Letting Schedule for June, 2018 County (FY 2018)
June, 2018 (FY 2018) | (see Links) |
SEP 2017 | OCT 2017 | NOV 2017 | DEC 2017 | JAN 2018 | FEB 2018 | MAR 2018 | APR 2018 | MAY 2018 | JUN 2018 | JUL 2018 | AUG 2018 | | |||||||
CCSJ | County/ District | Highway | Let Status | Contract Cost | Fund Cat | Description | DBE Goal |
---|---|---|---|---|---|---|---|
0911-00-075 | Angelina/ Lufkin | VA | Actual | $2,625,024 | 10 | CONSTRUCT CURB RAMPS ON VARIOUS LOCATIONS IN THE LUFKIN | 5.5 |
0328-04-044 | Atascosa/ San Antonio | SH 97 | Actual | $4,060,779 | 1 | REHABILITATE EXISTING ROADWAY | 0.0 |
0145-01-032 | Bailey/ Lubbock | US 70 | Actual | $203,371 | 8 | SAFETY | 0.0 |
0124-05-029 | Baylor/ Wichita Falls | US 183 | Actual | $5,712,264 | 1 | ADD SHOULDERS | 0.0 |
2057-01-009 | Bell/ Waco | SS 439 | Actual | $596,386 | 3 | CONSTRUCT SIDEWALKS WITH CURB AND GUTTER | 0.0 |
0231-03-146 | Bell/ Waco | US 190 | Actual | $4,388,326 | 1 | ROADWAY RECONFIGURATION TO IMPROVE TURNING MOVEMENTS | 6.0 |
2452-03-112 | Bexar/ San Antonio | SL 1604 | Actual | $46,366,578 | 1 | EXPAND FROM 4 LANE DIVIDED TO 4 LANE EXPRESSWAY | 7.5 |
0017-10-275 | Bexar/ San Antonio | IH 35 | Actual | $9,183,778 | 1 | SPOT BASE REPAIR, MILL, OVERLAY AND PAVEMENT MARKINGS | 0.0 |
2452-02-118 | Bexar/ San Antonio | SL 1604 | Actual | $807,649 | 2M | INTERSECTION OPERATIONAL IMPROVEMENTS- EB TO WB TURNAROUND | 4.5 |
1479-01-024 | Bexar/ San Antonio | SL 1604 | Actual | $41,945,572 | 2M | EXPAND FROM 2 LANES TO 4 LANE DIVIDED | 6.5 |
2452-03-118 | Bexar/ San Antonio | SL 1604 | Actual | $15,292,695 | 1 | RECONFIGURE RAMPS, CONSTRUCT TURNAROUNDS AT BULVERDE | 6.0 |
0073-08-193 | Bexar/ San Antonio | IH 37 | Actual | $99,554 | 10 | LANDSCAPE PLANTING AND IRRIGATION | 0.0 |
2452-02-119 | Bexar/ San Antonio | SL 1604 | Actual | $7,262,667 | 2M | INTERSECTION OPERATIONAL IMPROVEMENTS- CONSTRUCT 4 | 7.0 |
2938-02-022 | Brazoria/ Houston | FM 2917 | Actual | $3,438,978 | 1 | PAVEMENT REPAIR, SEAL COAT AND 1.5 IN ACP OVERLAY | 0.0 |
0480-01-039 | Brown/ Brownwood | SH 279 | Actual | $1,134,545 | 8 | IMPROVE GUARDRAIL TO DESIGN STANDARDS,INCREASE SUPERELEVATI | 0.0 |
1198-01-022 | Burnet/ Austin | RM 963 | Actual | $7,455,675 | 1 | PROVIDE ADDITIONAL PAVED SURFACE | 0.0 |
0535-03-025 | Caldwell/ Austin | IH 10 | Actual | $3,586,581 | 1 | BASE REPAIR, SEALCOAT, OVERLAY AND PAVEMENT MARKINGS ON | 0.0 |
0006-07-079 | Callahan/ Abilene | IH 20 | Actual | $7,402,195 | 1 | MILL AND OVERLAY | 0.0 |
0220-03-031 | Cameron/ Pharr | US 281 | Actual | $9,822,064 | 1 | REHAB EXISTING ROADWAY | 0.0 |
0946-01-044 | Cass/ Atlanta | FM 250 | Actual | $250,000 | 8 | RAILROAD CROSSING UPGRADES | 0.0 |
0945-03-009 | Cass/ Atlanta | FM 3129 | Actual | $11,184,878 | 1 | IMPROVE GUARDRAIL TO DESIGN STANDARDS & SAFETY TREAT FIXED | 2.0 |
0206-03-061 | Cherokee/ Tyler | US 79 | Actual | $8,258,557 | 1 | WIDEN ROADWAY FOR PASSING LANES-SUPER2 | 1.5 |
2679-02-008 | Collin/ Dallas | FM 2514 | Actual | $17,220,349 | 3 | RECONSTRUCT 2 LANE RURAL TO 4 LANE (ULTIMATE 6 LANE) URBAN | 8.0 |
0918-24-236 | Collin/ Dallas | CS | Actual | $1,784,566 | 3 | INTERSECTION IMPROVEMENTS TO CONVERT EXISTING FOUR-WAY STOP | 0.0 |
0918-24-235 | Collin/ Dallas | VA | Actual | $320,000 | 3 | IMPLEMENT ADAPTIVE TRAFFIC SIGNAL SYSTEMS ON PRESTON RD, | 0.0 |
0716-02-042 | Colorado/ Yoakum | FM 109 | Actual | $3,553,025 | 1 | ADD SHOULDERS | 3.5 |
0907-15-005 | Concho/ San Angelo | CS | Actual | $896,155 | 3 | SIDEWALKS, LIGHTING, AND BENCHES | 0.0 |
0197-02-121 | Dallas/ Dallas | US 175 | Actual | $13,852,206 | 1 | SLOPE FAILURE REPAIRS | 0.0 |
0092-14-093 | Dallas/ Dallas | IH 345 | Actual | $1,025,715 | 1 | BRIDGE DECK REPAIR AND ABUTMENT & BENT WORK | 0.0 |
2964-01-048 | Dallas/ Dallas | SH 161 | Actual | $20,388,171 | 1 | WIDEN AND RECONSTRUCT 4 (6 LANES DURING PEAK TRAVEL) TO 8 | 4.5 |
2374-01-185 | Dallas/ Dallas | IH 635 | Actual | $600,000 | 3 | CONSTRUCT 2 LANE CROSSOVER BETWEEN EB AND WB FRONTAGE ROADS | 0.0 |
1068-04-119 | Dallas/ Dallas | IH 30 | Actual | $39,090,571 | 11 | CONSTRUCT 0 TO 4 LANE FRONTAGE ROADS | 9.0 |
1068-04-174 | Dallas/ Dallas | IH 30 | Actual | $1,710,162 | 1 | MILL AND PLACE PERMEABLE FRICTION COURSE | 0.0 |
0081-03-061 | Denton/ Dallas | US 377 | Actual | $1,283,621 | 1 | INSTALLATION OF TRAFFIC SIGNALS | 0.0 |
0042-07-067 | Donley/ Childress | US 287 | Actual | $7,349,789 | 1 | REHABILITATION OF EXISTING ROAD | 0.0 |
0004-07-129 | Ector/ Odessa | IH 20 | Actual | $2,008,464 | 6 | BRIDGE REPAIR | 0.0 |
0924-00-099 | El Paso/ El Paso | VA | Actual | $2,097,783 | 1 | FY 2018 BRIDGE MAINTENANCE | 0.0 |
0924-06-556 | El Paso/ El Paso | VA | Actual | $1,800,000 | 3 | EL PASO COUNTY VAN POOL PROGRAM | 0.0 |
0918-22-156 | Ellis/ Dallas | VA | Actual | $250,000 | 3 | PRELIMINARY ENGINEERING FOR MIDLOTHIAN-WAXAHACHIE SHARED USE | 0.0 |
0918-22-157 | Ellis/ Dallas | VA | Actual | $4,729,743 | 1 | REPLACE TURNDOWNS AND GUARDRAILS | 0.0 |
1317-01-015 | Ellis/ Dallas | FM 1183 | Actual | $10,625,642 | 1 | RECONSTRUCT EXISTING PAVEMENT AND ADD SHOULDERS | 6.5 |
0092-03-050 | Ellis/ Dallas | IH 45 | Actual | $3,341,978 | 1 | SLOPE FAILURE REPAIR | 0.0 |
0535-06-044 | Fayette/ Yoakum | IH 10 | Actual | $12,184,596 | 1 | PAVEMENT REPAIR AND SURFACING | 0.0 |
0296-02-033 | Fisher/ Abilene | US 180 | Actual | $2,066,214 | 6 | BRIDGE REPLACEMENT | 0.0 |
0192-01-093 | Fort Bend/ Houston | SH 6 | Actual | $7,095,420 | 3 | WIDEN FROM 6 TO 8 LANES | 6.0 |
0675-01-072 | Freestone/ Bryan | IH 45 | Actual | $2,179,120 | 6 | INSTALLATION OF CRASH WALLS | 0.0 |
0500-04-106 | Galveston/ Houston | IH 45 | Actual | $215,461,466 | 2M | RECONSTRUCT PAVEMENT TO 8 MAIN LANES AND 2 2-LANE FRONTAGE | 8.0 |
0153-02-043 | Gonzales/ Yoakum | US 183 | Actual | $2,348,902 | 6 | MISC BRIDGE REPAIR | 0.0 |
0901-19-181 | Grayson/ Paris | CR | Actual | $1,224,765 | 6 | BRIDGE REPLACEMENT | 0.0 |
0545-04-051 | Gregg/ Tyler | SH 42 | Actual | $514,481 | 6 | CLEAN & PAINT STEEL GIRDERS, CONCRETE & STEEL PILE REPAIR | 0.0 |
0535-02-046 | Guadalupe/ San Antonio | IH 10 | Actual | $18,238,398 | 1 | BASE REPAIR, SEALCOAT, OVERLAY AND PAVEMENT MARKINGS ON | 0.0 |
0502-01-214 | Harris/ Houston | SH 225 | Actual | $3,679,007 | 1 | UPGRADE ILLUMINATION | 0.0 |
0912-70-086 | Harris/ Houston | CR | Actual | $232,781 | 8 | IMPROVE TRAFFIC SIGNAL AT INTERSECTION | 0.0 |
0271-16-145 | Harris/ Houston | IH 610 | Actual | $552,450 | 6 | CONCRETE DECK REPAIR, CONCRETE STRUCTURE REPAIR ON RAIL, | 0.0 |
0912-72-420 | Harris/ Houston | VA | Actual | $910,620 | 6 | RECONSTRUCT APPROACH SLAB, RECONSTRUCT ABUTMENT BACKWALL | 0.0 |
3050-03-021 | Harris/ Houston | FM 2978 | Actual | $7,143,764 | 2M | REPLACE BRIDGE AND APPROACHES | 3.5 |
0976-01-042 | Harris/ Houston | FM 865 | Actual | $250,000 | 8 | INSTALL GRADE CROSSING WARNING DEVICES | 0.0 |
0271-07-318 | Harris/ Houston | IH 10 | Actual | $536,493 | 10 | LANDSCAPE DEVELOPMENT | 0.0 |
0096-07-045 | Harrison/ Atlanta | US 80 | Actual | $872,795 | 1 | IMPROVE TRAFFIC SIGNAL AND ADD LEFT TURN LANE | 0.0 |
2094-01-038 | Hidalgo/ Pharr | FM 2220 | Actual | $12,060,054 | 1 | WIDEN TO 6 LANE | 7.0 |
0039-02-066 | Hidalgo/ Pharr | US 83 | Actual | $8,475,488 | 1 | OVERLAY | 0.0 |
0227-06-026 | Hockley/ Lubbock | US 385 | Actual | $24,005,486 | 11 | REHABILITATION OF EXISTING ROADWAY | 1.0 |
0117-06-045 | Houston/ Lufkin | SH 21 | Actual | $13,653,276 | 1 | RECONSTRUCT PAVEMENT AND ADD PASSING LANES | 4.0 |
0911-28-041 | Houston/ Lufkin | CR | Actual | $637,127 | 6 | REPLACE BRIDGE AND APPROACHES | 3.0 |
3034-01-005 | Houston/ Lufkin | FM 2967 | Actual | $1,828,547 | 1 | RECONSTRUCT AND WIDEN PAVEMENT | 0.0 |
0932-01-090 | Jefferson/ Beaumont | FM 365 | Actual | $11,009,930 | 6 | REPLACE BRIDGE AND APPROACHES | 2.0 |
0200-14-085 | Jefferson/ Beaumont | US 69 | Actual | $7,083,461 | 6 | REPAINT STEEL MEMBERS, REPLACE BACK WALLS AND APPROACH SLABS | 0.0 |
0254-03-079 | Jim Wells/ Corpus Christi | US 281 | Actual | $9,549,058 | 1 | BASE REPAIR AND OVERLAY (SB LANES) | 0.0 |
0100-05-184 | Karnes/ Corpus Christi | US 181 | Actual | $5,477,530 | 1 | RECONSTRUCT INTERSECTION | 3.0 |
0270-04-006 | Karnes/ Corpus Christi | BS 72-B | Actual | $1,875,606 | 1 | REHAB ROADWAY | 0.0 |
0918-11-103 | Kaufman/ Dallas | VA | Actual | $8,600,000 | 3 | INTERSECTION IMPROVEMENTS, SIGNAL IMPROVEMENTS, AND NEW | 0.0 |
0095-03-093 | Kaufman/ Dallas | US 80 | Actual | $9,937,840 | 1 | MILL AND OVERLAY EXISTING ROADWAY | 0.0 |
0141-09-070 | Kimble/ San Angelo | IH 10 | Actual | $8,436,548 | 1 | ACP OVERLAY | 0.0 |
0102-04-103 | Kleberg/ Corpus Christi | US 77 | Actual | $742,042 | 1 | SAFETY LIGHTING | 0.0 |
0913-29-037 | Lavaca/ Yoakum | CR | Actual | $1,440,158 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
0515-06-024 | Lavaca/ Yoakum | FM 957 | Actual | $1,634,631 | 8 | UPGRADE BRDG GUARDRAIL AND PROVIDE ADDITIONAL PAVED SURFACE | 3.0 |
0028-03-105 | Liberty/ Beaumont | US 90 | Actual | $862,499 | 8 | IMPROVE TRAFFIC SIGNALS | 0.0 |
0909-40-074 | Limestone/ Waco | CR | Actual | $1,132,233 | 6 | REHABILITATE BRIDGE AND APPROACHES | 0.0 |
0475-03-064 | Madison/ Bryan | OSR | Actual | $21,474,134 | 1 | REHABILITATION OF EXISTING ROAD CONSISTING OF GRADING, | 5.5 |
0013-01-010 | Montague/ Wichita Falls | US 81 | Actual | $1,943,208 | 8 | MILLED EDGELINE RUMBLE STRIPS | 0.0 |
1259-01-042 | Montgomery/ Houston | FM 1097 | Actual | $14,992,979 | 2M | WIDEN FROM 2 TO 4 LANES WITH CONTINUOUS LEFT TURN LANE | 6.0 |
0912-37-228 | Montgomery/ Houston | CR | Actual | $1,165,898 | 6 | REPLACE BRIDGE AND APPROACHES (NBI #12170AA0495001) | 4.5 |
0704-05-022 | Motley/ Childress | FM 94 | Actual | $6,578,166 | 1 | WIDENING OF NON-FREEWAY FACILITY | 0.0 |
0918-18-135 | Navarro/ Dallas | VA | Actual | $3,944,836 | 1 | REPLACE TURNDOWNS AND GUARDRAILS | 0.0 |
0092-13-023 | Navarro/ Dallas | BI 45-F | Actual | $9,961,808 | 1 | MINOR DRAINAGE PAVEMENT OVERLAY | 2.0 |
0394-03-040 | Panola/ Atlanta | FM 699 | Actual | $1,232,917 | 1 | RECONSTRUCT INTERSECTION WITH CONCRETE PAVING | 0.0 |
0189-01-011 | Red River/ Paris | SH 37 | Actual | $3,329,244 | 8 | SAFETY TREAT FIXED OBJECTS, TEXTURIZE SHOULDERS | 6.5 |
1423-01-034 | Refugio/ Corpus Christi | FM 1360 | Actual | $1,306,334 | 1 | SAFETY TRT FIXED OBJ, WIDEN LANES, WIDEN PAVED SHOULDERS | 3.5 |
0169-08-024 | Roberts/ Amarillo | US 60 | Actual | $12,995,352 | 11 | THICK OVERLAY AND JCP JOINT REPAIR | 1.0 |
0049-08-065 | Robertson/ Bryan | US 190 | Actual | $8,982,980 | 1 | CONSTRUCT TURN LANES AND PFC OVERLAY | 0.0 |
0344-02-047 | Runnels/ San Angelo | SH 158 | Actual | $250,000 | 8 | RAILROAD SIGNALS | 0.0 |
0495-04-065 | Smith/ Tyler | IH 20 | Actual | $14,479,479 | 1 | REALIGN & LENGTHEN WB EXIT & EB ENTRANCE RAMPS FOR US 69 | 5.0 |
0424-01-058 | Smith/ Tyler | SH 31 | Actual | $1,878,650 | 1 | RESURFACE ROADWAY W/PFC & UPGRADE BRIDGE RAIL & GUARD FENCE | 0.0 |
1603-03-040 | Tarrant/ Ft Worth | FM 1709 | Actual | $3,655,193 | 1 | REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS | 0.0 |
0902-00-169 | Tarrant/ Ft Worth | VA | Actual | $400,000 | 3 | EMISSIONS REDUCTION STRATEGIES FOR OZONE PRECURSORS INCL VOC | 0.0 |
0902-90-045 | Tarrant/ Ft Worth | VA | Actual | $1,242,298 | 3 | CONSTRUCT ALTERNATE TRANSPORTATION ROUTE CONSISTING OF | 4.0 |
0902-00-168 | Tarrant/ Ft Worth | VA | Actual | $400,000 | 3 | EMISSIONS REDUCTION STRATEGIES FOR OZONE PRECURSORS INCL VOC | 0.0 |
0014-16-276 | Tarrant/ Ft Worth | IH 35W | Actual | $977,455 | 6 | REPLACE BRIDGE & APPROACH RAILING/ADD SAFETY END | 0.0 |
0908-00-087 | Taylor/ Abilene | VA | Actual | $1,065,698 | 11 | SPOT PAVEMENT REPAIR | 0.0 |
0360-05-029 | Throckmorton/ Wichita Falls | US 380 | Actual | $3,013,336 | 1 | FULL DEPTH REPAIR AND OVERLAY | 0.0 |
0264-07-032 | Tom Green/ San Angelo | SL 306 | Actual | $4,253,182 | 1 | ACP OVERLAY | 0.0 |
0907-00-190 | Tom Green/ San Angelo | VA | Actual | $250,000 | 8 | RAILROAD SIGNALS | 0.0 |
0907-00-189 | Tom Green/ San Angelo | VA | Actual | $250,000 | 8 | RAILROAD SIGNALS | 0.0 |
0700-03-142 | Travis/ Austin | SH 71 | Actual | $4,146,079 | 1 | TOM AND PFC OVERLAY | 0.0 |
0914-04-301 | Travis/ Austin | VA | Actual | $566,693 | 3 | CONSTRUCT SIDEWALKS AND TRAFFIC CALMING | 0.0 |
0914-00-410 | Travis/ Austin | VA | Actual | $2,179,258 | 1 | INSTALL OR REBUILD TRAFFIC SIGNALS | 0.0 |
0440-06-018 | Travis/ Austin | SH 130 | Actual | $59,530,747 | 3 | ADD ONE LANE IN EACH DIRECTION | 0.0 |
0022-06-051 | Val Verde/ Laredo | US 90 | Actual | $474,691 | 1 | REHABILITATION OF EXISTING ROADWAY | 0.0 |
0917-19-050 | Washington/ Bryan | CS | Actual | $365,649 | 6 | REPLACE EXISTING BRIDGE CONSISTING OF GRADING, STRUCTURES, | 0.0 |
0086-01-091 | Webb/ Laredo | SH 359 | Actual | $28,607,885 | 1 | PROFILE EDGELINE MARKINGS, PROFILE CENTERLINE MARKINGS | 1.0 |
0043-09-135 | Wichita/ Wichita Falls | IH 44 | Actual | $8,930,359 | 1 | MILL & OVERLAY | 0.0 |
0903-03-114 | Wichita/ Wichita Falls | CS | Actual | $10,381 | 8 | 2017 FEDERAL SIGNAL PROGRAM | 0.0 |
0802-02-053 | Wichita/ Wichita Falls | FM 369 | Actual | $5,723,640 | 1 | ENCLOSE DRAINAGE DITCH | 5.5 |
0015-08-153 | Williamson/ Austin | IH 35 | Actual | $1,672,182 | 10 | LANDSCAPING AND IRRIGATION | 0.0 |
1202-01-020 | Williamson/ Austin | FM 972 | Actual | $9,621,491 | 1 | REHAB, ADD SHOULDER & SAFETY TREAT | 0.0 |
0292-02-040 | Winkler/ Odessa | SH 18 | Actual | $10,995,861 | 11 | ROADWAY REHABILITATION | 1.0 |
0352-01-061 | Wise/ Ft Worth | SH 114 | Actual | $4,988,364 | 1 | MILL, HMAC OVERLAY, PAVEMENT MARKINGS | 0.0 |
1179-01-043 | Wise/ Ft Worth | FM 920 | Actual | $3,315,175 | 1 | REPAIR BASE FAILURES, HMAC OVERLAY, PAVEMENT MARKINGS | 0.0 |
0461-08-023 | Yoakum/ Lubbock | SH 214 | Actual | $36,783,946 | 11 | SUPER 2 | 0.0 |
|