Letting Schedule for November, 2017 County (FY 2018)

Last Update: Monday, August 27, 2018
November, 2017 (FY 2018)(see Links)
SEP 2017 | OCT 2017 | NOV 2017 | DEC 2017 | JAN 2018 | FEB 2018 | MAR 2018 | APR 2018 | MAY 2018 | JUN 2018 | JUL 2018 | AUG 2018 |
CCSJCounty/
District
HighwayLet StatusContract
Cost
Fund
Cat
DescriptionDBE Goal
2960-01-012Angelina/
Lufkin
FM 1194Actual$451,9248PROVIDE ADDITIONAL PAVED SURFACE WIDTH0.0
0187-02-066Austin/
Yoakum
SH 36Actual$1,524,4631ACP OVERLAY0.0
2412-02-014Bee/
Corpus Christi
FM 351Actual$3,660,5701MILL AND INLAY0.0
0015-05-049Bell/
Waco
FM 817Actual$1,420,0366TRUSS CLEANING AND PAINTING0.0
0231-04-056Bell/
Waco
US 190Actual$1,074,5891SAFETY TREAT FIXED OBJECTS4.5
0915-12-583Bexar/
San Antonio
CSActual$1,716,0003CONSTRUCT NEW DRAINAGE STRUCTURE AND WIDEN SIDEWALKS0.0
0915-12-545Bexar/
San Antonio
CSActual$2,119,0723RECONSTRUCT ROADWAY WITH SIDEWALKS AND BIKE LANES0.0
0217-02-035Bowie/
Atlanta
US 71Actual$397,2093IMPROVE TRAFFIC SIGNAL, INSTALL ADVANCE WARNING SIGNS,0.0
0255-05-040Brooks/
Pharr
US 281Actual$2,634,4271OVERLAY NORTH & SOUTH BOUND LANES0.0
0918-24-213Collin/
Dallas
CSActual$354,1693SCHOOL PEDESTRIAN SAFETY ENHANCEMENT - SIDEWALK IMPROVEMENTS0.0
0918-00-275Dallas/
Dallas
VAActual$2,916,1931INSTALLATION OF TRAFFIC SIGNALS2.5
0918-47-136Dallas/
Dallas
CSActual$3,999,9553FM 1382 HIKE AND BIKE TRAIL (PHASE 2)0.0
2374-01-180Dallas/
Dallas
IH 635Actual$15,137,4563CONSTRUCT NOISE WALLS AT VARIOUS LOCATIONS0.0
0918-47-137Dallas/
Dallas
CSActual$5,039,8563NORTHAVEN TRAIL (PHASES 2B AND 2C) -0.0
0941-01-024Dewitt/
Yoakum
FM 237Actual$968,5398SAFETY TREAT FIXED OBJECTS4.0
0007-04-126Eastland/
Brownwood
SH 206Actual$6,620,2721SEAL COAT0.0
0924-06-450El Paso/
El Paso
VAActual$1,964,35010CONSTRUCT CURB RAMPS AT VARIOUS LOCATIONS IN CLINT, EL PASO,7.0
0072-01-053Gillespie/
Austin
US 87Actual$1,115,1881MILL, SEAL & TOM0.0
0025-07-064Gonzales/
Yoakum
SH 97Actual$6,210,7921SEAL COAT0.0
0910-07-071Gregg/
Tyler
CSActual$5,78110REPAIR CULVERT AND ROADWAY0.0
3635-02-002Grimes/
Bryan
SH 249Actual$223,192,1813CONSTRUCT NEW LOCATION 2 LANE NON-TOLLED ROADWAY.0.0
0366-02-090Guadalupe/
San Antonio
SH 123Actual$795,5811INSTALL SIGNAL AND CONSTRUCT INTERSECTION OPERATIONAL4.0
0042-09-123Hall/
Childress
US 287Actual$4,762,7521ASPHALTIC CONCRETE PAVEMENT OVERLAY0.0
0912-71-386Harris/
Houston
MHActual$20,207,01411CONSTRUCT 4-LN DIVIDED (RAISED MEDIAN) URBAN STREET FACILITY8.0
0912-00-551Harris/
Houston
VAActual$3,875,0003CLEAN CITIES/CLEAN VEHICLES PROGRAM (ENGINE/VEHICLE0.0
0912-71-799Harris/
Houston
CSActual$2,846,48811SHARED USE PATH AND BRIDGE RESTORATION3.5
3256-01-109Harris/
Houston
SL 8Actual$597,08011CONSTRUCT 6 TO 8 FT SIDEWALK4.0
0471-02-071Hays/
Austin
SH 21Actual$922,2501REPAIR LEVEL UP AND SEAL COAT0.0
0030-07-019Hemphill/
Amarillo
US 83Actual$15,225,9231SEALCOAT0.0
0197-06-047Henderson/
Tyler
US 175Actual$11,97010MONITOR REMOVAL & REMOVE DEBRIS FROM TORNADO EVENT, APR-20170.0
0117-07-041Houston/
Lufkin
SH 7Actual$8,650,9581RESURFACE WITH SEAL COAT0.0
0005-06-116Howard/
Abilene
IH 20Actual$1,097,9731INSTALL INTERSECTION FLASHING BEACON, ADVANCE WARNINING0.0
1493-01-017Hunt/
Paris
FM 1569Actual$3,744,3731REHABILITATION OF EXISTING ROAD5.5
0141-08-047Kimble/
San Angelo
IH 10Actual$7,994,6511ACP OVERLAY0.0
0052-04-050Lamb/
Lubbock
US 84Actual$14,493,3031SEAL COAT0.0
0114-07-080Lee/
Austin
US 290Actual$908,7566REHABILITATE BRIDGE FOR THE BRIDGE MAINTENANCE AND3.0
0005-04-071Martin/
Odessa
IH 20Actual$7,645,5491REHABILITATION OF EXISTING ROAD1.0
3635-01-001Montgomery/
Houston
SH 249Actual$299,257,1803CONSTRUCT 4 LANE TOLLWAY IN SECTIONS0.0
0720-02-086Montgomery/
Houston
SH 249Actual$238,2651INSTALL PAVEMENT MARKINGS0.0
0090-05-097Potter/
Amarillo
IH 40Actual$1,969,8971INTERSECTION IMPROVEMENTS AT RM 2381 (BUSHLAND)3.0
0427-02-009Red River/
Paris
FM 1158Actual$2,730,7511REHABILITATION OF EXISTING ROAD2.5
0175-09-020Rusk/
Tyler
US 59Actual$117,1971RESURFACE WITH SEAL COAT0.0
0910-16-135Smith/
Tyler
CSActual$5,359,5043CONSTRUCT 10' WIDE MULTI-PURPOSE LEGACY TRAILS, PHASE 17.0
0257-01-047Stephens/
Brownwood
US 183Actual$307,47011DRAIANGE IMPROVEMENTS0.0
0353-03-099Tarrant/
Ft Worth
SH 114Actual$1,819,2093LANDSCAPE ENHANCEMENT0.0
0902-90-031Tarrant/
Ft Worth
VAActual$2,494,6863PEDESTRIAN AND BIKE TRAIL0.0
0914-04-302Travis/
Austin
VAActual$3,441,0303INSTALL PEDESTRIAN SAFETY DEVICES CITYWIDE0.0
0522-02-038Van Zandt/
Tyler
SH 243Actual$159,39610MONITOR REMOVAL & REMOVE DEBRIS FROM TORNADO EVENT, APR-20170.0
1322-02-016Van Zandt/
Tyler
FM 1255Actual$187,94510MONITOR REMOVAL & REMOVE DEBRIS FROM TORNADO EVENT, APR-20170.0
0495-03-064Van Zandt/
Tyler
IH 20Actual$6,57310MONITOR REMOVAL & REMOVE DEBRIS FROM TORNADO EVENT, APR-20170.0
1673-02-018Van Zandt/
Tyler
FM 1861Actual$280,52310MONITOR REMOVAL & REMOVE DEBRIS FROM TORNADO EVENT, APR-20170.0
1671-02-010Van Zandt/
Tyler
FM 1651Actual$95,42010MONITOR REMOVAL & REMOVE DEBRIS FROM TORNADO EVENT, APR-20170.0
2957-01-010Van Zandt/
Tyler
RM 2909Actual$38,20710MONITOR REMOVAL & REMOVE DEBRIS FROM TORNADO EVENT, APR-20170.0
0443-01-030Van Zandt/
Tyler
SH 198Actual$70,67010MONITOR REMOVAL & REMOVE DEBRIS FROM TORNADO EVENT, APR-20170.0
0108-02-035Van Zandt/
Tyler
SH 19Actual$60,39810MONITOR REMOVAL & REMOVE DEBRIS FROM TORNADO EVENT, APR-20170.0
0245-02-034Van Zandt/
Tyler
SH 64Actual$6,04610MONITOR REMOVAL & REMOVE DEBRIS FROM TORNADO EVENT, APR-20170.0
0443-03-022Van Zandt/
Tyler
FM 17Actual$25,77710MONITOR REMOVAL & REMOVE DEBRIS FROM TORNADO EVENT, APR-20170.0
0095-06-070Van Zandt/
Tyler
US 80Actual$68,96810MONITOR REMOVAL & REMOVE DEBRIS FROM TORNADO EVENT, APR-20170.0
0043-05-106Wilbarger/
Wichita Falls
US 287Actual$5,854,4331SEAL COAT0.0
0133-08-035Young/
Wichita Falls
SH 114Actual$1,176,9901SPOT MILL, BASE REPAIR & OVERLAY0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract