Letting Schedule for March, 2018 County (FY 2018)
March, 2018 (FY 2018) | (see Links) |
SEP 2017 | OCT 2017 | NOV 2017 | DEC 2017 | JAN 2018 | FEB 2018 | MAR 2018 | APR 2018 | MAY 2018 | JUN 2018 | JUL 2018 | AUG 2018 | | |||||||
CCSJ | County/ District | Highway | Let Status | Contract Cost | Fund Cat | Description | DBE Goal |
---|---|---|---|---|---|---|---|
1157-01-014 | Angelina/ Lufkin | FM 841 | Actual | $1,083,170 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
2023-01-013 | Aransas/ Corpus Christi | FM 2165 | Actual | $11,828 | 10 | REPAIR OR REPLACE SCHOOL ZONE FLASHERS DAMAGED BY HIGH WINDS | 0.0 |
0180-04-125 | Aransas/ Corpus Christi | SH 35 | Actual | $11,834 | 10 | REPAIR OR REPLACE SCHOOL ZONE FLASHERS DAMAGED BY HIGH WINDS | 0.0 |
0507-04-047 | Aransas/ Corpus Christi | FM 1069 | Actual | $11,811 | 10 | REPAIR OR REPLACE SCHOOL ZONE FLASHERS DAMAGED BY HIGH WINDS | 0.0 |
0180-04-124 | Aransas/ Corpus Christi | BS 35-L | Actual | $11,839 | 10 | REPAIR OR REPLACE SCHOOL ZONE FLASHERS DAMAGED BY HIGH WINDS | 0.0 |
0180-04-126 | Aransas/ Corpus Christi | BS 35-L | Actual | $11,828 | 10 | REPAIR OR REPLACE SCHOOL ZONE FLASHERS DAMAGED BY HIGH WINDS | 0.0 |
0909-36-152 | Bell/ Waco | CS | Actual | $11,748,508 | 3 | CONSTRUCT ALTERNATE TRANSPORTATION ROUTE CONSISTING OF | 0.0 |
0836-02-071 | Bell/ Waco | SH 195 | Actual | $980,052 | 11 | MILL AND OVERLAY | 0.0 |
0010-13-094 | Bowie/ Atlanta | US 67 | Actual | $1,101,251 | 8 | INSTALL CONTINUOUS TURN LANE, MILLED EDGELINE RUMBLE STRIPS | 0.0 |
0010-19-012 | Bowie/ Atlanta | FM 991 | Actual | $1,975,619 | 8 | SAFETY TREAT FIXED OBJECTS | 0.0 |
0586-01-066 | Brazoria/ Houston | SH 332 | Actual | $3,248,212 | 1 | SEAL COAT,LEVEL-UP,WITH LOOP DETECTORS AND 1.5" ACP OVERLAY | 0.0 |
0178-04-005 | Brazoria/ Houston | FM 523 | Actual | $1,033,120 | 8 | IMPROVE TRAFFIC SIGNALS | 0.0 |
0684-01-069 | Cameron/ Pharr | FM 511 | Actual | $3,694,601 | 1 | REHABILITATE PAVEMENT | 3.5 |
0220-05-070 | Cameron/ Pharr | SH 48 | Actual | $1,219,567 | 3 | INSTALL TRAFFIC SIGNAL | 0.0 |
0277-03-027 | Cass/ Atlanta | SH 77 | Actual | $3,702,677 | 8 | TEXTURIZE SHOULDERS & CL TEXTURING | 0.0 |
0508-02-121 | Chambers/ Beaumont | IH 10 | Actual | $263,502 | 1 | EXTEND WB LEFT TURN LANE AND CONSTRUCT MEDIAN IMPROVEMENTS | 0.0 |
0047-06-162 | Collin/ Dallas | US 75 | Actual | $1,120,627 | 1 | FULL DEPTH CONCRETE REPAIR | 0.0 |
2745-01-008 | Collin/ Dallas | FM 2755 | Actual | $1,672,085 | 1 | BASE REPAIR AND OVERLAY | 0.0 |
0918-24-214 | Collin/ Dallas | CS | Actual | $2,115,509 | 3 | COTTONWOOD CREEK TRAIL EXTENSION - CONSTRUCT HIKE AND BIKE | 0.0 |
0182-02-038 | Comanche/ Brownwood | SH 36 | Actual | $5,314,298 | 1 | BASE OVERLAY,2 COURSE SURFACE TREATMENT, ACP | 0.0 |
0453-02-018 | Crosby/ Lubbock | US 62 | Actual | $10,655,730 | 1 | OVERLAY | 0.0 |
0196-03-262 | Dallas/ Dallas | IH 35E | Actual | $4,416,287 | 1 | SLOPE FAILURE REPAIRS | 3.0 |
0196-03-276 | Dallas/ Dallas | IH 35E | Actual | $4,545,956 | 1 | SLOPE FAILURE REPAIR | 3.0 |
1567-01-037 | Denton/ Dallas | FM 720 | Actual | $15,258,078 | 1 | WIDEN TWO LANE RURAL TO SIX LANES URBAN DIVIDED | 0.0 |
0816-02-079 | Denton/ Dallas | FM 455 | Actual | $1,981,815 | 3 | INTERSECTION IMPROVEMENTS | 0.0 |
0573-05-019 | Dewitt/ Yoakum | FM 240 | Actual | $1,415,962 | 11 | PAVEMENT REPAIR AND RESURFACING | 0.0 |
0005-01-107 | Ector/ Odessa | BI 20-E | Actual | $11,524,746 | 1 | ROADWAY REHABILITATION | 0.0 |
0906-00-161 | Ector/ Odessa | VA | Actual | $980,506 | 1 | PAVEMENT MARKINGS | 0.0 |
0906-00-159 | Ector/ Odessa | VA | Actual | $1,027,314 | 1 | PAVEMENT MARKINGS | 0.0 |
0924-06-436 | El Paso/ El Paso | CS | Actual | $32,000,000 | 3 | WIDEN 4-LANE DIVIDED TO 6-LANE DIVIDED | 0.0 |
2552-03-063 | El Paso/ El Paso | SL 375 | Actual | $3,042,389 | 2M | CONSTRUCT TYPE 1 NOISE WALLS (ON JOE BATTLE BLVD AT AL ROBER | 0.0 |
0343-03-028 | Erath/ Ft Worth | SH 108 | Actual | $9,079,687 | 1 | WIDEN PAVEMENT, EXTEND CULVERTS, SEAL COAT, PAVEMENT MARKING | 7.0 |
0978-02-078 | Galveston/ Houston | FM 3436 | Actual | $658,313 | 1 | REPLACE MBGF, 1 IN LEVEL UP AND 1 IN TOM | 0.0 |
0500-01-145 | Galveston/ Houston | IH 45 | Actual | $1,613,566 | 1 | BASE REPAIR, MILLING, SEAL COAT, 1 IN TOM C AND 3/4 IN TOM F | 0.0 |
0026-01-027 | Gonzales/ Yoakum | US 90 | Actual | $2,940,046 | 1 | PAVEMENT REPAIR AND RESURFACING | 0.0 |
0202-08-063 | Grayson/ Paris | SH 289 | Actual | $260,280 | 2U | REPLACE CULVERTS AND IMPROVE DRAINAGE | 0.0 |
0703-02-059 | Hardin/ Beaumont | FM 92 | Actual | $63,510 | 8 | MILLED EDGELINE RUMBLE STRIPS | 0.0 |
0178-01-036 | Harris/ Houston | SH 35 | Actual | $1,742,028 | 1 | CONCRETE REPAIR, PLANING, SEAL COAT, 1" TOM & PAV MARKINGS | 0.0 |
0912-00-521 | Harris/ Houston | VA | Actual | $4,000,000 | 1 | ITS SUPPORT (TRANSTAR) (NON-LET) | 0.0 |
0912-00-524 | Harris/ Houston | VA | Actual | $1,500,000 | 1 | UPGRADE DMS BOARDS (NON LETTING) | 0.0 |
0039-17-196 | Hidalgo/ Pharr | IH 2 | Actual | $1,227,278 | 6 | INSTALL DEFLECTION WALLS, SYSTEM PAINTING & SEAL JOINTS | 0.0 |
0072-06-075 | Kendall/ San Antonio | IH 10 | Actual | $66,720,889 | 1 | RECONSTRUCT GRADE SEPARATION AT US 87 SOUTH "Y", RECONFIGURE | 0.0 |
0052-13-005 | Lamb/ Lubbock | SL 430 | Actual | $680,879 | 11 | INTERSECTION & OPERATIONAL IMPROVEMENTS | 0.0 |
0269-03-035 | Lavaca/ Yoakum | US 77A | Actual | $2,141,192 | 8 | SAFETY TREAT FIXED OBJECTS, IMPROVE GUARDRAIL TO DESIGN STAN | 5.5 |
0593-01-123 | Liberty/ Beaumont | SH 321 | Actual | $1,289,749 | 1 | RESURFACE ROADWAY | 0.0 |
0831-02-020 | Limestone/ Waco | FM 342 | Actual | $737,363 | 8 | SAFETY TREAT FIXED OBJECTS | 4.0 |
0905-00-075 | Lubbock/ Lubbock | VA | Actual | $637,567 | 11 | TRAFFIC CONTROL DEVICES | 0.0 |
0846-03-046 | Matagorda/ Yoakum | FM 521 | Actual | $1,784,799 | 1 | ACP OVERLAY | 0.0 |
0209-07-045 | Mclennan/ Waco | FM 933 | Actual | $1,072,703 | 8 | SAFETY TREAT FIXED OBJECTS | 6.0 |
0049-01-090 | Mclennan/ Waco | SH 6 | Actual | $1,122,890 | 1 | UNDERSEAL/LEVELUP/OVERLAY | 0.0 |
0848-04-046 | Medina/ San Antonio | FM 462 | Actual | $2,397,370 | 1 | REHAB & WIDEN NARROW ROADWAY TO ADD SHOULDERS | 5.0 |
2744-01-011 | Montgomery/ Houston | FM 2854 | Actual | $22,853,755 | 1 | RECONSTRUCT TO 4 LANE DIVIDED CURB AND GUTTER | 6.5 |
0006-03-134 | Nolan/ Abilene | IH 20 | Actual | $2,154,098 | 1 | REHABILITATE ROADWAY,1-CST, OVERLAY | 2.5 |
0902-39-021 | Palo Pinto/ Ft Worth | CR | Actual | $855,122 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
0177-01-103 | Polk/ Lufkin | US 59 | Actual | $640,572 | 11 | OVERLAY WITH PFC_(NORTH BOUND LANES ONLY) | 0.0 |
0203-12-007 | Rains/ Paris | FM 2795 | Actual | $1,144,445 | 3 | CONSTRUCT SIDEWALK | 0.0 |
0077-01-029 | Reagan/ San Angelo | US 67 | Actual | $7,687,745 | 11 | ACP OVERLAY | 0.0 |
0221-02-026 | Red River/ Paris | US 271 | Actual | $970,080 | 8 | SAFETY TREAT FIXED OBJECTS | 5.0 |
0479-01-019 | Reeves/ Odessa | SH 302 | Actual | $11,565,347 | 11 | ROADWAY REHABIITATION | 0.0 |
0009-04-066 | Rockwall/ Dallas | SH 66 | Actual | $2,594,369 | 1 | SLOPE FAILURE REPAIR | 0.0 |
0372-01-102 | San Patricio/ Corpus Christi | US 77 | Actual | $5,366,334 | 1 | OVERLAY ROADWAY (NB AND SB LANES) | 1.0 |
0063-06-098 | Shelby/ Lufkin | US 96 | Actual | $10,452,733 | 11 | PLANE, LEVEL-UP AND PFC | 0.0 |
0191-01-085 | Smith/ Tyler | US 69 | Actual | $3,783,276 | 1 | REPAIR & REPAVE ROADWAY | 0.0 |
0492-05-026 | Smith/ Tyler | FM 346 | Actual | $2,495,603 | 1 | REPLACE BRIDGE & APPROACHES | 2.0 |
0910-16-125 | Smith/ Tyler | CR | Actual | $905,229 | 6 | REPLACE BRIDGE AND APPROACHES | 3.0 |
0902-90-027 | Tarrant/ Ft Worth | VA | Actual | $366,646 | 3 | 10' MULTI USE TRAIL ON N SIDE OF MT. RD; SRTS RIDGEVIEW ELEM | 0.0 |
1330-01-063 | Tarrant/ Ft Worth | FM 1187 | Actual | $2,531,699 | 1 | REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS | 0.0 |
1978-01-056 | Tarrant/ Ft Worth | FM 1938 | Actual | $2,714,224 | 1 | REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS | 0.0 |
0747-04-073 | Tarrant/ Ft Worth | FM 157 | Actual | $340,000 | 3 | INSTALLATION OF FULL TRAFFIC SIGNAL & CROSSWALK | 0.0 |
2266-02-139 | Tarrant/ Ft Worth | SH 360 | Actual | $2,063,813 | 1 | REPAIR CONCRETE PAVEMENT FAILURES, DIAMOND GRIND, PAVEMENT | 0.0 |
0908-00-085 | Taylor/ Abilene | VA | Actual | $514,145 | 1 | BRIDGE REPAIR | 0.0 |
0011-01-036 | Taylor/ Abilene | SH 351 | Actual | $1,832,852 | 1 | MILL,SPOT REPAIR & OVERLAY | 0.0 |
0733-03-054 | Taylor/ Abilene | FM 126 | Actual | $1,259,839 | 1 | OVERLAY | 0.0 |
0221-05-090 | Titus/ Atlanta | US 271 | Actual | $2,629,224 | 1 | RESURFACE EXISTING 2-LANE HIGHWAY | 0.0 |
0914-00-397 | Travis/ Austin | VA | Actual | $1,621,296 | 1 | FY 2018 NON-SITE SPECIFIC SIGNALS | 0.0 |
0914-00-403 | Travis/ Austin | VA | Actual | $2,625,000 | 7 | PURCHASE 6 BUSES FOR CARTS | 0.0 |
3043-01-011 | Tyler/ Beaumont | FM 2992 | Actual | $499,639 | 1 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | 0.0 |
0024-01-103 | Uvalde/ San Antonio | US 90 | Actual | $6,486,844 | 1 | OVERLAY & PAVEMENT MARKINGS | 0.0 |
0910-12-125 | Van Zandt/ Tyler | CR | Actual | $1,009,557 | 6 | REPLACE BRIDGE AND APPROACHES | 3.0 |
0522-03-026 | Van Zandt/ Tyler | FM 16 | Actual | $471,971 | 1 | IMPROVE INTERSECTION ALIGNMENT | 0.0 |
0913-27-061 | Victoria/ Yoakum | CR | Actual | $1,736,766 | 6 | REPLACE BRIDGE AND APPROACHES | 3.0 |
0675-06-096 | Walker/ Bryan | IH 45 | Actual | $8,437,404 | 1 | FOR THE CONSTRUCTION OF AN OVERLAY CONSISTING OF MILLING, | 0.0 |
0018-03-049 | Webb/ Laredo | IH 35 | Actual | $1,462,613 | 1 | NEW LOCATION TWO LANE HIGHWAY | 3.0 |
0903-00-088 | Wichita/ Wichita Falls | VA | Actual | $523,097 | 1 | SIGN UPGRADE | 0.0 |
|