $27,150 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-461 | Harris/ Houston | CR | Actual | $28,788 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-472 | Harris/ Houston | CR | Actual | $28,268 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-489 | Harris/ Houston | CS | Actual | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-490 | Harris/ Houston | CS | Actual | $21,036 | 10 | REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-480 | Harris/ Houston | CS | Actual | $24,963 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-488 | Harris/ Houston | CS | Actual | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-493 | Harris/ Houston | CS | Actual | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-494 | Harris/ Houston | CS | Actual | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-491 | Harris/ Houston | CS | Actual | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-492 | Harris/ Houston | CS | Actual | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-475 | Harris/ Houston | CR | Actual | $29,048 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-473 | Harris/ Houston | CR | Actual | $17,252 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-474 | Harris/ Houston | CR | Actual | $17,252 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-476 | Harris/ Houston | CR | Actual | $17,201 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-479 | Harris/ Houston | CS | Actual | $22,463 | 10 | REPLACED THE TRAFFIC SIGNAL CABINET AND ITS EQUIPMENT | 0.0 |
0912-72-478 | Harris/ Houston | CR | Actual | $19,900 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-477 | Harris/ Houston | CR | Actual | $15,434 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0164-01-071 | Henderson/ Tyler | BS 31H | Actual | $1,146,125 | 1 | RESURFACE ROADWAY WITH PFC | 0.0 |
0921-02-305 | Hidalgo/ Pharr | CS | Actual | $1,371,614 | 6 | REPLACE BRIDGE AND RECONSTRUCT APPROACHES | 5.5 |
0014-05-039 | Hill/ Waco | SH 81 | Actual | $1,957,234 | 1 | MISC SPOT PAVEMENT REPAIRS | 0.0 |
0901-28-085 | Hopkins/ Paris | CR | Actual | $275,981 | 6 | BRIDGE REPLACEMENT | 0.0 |
0064-08-057 | Jasper/ Beaumont | US 96 | Actual | $11,114,992 | 11 | OVERLAY EXISTING ROADWAY | 0.0 |
0920-00-121 | Jefferson/ Beaumont | VA | Actual | $272,910 | 10 | INSTALL LANDSCAPING | 0.0 |
0200-11-095 | Jefferson/ Beaumont | US 69 | Actual | $25,678,191 | 2U | WIDEN FREEWAY FROM 4 TO 6 LANES | 6.5 |
0739-02-162 | Jefferson/ Beaumont | IH 10 | Actual | $131,964,009 | 1 | WIDEN FREEWAY FROM 4 TO 6 LANES | 7.0 |
0259-05-077 | Johnson/ Ft Worth | US 67 | Actual | $200,490 | 10 | LANDSCAPING IN MEDIAN OF US 67 & GREENBELT BETWEEN US 67 & | 0.0 |
2417-02-016 | Johnson/ Ft Worth | FM 2331 | Actual | $1,726,315 | 1 | REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS, | 0.0 |
0691-01-035 | Karnes/ Corpus Christi | FM 81 | Actual | $4,618,436 | 1 | WIDEN OR REPLACE STRUCTURE | 0.0 |
0751-02-025 | Kaufman/ Dallas | FM 148 | Actual | $3,314,752 | 6 | REPLACE BRIDGE AND APPROACHES | 5.0 |
0751-02-026 | Kaufman/ Dallas | FM 148 | Actual | $9,840,224 | 1 | RECONSTRUCT EXISTING PAVEMENT AND ADD SHOULDERS | 3.0 |
0072-10-006 | Kendall/ San Antonio | FM 289 | Actual | $861,247 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | 0.0 |
0215-06-039 | Kendall/ San Antonio | SH 46 | Actual | $11,087,003 | 1 | EXPAND FROM 2 LANES TO 4 LANES WITH RAISED MEDIAN OR | 7.5 |
0383-04-061 | Kleberg/ Corpus Christi | SH 141 | Actual | $3,394,740 | 1 | MISCELLANEOUS CONSTRUCTION | 6.5 |
0018-01-097 | La Salle/ Laredo | IH 35 | Actual | $5,124,009 | 1 | RESURFACE OF EXISTING HIGHWAY | 0.0 |
0045-08-038 | Lamar/ Paris | US 82 | Actual | $179,971 | 8 | INSTALL INTERSECTION FLASHING BEACON | 0.0 |
2657-01-031 | Lamar/ Paris | FM 2648 | Actual | $4,765,429 | 1 | REHABILITATION OF EXISTING ROAD | 0.0 |
0269-02-065 | Lavaca/ Yoakum | US 77 | Actual | $1,016,870 | 8 | IMPROVE GUARDRAIL TO DESIGN STANDARDS, SAFETY TREAT FIXED OB | 5.0 |
0014-08-084 | Mclennan/ Waco | IH 35 | Actual | $914,656 | 1 | MISC SPOT PAVEMENT REPAIRS | 0.0 |
2362-01-036 | Mclennan/ Waco | SL 340 | Actual | $1,855,786 | 1 | SEAL & OVERLAY | 0.0 |
0517-03-035 | Mcmullen/ San Antonio | SH 16 | Actual | $35,713,857 | 11 | REHAB AND WIDEN TO PROVIDE PASSING LANES & OPERATIONAL | 3.0 |
0421-01-045 | Medina/ San Antonio | SH 173 | Actual | $2,225,938 | 1 | RESTORE EXISTING ROADWAY | 0.0 |
0005-15-088 | Midland/ Odessa | IH 20 | Actual | $4,697,164 | 1 | REVERSAL OF EB ON/OFF RAMPS | 2.5 |
0906-32-054 | Midland/ Odessa | CS | Actual | $1,338,056 | 3 | IMPROVE TRAFFIC SIGNALS, ADD RIGHT TURN LANE | 3.0 |
1986-01-063 | Montgomery/ Houston | FM 1314 | Actual | $2,193,840 | 1 | BASE REPAIR, OCST, 2IN HMA LEVEL-UP, 2IN HMA OVERLAY | 0.0 |
0392-01-073 | Morris/ Atlanta | US 259 | Actual | $6,819,000 | 1 | RESURFACE EXISTING 4-LANE ROADWAY | 0.0 |
2590-01-020 | Nacogdoches/ Lufkin | FM 2609 | Actual | $2,711,569 | 11 | WIDEN FROM 2 TO 4 LANES | 6.0 |
0092-13-028 | Navarro/ Dallas | BI 45-F | Actual | $2,136,367 | 1 | FLEXIBLE PAVEMENT REPAIR, MILL, OVERLAY AND PAVEMENT MARKING | 0.0 |
0102-16-001 | Nueces/ Corpus Christi | US 77 | Actual | $121,801,435 | 11 | CONSTRUCT RELIEF ROUTE AROUND DRISCOLL | 6.5 |
0916-35-200 | Nueces/ Corpus Christi | CS | Actual | $636,000 | 3 | CONSTRUCTION HIKE & BIKE TRAIL | 0.0 |
0028-09-116 | Orange/ Beaumont | IH 10 | Actual | $15,162,924 | 8 | 006507057IGH MAST LIGHTING | 1.0 |
1091-03-012 | Rockwall/ Dallas | FM 1140 | Actual | $4,100,492 | 1 | RESTORE EXISTING PAVEMENT AND ADD SHOULDERS | 5.0 |
0393-02-027 | Rusk/ Tyler | SH 149 | Actual | $7,177,336 | 1 | REPAIR AND RESURFACE ROADWAY | 0.0 |
0403-02-019 | San Jacinto/ Lufkin | FM 224 | Actual | $520,554 | 8 | IMPROVE GUARDRAIL TO DESIGN STANDARDS | 0.0 |
3026-01-026 | San Patricio/ Corpus Christi | FM 2986 | Actual | $19,125,024 | 1 | UPGRADE TO 5-LANE URBAN ROADWAY BY CONSTRUCTING ADDTNL 2 | 7.0 |
0191-03-081 | Smith/ Tyler | FM 2493 | Actual | $14,374,208 | 1 | WIDEN FROM 2 LNS TO 4 LNS W/FLUSH MEDIAN (CONT LEFT TURN LN) | 7.5 |
0164-04-160 | Smith/ Tyler | SH 31 | Actual | $4,013,129 | 1 | RESURFACE ROADWAY | 0.0 |
0910-00-111 | Smith/ Tyler | VA | Actual | $1,050,301 | 1 | THERMOPLASTIC PAVEMENT MARKINGS | 0.0 |
2654-01-022 | Smith/ Tyler | FM 2661 | Actual | $3,232,825 | 1 | WIDEN TO 26' FOR SAFETY,W/MILLED CENTER & EDGELINE RMBLESTRP | 0.0 |
1068-01-219 | Tarrant/ Ft Worth | IH 30 | Actual | $469,482 | 10 | LANDSCAPE ENHANCEMENT | 0.0 |
0081-02-069 | Tarrant/ Ft Worth | US 377 | Actual | $439,449 | 11 | LANDSCAPING IMPROVEMENTS | 0.0 |
0902-90-086 | Tarrant/ Ft Worth | VA | Actual | $20,000,000 | 5 | CONSTRUCTION OF NEW COMMUTER RAIL LINE | 0.0 |
0902-90-102 | Tarrant/ Ft Worth | CS | Actual | $6,264,000 | 3 | 7TH STREET DISTRICT CIRCULATOR BUSES AND CHARGING STATIONS | 0.0 |
0902-90-026 | Tarrant/ Ft Worth | VA | Actual | $1,785,000 | 3 | INTERSECTION/SIGNAL IMPROVEMENTS; TRAIL; PEDESTRIAN | 0.0 |
0902-90-060 | Tarrant/ Ft Worth | VA | Actual | $2,091,000 | 7 | VANPOOL PROGRAM FY 18; OPER VANPOOL SUBSIDY INITIATIVE FOR | 0.0 |
0033-06-114 | Taylor/ Abilene | US 83 | Actual | $445,501 | 1 | ILLUMINATION UPGRADE | 0.0 |
0907-00-170 | Tom Green/ San Angelo | VA | Actual | $8,650,139 | 1 | REPLACE GUARD FENCE, BRIDGE RAIL, AND SAFETY END TREATMENTS | 2.0 |
0077-06-099 | Tom Green/ San Angelo | US 67 | Actual | $3,384,898 | 11 | ACP OVERLAY | 0.0 |
2100-01-054 | Travis/ Austin | RM 2222 | Actual | $17,766,574 | 1 | RECONSTRUCT 4-LANE ROADWAY TO 6-LANE DIVIDED ROADWAY | 7.0 |
1186-01-098 | Travis/ Austin | FM 969 | Actual | $243,642 | 8 | SAFETY LIGHTING | 0.0 |
0914-04-229 | Travis/ Austin | CS | Actual | $632,636 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
3417-03-024 | Travis/ Austin | FM 734 | Actual | $461,660 | 3 | ADDING 2ND LEFT TURN LANES TO TWO INTERSECTIONS TO CREATE | 0.0 |
0265-02-035 | Travis/ Austin | SH 71 | Actual | $222,548 | 3 | EXTEND WESTBOUND LEFT TURN LANE | 0.0 |
0683-07-008 | Travis/ Austin | SH 45 | Actual | $2,859,869 | 10 | LANDSCAPING AND IRRIGATION | 0.0 |
0143-10-052 | Victoria/ Yoakum | US 87 | Actual | $2,249,788 | 1 | ACP OVERLAY | 0.0 |
0922-00-064 | Webb/ Laredo | VA | Actual | $2,212,139 | 1 | REPLACEMENT OF BRIDGE RAIL AND REPLACE APPROACH RAIL | 5.5 |
0043-07-111 | Wilbarger/ Wichita Falls | US 287 | Actual | $533,706 | 1 | IMPROVE GUARDRAIL TO DESIGN STANDARDS | 0.0 |
0015-08-140 | Williamson/ Austin | IH 35 | Actual | $7,123,810 | 2M | BRIDGE REPLACEMENT | 3.0 |
1371-01-021 | Winkler/ Odessa | FM 1232 | Tentative | $250,000 | 8 | INSTALL LIGHTS AND GATES FOR DOT# 864 593F | 0.0 |
0902-20-111 | Wise/ Ft Worth | CR | Actual | $555,439 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
|