Letting Schedule for February, 2018 County (FY 2018)
February, 2018 (FY 2018) | (see Links) |
SEP 2017 | OCT 2017 | NOV 2017 | DEC 2017 | JAN 2018 | FEB 2018 | MAR 2018 | APR 2018 | MAY 2018 | JUN 2018 | JUL 2018 | AUG 2018 | | |||||||
CCSJ | County/ District | Highway | Let Status | Contract Cost | Fund Cat | Description | DBE Goal |
---|---|---|---|---|---|---|---|
0548-05-049 | Andrews/ Odessa | SH 176 | Actual | $13,715,435 | 11 | ROADWAY WIDENING TO A MODIFIED SUPER 2 | 1.5 |
0200-01-089 | Angelina/ Lufkin | US 69 | Actual | $161,145 | 1 | INSTALL TRAFFIC SIGNAL | 0.0 |
0408-02-046 | Austin/ Yoakum | SH 159 | Actual | $4,364,573 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
0915-00-181 | Bexar/ San Antonio | VA | Actual | $1,470,896 | 1 | DISTRICTWIDE NON-SITE SPECIFIC TRAFFIC SIGNALS-FY 2018 | 0.0 |
0521-05-145 | Bexar/ San Antonio | IH 410 | Actual | $3,132,053 | 1 | OVERLAY & PAVEMENT MARKING ON FRONTAGE ROADS | 1.5 |
0192-03-017 | Brazoria/ Houston | SH 6 | Actual | $1,872,006 | 1 | PAVEMENT REPAIR AND ASPHALTIC CONCRETE PAVEMENT OVERLAY | 0.0 |
0598-03-059 | Brazoria/ Houston | SH 288 | Actual | $1,967,000 | 3 | CONSTRUCT TRUCK WEIGH FACILITY | 0.0 |
0006-11-022 | Callahan/ Abilene | FM 18 | Actual | $2,256,125 | 8 | PROFILE EDGELINE MARKINGS | 0.0 |
0039-12-058 | Cameron/ Pharr | BU 77-X | Actual | $1,260,317 | 8 | INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT | 0.0 |
0169-05-042 | Carson/ Amarillo | US 60 | Actual | $12,685,032 | 11 | PRESERVATION AND SAFETY IMPROVEMENTS ON A FREIGHT CORRIDOR | 0.0 |
2405-01-012 | Clay/ Wichita Falls | FM 2393 | Actual | $2,658,384 | 11 | REHABILITATION OF EXISTING ROAD | 3.0 |
1012-03-018 | Collin/ Dallas | FM 981 | Actual | $2,834,582 | 6 | REPLACE BRIDGE AND APPROACHES | 3.0 |
0918-24-127 | Collin/ Dallas | CS | Actual | $1,592,905 | 3 | EXPAND INTERSECTION TO ADD RIGHT AND LEFT TURN LANES | 0.0 |
0918-24-216 | Collin/ Dallas | CS | Actual | $648,772 | 3 | UNIVERSITY TRAIL PHASE II - CONSTRUCT HIKE AND BIKE TRAIL | 0.0 |
0045-01-061 | Cooke/ Wichita Falls | US 82 | Actual | $2,164,327 | 1 | PAVEMENT REPAIR, SEAL AND PFC OVERLAY (EB ONLY) | 0.0 |
1594-02-012 | Coryell/ Waco | FM 1783 | Actual | $1,126,439 | 11 | REPLACE BRIDGE AND APPROACHES | 3.0 |
2166-02-007 | Dewitt/ Yoakum | FM 966 | Actual | $401,436 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
0042-06-071 | Donley/ Childress | US 287 | Actual | $1,019,046 | 1 | ADD DECEL LANES | 0.0 |
0127-02-141 | Eastland/ Brownwood | US 183 | Actual | $4,279,880 | 1 | ADD PASSING LANES | 3.0 |
0924-00-098 | El Paso/ El Paso | VA | Actual | $1,049,667 | 1 | FY 2018 STRIPING PROJECT | 0.0 |
0048-03-091 | Ellis/ Dallas | US 77 | Actual | $1,272,192 | 1 | BASE REPAIR AND OVERLAY | 0.0 |
1258-02-037 | Fort Bend/ Houston | FM 1093 | Actual | $954,290 | 1 | BASE REPAIR AND 1.5" ACP OVERLAY | 0.0 |
0155-02-026 | Goliad/ Corpus Christi | US 183 | Actual | $1,302,139 | 8 | TEXTURIZE SHOULDERS (ROLL OR MILL IN) CENTERLINE TEXTURING | 0.0 |
0904-13-024 | Gray/ Amarillo | CR | Actual | $1,521,586 | 6 | REPLACE BRIDGE AND APPROACHES | 3.5 |
1385-02-024 | Gregg/ Tyler | SH 300 | Actual | $7,871,366 | 1 | REPAIR & RESURFACE ROADWAY | 3.5 |
0495-07-075 | Gregg/ Tyler | IH 20 | Actual | $2,959,996 | 1 | PLANE AND RESURFACE ROADWAY-EBL | 0.0 |
0377-01-048 | Gregg/ Tyler | SH 135 | Actual | $2,716,390 | 1 | PLANE & REPAVE ROADWAY | 0.0 |
0774-03-014 | Hamilton/ Waco | FM 1602 | Actual | $3,680,763 | 1 | WIDEN PAVEMENT TO ADD SHOULDERS | 5.0 |
0976-01-039 | Harris/ Houston | FM 865 | Actual | $3,521,469 | 1 | BASE REPAIR, MILLING, SEAL COAT, TOM OVERLAY, STRIPING, CURB | 0.0 |
1062-02-026 | Harris/ Houston | FM 2100 | Actual | $260,251 | 1 | PROP LEFT & RIGHT TURN LANES,SHOULDER WIDENING,MILLING, | 0.0 |
0164-03-053 | Henderson/ Tyler | SH 31 | Actual | $3,437,034 | 1 | REPAIR & REPAVE ROADWAY | 0.0 |
0109-06-041 | Houston/ Lufkin | SH 19 | Actual | $352,902 | 8 | MILLED EDGELINE AND CENTERLINE RUMBLE STRIPS | 0.0 |
0005-06-120 | Howard/ Abilene | IH 20 | Actual | $1,870,814 | 1 | INSTALLATION OF PAVEMENT MARKINGS AND RAISED REFLECTIVE | 0.0 |
0374-05-027 | Hudspeth/ El Paso | US 62 | Actual | $76,981 | 6 | BOX CULVERT STRUCTURAL REPAIR | 0.0 |
0083-01-054 | Hunt/ Paris | BS 11H | Actual | $1,102,175 | 3 | CONSTRUCT SIDEWALKS AND RAMPS, ADA COMPLIANT, MPO-TAP 2014 | 0.0 |
1309-01-033 | Jack/ Ft Worth | US 380 | Actual | $4,142,119 | 1 | REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS | 0.0 |
0173-03-040 | Kaufman/ Dallas | SH 34 | Actual | $2,186,589 | 1 | SPOT BASE REPAIR, LEVEL UP MILL AND INLAY | 0.0 |
0142-05-080 | Kerr/ San Antonio | SH 27 | Actual | $12,254,690 | 1 | REHAB AND WIDEN ROADWAY TO PROVIDE PASSING LANES AND | 5.0 |
0035-07-043 | Kimble/ San Angelo | US 83 | Actual | $6,072,341 | 1 | ADD PASSING LANES | 2.0 |
0157-02-047 | Knox/ Childress | US 277 | Actual | $7,052,405 | 1 | ASPHALTIC CONCRETE PAVEMENT OVERLAY | 0.0 |
0769-01-028 | Lamar/ Paris | FM 197 | Actual | $2,820,978 | 1 | REHABILITATION OF EXISTING ROAD | 3.0 |
0435-01-073 | Lamar/ Paris | FM 38 | Actual | $2,307,154 | 1 | REHABILITATION OF EXISTING ROAD | 2.0 |
0901-00-054 | Lamar/ Paris | VA | Actual | $2,490,646 | 10 | CONSTRUCT CURB RAMPS, SH 11, SH 78, SH 121, SL 205, | 5.0 |
0913-29-035 | Lavaca/ Yoakum | CR | Actual | $643,880 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
0211-02-026 | Lee/ Austin | US 77 | Actual | $6,505,846 | 1 | LEVEL-UP, FULL DEPTH REPAIR AND TOM | 0.0 |
0593-01-120 | Liberty/ Beaumont | SH 321 | Actual | $6,073,524 | 8 | INSTALL CONTINUOUS TURN LANE, PASSING LANES & RUMBLE STRIPS | 3.0 |
0905-00-073 | Lubbock/ Lubbock | VA | Actual | $4,100,216 | 1 | TRAFFIC CONTROL DEVICES | 0.0 |
3330-01-010 | Mclennan/ Waco | FM 3223 | Actual | $1,145,780 | 1 | SEAL AND OVERLAY | 0.0 |
0055-08-099 | Mclennan/ Waco | US 84 | Actual | $27,664,767 | 2U | ADD FRONTAGE RDS & OP @ FM 2837 TO REDUCE CONGESTION, | 6.0 |
0909-00-049 | Mclennan/ Waco | VA | Actual | $2,109,094 | 10 | CONSTRUCT CURB RAMPS ALONG US 281, SH 6, SH 31, FM 939, | 5.0 |
0834-04-024 | Mclennan/ Waco | FM 308 | Actual | $1,345,902 | 8 | SAFETY TREAT FIXED OBJECTS | 5.0 |
0833-03-049 | Mclennan/ Waco | FM 1637 | Actual | $351,970 | 1 | THIN OVERLAY MIXTURE (TOM) | 0.0 |
0239-02-037 | Montague/ Wichita Falls | SH 59 | Actual | $1,188,139 | 1 | PAVEMENT REPAIR AND OVERLAY | 0.0 |
0053-12-064 | Nolan/ Abilene | US 84 | Actual | $949,768 | 8 | TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS | 0.0 |
0053-12-065 | Nolan/ Abilene | US 84 | Actual | $3,428,905 | 1 | ROADWAY REHABILITATION / ARMORING | 0.0 |
0920-30-083 | Orange/ Beaumont | CR | Actual | $550,618 | 3 | WIDEN EXISTING ROADWAY | 0.0 |
0499-03-058 | Orange/ Beaumont | SH 12 | Actual | $7,695,430 | 8 | INSTALL CONTINUOUS TURN LANE , PASSING LANES, & RUMBLE | 1.0 |
0902-38-123 | Parker/ Ft Worth | VA | Actual | $1,148,573 | 3 | BIKE & PEDESTRIAN TRAIL; TRAFFIC SIGNAL | 0.0 |
0008-03-107 | Parker/ Ft Worth | IH 20 | Actual | $2,800,803 | 1 | FRONTAGE ROADS - REPAIR BASE FAILURES, MILL, HMAC OVERLAY, | 0.0 |
0904-00-180 | Potter/ Amarillo | VA | Actual | $650,882 | 1 | THERMOPLASTIC STRIPING | 0.0 |
0798-01-025 | Roberts/ Amarillo | FM 282 | Actual | $2,430,205 | 6 | REPLACE EXISTING BRIDGE AND APPROACHES | 0.0 |
0059-03-020 | Shelby/ Lufkin | SH 7 | Actual | $2,054,209 | 1 | OVERLAY WITH PFC | 0.0 |
0902-48-874 | Tarrant/ Ft Worth | VA | Actual | $3,308,863 | 1 | DFW CONNECTOR COMPREHENSIVE MAINTENANCE AGREEMENT FY18 | 0.0 |
2266-02-086 | Tarrant/ Ft Worth | SH 360 | Actual | $61,767,953 | 2M | WIDEN & RECONSTRUCT 6 TO 8 LANES | 8.0 |
0114-20-011 | Travis/ Austin | SL 212 | Actual | $1,493,812 | 1 | MILL AND INLAY | 0.0 |
0910-12-132 | Van Zandt/ Tyler | CS | Actual | $725,538 | 3 | PEDESTRIAN SIDEWALKS CONNECTING HOUSING AUTHORITY, CITY PARK | 0.0 |
2350-01-059 | Victoria/ Yoakum | US 77 | Actual | $327,280 | 1 | CONSTRUCT TRAFFIC SIGNAL | 0.0 |
0088-05-091 | Victoria/ Yoakum | US 59 | Actual | $9,143,357 | 1 | ACP OVERLAY | 0.0 |
1200-01-027 | Williamson/ Austin | FM 973 | Actual | $1,260,301 | 1 | ONE COURSE SURFACE TREATMENT | 0.0 |
0850-04-027 | Wilson/ San Antonio | FM 775 | Actual | $3,502,740 | 1 | MILL, OVERLAY, PAVEMENT MARKINGS AND RECONSTRUCT FM 3432 | 3.5 |
0143-03-044 | Wilson/ San Antonio | US 87 | Actual | $4,030,997 | 1 | REHABITITATE EXISTING ROADWAY | 3.0 |
|