Letting Schedule for December, 2017 County (FY 2018)

Last Update: Wednesday, December 27, 2017
December, 2017 (FY 2018)(see Links)
SEP 2017 | OCT 2017 | NOV 2017 | DEC 2017 | JAN 2018 | FEB 2018 | MAR 2018 | APR 2018 | MAY 2018 | JUN 2018 | JUL 2018 | AUG 2018 |
CCSJCounty/
District
HighwayLet StatusContract
Cost
Fund
Cat
Description
0200-01-083Angelina/
Lufkin
US 69Actual$1,595,1291RESURFACE WITH THIN OVERLAY MIXTURE
0187-04-032Austin/
Yoakum
SH 36Actual$886,7948SAFETY TREAT FIXED OBJECTS
0231-03-143Bell/
Waco
US 190Actual$8,011,4151WIDEN FROM FOUR TO SIX LANES AND RESURFACE
2304-02-042Bell/
Waco
FM 2410Actual$897,3231SEAL, LEVEL UP AND OVERLAY
0218-01-095Bowie/
Atlanta
US 59Actual$185,7408INSTALL ADVANCE INTERSECTION WARNING SIGNALS AND SIGNS,
0116-04-100Brazos/
Bryan
SH 21Actual$8,216,2541OVERLAY CONSISTING OF HMA OVERLAY, SURFACE AND PAVEMENT
0150-05-048Burnet/
Austin
SH 29Actual$5,310,0301EDGE MILL, REPAIR & TOM
0153-01-013Caldwell/
Austin
US 183Actual$2,032,8851INTERSECTION IMPROVEMENTS
0437-02-014Callahan/
Abilene
US 283Actual$3,807,03211REHABILITATION
0039-08-100Cameron/
Pharr
IH 69EActual$10,077,4391CONSTRUCT NB FRONTAGE RD OVERPASSES FOR VEHICLES & HIKE AND
0055-06-033Coryell/
Waco
US 84Actual$375,1246DECK AND RAILING REPAIRS/REHABILITATION
0442-02-088Dallas/
Dallas
IH 35EActual$666,000,0013I30-CO:CONV 2R-HOV TO 2R-EXP;CO-US67:RC&WDN 8 TO 10GP,1R-HOV
0132-02-033Dickens/
Childress
US 82Actual$2,754,1821ASPHALTIC CONCRETE PAVEMENT OVERLAY
0924-06-504El Paso/
El Paso
CSActual$850,0003MULTIMODAL STREET IMPROVEMENTS FOR PEDESTRIANS, BICYCLES AND
0924-06-503El Paso/
El Paso
CSActual$2,399,0623CONSTRUCTION OF ROUNDABOUT
0167-02-059El Paso/
El Paso
SL 478Actual$1,250,0003CONSTRUCTION OF PEDESTRIAN ENHANCEMENTS ALONG THE DYER RTS R
2121-01-091El Paso/
El Paso
IH 10Actual$8,321,65511REHAB AND OPERATIONAL IMPROVEMENTS-WESTBOUND FRONTAGE ROAD
0079-05-057Erath/
Ft Worth
US 67Actual$9,554,9091SEAL COAT MAIN LANES
1980-01-008Fannin/
Paris
FM 1629Actual$1,652,48711PROVIDE ADDITIONAL PAVED SURFACE WIDTH
1708-01-013Fannin/
Paris
FM 1752Actual$5,448,1661REHABILITATION OF EXISTING ROAD
0389-06-107Galveston/
Houston
SH 146Actual$221,1531RAISE APPROACH AT BRIDGE
0047-01-069Grayson/
Paris
US 75Actual$1,366,98011FULL DEPTH REPAIR REINFORCE CONCRETE PAVEMENT, SLAB JACKING
0912-00-523Harris/
Houston
VAActual$1,543,4461INSTALL TRAFFIC SIGNALS (SITE SPECIFIC)
0271-17-163Harris/
Houston
IH 610Actual$55,609,7282MDEDICATED BUS LANE
0698-02-052Hidalgo/
Pharr
FM 88Actual$698,7258PROFILE EDGELINE MARKINGS, RAISED CENTERLINE RUMBLE STRIPS
0921-02-300Hidalgo/
Pharr
CSActual$03CONSTRUCT NEW 4 LANE
0009-18-020Hopkins/
Paris
BU 67-VActual$11,054,3441SEAL COAT
0901-28-090Hopkins/
Paris
VAActual$774,8833CONSTRUCT SIDEWALK AND SHARED USE PATH
0005-05-109Howard/
Abilene
IH 20Actual$7,524,1761SPOT BASE REPAIR, 1-COURSE SURFACE TREATMENT, 2 SMA-D
0009-15-027Hunt/
Paris
US 69Actual$3,132,94511FULL DEPTH CONCRETE REPAIR, PLANE, REHAB. SHLDRS
0089-12-004Jackson/
Yoakum
SL 522Actual$681,7308SAFETY TREAT FIXED OBJECTS
0786-01-083Jefferson/
Beaumont
FM 364Actual$3,319,92811WIDEN TO FOUR LANES WITH A CENTER LEFT TURN LANE
0033-05-092Jones/
Abilene
US 83Actual$11,060,9191SEAL COAT MAINLANES AND FRONTAGE ROADS
0032-05-041King/
Childress
US 83Actual$4,641,7651ASPHALTIC CONCRETE PAVEMENT OVERLAY
0150-02-040Llano/
Austin
SH 29Actual$1,911,1141LEVEL-UP AND SEAL COAT
0210-02-024Milam/
Bryan
US 77Actual$59,7958MISCELLANEOUS CONSTRUCTION CONSISTING OF INSTALLATION OF AN
0118-08-074Nacogdoches/
Lufkin
SH 21Actual$1,843,1428IMPROVE GUARDRAIL TO DESIGN STANDARDS, SAFETY TREAT FIXED
0574-01-029Navarro/
Dallas
SH 309Actual$3,338,9866REPLACE BRIDGES AND APPROACHES
0074-06-221Nueces/
Corpus Christi
IH 37Actual$4,587,9581MILL,UNDERSEAL,OVERLAY AND NOVACHIP
0063-10-013Panola/
Atlanta
US 59Actual$263,5868SAFETY LIGHTING AT INTERSECTION
0393-03-034Panola/
Atlanta
SH 149Actual$4,561,9941REHABILITATE EXISTING 2-LANE HIGHWAY
0020-06-017Presidio/
El Paso
US 90Actual$9,971,1771SEAL COAT
0901-27-048Red River/
Paris
VAActual$536,6293CONSTRUCT SHARED USE PATH
0910-16-143Smith/
Tyler
VAActual$140,6711CONSTRUCT SIDEWALKS AND CURB RAMPS 2015 GOVERNORS COMMUNITY
0141-14-016Sutton/
San Angelo
SL 467Actual$6,212,3801SEAL COAT
0902-00-159Tarrant/
Ft Worth
VAActual$1,740,0003SCHOOL BUS, CLEAN TECHNOLOGY REVOLVING LOAN PROGRAM,
0008-13-221Tarrant/
Ft Worth
IH 820Actual$210,561,6631RM TO TRIN:RECON TO 6 LNS + AUX,&CONST IH 820/SH 121 DIR CON
0172-02-074Tarrant/
Ft Worth
BU 287PActual$1,180,4573PEDESTRIAN AND BIKE TRAIL
0125-02-033Throckmorton/
Wichita Falls
US 183Actual$1,658,3231OVERLAY
0907-00-167Tom Green/
San Angelo
VAActual$805,4251PAVEMENT MARKINGS
3417-03-023Travis/
Austin
FM 734Actual$271,6743CONSTRUCTION OF MEDIAN AND LEFT TURN LANE
0440-06-017Travis/
Austin
SH 130Actual$40,221,0633ADD ONE LANE IN EACH DIRECTION
0914-04-300Travis/
Austin
VAActual$2,066,4373WIDEN TRAIL,INSTALL NEW BRIDGE, IMPROVE CROSSING FOR BIKE
0095-07-059Van Zandt/
Tyler
US 80Actual$9,992,7791SEAL COAT AND PAVEMENT MARKINGS
2262-01-016Ward/
Odessa
FM 1776Actual$10,692,2581SEAL COAT
0913-09-062Wharton/
Yoakum
CRActual$341,3116REPLACE BRIDGE AND APPROACHES
0043-05-107Wilbarger/
Wichita Falls
US 287Actual$2,280,3336DECK AND CONCRETE STRUCTURE REPAIR
1202-03-014Williamson/
Austin
FM 1063Actual$1,291,5538UPGRADE METAL BEAM GUARD FENCE & SAFETY TREAT FIXED OBJECTS
1711-01-029Young/
Wichita Falls
FM 1769Actual$3,919,3811REHAB, WIDEN & OVERLAY


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract