0109-02-026 | Anderson/ Tyler | US 287 | Actual | $4,115,723 | 1 | REPAIR & RESURFACE ROADWAY | 0.0 |
0911-38-069 | Angelina/ Lufkin | CR | Actual | $359,675 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
0200-02-039 | Angelina/ Lufkin | US 69 | Actual | $72,924,632 | 1 | WIDEN FROM 2 LANES TO 4 LANE DIVIDED RURAL | 5.5 |
0613-02-063 | Atascosa/ San Antonio | SH 16 | Actual | $5,233,336 | 1 | REPLACE EXISTING BRIDGE | 0.0 |
0156-06-052 | Baylor/ Wichita Falls | US 82 | Actual | $4,156,857 | 1 | RE-ALIGN ROADWAY | 2.0 |
0232-05-016 | Bell/ Waco | FM 2305 | Actual | $852,513 | 1 | SEAL AND OVERLAY | 0.0 |
3508-01-028 | Bexar/ San Antonio | SH 151 | Actual | $10,221,196 | 1 | OVERLAY & PAVEMENT MARKINGS ON FRONTAGE ROADS | 0.0 |
0017-09-104 | Bexar/ San Antonio | IH 35 | Actual | $387,594 | 10 | LANDSCAPE PLANTING AND IRRIGATION | 0.0 |
0072-12-198 | Bexar/ San Antonio | IH 10 | Actual | $1,462,423 | 1 | INTERSECTION AND OPERATIONAL IMPROVEMENTS | 0.0 |
0025-02-160 | Bexar/ San Antonio | IH 10 | Actual | $112,476,087 | 1 | EXPAND FROM 4 TO 6 LANE EXPRESSWAY | 0.0 |
0017-10-280 | Bexar/ San Antonio | IH 35 | Actual | $5,055,011 | 1 | CONSTRUCT SIDEWALKS ALONG FRONTAGE ROADS | 8.0 |
0915-00-168 | Bexar/ San Antonio | VA | Actual | $1,413,507 | 10 | CONSTRUCT CURB RAMPS AT VARIOUS LOCATIONS IN ATASCOSA, | 6.0 |
0915-00-179 | Bexar/ San Antonio | VA | Actual | $1,504,865 | 10 | CONSTRUCT CURB RAMPS AT VARIOUS LOCATIONS IN BANDERA AND | 6.0 |
0521-06-144 | Bexar/ San Antonio | IH 410 | Actual | $1,449,247 | 1 | HIGH MAST AND CONTINUOUS ILLUMINATION | 0.0 |
1024-01-074 | Chambers/ Beaumont | FM 565 | Actual | $1,939,139 | 1 | WIDEN PAVED SURFACE WIDTH, INSTALL CONTINUOUS TURN LANE | 5.5 |
0123-03-021 | Cherokee/ Tyler | US 84 | Actual | $2,950,223 | 1 | PLANE, REPAIR & RESURFACE ROADWAY | 0.0 |
0636-01-038 | Coleman/ Brownwood | SH 153 | Actual | $2,320,019 | 8 | MILLED EDGELINE/CENTERLINE RUMBLE STRIPS | 0.0 |
0091-03-027 | Collin/ Dallas | SH 289 | Actual | $1,374,631 | 1 | INSTALLATION OF TRAFFIC SIGNALS | 0.0 |
0823-01-029 | Cooke/ Wichita Falls | FM 373 | Actual | $3,305,240 | 1 | EXTEND CULVERTS | 5.5 |
0229-03-035 | Crane/ Odessa | US 385 | Actual | $26,011,706 | 1 | WIDENING TO AN ULTIMATE 4-LANE DIVIDED HIGHWAY | 5.0 |
7106-05-001 | Crane/ Odessa | RL SO | Actual | $5,637,290 | RL | REHABILITATION OF SOUTH ORIENT RR TO 25 MPH TRACK SPEEDS | 0.0 |
7107-04-001 | Crockett/ San Angelo | RL SO | Actual | $435,505 | RL | REHABILITATION OF SOUTH ORIENT RR TO 25 MPH TRACK SPEEDS | 0.0 |
0040-01-050 | Dallam/ Amarillo | US 87 | Actual | $11,406,918 | 8 | MILLED EDGELINE RUMBLE STRIPS | 0.0 |
0918-00-273 | Dallas/ Dallas | VA | Actual | $1,640,000 | 3 | AIR QUALITY MARKETING AND EDUCATION PROGRAM | 0.0 |
0095-13-040 | Dallas/ Dallas | IH 20 | Actual | $3,371,473 | 10 | LANDSCAPE TREATMENT OF RIGHT OF WAY AND MEDIANS | 0.0 |
0918-47-176 | Dallas/ Dallas | CS | Actual | $3,519,866 | 11 | DRAINAGE IMPROVEMENTS | 0.0 |
2374-02-143 | Dallas/ Dallas | IH 635 | Actual | $345,610 | 5 | CONSTRUCT SIDEWALKS ON APPROACHES & IMPLEMENT PEDESTRIAN | 0.0 |
0143-09-070 | Dewitt/ Yoakum | US 87 | Actual | $107,997 | 10 | LANDSCAPE DEVELOPMENT ON US 87 IN CUERO | 0.0 |
0127-02-142 | Eastland/ Brownwood | US 183 | Actual | $13,671,388 | 1 | RECONSTRUCT URBAN ROADWAY | 6.0 |
0004-06-036 | Ector/ Odessa | IH 20 | Actual | $6,517,125 | 8 | INSTALL MEDIAN BARRIER | 0.0 |
0924-06-547 | El Paso/ El Paso | CS | Actual | $985,558 | 3 | CONSTRUCTION OF PEDESTRIAN AND BIKE ENHANCEMENTS (TO INCLUDE | 0.0 |
1051-01-037 | Ellis/ Dallas | FM 664 | Actual | $30,899,007 | 11 | WIDEN FROM 2 LANES TO 6 LANES URBAN DIVIDED, INCLUDING | 7.5 |
1394-02-026 | Ellis/ Dallas | FM 1387 | Actual | $1,128,587 | 8 | SAFETY TREAT FIXED OBJECTS,CONSTRUCT PAVED SHOULDERS (1-4FT) | 4.5 |
1257-01-049 | Fort Bend/ Houston | FM 1092 | Actual | $2,554,182 | 7 | CONSTRUCT DEDICATED TURN LANES, UPGRADE TRAFFIC SIGNALS AND | 5.5 |
0017-06-084 | Frio/ San Antonio | IH 35 | Actual | $15,802,905 | 1 | REHAB EXISTING FRONTAGE ROADS | 3.5 |
0367-02-075 | Galveston/ Houston | SH 87 | Actual | $18,290,225 | 11 | REHABILITATE AND RAISE ROADWAY | 2.5 |
0045-04-066 | Grayson/ Paris | SH 56 | Actual | $498,450 | 3 | CONSTRUCT SHARED USE PATH AND STREETSCAPE | 0.0 |
0500-03-583 | Harris/ Houston | IH 45 | Actual | $2,091,866 | 1 | RESTORATION OF FRONTAGE ROADS | 0.0 |
0389-05-116 | Harris/ Houston | SH 146 | Actual | $192,651,736 | 2M | WIDEN TO 6-LANES WITH 4-LANE EXPRESS LANES | 7.0 |
3256-01-111 | Harris/ Houston | SL 8 | Actual | $473,750 | 10 | LANDSCAPE DEVELOPMENT | 0.0 |
1005-02-001 | Harris/ Houston | FM 525 | Actual | $1,905,026 | 1 | REMOVE BOTTLENECK BY WIDENING FROM 2 TO 4 LANES DIVIDED | 4.0 |
0912-72-333 | Harris/ Houston | CS | Actual | $948,218 | 6 | REPLACE BRIDGE AND APPROACHES (NBI #12102B36609271) | 4.5 |
0912-72-366 | Harris/ Houston | CR | Actual | $5,097,000 | 3 | CONSTRUCT GEOMETRIC IMPROVEMENTS AND ITS/TRAFFIC SIGNAL | 0.0 |
3510-06-015 | Harris/ Houston | SH 99 | Actual | $2,359,260 | 1 | CONSTRUCT SOUNDWALL | 0.0 |
0843-06-021 | Harrison/ Atlanta | FM 450 | Actual | $810,719 | 8 | RAILROAD CROSSING UPGRADES | 0.0 |
0495-08-110 | Harrison/ Atlanta | IH 20 | Actual | $1,975,599 | 6 | BRIDGE PREVENTATIVE MAINTENANCE | 0.0 |
0109-06-040 | Houston/ Lufkin | SH 19 | Actual | $890,156 | 8 | IMPROVE GUARDRAIL TO DESIGN STANDARD/SAFETY TREAT FIXED | 5.0 |
0005-05-111 | Howard/ Abilene | IH 20 | Actual | $573,322 | 8 | INSTALL MEDIAN BARRIER | 0.0 |
0415-01-025 | Jeff Davis/ El Paso | SH 118 | Actual | $233,352 | 8 | IMPROVE GUARDRAIL TO DESIGN STANDARDS | 0.0 |
0028-07-052 | Jefferson/ Beaumont | US 90 | Actual | $277,678 | 6 | UPGRADE BRIDGE AND APPROACH RAILING | 0.0 |
3207-01-011 | Johnson/ Ft Worth | FM 3136 | Actual | $5,913,805 | 1 | WIDEN PAVEMENT, EXTEND CULVERTS, PAVEMENT MARKING | 6.5 |
0014-03-095 | Johnson/ Ft Worth | IH 35W | Actual | $10,982,248 | 1 | REPAIR CONCRETE FAILURES, MILL, HMAC OVERLAY, PAVEMENT | 1.0 |
0014-03-096 | Johnson/ Ft Worth | IH 35W | Actual | $565,686 | 8 | SAFETY LIGHTING | 0.0 |
3372-01-016 | Johnson/ Ft Worth | FM 3391 | Actual | $2,217,686 | 1 | REPAIR BASE FAILURES, HMAC OVERLAY, PAVEMENT MARKINGS | 0.0 |
0100-10-015 | Karnes/ Corpus Christi | BU 181F | Actual | $5,545,328 | 1 | 2018 DISTRICT WIDE SEAL COAT PROJECT LOW CONTROL CSJ | 0.0 |
0231-01-056 | Lampasas/ Brownwood | US 190 | Actual | $1,221,675 | 1 | PLANING AND ACP OVERLAY | 0.0 |
0334-05-032 | Lee/ Austin | FM 141 | Actual | $1,265,805 | 1 | LEVEL-UP & SEAL COAT | 0.0 |
1206-01-018 | Live Oak/ Corpus Christi | FM 1358 | Actual | $2,850,575 | 1 | REPLACE BRIDGE AND APPROACHES | 2.5 |
0071-05-031 | Mason/ Austin | US 87 | Actual | $3,081,554 | 1 | REPAIR, LEVEL-UP & SEAL COAT | 0.0 |
0605-01-064 | Matagorda/ Yoakum | FM 457 | Actual | $3,100,209 | 1 | PAVEMENT REPAIR AND RESURFACING | 0.0 |
2561-01-011 | Mcculloch/ Brownwood | SH 71 | Actual | $2,743,820 | 1 | REHAB EXISTING ROADWAY | 0.0 |
0542-05-017 | Mcmullen/ San Antonio | US 59 | Actual | $187,883 | 1 | 2018 HOT RUBBER SEAL PROJECT | 0.0 |
0380-09-087 | Midland/ Odessa | BS 349C | Actual | $8,411,644 | 1 | ROADWAY REHABILITATION | 4.0 |
1407-02-023 | Nacogdoches/ Lufkin | FM 1638 | Actual | $2,764,682 | 8 | SAFETY TREAT FIXED OBJECTS; PROVIDE ADDITIONAL PAVED SURFACE | 0.0 |
0893-01-034 | Nacogdoches/ Lufkin | FM 226 | Actual | $1,082,944 | 8 | IMPROVE GUARDRAIL TO DESIGN STANDARDS,SAFETY TREAT FIXED | 5.5 |
0997-03-007 | Navarro/ Dallas | FM 667 | Actual | $20,052,563 | 1 | REHABILITATE EXISTING ROADWAY AND ADD SHOULDERS | 4.0 |
0916-00-086 | Nueces/ Corpus Christi | VA | Actual | $1,361,810 | 1 | DISTRICT WIDE SIGN REPLACEMENT | 0.0 |
0102-01-088 | Nueces/ Corpus Christi | SH 44 | Actual | $34,109,727 | 1 | UPGRADE FROM 4-LN DIVIDED HWY TO 4-LN FREEWAY W/FTRG | 5.5 |
0102-01-116 | Nueces/ Corpus Christi | BS 44D | Actual | $3,202,151 | 1 | 2018 HOT RUBBER SEAL PROJECT | 0.0 |
0617-01-196 | Nueces/ Corpus Christi | SH 358 | Actual | $6,115,731 | 1 | NOVACHIP ROADWAY | 3.0 |
0883-02-086 | Orange/ Beaumont | FM 105 | Actual | $1,372,419 | 1 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH, MILLED EDGELINE | 0.0 |
0008-09-036 | Parker/ Ft Worth | FM 5 | Actual | $5,652,592 | 1 | REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS | 0.0 |
1601-02-032 | Parker/ Ft Worth | FM 1884 | Actual | $113,741 | 3 | INSTALLATION OF TRAFFIC ACTUATED SIGNAL | 0.0 |
0168-01-029 | Parmer/ Lubbock | US 60 | Actual | $19,960,374 | 1 | REHABILITATION OF EXISTING ROADWAY | 0.0 |
0928-02-020 | Polk/ Lufkin | FM 350 | Actual | $1,793,394 | 8 | IMPROVE GUARDRAIL TO DESIGN STANDARDS, SAFETY TREAT FIXED | 6.0 |
0090-05-095 | Potter/ Amarillo | SL 279 | Actual | $1,519,750 | 8 | IMPROVE TRAFFIC SIGNALS | 0.0 |
1639-01-014 | Reeves/ Odessa | FM 1450 | Actual | $8,074,513 | 1 | ROADWAY REHABILITATION | 0.0 |
0139-04-045 | Reeves/ Odessa | US 285 | Actual | $30,721,831 | 1 | ROADWAY WIDENING TO A MODIFIED SUPER 2 | 4.0 |
0626-01-007 | Reeves/ Odessa | PR 30B | Actual | $448,565 | 10 | REHABILITATE STATE PARK ROADS AND PARKING LOTS | 0.0 |
1015-01-023 | Rockwall/ Dallas | FM 3549 | Actual | $10,231,299 | 11 | WIDEN FROM 2 LANE RURAL TO 4 LANE URBAN DIVIDED | 6.0 |
0158-01-080 | Runnels/ San Angelo | US 67 | Actual | $95,835 | 1 | REPAIR BRIDGE RAILINGS | 0.0 |
0138-04-046 | Rusk/ Tyler | US 259 | Actual | $5,863,095 | 1 | REPAIR & REPAVE ROADWAY-NBL ONLY | 0.0 |
0907-26-004 | Schleicher/ San Angelo | CS | Actual | $517,129 | 3 | SIDEWALKS AND TRAFFIC SAFETY IMPROVEMENTS | 0.0 |
0902-48-744 | Tarrant/ Ft Worth | CR | Actual | $2,677,658 | 6 | REPLACE AND RELOCATE BRIDGE AND APPROACH | 2.0 |
0008-05-027 | Tarrant/ Ft Worth | SH 180 | Actual | $7,359,569 | 1 | REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS | 0.0 |
0363-01-146 | Tarrant/ Ft Worth | SH 26 | Actual | $358,098 | 11 | INSTALLATION OF LANDSCAPING AND IRRIGATION WITHIN MEDIANS OF | 0.0 |
0006-04-072 | Taylor/ Abilene | IH 20 | Actual | $697,909 | 6 | REPLACE BRIDGE AND APPROACH RAILING OR | 0.0 |
0006-18-058 | Taylor/ Abilene | BI 20-R | Actual | $6,206,482 | 1 | OVERLAY AND TRAFFIC SIGNAL UPGRADES | 0.0 |
1200-03-055 | Travis/ Austin | FM 973 | Actual | $420,763 | 3 | CONSTRUCT RIGHT AND LEFT TURN LANES | 0.0 |
0914-00-398 | Travis/ Austin | VA | Actual | $1,940,488 | 1 | FY 2018 SITE SPECIFIC SIGNALS | 0.0 |
0877-03-025 | Tyler/ Beaumont | FM 256 | Actual | $598,911 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
0248-05-064 | Upshur/ Atlanta | US 271 | Actual | $5,482,194 | 1 | RESURFACE EXISTING 4-LANE HIGHWAY | 0.0 |
0088-06-004 | Victoria/ Yoakum | BU 59-T | Actual | $367,368 | 8 | IMPROVE TRAFFIC SIGNALS | 0.0 |
0088-05-085 | Victoria/ Yoakum | US 59 | Actual | $24,531,769 | 1 | UPGRADE TO RURAL FREEWAY | 0.0 |
2350-01-057 | Victoria/ Yoakum | SL 463 | Actual | $6,933,390 | 1 | PAVEMENT REPAIR AND RESURFACING | 0.0 |
0913-09-073 | Wharton/ Yoakum | CR | Actual | $1,100,438 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
0043-06-088 | Wilbarger/ Wichita Falls | US 70 | Actual | $1,713,073 | 1 | MILL HOT MIX ON BRIDGE AND APPROACHES | 0.0 |
1566-01-011 | Williamson/ Austin | FM 1660 | Actual | $2,446,755 | 1 | DEPTH REPAIR, UNDERSEAL & THIN OV | 0.0 |
1378-02-053 | Williamson/ Austin | RM 1431 | Actual | $988,635 | 11 | INSTALLATION OF A SOUND WALL ALONG THE NORTH RIGHT OF WAY | 0.0 |
0320-03-099 | Williamson/ Austin | SH 95 | Actual | $858,418 | 6 | REPLACE DECK AND STRUCTURAL REPAIRS | 0.0 |
0320-03-092 | Williamson/ Austin | SH 95 | Actual | $404,915 | 6 | BRIDGE WIDENING & REPLACE APPROACHES | 0.0 |
0910-35-035 | Wood/ Tyler | CS | Actual | $870,751 | 3 | W COKE RD PEDESTRIAN SAFE RT & WINNSBORO ELEMENTARY SRTS | 0.0 |
|