Detail Letting Schedule for Dallas County (FY 2019)
Bid Tabulations Dashboard
This report will no longer be updated, please access links on the Contract Letting page. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
Dallas County (FY 2019) |
CCSJ: 0008-08-076 |
|||
District: | DALLAS | Let Date: | Apr 2019 |
Highway: | SH 180 | Let Status: | Actual |
Project ID: | NH 2019(709) | CSJ: | 0008-08-076 |
Description: | REHABILITATE EXISTING ROADWAY | Handling Code: | |
Limits From: | EAST OF UPRR | Fund Cat: | 1 |
Limits To: | WEST N. MERRIFIELD RD | ESTIMATE: | $1,522,450 |
Length: | 1.4 | Actual | $1,120,776 |
Back... | Totals for 0008-08-076 | ||
---|---|---|---|
Length: | 1.4 | ||
Estimate: | $1,522,450 | ||
Actual: | $1,120,776 | ||
CCSJ: 0009-02-040 |
|||
District: | DALLAS | Let Date: | Apr 2019 |
Highway: | SH 78 | Let Status: | Actual |
Project ID: | CM 2019(794) | CSJ: | 0009-02-040 |
Description: | INTERSECTION IMPROVEMENT | Handling Code: | |
Limits From: | IN GARLAND FROM IH 635 | Fund Cat: | 5 |
Limits To: | FOREST LANE | ESTIMATE: | $3,379,565 |
Length: | 2.0 | Actual | $3,869,774 |
District: | DALLAS | Let Date: | Apr 2019 |
Highway: | SS 244 | Let Status: | Actual |
Project ID: | CM 2019(794) | CSJ: | 0353-05-089 |
Description: | TRAFFIC SIGNAL AND PEDESTRIAN IMPROVEMENTS | Handling Code: | |
Limits From: | NORTHWEST HIGHWAY AT PLANO RD | Fund Cat: | 5 |
Limits To: | . | ESTIMATE: | $328,298 |
Length: | 0.2 | Actual | $369,710 |
District: | DALLAS | Let Date: | Apr 2019 |
Highway: | SS 244 | Let Status: | Actual |
Project ID: | CM 2019(794) | CSJ: | 0353-05-090 |
Description: | TRAFFIC SIGNAL AND PEDESTRIAN IMPROVEMENTS | Handling Code: | |
Limits From: | ON NORTHWEST HWY AT JUPITER IN DALL | Fund Cat: | 5 |
Limits To: | . | ESTIMATE: | $323,419 |
Length: | 0.2 | Actual | $360,169 |
Back... | Totals for 0009-02-040 | ||
Length: | 2.4 | ||
Estimate: | $4,031,282 | ||
Actual: | $4,599,653 | ||
CCSJ: 0009-02-069 |
|||
District: | DALLAS | Let Date: | Jan 2019 |
Highway: | SH 78 | Let Status: | Actual |
Project ID: | CM 2019(413) | CSJ: | 0009-02-069 |
Description: | 9 INTERSECTION IMPROVEMENTS | Handling Code: | |
Limits From: | GARLAND RD FROM SOUTH OF TRANQUILLA | Fund Cat: | 5 |
Limits To: | SP 244 (NORTHWEST HIGHWAY) | ESTIMATE: | $7,492,783 |
Length: | 2.9 | Actual | $7,698,985 |
District: | DALLAS | Let Date: | Jan 2019 |
Highway: | SH 78 | Let Status: | Actual |
Project ID: | ROW 9-2-70 | CSJ: | 0009-02-070 |
Description: | UTILITIES | Handling Code: | |
Limits From: | GARLAND RD FROM SOUTH OF TRANQUILLA | Fund Cat: | ROW |
Limits To: | SP 244 (NORTHWEST HIGHWAY) | ESTIMATE: | $7,440,345 |
Length: | 2.9 | Actual | $989,450 |
Back... | Totals for 0009-02-069 | ||
Length: | 5.8 | ||
Estimate: | $14,933,128 | ||
Actual: | $8,688,435 | ||
CCSJ: 0009-11-243 |
|||
District: | DALLAS | Let Date: | Feb 2019 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | C 9-11-243 | CSJ: | 0009-11-243 |
Description: | FULL DEPTH CONCRETE PAVEMENT REPAIR ON EB FRONTAGE ROADS | Handling Code: | |
Limits From: | US 80 | Fund Cat: | 1 |
Limits To: | NORTH GALLOWAY | ESTIMATE: | $1,108,114 |
Length: | 3.4 | Actual | $1,381,126 |
Back... | Totals for 0009-11-243 | ||
Length: | 3.4 | ||
Estimate: | $1,108,114 | ||
Actual: | $1,381,126 | ||
CCSJ: 0009-11-245 |
|||
District: | DALLAS | Let Date: | Jan 2019 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | C 9-11-245 | CSJ: | 0009-11-245 |
Description: | FULL DEPTH CONCRETE REPAIR | Handling Code: | |
Limits From: | BELT LINE RD | Fund Cat: | 1 |
Limits To: | BASS PRO DR | ESTIMATE: | $504,559 |
Length: | 3.5 | Actual | $414,585 |
District: | DALLAS | Let Date: | Jan 2019 |
Highway: | US 75 | Let Status: | Actual |
Project ID: | C 47-7-235 | CSJ: | 0047-07-235 |
Description: | FULL DEPTH CONCRETE REPAIR | Handling Code: | |
Limits From: | ROYAL LN | Fund Cat: | 1 |
Limits To: | HALL STREET | ESTIMATE: | $220,219 |
Length: | 7.1 | Actual | $223,540 |
District: | DALLAS | Let Date: | Jan 2019 |
Highway: | SH 114 | Let Status: | Actual |
Project ID: | C 353-4-105 | CSJ: | 0353-04-105 |
Description: | FULL DEPTH CONCRETE REPAIR | Handling Code: | |
Limits From: | FREEPORT PARKWAY | Fund Cat: | 1 |
Limits To: | ESTERS BLVD | ESTIMATE: | $775,014 |
Length: | 0.9 | Actual | $698,343 |
Back... | Totals for 0009-11-245 | ||
Length: | 11.5 | ||
Estimate: | $1,499,792 | ||
Actual: | $1,336,468 | ||
CCSJ: 0047-07-230 |
|||
District: | DALLAS | Let Date: | Feb 2019 |
Highway: | US 75 | Let Status: | Actual |
Project ID: | STP 2019(498)HES | CSJ: | 0047-07-230 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | AT FOREST LANE | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $398,248 |
Length: | 0.2 | Actual | $410,544 |
District: | DALLAS | Let Date: | Feb 2019 |
Highway: | US 75 | Let Status: | Actual |
Project ID: | STP 2019(498)HES | CSJ: | 0047-07-234 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | AT WALNUT HILL LN | Fund Cat: | 8 |
Limits To: | IN THE CITY OF DALLAS | ESTIMATE: | $419,063 |
Length: | 0.2 | Actual | $425,015 |
District: | DALLAS | Let Date: | Feb 2019 |
Highway: | SL 12 | Let Status: | Actual |
Project ID: | STP 2019(498)HES | CSJ: | 0581-01-147 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | AT MILITARY PKWY | Fund Cat: | 8 |
Limits To: | IN THE CITY OF DALLAS | ESTIMATE: | $244,662 |
Length: | 0.2 | Actual | $249,113 |
District: | DALLAS | Let Date: | Feb 2019 |
Highway: | IH 635 | Let Status: | Actual |
Project ID: | STP 2019(498)HES | CSJ: | 2374-01-182 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | AT INWOOD RD | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $458,248 |
Length: | 0.2 | Actual | $570,837 |
Back... | Totals for 0047-07-230 | ||
Length: | 0.8 | ||
Estimate: | $1,520,220 | ||
Actual: | $1,655,509 | ||
CCSJ: 0092-01-052 |
|||
District: | DALLAS | Let Date: | Jun 2019 |
Highway: | US 175 | Let Status: | Approved |
Project ID: | NH 2013(596) | CSJ: | 0092-01-052 |
Description: | RECONSTRUCT FREEWAY TO 6 LANE DIVIDED ARTERIAL | Handling Code: | |
Limits From: | SOUTH OF BUDD ST | Fund Cat: | 2M |
Limits To: | IH 45 | ESTIMATE: | $28,596,324 |
Length: | 1.2 | Actual | $0 |
District: | DALLAS | Let Date: | Jun 2019 |
Highway: | SH 310 | Let Status: | Approved |
Project ID: | NH 2013(596) | CSJ: | 0092-01-059 |
Description: | RECONSTRUCT I-45 AND SM WRIGHT INTERCHANGE | Handling Code: | |
Limits From: | PENNSYLVANIA AVENUE | Fund Cat: | 2M |
Limits To: | NORTH OF AL LIPSCOMB WAY | ESTIMATE: | $10,073,369 |
Length: | 0.5 | Actual | $0 |
District: | DALLAS | Let Date: | Jun 2019 |
Highway: | SH 310 | Let Status: | Approved |
Project ID: | ROW 92-1-60 | CSJ: | 0092-01-060 |
Description: | UTILITIES | Handling Code: | |
Limits From: | PENNSYLVANIA AVENUE | Fund Cat: | ROW |
Limits To: | NORTH OF AL LIPSCOMB WAY | ESTIMATE: | |
Length: | 0.6 | Actual | $0 |
District: | DALLAS | Let Date: | Jun 2019 |
Highway: | US 175 | Let Status: | Approved |
Project ID: | ROW 92-1-61 | CSJ: | 0092-01-061 |
Description: | UTILITIES | Handling Code: | |
Limits From: | SOUTH OF BUDD ST | Fund Cat: | ROW |
Limits To: | IH 45 | ESTIMATE: | |
Length: | 1.6 | Actual | $0 |
District: | DALLAS | Let Date: | Jun 2019 |
Highway: | IH 45 | Let Status: | Approved |
Project ID: | NH 2019(859) | CSJ: | 0092-14-088 |
Description: | RECONSTRUCT I-45 AND SM WRIGHT INTERCHANGE | Handling Code: | |
Limits From: | LENWAY ST. | Fund Cat: | 2M |
Limits To: | GOOD LATIMER | ESTIMATE: | $31,400,461 |
Length: | 1.0 | Actual | $0 |
District: | DALLAS | Let Date: | Jun 2019 |
Highway: | IH 45 | Let Status: | Approved |
Project ID: | ROW 92-14-91 | CSJ: | 0092-14-091 |
Description: | ROW ACQUISITION, UTILITY ADJUSTMENTS AND RELOCATION | Handling Code: | |
Limits From: | LENWAY ST. | Fund Cat: | ROW |
Limits To: | GOOD LATIMER | ESTIMATE: | |
Length: | 1.0 | Actual | $0 |
Award Status Back... | Totals for 0092-01-052 | ||
Length: | 5.9 | ||
Estimate: | $70,070,154 | ||
Actual: | |||
CCSJ: 0092-02-129 |
|||
District: | DALLAS | Let Date: | May 2019 |
Highway: | IH 45 | Let Status: | Approved |
Project ID: | NH 2019(926) | CSJ: | 0092-02-129 |
Description: | Install/Replace Signs | Handling Code: | |
Limits From: | ELLIS COUNTY LINE | Fund Cat: | 1 |
Limits To: | SH 310 | ESTIMATE: | $226,080 |
Length: | 8.4 | Actual | $0 |
District: | DALLAS | Let Date: | May 2019 |
Highway: | IH 45 | Let Status: | Approved |
Project ID: | NH 2019(926) | CSJ: | 0092-14-095 |
Description: | Install/Replace Signs | Handling Code: | |
Limits From: | SH 310 | Fund Cat: | 1 |
Limits To: | IH 30 | ESTIMATE: | $355,821 |
Length: | 11.5 | Actual | $0 |
District: | DALLAS | Let Date: | May 2019 |
Highway: | US 287 | Let Status: | Approved |
Project ID: | NH 2019(926) | CSJ: | 0172-13-005 |
Description: | Install/Replace Signs | Handling Code: | |
Limits From: | NORTH OF FORTH WORTH RD | Fund Cat: | 1 |
Limits To: | SOUTH OF WAXAHACHIE CREEK | ESTIMATE: | $133,826 |
Length: | 4.1 | Actual | $0 |
District: | DALLAS | Let Date: | May 2019 |
Highway: | SL 12 | Let Status: | Approved |
Project ID: | NH 2019(926) | CSJ: | 0581-02-149 |
Description: | Install/Replace Signs | Handling Code: | |
Limits From: | UNION BOWER RD | Fund Cat: | 1 |
Limits To: | SS 408 | ESTIMATE: | $163,735 |
Length: | 6.6 | Actual | $0 |
District: | DALLAS | Let Date: | May 2019 |
Highway: | SS 408 | Let Status: | Approved |
Project ID: | NH 2019(926) | CSJ: | 3000-01-024 |
Description: | INSTALL GUIDE SIGNS | Handling Code: | |
Limits From: | IH 20 | Fund Cat: | 1 |
Limits To: | LOOP 12 | ESTIMATE: | $84,050 |
Length: | 4.2 | Actual | $0 |
Back... | Totals for 0092-02-129 | ||
Length: | 34.8 | ||
Estimate: | $963,511 | ||
Actual: | |||
CCSJ: 0092-07-060 |
|||
District: | DALLAS | Let Date: | May 2019 |
Highway: | SH 356 | Let Status: | Approved |
Project ID: | NH 2019(927) | CSJ: | 0092-07-060 |
Description: | REHABILITATE EXISTING ROADWAY | Handling Code: | |
Limits From: | N BELT LINE RD | Fund Cat: | 1 |
Limits To: | N. MACARTHUR BLVD | ESTIMATE: | $2,477,087 |
Length: | 2.5 | Actual | $0 |
Back... | Totals for 0092-07-060 | ||
Length: | 2.5 | ||
Estimate: | $2,477,087 | ||
Actual: | |||
CCSJ: 0092-14-092 |
|||
District: | DALLAS | Let Date: | Feb 2019 |
Highway: | IH 345 | Let Status: | Actual |
Project ID: | C 92-14-92 | CSJ: | 0092-14-092 |
Description: | FULL DEPTH CONCRETE REPAIR ON FRONTAGE ROADS | Handling Code: | |
Limits From: | NORTH GOOD LATIMER EXPY | Fund Cat: | 1 |
Limits To: | SS 366 | ESTIMATE: | $552,461 |
Length: | 0.5 | Actual | $349,164 |
District: | DALLAS | Let Date: | Feb 2019 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | C 2374-3-84 | CSJ: | 2374-03-084 |
Description: | CONCRETE FULL DEPTH REPAIR ON FRTG RD | Handling Code: | |
Limits From: | SH 342 | Fund Cat: | 1 |
Limits To: | BONNIE VIEW LANE | ESTIMATE: | $2,701,936 |
Length: | 1.9 | Actual | $3,123,389 |
Back... | Totals for 0092-14-092 | ||
Length: | 2.4 | ||
Estimate: | $3,254,397 | ||
Actual: | $3,472,553 | ||
CCSJ: 0095-13-043 |
|||
District: | DALLAS | Let Date: | Mar 2019 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | NH 2019(668) | CSJ: | 0095-13-043 |
Description: | FULL DEPTH CONCRETE REPAIR AND OVERLAY EB AND WB | Handling Code: | |
Limits From: | IH 635 | Fund Cat: | 1 |
Limits To: | KAUFMAN COUNTY LINE | ESTIMATE: | $12,871,778 |
Length: | 6.2 | Actual | $11,231,721 |
District: | DALLAS | Let Date: | Mar 2019 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | NH 2019(668) | CSJ: | 0095-14-031 |
Description: | MILL EB, FULL DEPTH CONCRETE REPAIR AND OVERLAY EB AND WB | Handling Code: | |
Limits From: | DALLAS COUNTY LINE | Fund Cat: | 1 |
Limits To: | BIG BRUSHY CREEK | ESTIMATE: | $15,612,421 |
Length: | 8.6 | Actual | $13,210,235 |
Back... | Totals for 0095-13-043 | ||
Length: | 14.8 | ||
Estimate: | $28,484,199 | ||
Actual: | $24,441,956 | ||
CCSJ: 0196-03-278 |
|||
District: | DALLAS | Let Date: | Jul 2019 |
Highway: | IH 35E | Let Status: | Approved |
Project ID: | NH 1902(220) | CSJ: | 0196-03-278 |
Description: | REHABILITATE EXISTING ROADWAY | Handling Code: | |
Limits From: | NORTH OF OAK LAWN AVE. | Fund Cat: | 1 |
Limits To: | NORTH OF HARRY HINES BLVD. RAMPS | ESTIMATE: | $4,740,383 |
Length: | 5.4 | Actual | $0 |
Back... | Totals for 0196-03-278 | ||
Length: | 5.4 | ||
Estimate: | $4,740,383 | ||
Actual: | |||
CCSJ: 0197-02-126 |
|||
District: | DALLAS | Let Date: | Jun 2019 |
Highway: | US 175 | Let Status: | Approved |
Project ID: | NH 2019(861) | CSJ: | 0197-02-126 |
Description: | REHABILITATE EXISTING ROADWAY | Handling Code: | |
Limits From: | IH 20 | Fund Cat: | 1 |
Limits To: | KAUFMAN COUNTY LINE | ESTIMATE: | $2,924,655 |
Length: | 7.3 | Actual | $0 |
Back... | Totals for 0197-02-126 | ||
Length: | 7.3 | ||
Estimate: | $2,924,655 | ||
Actual: | |||
CCSJ: 0353-04-106 |
|||
District: | DALLAS | Let Date: | Apr 2019 |
Highway: | SS 348 | Let Status: | Actual |
Project ID: | NH 2019(718) | CSJ: | 0353-04-106 |
Description: | REHABILITATE EXISTING ROADWAY | Handling Code: | |
Limits From: | SH 114 | Fund Cat: | 1 |
Limits To: | SL 12 | ESTIMATE: | $3,689,454 |
Length: | 3.2 | Actual | $4,542,845 |
District: | DALLAS | Let Date: | Apr 2019 |
Highway: | SL 12 | Let Status: | Actual |
Project ID: | NH 2019(718) | CSJ: | 0353-04-107 |
Description: | MILL, CONCRETE FULL DEPTH REPAIR, OVERLAY & PAVEMENT | Handling Code: | |
Limits From: | SPUR 348 | Fund Cat: | 1 |
Limits To: | SHADY TRAIL | ESTIMATE: | $445,827 |
Length: | 0.6 | Actual | $675,940 |
District: | DALLAS | Let Date: | Apr 2019 |
Highway: | SL 12 | Let Status: | Actual |
Project ID: | C 353-5-122 | CSJ: | 0353-05-122 |
Description: | MILL, CONCRETE FULL DEPTH REPAIR AND OVERLAY | Handling Code: | |
Limits From: | SHADY TRAIL | Fund Cat: | 1 |
Limits To: | US 75 | ESTIMATE: | $5,207,090 |
Length: | 7.4 | Actual | $7,752,406 |
Back... | Totals for 0353-04-106 | ||
Length: | 11.2 | ||
Estimate: | $9,342,371 | ||
Actual: | $12,971,191 | ||
CCSJ: 0353-05-121 |
|||
District: | DALLAS | Let Date: | Jun 2019 |
Highway: | SL 12 | Let Status: | Approved |
Project ID: | STP 2019(865)HES | CSJ: | 0353-05-121 |
Description: | INSTALL ADVANCE WARNING SIGNS AND CHEVRONS, MODERNIZE BRIDGE | Handling Code: | |
Limits From: | SHADY TRAIL | Fund Cat: | 8 |
Limits To: | N BUCKNER BLVD | ESTIMATE: | $1,198,855 |
Length: | 10.7 | Actual | $0 |
District: | DALLAS | Let Date: | Jun 2019 |
Highway: | SL 12 | Let Status: | Approved |
Project ID: | STP 2019(865)HES | CSJ: | 0581-01-154 |
Description: | INSTALL ADVANCE WARNING SIGNS AND CHEVRONS, MODERNIZE BRIDGE | Handling Code: | |
Limits From: | NB I-35 E FRONTAGE ROADS | Fund Cat: | 8 |
Limits To: | E NORTHWEST HIGHWAY | ESTIMATE: | $1,268,083 |
Length: | 19.6 | Actual | $0 |
District: | DALLAS | Let Date: | Jun 2019 |
Highway: | SL 12 | Let Status: | Approved |
Project ID: | STP 2019(865)HES | CSJ: | 0581-02-148 |
Description: | INSTALL ADVANCE WARNING SIGNS AND CHEVRONS, MODERNIZE BRIDGE | Handling Code: | |
Limits From: | SB INTERSTATE 35E FRONTAGE RD | Fund Cat: | 8 |
Limits To: | SPUR 348 | ESTIMATE: | $1,562,266 |
Length: | 16.9 | Actual | $0 |
District: | DALLAS | Let Date: | Jun 2019 |
Highway: | SL 12 | Let Status: | Approved |
Project ID: | STP 2019(865)HES | CSJ: | 0581-02-152 |
Description: | INSTALL MEDIAN CONCRETE BARRIERS | Handling Code: | |
Limits From: | SINGLETON BLVD | Fund Cat: | 1 |
Limits To: | 0.266 MI N OF SINGLETON BLVD | ESTIMATE: | $347,219 |
Length: | 0.3 | Actual | $0 |
Back... | Totals for 0353-05-121 | ||
Length: | 47.5 | ||
Estimate: | $4,376,422 | ||
Actual: | |||
CCSJ: 0430-01-060 |
|||
District: | DALLAS | Let Date: | Jun 2019 |
Highway: | SH 352 | Let Status: | Approved |
Project ID: | STP 2019(866)HES | CSJ: | 0430-01-060 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | AT PRAIRIE CREEK | Fund Cat: | 8 |
Limits To: | IN THE CITY OF DALLAS | ESTIMATE: | $259,919 |
Length: | 0.2 | Actual | $0 |
District: | DALLAS | Let Date: | Jun 2019 |
Highway: | SH 342 | Let Status: | Approved |
Project ID: | STP 2019(866)HES | CSJ: | 0048-01-065 |
Description: | TRAFFIC SIGNAL IMPROVEMENT AND INSTALL SIDEWALKS | Handling Code: | |
Limits From: | AT CAMP WISDOM RD INTERSECTION | Fund Cat: | 8 |
Limits To: | IN THE CITY OF DALLAS | ESTIMATE: | $305,246 |
Length: | 0.2 | Actual | $0 |
District: | DALLAS | Let Date: | Jun 2019 |
Highway: | SL 354 | Let Status: | Approved |
Project ID: | STP 2019(866)HES | CSJ: | 0196-06-031 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | AT LOMBARDY LANE | Fund Cat: | 8 |
Limits To: | IN THE CITY OF DALLAS | ESTIMATE: | $286,512 |
Length: | 0.2 | Actual | $0 |
District: | DALLAS | Let Date: | Jun 2019 |
Highway: | SH 352 | Let Status: | Approved |
Project ID: | STP 2019(866)HES | CSJ: | 0197-01-013 |
Description: | TRAFFIC SIGNAL IMPROVEMENT AND INSTALL SIDEWALKS | Handling Code: | |
Limits From: | AT FITZHUGH AVE INTERSECTION | Fund Cat: | 8 |
Limits To: | IN THE CITY OF DALLAS | ESTIMATE: | $313,178 |
Length: | 0.2 | Actual | $0 |
District: | DALLAS | Let Date: | Jun 2019 |
Highway: | SH 352 | Let Status: | Approved |
Project ID: | STP 2019(866)HES | CSJ: | 0430-01-061 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | AT ST AUGUSTINE | Fund Cat: | 8 |
Limits To: | IN THE CITY OF DALLAS | ESTIMATE: | $269,123 |
Length: | 0.2 | Actual | $0 |
District: | DALLAS | Let Date: | Jun 2019 |
Highway: | SL 12 | Let Status: | Approved |
Project ID: | STP 2019(866)HES | CSJ: | 0581-01-143 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | AT SAMUEL BLVD | Fund Cat: | 8 |
Limits To: | IN THE CITY OF DALLAS | ESTIMATE: | $320,859 |
Length: | 0.2 | Actual | $0 |
District: | DALLAS | Let Date: | Jun 2019 |
Highway: | SL 12 | Let Status: | Approved |
Project ID: | STP 2019(866)HES | CSJ: | 0581-01-149 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | AT EAST LAKE HIGHLANDS | Fund Cat: | 8 |
Limits To: | IN THE CITY OF DALLAS | ESTIMATE: | $314,800 |
Length: | 0.2 | Actual | $0 |
District: | DALLAS | Let Date: | Jun 2019 |
Highway: | SL 12 | Let Status: | Approved |
Project ID: | STP 2019(866)HES | CSJ: | 0581-01-153 |
Description: | TRAFFIC SIGNAL IMPROVEMENT AND INSTALL SIDEWALKS | Handling Code: | |
Limits From: | AT MERCER DR INTERSECTION | Fund Cat: | 8 |
Limits To: | IN THE CITY OF DALLAS | ESTIMATE: | $244,330 |
Length: | 0.2 | Actual | $0 |
District: | DALLAS | Let Date: | Jun 2019 |
Highway: | SS 303 | Let Status: | Approved |
Project ID: | STP 2019(866)HES | CSJ: | 2208-02-024 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | AT DUNCANVILLE RD | Fund Cat: | 8 |
Limits To: | IN THE CITY OF DALLAS | ESTIMATE: | $296,764 |
Length: | 0.2 | Actual | $0 |
Back... | Totals for 0430-01-060 | ||
Length: | 1.8 | ||
Estimate: | $2,610,731 | ||
Actual: | |||
CCSJ: 0581-01-137 |
|||
District: | DALLAS | Let Date: | Jan 2019 |
Highway: | SL 12 | Let Status: | Actual |
Project ID: | BR 2019(491) | CSJ: | 0581-01-137 |
Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: | |
Limits From: | AT MOCKINGBIRD / PEAVY | Fund Cat: | 6 |
Limits To: | . | ESTIMATE: | $5,597,830 |
Length: | 0.2 | Actual | $6,192,206 |
Back... | Totals for 0581-01-137 | ||
Length: | 0.2 | ||
Estimate: | $5,597,830 | ||
Actual: | $6,192,206 | ||
CCSJ: 0581-02-124 |
|||
District: | DALLAS | Let Date: | Jul 2019 |
Highway: | SL 12 | Let Status: | Approved |
Project ID: | NH 1902(201) | CSJ: | 0581-02-124 |
Description: | Intersection Improvement | Handling Code: | |
Limits From: | AT SH 183 | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | 210,000,000 |
Length: | 1.3 | Actual | $0 |
District: | DALLAS | Let Date: | Jul 2019 |
Highway: | SS 482 | Let Status: | Approved |
Project ID: | NH 1902(201) | CSJ: | 0094-03-060 |
Description: | Interchange Improvement | Handling Code: | |
Limits From: | AT SH 114 & SH 183 | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | 210,000,000 |
Length: | 0.5 | Actual | $0 |
District: | DALLAS | Let Date: | Jul 2019 |
Highway: | SS 482 | Let Status: | Approved |
Project ID: | ROW 94-3-107 | CSJ: | 0094-03-107 |
Description: | ROW ACQUISITION, RELOCATION & UTILITIES | Handling Code: | |
Limits From: | AT SH 114 & SH 183 | Fund Cat: | ROW |
Limits To: | . | ESTIMATE: | |
Length: | 0.2 | Actual | $0 |
District: | DALLAS | Let Date: | Jul 2019 |
Highway: | SL 12 | Let Status: | Approved |
Project ID: | ROW 581-2-129 | CSJ: | 0581-02-129 |
Description: | UTILITY WORK ONLY | Handling Code: | |
Limits From: | AT SH 183 | Fund Cat: | ROW |
Limits To: | . | ESTIMATE: | |
Length: | 1.3 | Actual | $0 |
Back... | Totals for 0581-02-124 | ||
Length: | 3.3 | ||
Estimate: | $420,000,000 | ||
Actual: | |||
CCSJ: 0918-00-258 |
|||
District: | DALLAS | Let Date: | Aug 2019 |
Highway: | VA | Let Status: | Tentative |
Project ID: | CM ( ) | CSJ: | 0918-00-258 |
Description: | FREEWAY INCIDENT MANAGEMENT PROGRAM; FY 2018 FUNDING; | Handling Code: | XX |
Limits From: | M&O - REGIONAL COMMUNICATION SYSTEM | Fund Cat: | 3 |
Limits To: | (EASTERN SUB) | ESTIMATE: | $2,737,999 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0918-00-258 | ||
Length: | 0 | ||
Estimate: | $2,737,999 | ||
Actual: | |||
CCSJ: 0918-00-286 |
|||
District: | DALLAS | Let Date: | Oct 2018 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2019(178) | CSJ: | 0918-00-286 |
Description: | INSTALLATION OF TRAFFIC SIGNALS | Handling Code: | |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 1 |
Limits To: | IN THE DALLAS DISTRICT | ESTIMATE: | $2,976,000 |
Length: | 0.0 | Actual | $2,294,098 |
Back... | Totals for 0918-00-286 | ||
Length: | 0 | ||
Estimate: | $2,976,000 | ||
Actual: | $2,294,098 | ||
CCSJ: 0918-00-287 |
|||
District: | DALLAS | Let Date: | Mar 2019 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2019(631) | CSJ: | 0918-00-287 |
Description: | WRONG WAY DRIVING IMPLEMENTATION TO PREVENT WRONG WAY | Handling Code: | |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 1 |
Limits To: | IN THE DALLAS DISTRICT | ESTIMATE: | $700,409 |
Length: | 0.0 | Actual | $671,750 |
Back... | Totals for 0918-00-287 | ||
Length: | 0 | ||
Estimate: | $700,409 | ||
Actual: | $671,750 | ||
CCSJ: 0918-00-288 |
|||
District: | DALLAS | Let Date: | Jul 2019 |
Highway: | VA | Let Status: | Approved |
Project ID: | STP 1902(116) | CSJ: | 0918-00-288 |
Description: | NON-SITE SPECIFIC INSTALLATION OF TRAFFIC SIGNALS | Handling Code: | |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 1 |
Limits To: | IN THE DALLAS DISTRICT | ESTIMATE: | $2,500,000 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0918-00-288 | ||
Length: | 0 | ||
Estimate: | $2,500,000 | ||
Actual: | |||
CCSJ: 0918-00-290 |
|||
District: | DALLAS | Let Date: | Nov 2018 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2019(483)MM | CSJ: | 0918-00-290 |
Description: | MOBILITY ASSISTANCE PATROL THAT PROVIDES ASSISTANCE TO | Handling Code: | XX |
Limits From: | REGIONAL MOBILITY ASSISTANCE PATROL | Fund Cat: | 7 |
Limits To: | . | ESTIMATE: | $4,155,844 |
Length: | 0.1 | Actual | $4,685,292 |
Back... | Totals for 0918-00-290 | ||
Length: | 0.1 | ||
Estimate: | $4,155,844 | ||
Actual: | $4,685,292 | ||
CCSJ: 0918-00-291 |
|||
District: | DALLAS | Let Date: | Aug 2019 |
Highway: | CS | Let Status: | Tentative |
Project ID: | CM 2019(740) | CSJ: | 0918-00-291 |
Description: | ENGINEERING/ENVIRONMENTAL FOR COTTON BELT REGIONAL RAIL | Handling Code: | TR |
Limits From: | DFW TERMINAL B | Fund Cat: | 3 |
Limits To: | SHILOH STATION IN PLANO | ESTIMATE: | $21,281,250 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0918-00-291 | ||
Length: | 0 | ||
Estimate: | $21,281,250 | ||
Actual: | |||
CCSJ: 0918-00-292 |
|||
District: | DALLAS | Let Date: | Aug 2019 |
Highway: | CS | Let Status: | Tentative |
Project ID: | CM 2019(741) | CSJ: | 0918-00-292 |
Description: | COTTON BELT #4: COTTON BELT REGIONAL RAIL PROJECT | Handling Code: | TR |
Limits From: | COTTON BELT | Fund Cat: | 5 |
Limits To: | . | ESTIMATE: | $12,500,000 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0918-00-292 | ||
Length: | 0 | ||
Estimate: | $12,500,000 | ||
Actual: | |||
CCSJ: 0918-00-295 |
|||
District: | DALLAS | Let Date: | May 2019 |
Highway: | VA | Let Status: | Approved |
Project ID: | NH 2019(966) | CSJ: | 0918-00-295 |
Description: | HIGHWAY IMPROVEMENT | Handling Code: | |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 1 |
Limits To: | IN THE DALLAS DISTRICT | ESTIMATE: | $3,046,962 |
Length: | 591.5 | Actual | $0 |
Back... | Totals for 0918-00-295 | ||
Length: | 591.5 | ||
Estimate: | $3,046,962 | ||
Actual: | |||
CCSJ: 0918-45-372 |
|||
District: | DALLAS | Let Date: | Oct 2018 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 97(439)MM | CSJ: | 0918-45-372 |
Description: | RECONST 4 LANE UNDIVIDED TO 4 LANE DIVIDED WITH INTERSECTION | Handling Code: | LC |
Limits From: | ON DOLPHIN RD FROM SPRING AVE | Fund Cat: | 3 |
Limits To: | NORTH OF HASKELL AVE/MILITARY PKWY | ESTIMATE: | $2,584,107 |
Length: | 0.4 | Actual | $7,559,936 |
Back... | Totals for 0918-45-372 | ||
Length: | 0.4 | ||
Estimate: | $2,584,107 | ||
Actual: | $7,559,936 | ||
CCSJ: 0918-45-817 |
|||
District: | DALLAS | Let Date: | Dec 2018 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 1602(579) | CSJ: | 0918-45-817 |
Description: | CITYWIDE SIGNAL SYSTEM UPGRADE | Handling Code: | LC |
Limits From: | VARIOUS LOCATIONS IN CITY OF | Fund Cat: | 3 |
Limits To: | CARROLLTON - OFF-SYSTEM | ESTIMATE: | $900,000 |
Length: | 0.0 | Actual | $787,883 |
District: | DALLAS | Let Date: | Dec 2018 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 1602(580) | CSJ: | 0918-45-818 |
Description: | CITYWIDE SIGNAL SYSTEM UPGRADE | Handling Code: | LC |
Limits From: | VARIOUS LOCATIONS IN CITY OF | Fund Cat: | 5 |
Limits To: | CARROLLTON ON-SYSTEM | ESTIMATE: | $200,000 |
Length: | 0.0 | Actual | $226,315 |
Back... | Totals for 0918-45-817 | ||
Length: | 0 | ||
Estimate: | $1,100,000 | ||
Actual: | $1,014,198 | ||
CCSJ: 0918-47-062 |
|||
District: | DALLAS | Let Date: | Apr 2019 |
Highway: | CS | Let Status: | Actual |
Project ID: | BR 2013(300) | CSJ: | 0918-47-062 |
Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: | |
Limits From: | ON THIRD ST AT KELLER BRANCH | Fund Cat: | 6 |
Limits To: | IN CITY OF LANCASTER | ESTIMATE: | $739,073 |
Length: | 0.1 | Actual | $793,042 |
Back... | Totals for 0918-47-062 | ||
Length: | 0.1 | ||
Estimate: | $739,073 | ||
Actual: | $793,042 | ||
CCSJ: 0918-47-069 |
|||
District: | DALLAS | Let Date: | Feb 2019 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2012(401)FRS | CSJ: | 0918-47-069 |
Description: | RAILROAD ADVANCED PREEMPTION | Handling Code: | XX |
Limits From: | RAILROAD CROSSINGS AT UPRR, FROM | Fund Cat: | 3 |
Limits To: | SH161 TO BAGDAD IN GRAND PRAIRIE | ESTIMATE: | $1,541,880 |
Length: | 0.0 | Actual | $1,765,880 |
Back... | Totals for 0918-47-069 | ||
Length: | 0 | ||
Estimate: | $1,541,880 | ||
Actual: | $1,765,880 | ||
CCSJ: 0918-47-099 |
|||
District: | DALLAS | Let Date: | Feb 2019 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2014(094)TE | CSJ: | 0918-47-099 |
Description: | BIKE AND PEDESTRAIN FACILITY; CONCRETE TRAIL; LIGHTING AND | Handling Code: | LC |
Limits From: | ROCK ISLAND BIKE AND PED FACILITY | Fund Cat: | 3 |
Limits To: | ALONG TRE RAIL LINE | ESTIMATE: | $3,900,000 |
Length: | 2.4 | Actual | $3,654,094 |
Back... | Totals for 0918-47-099 | ||
Length: | 2.4 | ||
Estimate: | $3,900,000 | ||
Actual: | $3,654,094 | ||
CCSJ: 0918-47-115 |
|||
District: | DALLAS | Let Date: | Sep 2018 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2019(039) | CSJ: | 0918-47-115 |
Description: | CONSTRUCT CURB RAMPS AND SIDEWALKS IN THE CITY OF DALLAS, | Handling Code: | |
Limits From: | VARIOUS LOCATIONS ON STATE HIGHWAYS | Fund Cat: | 10 |
Limits To: | IN DALLAS COUNTY | ESTIMATE: | $2,416,541 |
Length: | 0.0 | Actual | $2,237,635 |
Back... | Totals for 0918-47-115 | ||
Length: | 0 | ||
Estimate: | $2,416,541 | ||
Actual: | $2,237,635 | ||
CCSJ: 0918-47-139 |
|||
District: | DALLAS | Let Date: | Oct 2018 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2017(213)TP | CSJ: | 0918-47-139 |
Description: | TRINITY SKYLINE TRAIL - CONSTRUCT HIKE AND BIKE TRAIL | Handling Code: | LC |
Limits From: | SYLVAN AVENUE | Fund Cat: | 3 |
Limits To: | CAMPION TRAIL IN CITY OF IRVING | ESTIMATE: | $4,284,989 |
Length: | 4.7 | Actual | $5,878,100 |
Back... | Totals for 0918-47-139 | ||
Length: | 4.7 | ||
Estimate: | $4,284,989 | ||
Actual: | $5,878,100 | ||
CCSJ: 0918-47-140 |
|||
District: | DALLAS | Let Date: | Feb 2019 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 1602(604)TP | CSJ: | 0918-47-140 |
Description: | BROOKHAVEN COLLEGE CAMPUS - INTERCITY CONNECTIONS -CONSTRUCT | Handling Code: | LC |
Limits From: | ON MARSH LN AT FARMERS CREEK | Fund Cat: | 3 |
Limits To: | AND ON VALLEY VIEW LN AT ROSSER RD | ESTIMATE: | $621,797 |
Length: | 0.3 | Actual | $613,333 |
Back... | Totals for 0918-47-140 | ||
Length: | 0.3 | ||
Estimate: | $621,797 | ||
Actual: | $613,333 | ||
CCSJ: 0918-47-142 |
|||
District: | DALLAS | Let Date: | Aug 2019 |
Highway: | CS | Let Status: | Tentative |
Project ID: | STP 2017(467)TP | CSJ: | 0918-47-142 |
Description: | DELAWARE CREEK TRAIL CONNECTOR - CONSTRUCT HIKE & BIKE TRAIL | Handling Code: | LC |
Limits From: | CAMPION TR IN MOUNTAIN CR PRESERVE | Fund Cat: | 3 |
Limits To: | DELAWARE CREEK TRAIL @ SENTER PARK | ESTIMATE: | $2,220,109 |
Length: | 2.0 | Actual | $0 |
Back... | Totals for 0918-47-142 | ||
Length: | 2 | ||
Estimate: | $2,220,109 | ||
Actual: | |||
CCSJ: 0918-47-165 |
|||
District: | DALLAS | Let Date: | Oct 2018 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2017(431)TAPS | CSJ: | 0918-47-165 |
Description: | PLEASANT RUN ROAD TRAIL - INSTALL BIKE/PEDESTRIAN TRAIL | Handling Code: | LC |
Limits From: | ON PLEASANT RUN RD | Fund Cat: | 3 |
Limits To: | LANCASTER/HUTCHINS TO MILLERS FERRY | ESTIMATE: | $2,570,548 |
Length: | 3.1 | Actual | $2,364,566 |
Back... | Totals for 0918-47-165 | ||
Length: | 3.1 | ||
Estimate: | $2,570,548 | ||
Actual: | $2,364,566 | ||
CCSJ: 0918-47-168 |
|||
District: | DALLAS | Let Date: | Aug 2019 |
Highway: | CS | Let Status: | Tentative |
Project ID: | C 918-47-168 | CSJ: | 0918-47-168 |
Description: | RECONSTRUCT 6/8 LN TO 6 LN WITH BIKE/PEDESTRIAN IMPROVEMENTS | Handling Code: | XX |
Limits From: | ON RIVERFRONT BLVD FROM CADIZ ST | Fund Cat: | 3 |
Limits To: | UNION PACIFIC RAILROAD | ESTIMATE: | $28,042,780 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0918-47-168 | ||
Length: | 0 | ||
Estimate: | $28,042,780 | ||
Actual: | |||
CCSJ: 0918-47-178 |
|||
District: | DALLAS | Let Date: | Apr 2019 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2019(720)HES | CSJ: | 0918-47-178 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | BROCKBANK DR AT LOMBARDY LN | Fund Cat: | 3 |
Limits To: | IN THE CITY OF DALLAS | ESTIMATE: | $205,158 |
Length: | 0.2 | Actual | $246,320 |
District: | DALLAS | Let Date: | Apr 2019 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2019(720)HES | CSJ: | 0918-47-181 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | ILLINOIS AVE AT VERNON AVE | Fund Cat: | 3 |
Limits To: | IN THE CITY OF DALLAS | ESTIMATE: | $267,808 |
Length: | 0.2 | Actual | $347,288 |
District: | DALLAS | Let Date: | Apr 2019 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2019(720)HES | CSJ: | 0918-47-189 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | FERGUSON RD AT MAYLEE-SHILOH RD | Fund Cat: | 3 |
Limits To: | IN THE CITY OF DALLAS | ESTIMATE: | $228,422 |
Length: | 0.2 | Actual | $286,314 |
District: | DALLAS | Let Date: | Apr 2019 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2019(720)HES | CSJ: | 0918-47-190 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | CEDAR SPRINGS RD AT DOUGLAS AVE | Fund Cat: | 3 |
Limits To: | IN THE CITY OF DALLAS | ESTIMATE: | $202,637 |
Length: | 0.2 | Actual | $267,621 |
District: | DALLAS | Let Date: | Apr 2019 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2019(720)HES | CSJ: | 0918-47-191 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | OLIVE ST AT SAN JACINTO ST | Fund Cat: | 3 |
Limits To: | IN THE CITY OF DALLAS | ESTIMATE: | $155,851 |
Length: | 0.2 | Actual | $182,457 |
Back... | Totals for 0918-47-178 | ||
Length: | 1 | ||
Estimate: | $1,059,877 | ||
Actual: | $1,330,000 | ||
CCSJ: 0918-47-233 |
|||
District: | DALLAS | Let Date: | Nov 2018 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2019(228) | CSJ: | 0918-47-233 |
Description: | PRELIMINARY ENGINEERING FOR VELOWEB SHARED-USE PATH | Handling Code: | XX |
Limits From: | DCTA HEBRON STATION | Fund Cat: | 3 |
Limits To: | IRVING CAMPION TRAIL NRTH EXTENSION | ESTIMATE: | $625,000 |
Length: | 0.1 | Actual | $625,000 |
Back... | Totals for 0918-47-233 | ||
Length: | 0.1 | ||
Estimate: | $625,000 | ||
Actual: | $625,000 | ||
CCSJ: 0918-47-243 |
|||
District: | DALLAS | Let Date: | Feb 2019 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 2019(650) | CSJ: | 0918-47-243 |
Description: | INTERSECTION IMPROVEMENTS INCLUDING TRAFFIC SIGNAL UPGRADES | Handling Code: | LC |
Limits From: | ON PARK LANE AT US 75 AND ON WALNUT | Fund Cat: | 3 |
Limits To: | ST AT GREENVILLE,ABRAMS,& RICHLAND | ESTIMATE: | $1,055,855 |
Length: | 0.1 | Actual | $1,316,685 |
Back... | Totals for 0918-47-243 | ||
Length: | 0.1 | ||
Estimate: | $1,055,855 | ||
Actual: | $1,316,685 | ||
CCSJ: 0918-47-245 |
|||
District: | DALLAS | Let Date: | Mar 2019 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 918-47-245 | CSJ: | 0918-47-245 |
Description: | DEVELOP A STRATEGIC MOBILITY PLAN FOR THE CITY OF DALLAS | Handling Code: | XX |
Limits From: | CITYWIDE | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $1,000,000 |
Length: | 0.1 | Actual | $1,000,000 |
Back... | Totals for 0918-47-245 | ||
Length: | 0.1 | ||
Estimate: | $1,000,000 | ||
Actual: | $1,000,000 | ||
CCSJ: 1047-02-050 |
|||
District: | DALLAS | Let Date: | Jun 2019 |
Highway: | FM 1382 | Let Status: | Approved |
Project ID: | NH 2019(857) | CSJ: | 1047-02-050 |
Description: | Traffic Signal Improvements | Handling Code: | |
Limits From: | WEST OF STRAUS ROAD | Fund Cat: | 1 |
Limits To: | POLK STREET | ESTIMATE: | $771,738 |
Length: | 10.0 | Actual | $0 |
District: | DALLAS | Let Date: | Jun 2019 |
Highway: | VA | Let Status: | Approved |
Project ID: | C 918-00-276 | CSJ: | 0918-00-276 |
Description: | Furnish & Install Dynamic Message Signs | Handling Code: | |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 1 |
Limits To: | IN THE DALLAS DISTRICT | ESTIMATE: | $766,520 |
Length: | 0.0 | Actual | $0 |
District: | DALLAS | Let Date: | Jun 2019 |
Highway: | FM 1382 | Let Status: | Approved |
Project ID: | NH 2019(857) | CSJ: | 1047-03-073 |
Description: | IMPROVEMENT OF TRAFFIC SIGNALS | Handling Code: | |
Limits From: | NEW CLARK ROAD | Fund Cat: | 1 |
Limits To: | WEST OF STRAUS ROAD | ESTIMATE: | $131,738 |
Length: | 0.5 | Actual | $0 |
District: | DALLAS | Let Date: | Jun 2019 |
Highway: | IH 30 | Let Status: | Approved |
Project ID: | STP 2019(858)MM | CSJ: | 1068-04-175 |
Description: | Highway Improvement | Handling Code: | |
Limits From: | TARRANT COUNTY LINE | Fund Cat: | 7 |
Limits To: | BECKLEY AVENUE | ESTIMATE: | $483,860 |
Length: | 11.5 | Actual | $0 |
Back... | Totals for 1047-02-050 | ||
Length: | 22 | ||
Estimate: | $2,153,856 | ||
Actual: | |||
CCSJ: 2208-02-022 |
|||
District: | DALLAS | Let Date: | Jan 2019 |
Highway: | SS 303 | Let Status: | Actual |
Project ID: | C 2208-2-22 | CSJ: | 2208-02-022 |
Description: | FULL DEPTH REPAIR CONCRETE PAVEMENT, OVERLAY AND PAVEMENT | Handling Code: | |
Limits From: | MOUNTAIN CREEK PARKWAY | Fund Cat: | 1 |
Limits To: | SPUR 408 | ESTIMATE: | $1,170,430 |
Length: | 1.3 | Actual | $1,203,893 |
District: | DALLAS | Let Date: | Jan 2019 |
Highway: | SH 161 | Let Status: | Actual |
Project ID: | C 2964-1-46 | CSJ: | 2964-01-046 |
Description: | FULL DEPTH CONCRETE REPAIR OF FRONTAGE ROADS | Handling Code: | |
Limits From: | SH 183 | Fund Cat: | 1 |
Limits To: | IH 635 | ESTIMATE: | $1,476,943 |
Length: | 7.1 | Actual | $1,552,396 |
Back... | Totals for 2208-02-022 | ||
Length: | 8.4 | ||
Estimate: | $2,647,374 | ||
Actual: | $2,756,289 | ||
CCSJ: 2374-01-137 |
|||
District: | DALLAS | Let Date: | Jul 2019 |
Highway: | IH 635 | Let Status: | Approved |
Project ID: | NH ( ) | CSJ: | 2374-01-137 |
Description: | Widen Road - Add Lanes | Handling Code: | DB |
Limits From: | MILLER ROAD | Fund Cat: | 2M |
Limits To: | WEST OF THE KCS RR (WEST OF SH 78) | ESTIMATE: | 230,221,536 |
Length: | 2.6 | Actual | $0 |
District: | DALLAS | Let Date: | Jul 2019 |
Highway: | IH 635 | Let Status: | Approved |
Project ID: | NH ( ) | CSJ: | 2374-01-171 |
Description: | INTERCHANGE IMPROVEMENTS | Handling Code: | DB |
Limits From: | AT SKILLMAN / AUDELIA INTERCHANGE | Fund Cat: | 2M |
Limits To: | . | ESTIMATE: | $69,377,000 |
Length: | 0.3 | Actual | $0 |
District: | DALLAS | Let Date: | Jul 2019 |
Highway: | IH 635 | Let Status: | Approved |
Project ID: | NH ( ) | CSJ: | 2374-01-183 |
Description: | WIDEN 8 TO 10 GENERAL PURPOSE LANES AND RECONSTRUCT 4/8 | Handling Code: | DB |
Limits From: | EAST OF US 75 | Fund Cat: | 1 |
Limits To: | MILLER ROAD | ESTIMATE: | 385,988,661 |
Length: | 3.2 | Actual | $0 |
District: | DALLAS | Let Date: | Jul 2019 |
Highway: | IH 635 | Let Status: | Approved |
Project ID: | NH ( ) | CSJ: | 2374-01-190 |
Description: | RECONSTRUCT EXISTING 2 MANAGED LANES TO 2 MANAGED LANES | Handling Code: | DB |
Limits From: | EAST OF US 75 | Fund Cat: | 2M |
Limits To: | MILLER ROAD | ESTIMATE: | $50,956,661 |
Length: | 3.2 | Actual | $0 |
District: | DALLAS | Let Date: | Jul 2019 |
Highway: | IH 635 | Let Status: | Approved |
Project ID: | NH ( ) | CSJ: | 2374-01-191 |
Description: | RECONSTRUCT EXISTING 2 HOV/EXPRESS TO 2 HOV/EXPRESS LANES | Handling Code: | DB |
Limits From: | MILLER ROAD | Fund Cat: | 2M |
Limits To: | WEST OF THE KCS RR (WEST OF SH 78) | ESTIMATE: | $35,650,161 |
Length: | 2.6 | Actual | $0 |
District: | DALLAS | Let Date: | Jul 2019 |
Highway: | IH 635 | Let Status: | Approved |
Project ID: | NH ( ) | CSJ: | 2374-02-053 |
Description: | WIDEN 8 TO 10 GENERAL PURPOSE LANES AND RECONSTRUCT 4/6 | Handling Code: | DB |
Limits From: | WEST OF THE KCS RR (WEST OF SH 78) | Fund Cat: | 7 |
Limits To: | IH 30 | ESTIMATE: | 215,019,615 |
Length: | 5.2 | Actual | $0 |
District: | DALLAS | Let Date: | Jul 2019 |
Highway: | IH 635 | Let Status: | Approved |
Project ID: | STP ( )MM | CSJ: | 2374-02-152 |
Description: | RECONSTRUCT EXISTING 2 HOV/EXPRESS TO 2 HOV/EXPRESS LANES | Handling Code: | DB |
Limits From: | WEST OF THE KCS RR (WEST OF SH 78) | Fund Cat: | 7 |
Limits To: | IH 30 | ESTIMATE: | 186,119,772 |
Length: | 5.2 | Actual | $0 |
District: | DALLAS | Let Date: | Jul 2019 |
Highway: | IH 635 | Let Status: | Approved |
Project ID: | NH ( ) | CSJ: | 2374-02-153 |
Description: | RECONSTRUCT INTERCHANGE | Handling Code: | DB |
Limits From: | AT IH 30 | Fund Cat: | 7 |
Limits To: | . | ESTIMATE: | 153,566,595 |
Length: | 1.0 | Actual | $0 |
Back... | Totals for 2374-01-137 | ||
Length: | 23.3 | ||
Estimate: | $1,326,900,001 | ||
Actual: | |||
CCSJ: 2374-04-060 |
|||
District: | DALLAS | Let Date: | Dec 2018 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | STP 2019(256)MM | CSJ: | 2374-04-060 |
Description: | CONSTRUCT 0 TO 4 LANE FRONTAGE ROADS | Handling Code: | |
Limits From: | NORTH MAIN STREET | Fund Cat: | 7 |
Limits To: | CAMP WISDOM ROAD IN DUNCANVILLE | ESTIMATE: | $10,519,774 |
Length: | 0.8 | Actual | $11,973,895 |
Back... | Totals for 2374-04-060 | ||
Length: | 0.8 | ||
Estimate: | $10,519,774 | ||
Actual: | $11,973,895 | ||
CCSJ: 2964-06-024 |
|||
District: | DALLAS | Let Date: | Aug 2019 |
Highway: | SH 190 | Let Status: | Tentative |
Project ID: | CRX 2964-6-24 | CSJ: | 2964-06-024 |
Description: | INSTALL RAILROAD CROSSING SURFACE | Handling Code: | XX |
Limits From: | NB FRTG RD AT DGNO RR | Fund Cat: | 10 |
Limits To: | DOT #415224W | ESTIMATE: | $22,144 |
Length: | 0.2 | Actual | $0 |
Back... | Totals for 2964-06-024 | ||
Length: | 0.2 | ||
Estimate: | $22,144 | ||
Actual: | |||
CCSJ: 2964-06-025 |
|||
District: | DALLAS | Let Date: | Oct 2018 |
Highway: | SH 190 | Let Status: | Actual |
Project ID: | C 2964-6-25 | CSJ: | 2964-06-025 |
Description: | INSTALL NOISE BARRIER ON FRONTAGE ROADS | Handling Code: | |
Limits From: | NORTH OF LAKE RAY HUBBARD | Fund Cat: | 1 |
Limits To: | SOUTH OF MILLER ROAD | ESTIMATE: | $1,769,691 |
Length: | 0.8 | Actual | $1,735,987 |
Back... | Totals for 2964-06-025 | ||
Length: | 0.8 | ||
Estimate: | $1,769,691 | ||
Actual: | $1,735,987 |
Handling Code | Definition |
---|---|
XX | Project not processed through statewide letting |
TR | Transfer of funds |
LC | Project let through local entity |
LC | Project not charged against district apportionment |
Let Status | Definition |
---|---|
Tentative | Estimated letting date for this project |
Approved | Project has administrative approval to be let |
Actual | Project was let to contract |