Letting Schedule for San Antonio District (FY 2018)

Last Update: Monday, November 13, 2017
San Antonio District (FY 2018)
Atascosa | Bexar | Comal | Guadalupe | Kendall | Kerr | Mcmullen | Medina | Uvalde | Wilson |

Atascosa County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0073-03-065US 281TentativeAug 2018$70,0001REMOVE CANTILEVERS AND INSTALL MEDIAN GATES AT
0613-02-063SH 16TentativeMay 2018$2,500,0001REPLACE EXISTING BRIDGE

Bexar County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0017-09-098IH 35ActualSep 2017$327,3798INSTALL WARNING/GUIDE SIGNS-OVERHEAD ADVANCE FLASHERS &
2452-03-118SL 1604TentativeMay 2018$18,330,0001RECONFIGURE RAMPS, CONSTRUCT TURNAROUNDS AT BULVERDE
0915-00-179VATentativeMay 2018$1,500,00010CONSTRUCT CURB RAMPS AT VARIOUS LOCATIONS IN BANDERA AND
0017-10-267IH 35ActualSep 2017$4,860,3701REPAIR / REPLACE BRIDGE EXPANSION JOINTS
3544-04-002SH 211TentativeAug 2018$18,100,0013CONSTRUCT TWO LANE RURAL HIGHWAY ON NEW LOCATION
0915-12-558CSActualOct 2017$5,816,0003CONSTRUCTION OF A TWO-WAY CYCLE TRACK, PEDESTRIAN FACILITIES
3508-01-028SH 151TentativeMay 2018$13,100,0001OVERLAY & PAVEMENT MARKINGS ON FRONTAGE ROADS
0915-12-595VATentativeMay 2018$6,000,0003EXTEND THE ALAZAN CREEK SECTION OF THE GREENWAY TRAIL SYSTEM
0915-12-594VATentativeMay 2018$1,382,7253CONSTRUCT MULTI USE PATH
0915-12-578CSTentativeMay 2018$8,632,5613WIDEN TO PROVIDE OPERATIONAL IMPROVEMENTS, BIKE LANES,
0915-12-601VATentativeMay 2018$1,500,0003UPGRADE TRAFFIC SIGNAL CONTROLLERS
2452-03-112SL 1604TentativeJun 2018$40,000,0001EXPAND FROM 4 LANE DIVIDED TO 4 LANE EXPRESSWAY
2452-02-119SL 1604TentativeMay 2018$11,000,0002MINTERSECTION OPERATIONAL IMPROVEMENTS- CONSTRUCT 4
2452-02-118SL 1604TentativeMay 2018$1,313,4262MINTERSECTION OPERATIONAL IMPROVEMENTS- EB TO WB TURNAROUND
0253-04-138US 281TentativeJul 2018$182,000,0001EXPAND TO 6 LANE EXPRESSWAY WITH FRONTAGE RDS -4 GENERAL
0072-07-070IH 10TentativeJul 2018$29,000,0001CONSTRUCT GRADE SEPARATION AT BALCONES CREEK ROAD
0915-00-199VATentativeMay 2018$2,000,0001DISTRICTWIDE ITS OPERATION AND MAINTENANCE FY 2018
0016-08-036SL 368TentativeAug 2018$649,4741INTERSECTION OPERATIONAL IMPROVEMENTS
0915-00-206VATentativeJul 2018$1,300,0001DISTRICTWIDE NON-SITE SPECIFIC TRAFFIC SIGNALS-FY 2018
0915-12-520CSTentativeJul 2018$7,800,0003REHAB AND REALIGN ROADWAY, INTERSECTION AND FLOOD CONTROL
0915-12-583CSActualNov 2017$1,716,0003CONSTRUCT NEW DRAINAGE STRUCTURE AND WIDEN SIDEWALKS
0915-12-543NRTentativeAug 2018$267,0007ALAMO AREA COMMUTE SOLUTION PGM-FY 2018
2230-01-013FM 1560TentativeAug 2018$12,325,0041EXPAND FROM 2 TO 4 LANES WITH RAISED MEDIANS, BIKE LANES AND
0915-12-545CSActualNov 2017$2,119,0723RECONSTRUCT ROADWAY WITH SIDEWALKS AND BIKE LANES
0915-12-544CSTentativeJun 2018$7,323,3513EXPAND FROM 2 TO 4 LANES, INCLUDING DRAINAGE IMPROVEMENTS,
0073-08-183IH 37TentativeAug 2018$2,900,0001CONSTRUCTION OF A PARTIAL FRONTAGE ROAD, RAMPS AND
0915-12-509CRTentativeAug 2018$8,097,4803RECONSTRUCT AND WIDEN TO 4 LANES WITH SHOULDER, PEDESTRIAN
1479-01-024SL 1604TentativeJun 2018$30,000,0002MEXPAND FROM 2 LANES TO 4 LANE DIVIDED
0915-00-205VATentativeApr 2018$1,500,0001DISTRICTWIDE NON-SITE SPECIFIC TRAFFIC SIGNALS-FY 2018
0915-00-182VATentativeApr 2018$1,200,0001DISTRICTWIDE GUIDESIGNS FY18
0025-02-160IH 10TentativeMay 2018$120,000,0001EXPAND FROM 4 TO 6 LANE EXPRESSWAY
0017-10-280IH 35TentativeMay 2018$4,000,0001CONSTRUCT SIDEWALKS ALONG FRONTAGE ROADS
0521-05-145IH 410ApprovedFeb 2018$3,088,0001OVERLAY & PAVEMENT MARKING ON FRONTAGE ROADS
0915-12-533CSApprovedJan 2018$1,224,0006REPLACE BRIDGE AND APPROACHES
0915-12-577VAApprovedMar 2018$5,000,0001INSTALL ITS DYNAMIC GUIDE SIGNS/DYNAMIC MESSAGE BOARDS
0915-00-181VAApprovedFeb 2018$1,500,0001DISTRICTWIDE NON-SITE SPECIFIC TRAFFIC SIGNALS-FY 2018
0915-12-550CSTentativeMay 2018$17,177,0003CONSTRUCT ENTRANCE & EXIT RAMPS BETWEEN HARRY WURZBACH AND
0521-06-144IH 410TentativeMay 2018$1,152,1151HIGH MAST ILLUMINATION
0072-12-198IH 10TentativeMay 2018$3,000,0001INTERSECTION AND OPERATIONAL IMPROVEMENTS
0915-00-168VATentativeMay 2018$1,500,00010CONSTRUCT CURB RAMPS AT VARIOUS LOCATIONS IN ATASCOSA,

Comal County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0253-03-072US 281ApprovedMar 2018$705,00011EXPAND 2 LANES TO 4 LANES DIVIDED RURAL
0016-04-113IH 35TentativeAug 2018$885,2171REVISE RAMPS AND CONVERT FRONTAGE ROADS FROM TWO WAY TO ONE
0016-05-118IH 35ActualOct 2017$11,789,3861SEAL COAT AND PAVEMENT MARKINGS ON FRONTAGE ROADS
0215-01-043SH 46ActualOct 2017$1,010,1048SAFETY TREAT FIXED OBJECTS, RESURFACING, WIDEN PAVED
0915-17-065CSTentativeMay 2018$1,158,2663CONSTRUCT SIDEWALKS, BIKE LANES, AND OFF-ROAD TRAIL

Guadalupe County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0366-12-028BS 123BTentativeJun 2018$2,995,2721MILL, OVERLAY & PAVEMENT MARKINGS
0366-02-090SH 123ActualNov 2017$795,5811INSTALL SIGNAL AND CONSTRUCT INTERSECTION OPERATIONAL
0025-10-094FM 78ActualOct 2017$600,8988INSTALL INTERSECTION FLASHING BEACON & SAFETY LIGHTING AT
0535-02-048IH 10ApprovedJan 2018$3,100,0001CONSTRUCT WEIGH STATION WEIGH IN MOTION RAMPS

Kendall County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0915-11-033VAActualOct 2017$2,570,9413TRAIL SYSTEM EXPANSION-EXTEND EXISTING OLD NO. 9 TRAIL SOUTH
0915-11-028CSActualOct 2017$581,9516REPLACE BRIDGE AND APPROACHES
0215-06-039SH 46TentativeMay 2018$11,001,0001EXPAND FROM 2 LANES TO 4 LANES WITH RAISED MEDIAN OR
0142-10-024RM 473ActualSep 2017$292,1218INSTALL CHEVRONS, PROFILE EDGELINE & CENTERLINE MARKINGS ON
0072-06-075IH 10ApprovedMar 2018$57,000,0001RECONSTRUCT GRADE SEPARATION AT US 87 SOUTH "Y", RECONFIGURE
0072-14-028US 87ApprovedJan 2018$2,530,9921OVERLAY AND PAVEMENT MARKINGS

Kerr County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0142-14-061IH 10ApprovedJan 2018$5,885,0001OVERLAY & PAVEMENT MARKINGS ON MAINLANES

Mcmullen County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0542-05-017US 59TentativeMay 2018$196,04612018 HOT RUBBER SEAL PROJECT
0483-02-021SH 72ApprovedJan 2018$30,276,4861REHAB AND WIDEN ROADWAY TO PROVIDE PASSING LANES AND

Medina County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
1066-02-017PR 37ActualSep 2017$1,606,1098INSTALL ADVANCE WARNING SIGNS, INVERTED PROFILE MARKINGS,
0421-01-045SH 173TentativeJul 2018$3,267,7201OVERLAY & PAVEMENT MARKINGS
0848-04-046FM 462ApprovedMar 2018$2,154,7431REHAB & WIDEN NARROW ROADWAY TO ADD SHOULDERS

Uvalde County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0024-01-103US 90ApprovedMar 2018$5,000,0001OVERLAY & PAVEMENT MARKINGS

Wilson County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0915-14-031CRApprovedJan 2018$328,4276REPLACE BRIDGE AND APPROACHES
0850-04-027FM 775ApprovedFeb 2018$3,375,8261MILL, OVERLAY, PAVEMENT MARKINGS AND RECONSTRUCT FM 3432
0143-03-044US 87ApprovedFeb 2018$4,428,3001REHABITITATE EXISTING ROADWAY


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract