Letting Schedule for March, 2018 County (FY 2018)

Last Update: Wednesday, January 17, 2018
March, 2018 (FY 2018)(see Links)
SEP 2017 | OCT 2017 | NOV 2017 | DEC 2017 | JAN 2018 | FEB 2018 | MAR 2018 | APR 2018 | MAY 2018 | JUN 2018 | JUL 2018 | AUG 2018 |
CCSJCounty/
District
HighwayLet StatusContract
Cost
Fund
Cat
Description
1157-01-014Angelina/
Lufkin
FM 841Approved$1,079,8086REPLACE BRIDGE AND APPROACHES
0836-02-071Bell/
Waco
SH 195Approved$980,05211MILL AND OVERLAY
0915-12-577Bexar/
San Antonio
VAApproved$4,888,6601INSTALL ITS DYNAMIC GUIDE SIGNS/DYNAMIC MESSAGE BOARDS
0010-13-094Bowie/
Atlanta
US 67Approved$1,990,4958INSTALL CONTINUOUS TURN LANE, MILLED EDGELINE RUMBLE STRIPS
0010-19-012Bowie/
Atlanta
FM 991Approved$1,975,6198SAFETY TREAT FIXED OBJECTS
0586-01-066Brazoria/
Houston
SH 332Approved$3,248,2121SEAL COAT,LEVEL-UP,WITH LOOP DETECTORS AND 1.5" ACP OVERLAY
0178-04-005Brazoria/
Houston
FM 523Approved$1,033,1208IMPROVE TRAFFIC SIGNALS
0684-01-069Cameron/
Pharr
FM 511Approved$2,260,0001REHABILITATE PAVEMENT
0220-05-070Cameron/
Pharr
SH 48Approved$1,093,5007INSTALL TRAFFIC SIGNAL
0277-03-028Cass/
Atlanta
SH 77Approved$3,702,6771RESURFACE EXISTING 2-LANE HIGHWAY
0508-02-121Chambers/
Beaumont
IH 10Approved$386,1987EXTEND WB LEFT TURN LANE AND CONSTRUCT MEDIAN IMPROVEMENTS
0047-06-162Collin/
Dallas
US 75Approved$1,140,7711FULL DEPTH CONCRETE REPAIR
2745-01-008Collin/
Dallas
FM 2755Approved$1,995,2451BASE REPAIR AND OVERLAY
0253-03-072Comal/
San Antonio
US 281Approved$781,25311EXPAND 2 LANES TO 4 LANES DIVIDED RURAL
0182-02-038Comanche/
Brownwood
SH 36Approved$5,311,5581BASE OVERLAY,2 COURSE SURFACE TREATMENT, ACP
0196-03-262Dallas/
Dallas
IH 35EApproved$4,304,6571SLOPE FAILURE REPAIRS
0196-03-276Dallas/
Dallas
IH 35EApproved$4,710,6301SLOPE FAILURE REPAIR
1567-01-037Denton/
Dallas
FM 720Approved$18,048,0971WIDEN TWO LANE RURAL TO SIX LANES URBAN DIVIDED
0816-02-079Denton/
Dallas
FM 455Approved$1,471,8893INTERSECTION IMPROVEMENTS
0573-05-019Dewitt/
Yoakum
FM 240Approved$1,415,96211PAVEMENT REPAIR AND RESURFACING
0906-00-159Ector/
Odessa
VAApproved$1,027,3141PAVEMENT MARKINGS
3570-01-009Ector/
Odessa
FM 3503Approved$2,375,4511REALIGN EXISTING ROADWAY AND APPROACHES
0906-00-161Ector/
Odessa
VAApproved$980,0061PAVEMENT MARKINGS
0005-01-107Ector/
Odessa
BI 20-EApproved$11,928,2301ROADWAY REHABILITATION
0343-03-028Erath/
Ft Worth
SH 108Approved$7,962,5391WIDEN PAVEMENT, EXTEND CULVERTS, SEAL COAT, PAVEMENT MARKING
0978-02-078Galveston/
Houston
FM 3436Approved$658,3131REPLACE MBGF, 1 IN LEVEL UP AND 1 IN TOM
0500-01-145Galveston/
Houston
IH 45Approved$1,613,5661BASE REPAIR, MILLING, SEAL COAT, 1 TOM C AND 3/4 TOM F
0026-01-027Gonzales/
Yoakum
US 90Approved$2,956,1861PAVEMENT REPAIR AND RESURFACING
0202-08-063Grayson/
Paris
SH 289Approved$260,2802UREPLACE CULVERTS AND IMPROVE DRAINAGE
0703-02-059Hardin/
Beaumont
FM 92Approved$63,5108MILLED EDGELINE RUMBLE STRIPS
0178-01-036Harris/
Houston
SH 35Approved$1,710,7281CONCRETE REPAIR, PLANING, SEAL COAT, 1" TOM & PAV MARKINGS
0039-17-196Hidalgo/
Pharr
IH 2Approved$758,0006INSTALL DEFLECTION WALLS, SYSTEM PAINTING & SEAL JOINTS
0072-06-075Kendall/
San Antonio
IH 10Approved$63,007,2051RECONSTRUCT GRADE SEPARATION AT US 87 SOUTH "Y", RECONFIGURE
0052-13-005Lamb/
Lubbock
SL 430Approved$680,87911INTERSECTION & OPERATIONAL IMPROVEMENTS
0269-03-035Lavaca/
Yoakum
US 77AApproved$2,141,1928SAFETY TREAT FIXED OBJECTS, IMPROVE GUARDRAIL TO DESIGN STAN
0334-05-032Lee/
Austin
FM 141Approved$749,1311LEVEL-UP & SEAL COAT
0593-01-123Liberty/
Beaumont
SH 321Approved$1,300,0001RESURFACE ROADWAY
0831-02-020Limestone/
Waco
FM 342Approved$793,5078SAFETY TREAT FIXED OBJECTS
0905-00-075Lubbock/
Lubbock
VAApproved$637,56711TRAFFIC CONTROL DEVICES
0846-03-046Matagorda/
Yoakum
FM 521Approved$1,784,7991ACP OVERLAY
0209-07-045Mclennan/
Waco
FM 933Approved$1,165,7358SAFETY TREAT FIXED OBJECTS
0049-01-090Mclennan/
Waco
SH 6Approved$1,122,8901UNDERSEAL/LEVELUP/OVERLAY
0848-04-046Medina/
San Antonio
FM 462Approved$2,397,3701REHAB & WIDEN NARROW ROADWAY TO ADD SHOULDERS
2744-01-011Montgomery/
Houston
FM 2854Approved$22,408,3291RECONSTRUCT TO 4 LANE DIVIDED CURB AND GUTTER
0006-03-134Nolan/
Abilene
IH 20Approved$2,152,9981REHABILITATE ROADWAY,1-CST, OVERLAY
0902-39-021Palo Pinto/
Ft Worth
CRApproved$855,1226REPLACE BRIDGE AND APPROACHES
0177-01-103Polk/
Lufkin
US 59Approved$640,57211OVERLAY WITH PFC_(NORTH BOUND LANES ONLY)
0077-01-029Reagan/
San Angelo
US 67Approved$7,903,25011ACP OVERLAY
0221-02-026Red River/
Paris
US 271Approved$970,0808SAFETY TREAT FIXED OBJECTS
0479-01-019Reeves/
Odessa
SH 302Approved$11,822,44711ROADWAY REHABIITATION
0009-04-066Rockwall/
Dallas
SH 66Approved$2,549,3691SLOPE FAILURE REPAIR
0372-01-102San Patricio/
Corpus Christi
US 77Approved$5,013,8001OVERLAY ROADWAY (NB AND SB LANES)
3026-01-026San Patricio/
Corpus Christi
FM 2986Approved$14,400,0002MUPGRADE TO 5-LANE URBAN ROADWAY BY CONSTRUCTING ADDTNL 2
0063-06-098Shelby/
Lufkin
US 96Approved$10,712,58811PLANE, LEVEL-UP AND PFC
0910-16-125Smith/
Tyler
CRApproved$981,2986REPLACE BRIDGE AND APPROACHES
0492-05-026Smith/
Tyler
FM 346Approved$2,491,8731REPLACE BRIDGE & APPROACHES
0191-01-085Smith/
Tyler
US 69Approved$3,883,6461REPAIR & REPAVE ROADWAY
1330-01-063Tarrant/
Ft Worth
FM 1187Approved$2,543,2791REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS
1978-01-056Tarrant/
Ft Worth
FM 1938Approved$2,714,2241REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS
0902-90-025Tarrant/
Ft Worth
VAApproved$1,558,6743LYNN CREEK LINEAR PARK TRAIL EXTENSION FROM END POINT OF
2266-02-139Tarrant/
Ft Worth
SH 360Approved$2,063,8131REPAIR CONCRETE PAVEMENT FAILURES, DIAMOND GRIND, PAVEMENT
0733-03-054Taylor/
Abilene
FM 126Approved$1,259,8391OVERLAY
0011-01-036Taylor/
Abilene
SH 351Approved$1,832,8521MILL,SPOT REPAIR & OVERLAY
0908-00-085Taylor/
Abilene
VAApproved$514,1451BRIDGE REPAIR
0221-05-090Titus/
Atlanta
US 271Approved$2,577,6921RESURFACE EXISTING 2-LANE HIGHWAY
0914-00-397Travis/
Austin
VAApproved$1,749,5711FY 2018 NON-SITE SPECIFIC SIGNALS
3043-01-011Tyler/
Beaumont
FM 2992Approved$820,2418SAFETY TREAT FIXED OBJECTS, PROVIDE ADDITIONAL PAVED SURFACE
0024-01-103Uvalde/
San Antonio
US 90Approved$5,000,0001OVERLAY & PAVEMENT MARKINGS
0910-12-125Van Zandt/
Tyler
CRApproved$1,118,0506REPLACE BRIDGE AND APPROACHES
0522-03-026Van Zandt/
Tyler
FM 16Approved$513,9921IMPROVE INTERSECTION ALIGNMENT
0913-27-061Victoria/
Yoakum
CRApproved$1,736,7666REPLACE BRIDGE AND APPROACHES
0675-06-096Walker/
Bryan
IH 45Approved$8,437,4041FOR THE CONSTRUCTION OF AN OVERLAY CONSISTING OF MILLING,
0922-33-170Webb/
Laredo
CSApproved$1,056,2503ZACATE CREEK MULTI-USE ALTERNATIVE TRANSPORTATION TRAIL
0018-03-049Webb/
Laredo
IH 35Approved$1,332,9301NEW LOCATION TWO LANE HIGHWAY
0903-00-088Wichita/
Wichita Falls
VAApproved$496,9611SIGN UPGRADE


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract