Detail Letting Schedule for Dallas County (FY 2019)

Last Update: Monday, October 22, 2018
Dallas County (FY 2019)

CCSJ: 0008-08-076

District:DALLASLet Date:Apr 2019
Highway:SH 180Let Status:Tentative
Project ID:NH ( )CSJ:0008-08-076
Description:MILL, OVERLAY AND FLEXIBLE PAVEMENT REPAIR ON FRONTAGE ROADSHandling
Code:
 
Limits From:0.6 MILES EAST OF MACARTHUR BLVD.Fund Cat:1
Limits To:NORTH MERRIFIELD RDESTIMATE:$1,165,002
Length:1.7Actual$0
 
Back...
Totals for 0008-08-076
Length:1.7
Estimate:$1,165,002
Actual:

CCSJ: 0009-02-069

District:DALLASLet Date:Jan 2019
Highway:SH 78Let Status:Approved
Project ID:CM 2019(413)CSJ:0009-02-069
Description:9 INTERSECTION IMPROVEMENTSHandling
Code:
 
Limits From:GARLAND RD FROM SOUTH OF TRANQUILLAFund Cat:5
Limits To:SP 244 (NORTHWEST HIGHWAY)ESTIMATE:$7,440,345
Length:2.9Actual$0
 
District:DALLASLet Date:Jan 2019
Highway:SH 78Let Status:Approved
Project ID:ROW 9-2-70CSJ:0009-02-070
Description:UTILITIESHandling
Code:
 
Limits From:GARLAND RD FROM SOUTH OF TRANQUILLAFund Cat:ROW
Limits To:SP 244 (NORTHWEST HIGHWAY)ESTIMATE:$7,440,345
Length:2.9Actual$0
 
Back...
Totals for 0009-02-069
Length:5.8
Estimate:$14,880,690
Actual:

CCSJ: 0009-11-243

District:DALLASLet Date:Feb 2019
Highway:IH 30Let Status:Approved
Project ID:C 9-11-243CSJ:0009-11-243
Description:FULL DEPTH CONCRETE REPAIR ON EB FRONTAGE ROADSHandling
Code:
 
Limits From:US 80Fund Cat:1
Limits To:NORTH GALLOWAYESTIMATE:$1,352,748
Length:2.7Actual$0
 
Back...
Totals for 0009-11-243
Length:2.7
Estimate:$1,352,748
Actual:

CCSJ: 0009-11-245

District:DALLASLet Date:Jan 2019
Highway:IH 30Let Status:Approved
Project ID:C 9-11-245CSJ:0009-11-245
Description:FULL DEPTH CONCRETE REPAIRHandling
Code:
 
Limits From:BELT LINE RDFund Cat:1
Limits To:BASS PRO DRESTIMATE:$551,870
Length:3.5Actual$0
 
District:DALLASLet Date:Jan 2019
Highway:US 75Let Status:Approved
Project ID:C 47-7-235CSJ:0047-07-235
Description:FULL DEPTH CONCRETE REPAIRHandling
Code:
 
Limits From:ROYAL LNFund Cat:1
Limits To:HALL STREETESTIMATE:$186,730
Length:7.1Actual$0
 
District:DALLASLet Date:Jan 2019
Highway:SH 114Let Status:Approved
Project ID:C 353-4-105CSJ:0353-04-105
Description:FULL DEPTH CONCRETE REPAIRHandling
Code:
 
Limits From:FREEPORT PARKWAYFund Cat:1
Limits To:ESTERS BLVDESTIMATE:$746,754
Length:0.9Actual$0
 
Back...
Totals for 0009-11-245
Length:11.5
Estimate:$1,485,354
Actual:

CCSJ: 0047-07-230

District:DALLASLet Date:Feb 2019
Highway:US 75Let Status:Approved
Project ID:STP ( )HESCSJ:0047-07-230
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:AT FOREST LANEFund Cat:8
Limits To:.ESTIMATE:$452,150
Length:0.2Actual$0
 
District:DALLASLet Date:Feb 2019
Highway:US 75Let Status:Approved
Project ID:STP ( )HESCSJ:0047-07-234
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:AT WALNUT HILL LNFund Cat:8
Limits To:IN THE CITY OF DALLASESTIMATE:$434,650
Length:0.2Actual$0
 
District:DALLASLet Date:Feb 2019
Highway:SL 12Let Status:Approved
Project ID:STP ( )HESCSJ:0581-01-147
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:AT MILITARY PKWYFund Cat:8
Limits To:IN THE CITY OF DALLASESTIMATE:$344,000
Length:0.2Actual$0
 
District:DALLASLet Date:Feb 2019
Highway:IH 635Let Status:Approved
Project ID:STP ( )HESCSJ:2374-01-182
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:AT INWOOD RDFund Cat:8
Limits To:.ESTIMATE:$522,000
Length:0.2Actual$0
 
Back...
Totals for 0047-07-230
Length:0.8
Estimate:$1,752,800
Actual:

CCSJ: 0092-01-052

District:DALLASLet Date:Jun 2019
Highway:US 175Let Status:Tentative
Project ID:NH 2013(596)CSJ:0092-01-052
Description:RECONSTRUCT FREEWAY TO 6 LANE DIVIDED ARTERIALHandling
Code:
 
Limits From:SOUTH OF BUDD STFund Cat:2M
Limits To:IH 45ESTIMATE:$38,874,938
Length:1.6Actual$0
 
District:DALLASLet Date:Jun 2019
Highway:SH 310Let Status:Tentative
Project ID:NH ( )CSJ:0092-01-059
Description:RECONSTRUCT I-45 AND SM WRIGHT INTERCHANGEHandling
Code:
 
Limits From:PENNSYLVANIA AVENUEFund Cat:2M
Limits To:NORTH OF AL LIPSCOMB WAYESTIMATE:$9,581,017
Length:0.6Actual$0
 
District:DALLASLet Date:Jun 2019
Highway:IH 45Let Status:Tentative
Project ID:NH ( )CSJ:0092-14-088
Description:RECONSTRUCT I-45 AND SM WRIGHT INTERCHANGEHandling
Code:
 
Limits From:LENWAY ST.Fund Cat:2M
Limits To:GOOD LATIMERESTIMATE:$24,341,071
Length:1.0Actual$0
 
Back...
Totals for 0092-01-052
Length:3.2
Estimate:$72,797,026
Actual:

CCSJ: 0092-02-129

District:DALLASLet Date:May 2019
Highway:IH 45Let Status:Tentative
Project ID:NH ( )CSJ:0092-02-129
Description:INSTALL GUIDE SIGNSHandling
Code:
 
Limits From:ELLIS COUNTY LINEFund Cat:1
Limits To:SH 310ESTIMATE:$296,520
Length:8.4Actual$0
 
District:DALLASLet Date:May 2019
Highway:IH 45Let Status:Tentative
Project ID:NH ( )CSJ:0092-14-095
Description:INSTALL GUIDE SIGNSHandling
Code:
 
Limits From:SH 310Fund Cat:1
Limits To:IH 30ESTIMATE:$262,088
Length:11.5Actual$0
 
District:DALLASLet Date:May 2019
Highway:US 287Let Status:Tentative
Project ID:NH ( )CSJ:0172-13-005
Description:INSTALL GUIDE SIGNSHandling
Code:
 
Limits From:NORTH OF FORTH WORTH RDFund Cat:1
Limits To:SOUTH OF WAXAHACHIE CREEKESTIMATE:$213,667
Length:0.1Actual$0
 
District:DALLASLet Date:May 2019
Highway:SL 12Let Status:Tentative
Project ID:NH ( )CSJ:0581-02-149
Description:INSTALL GUIDE SIGNSHandling
Code:
 
Limits From:UNION BOWER RDFund Cat:1
Limits To:SS 408ESTIMATE:$120,263
Length:6.6Actual$0
 
District:DALLASLet Date:May 2019
Highway:SS 408Let Status:Tentative
Project ID:NH ( )CSJ:3000-01-024
Description:INSTALL GUIDE SIGNSHandling
Code:
 
Limits From:IH 20Fund Cat:1
Limits To:LOOP 12ESTIMATE:$82,595
Length:4.2Actual$0
 
Back...
Totals for 0092-02-129
Length:30.8
Estimate:$975,133
Actual:

CCSJ: 0092-07-060

District:DALLASLet Date:May 2019
Highway:SH 356Let Status:Tentative
Project ID:NH ( )CSJ:0092-07-060
Description:MILL, OVERLAY, AND FLEXIBLE PAVEMENT REPAIR ON FRONTAGE ROADHandling
Code:
 
Limits From:N BELT LINE RDFund Cat:1
Limits To:E 6TH STREETESTIMATE:$2,012,131
Length:5.7Actual$0
 
Back...
Totals for 0092-07-060
Length:5.7
Estimate:$2,012,131
Actual:

CCSJ: 0092-14-092

District:DALLASLet Date:Feb 2019
Highway:IH 345Let Status:Approved
Project ID:C 92-14-92CSJ:0092-14-092
Description:FULL DEPTH CONCRETE REPAIR ON FRONTAGE ROADSHandling
Code:
 
Limits From:NORTH GOOD LATIMER EXPYFund Cat:1
Limits To:SS 366ESTIMATE:$601,035
Length:0.5Actual$0
 
District:DALLASLet Date:Feb 2019
Highway:IH 20Let Status:Approved
Project ID:C 2374-3-84CSJ:2374-03-084
Description:CONCRETE FULL DEPTH REPAIR ON FRTG RDHandling
Code:
 
Limits From:SH 342Fund Cat:1
Limits To:BONNIE VIEW LANEESTIMATE:$3,078,375
Length:1.9Actual$0
 
Back...
Totals for 0092-14-092
Length:2.4
Estimate:$3,679,410
Actual:

CCSJ: 0095-13-043

District:DALLASLet Date:Jun 2019
Highway:IH 20Let Status:Tentative
Project ID:NH ( )CSJ:0095-13-043
Description:FULL DEPTH CONCRETE REPAIR, SLOT STITCHING AND OVERLAY EBHandling
Code:
 
Limits From:IH 635Fund Cat:1
Limits To:KAUFMAN COUNTY LINEESTIMATE:$18,432,765
Length:6.2Actual$0
 
Back...
Totals for 0095-13-043
Length:6.2
Estimate:$18,432,765
Actual:

CCSJ: 0196-03-278

District:DALLASLet Date:Jul 2019
Highway:IH 35ELet Status:Tentative
Project ID:NH ( )CSJ:0196-03-278
Description:MILL, FULL DEPTH CONCRETE PAVEMENT REPAIR, OVERLAY ON THEHandling
Code:
 
Limits From:NORTH OF OAK LAWN AVE.Fund Cat:1
Limits To:NORTH OF HARRY HINES BLVD. RAMPSESTIMATE:$3,874,573
Length:5.4Actual$0
 
Back...
Totals for 0196-03-278
Length:5.4
Estimate:$3,874,573
Actual:

CCSJ: 0197-02-124

District:DALLASLet Date:Apr 2019
Highway:US 175Let Status:Tentative
Project ID:STP ( )CSJ:0197-02-124
Description:RAMP MODIFICATIONSHandling
Code:
 
Limits From:EAST OF E. MALLOY BRIDGE RDFund Cat:1
Limits To:KAUFMAN COUNTY LINEESTIMATE:$2,000,000
Length:0.7Actual$0
 
District:DALLASLet Date:Apr 2019
Highway:US 175Let Status:Tentative
Project ID:NH ( )CSJ:0197-03-074
Description:RAMP MODIFICATIONSHandling
Code:
 
Limits From:DALLAS COUNTY LINEFund Cat:1
Limits To:WEST OF FM 1389ESTIMATE:$2,000,000
Length:0.6Actual$0
 
Back...
Totals for 0197-02-124
Length:1.3
Estimate:$4,000,000
Actual:

CCSJ: 0197-02-126

District:DALLASLet Date:Jun 2019
Highway:US 175Let Status:Tentative
Project ID:NH ( )CSJ:0197-02-126
Description:MILL, FULL DEPTH PVMT. REPAIR, ACP OVERLAY AND PAVEMENTHandling
Code:
 
Limits From:IH 20Fund Cat:1
Limits To:KAUFMAN COUNTY LINEESTIMATE:$2,777,067
Length:7.2Actual$0
 
Back...
Totals for 0197-02-126
Length:7.2
Estimate:$2,777,067
Actual:

CCSJ: 0353-04-106

District:DALLASLet Date:Apr 2019
Highway:SS 348Let Status:Tentative
Project ID:NH ( )CSJ:0353-04-106
Description:CONCRETE FULL DEPTH REPAIR, OVERLAY, & PAVEMENT MARKINGSHandling
Code:
 
Limits From:SH 114Fund Cat:1
Limits To:SL 12ESTIMATE:$2,964,998
Length:6.2Actual$0
 
District:DALLASLet Date:Apr 2019
Highway:SL 12Let Status:Tentative
Project ID:NH ( )CSJ:0353-04-107
Description:MILL, CONCRETE FULL DEPTH REPAIR, OVERLAY & PAVEMENTHandling
Code:
 
Limits From:SPUR 348Fund Cat:1
Limits To:SHADY TRAILESTIMATE:$1,087,732
Length:0.6Actual$0
 
District:DALLASLet Date:Apr 2019
Highway:SL 12Let Status:Tentative
Project ID:NH ( )CSJ:0353-05-122
Description:MILL, CONCRETE FULL DEPTH REPAIR AND OVERLAYHandling
Code:
 
Limits From:SHADY TRAILFund Cat:1
Limits To:US 75ESTIMATE:$9,030,145
Length:8.5Actual$0
 
Back...
Totals for 0353-04-106
Length:15.3
Estimate:$13,082,875
Actual:

CCSJ: 0353-05-121

District:DALLASLet Date:Jun 2019
Highway:SL 12Let Status:Tentative
Project ID:STP ( )HESCSJ:0353-05-121
Description:INSTALL ADVANCE WARNING SIGNS AND CHEVRONS, MODERNIZE BRIDGEHandling
Code:
 
Limits From:SHADY TRAILFund Cat:8
Limits To:N BUCKNER BLVDESTIMATE:$1,253,924
Length:10.7Actual$0
 
District:DALLASLet Date:Jun 2019
Highway:SL 12Let Status:Tentative
Project ID:STP ( )HESCSJ:0581-01-154
Description:INSTALL ADVANCE WARNING SIGNS AND CHEVRONS, MODERNIZE BRIDGEHandling
Code:
 
Limits From:NB I-35 E FRONTAGE ROADSFund Cat:8
Limits To:E NORTHWEST HIGHWAYESTIMATE:$3,860,335
Length:19.6Actual$0
 
District:DALLASLet Date:Jun 2019
Highway:SL 12Let Status:Tentative
Project ID:STP ( )HESCSJ:0581-02-148
Description:INSTALL ADVANCE WARNING SIGNS AND CHEVRONS, MODERNIZE BRIDGEHandling
Code:
 
Limits From:SB INTERSTATE 35E FRONTAGE RDFund Cat:8
Limits To:SPUR 348ESTIMATE:$860,392
Length:16.9Actual$0
 
Back...
Totals for 0353-05-121
Length:47.2
Estimate:$5,974,651
Actual:

CCSJ: 0430-01-060

District:DALLASLet Date:Jun 2019
Highway:SH 352Let Status:Tentative
Project ID:STP ( )HESCSJ:0430-01-060
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:AT PRAIRIE CREEKFund Cat:8
Limits To:IN THE CITY OF DALLASESTIMATE:$258,983
Length:0.2Actual$0
 
District:DALLASLet Date:Jun 2019
Highway:SH 342Let Status:Tentative
Project ID:STP ( )HESCSJ:0048-01-065
Description:TRAFFIC SIGNAL IMPROVEMENT AND INSTALL SIDEWALKSHandling
Code:
 
Limits From:AT CAMP WISDOM RD INTERSECTIONFund Cat:8
Limits To:IN THE CITY OF DALLASESTIMATE:$371,507
Length:0.2Actual$0
 
District:DALLASLet Date:Jun 2019
Highway:SL 354Let Status:Tentative
Project ID:STP ( )HESCSJ:0196-06-031
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:AT LOMBARDY LANEFund Cat:8
Limits To:IN THE CITY OF DALLASESTIMATE:$290,314
Length:0.2Actual$0
 
District:DALLASLet Date:Jun 2019
Highway:SH 352Let Status:Tentative
Project ID:STP ( )HESCSJ:0197-01-013
Description:TRAFFIC SIGNAL IMPROVEMENT AND INSTALL SIDEWALKSHandling
Code:
 
Limits From:AT FITZHUGH AVE INTERSECTIONFund Cat:8
Limits To:IN THE CITY OF DALLASESTIMATE:$375,407
Length:0.2Actual$0
 
District:DALLASLet Date:Jun 2019
Highway:SH 352Let Status:Tentative
Project ID:STP ( )HESCSJ:0430-01-061
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:AT ST AUGUSTINEFund Cat:8
Limits To:IN THE CITY OF DALLASESTIMATE:$263,769
Length:0.2Actual$0
 
District:DALLASLet Date:Jun 2019
Highway:SL 12Let Status:Tentative
Project ID:STP ( )HESCSJ:0581-01-143
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:AT SAMUEL BLVDFund Cat:8
Limits To:IN THE CITY OF DALLASESTIMATE:$330,913
Length:0.2Actual$0
 
District:DALLASLet Date:Jun 2019
Highway:SL 12Let Status:Tentative
Project ID:STP ( )HESCSJ:0581-01-149
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:AT EAST LAKE HIGHLANDSFund Cat:8
Limits To:IN THE CITY OF DALLASESTIMATE:$320,394
Length:0.2Actual$0
 
District:DALLASLet Date:Jun 2019
Highway:SL 12Let Status:Tentative
Project ID:STP ( )HESCSJ:0581-01-153
Description:TRAFFIC SIGNAL IMPROVEMENT AND INSTALL SIDEWALKSHandling
Code:
 
Limits From:AT MERCER DR INTERSECTIONFund Cat:8
Limits To:IN THE CITY OF DALLASESTIMATE:$318,667
Length:0.2Actual$0
 
District:DALLASLet Date:Jun 2019
Highway:SS 303Let Status:Tentative
Project ID:STP ( )HESCSJ:2208-02-024
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:AT DUNCANVILLE RDFund Cat:8
Limits To:IN THE CITY OF DALLASESTIMATE:$264,665
Length:0.2Actual$0
 
Back...
Totals for 0430-01-060
Length:1.8
Estimate:$2,794,619
Actual:

CCSJ: 0581-02-124

District:DALLASLet Date:Jul 2019
Highway:SL 12Let Status:Tentative
Project ID:NH ( )CSJ:0581-02-124
Description:RECONSTRUCT INTERCHANGE (PH 2)Handling
Code:
 
Limits From:AT SH 183Fund Cat:1
Limits To:.ESTIMATE:210,000,000
Length:1.3Actual$0
 
District:DALLASLet Date:Jul 2019
Highway:SS 482Let Status:Tentative
Project ID:NH ( )CSJ:0094-03-060
Description:RECONSTRUCT INTERCHANGE (PH 2)Handling
Code:
 
Limits From:AT SH 114 & SH 183Fund Cat:1
Limits To:.ESTIMATE:210,000,000
Length:0.7Actual$0
 
Back...
Totals for 0581-02-124
Length:2
Estimate:$420,000,000
Actual:

CCSJ: 0918-00-258

District:DALLASLet Date:Aug 2019
Highway:VALet Status:Tentative
Project ID:CM ( )CSJ:0918-00-258
Description:FREEWAY INCIDENT MANAGEMENT PROGRAM; FY 2018 FUNDING;Handling
Code:
XX
Limits From:M&O - REGIONAL COMMUNICATION SYSTEMFund Cat:3
Limits To:(EASTERN SUB)ESTIMATE:$2,737,999
Length:0.0Actual$0
 
Back...
Totals for 0918-00-258
Length:0
Estimate:$2,737,999
Actual:

CCSJ: 0918-00-286

District:DALLASLet Date:Oct 2018
Highway:VALet Status:Actual
Project ID:STP 2019(178)CSJ:0918-00-286
Description:INSTALLATION OF TRAFFIC SIGNALSHandling
Code:
 
Limits From:VARIOUS LOCATIONSFund Cat:1
Limits To:IN THE DALLAS DISTRICTESTIMATE:$2,976,000
Length:0.0Actual$2,294,098
 
Proposal Request
List Showing Order
Bid List
Addenda
Bid Tabulations
Back...
Totals for 0918-00-286
Length:0
Estimate:$2,976,000
Actual:$2,294,098

CCSJ: 0918-00-287

District:DALLASLet Date:May 2019
Highway:VALet Status:Tentative
Project ID:STP ( )CSJ:0918-00-287
Description:WRONG WAY DRIVING IMPLEMENTATION TO PREVENT WRONG WAYHandling
Code:
 
Limits From:VARIOUS LOCATIONSFund Cat:1
Limits To:IN THE DALLAS DISTRICTESTIMATE:$685,410
Length:0.0Actual$0
 
Back...
Totals for 0918-00-287
Length:0
Estimate:$685,410
Actual:

CCSJ: 0918-00-290

District:DALLASLet Date:Aug 2019
Highway:VALet Status:Tentative
Project ID:STP 2019(483)MMCSJ:0918-00-290
Description:MOBILITY ASSISTANCE PATROL THAT PROVIDES ASSISTANCE TOHandling
Code:
XX
Limits From:REGIONAL MOBILITY ASSISTANCE PATROLFund Cat:7
Limits To:.ESTIMATE:$4,155,844
Length:0.1Actual$0
 
Back...
Totals for 0918-00-290
Length:0.1
Estimate:$4,155,844
Actual:

CCSJ: 0918-45-372

District:DALLASLet Date:Oct 2018
Highway:CSLet Status:Actual
Project ID:STP 97(439)MMCSJ:0918-45-372
Description:RECONST 4 LANE UNDIVIDED TO 4 LANE DIVIDED WITH INTERSECTIONHandling
Code:
LC
Limits From:ON DOLPHIN RD FROM SPRING AVEFund Cat:3
Limits To:NORTH OF HASKELL AVE/MILITARY PKWYESTIMATE:$2,584,107
Length:0.4Actual$7,559,936
 
District:DALLASLet Date:Oct 2018
Highway:CSLet Status:Approved
Project ID:STP 2012(818)MMCSJ:0918-45-826
Description:ROW ACQUISITION, RELOCATION ASSITANCE AND UTILITIESHandling
Code:
LC
Limits From:ON DOLPHIN RD FROM SPRING AVEFund Cat:ROW
Limits To:NORTH OF HASKELL AVE/MILITARY PKWYESTIMATE:
Length:0.4Actual$0
 
Back...
Totals for 0918-45-372
Length:0.8
Estimate:$2,584,107
Actual:$7,559,936

CCSJ: 0918-45-817

District:DALLASLet Date:Oct 2018
Highway:CSLet Status:Approved
Project ID:CM 1602(579)CSJ:0918-45-817
Description:CITYWIDE SIGNAL SYSTEM UPGRADEHandling
Code:
LC
Limits From:VARIOUS LOCATIONS IN CITY OFFund Cat:3
Limits To:CARROLLTON - OFF-SYSTEMESTIMATE:$900,000
Length:0.0Actual$0
 
District:DALLASLet Date:Oct 2018
Highway:CSLet Status:Approved
Project ID:CM 1602(580)CSJ:0918-45-818
Description:CITYWIDE SIGNAL SYSTEM UPGRADEHandling
Code:
LC
Limits From:VARIOUS LOCATIONS IN CITY OFFund Cat:5
Limits To:CARROLLTON ON-SYSTEMESTIMATE:$200,000
Length:0.0Actual$0
 
Back...
Totals for 0918-45-817
Length:0
Estimate:$1,100,000
Actual:

CCSJ: 0918-47-099

District:DALLASLet Date:Aug 2019
Highway:CSLet Status:Tentative
Project ID:STP 2014(094)TECSJ:0918-47-099
Description:BIKE AND PEDESTRAIN FACILITY; CONCRETE TRAIL; LIGHTING ANDHandling
Code:
LC
Limits From:ROCK ISLAND BIKE AND PED FACILITYFund Cat:3
Limits To:ALONG TRE RAIL LINEESTIMATE:$3,900,000
Length:2.4Actual$0
 
Back...
Totals for 0918-47-099
Length:2.4
Estimate:$3,900,000
Actual:

CCSJ: 0918-47-115

District:DALLASLet Date:Sep 2018
Highway:VALet Status:Actual
Project ID:STP 2019(039)CSJ:0918-47-115
Description:CONSTRUCT CURB RAMPS AND SIDEWALKS IN THE CITY OF DALLAS,Handling
Code:
 
Limits From:VARIOUS LOCATIONS ON STATE HIGHWAYSFund Cat:10
Limits To:IN DALLAS COUNTYESTIMATE:$2,416,541
Length:0.0Actual$2,237,635
 
Proposal Request
List Showing Order
Bid List
Addenda
Bid Tabulations
Award Status
Back...
Totals for 0918-47-115
Length:0
Estimate:$2,416,541
Actual:$2,237,635

CCSJ: 0918-47-139

District:DALLASLet Date:Feb 2019
Highway:CSLet Status:Approved
Project ID:STP 2017(213)TPCSJ:0918-47-139
Description:TRINITY SKYLINE TRAIL - CONSTRUCT HIKE AND BIKE TRAILHandling
Code:
LC
Limits From:SYLVAN AVENUEFund Cat:3
Limits To:CAMPION TRAIL IN CITY OF IRVINGESTIMATE:$4,284,989
Length:4.7Actual$0
 
Back...
Totals for 0918-47-139
Length:4.7
Estimate:$4,284,989
Actual:

CCSJ: 0918-47-140

District:DALLASLet Date:Dec 2018
Highway:CSLet Status:Approved
Project ID:STP 1602(604)TPCSJ:0918-47-140
Description:BROOKHAVEN COLLEGE CAMPUS - INTERCITY CONNECTIONS -CONSTRUCTHandling
Code:
LC
Limits From:ON MARSH LN AT FARMERS CREEKFund Cat:3
Limits To:AND ON VALLEY VIEW LN AT ROSSER RDESTIMATE:$621,797
Length:0.3Actual$0
 
Back...
Totals for 0918-47-140
Length:0.3
Estimate:$621,797
Actual:

CCSJ: 0918-47-142

District:DALLASLet Date:Aug 2019
Highway:CSLet Status:Tentative
Project ID:STP 2017(467)TPCSJ:0918-47-142
Description:DELAWARE CREEK TRAIL CONNECTOR - CONSTRUCT HIKE & BIKE TRAILHandling
Code:
LC
Limits From:CAMPION TR IN MOUNTAIN CR PRESERVEFund Cat:3
Limits To:DELAWARE CREEK TRAIL @ SENTER PARKESTIMATE:$2,220,109
Length:2.0Actual$0
 
Back...
Totals for 0918-47-142
Length:2
Estimate:$2,220,109
Actual:

CCSJ: 0918-47-165

District:DALLASLet Date:Oct 2018
Highway:CSLet Status:Approved
Project ID:STP 2017(431)TAPSCSJ:0918-47-165
Description:PLEASANT RUN ROAD TRAIL - INSTALL BIKE/PEDESTRIAN TRAILHandling
Code:
LC
Limits From:ON PLEASANT RUN RDFund Cat:3
Limits To:LANCASTER/HUTCHINS TO MILLERS FERRYESTIMATE:$2,570,548
Length:3.1Actual$0
 
Back...
Totals for 0918-47-165
Length:3.1
Estimate:$2,570,548
Actual:

CCSJ: 0918-47-178

District:DALLASLet Date:Apr 2019
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-178
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:BROCKBANK DR AT LOMBARDY LNFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$262,839
Length:0.2Actual$0
 
District:DALLASLet Date:Apr 2019
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-181
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:ON ILLINOIS AVE AT VERNON AVEFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$296,441
Length:0.2Actual$0
 
District:DALLASLet Date:Apr 2019
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-189
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:ON FERGUSON RD AT MAYLEE-SHILOH RDFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$308,952
Length:0.2Actual$0
 
District:DALLASLet Date:Apr 2019
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-190
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:ON CEDAR SPRINGS RD AT DOUGLAS AVEFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$264,075
Length:0.2Actual$0
 
District:DALLASLet Date:Apr 2019
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-191
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:ON OLIVE ST AT SAN JACINTO STFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$213,953
Length:0.2Actual$0
 
Back...
Totals for 0918-47-178
Length:1
Estimate:$1,346,260
Actual:

CCSJ: 0918-47-243

District:DALLASLet Date:Aug 2019
Highway:CSLet Status:Tentative
Project ID:CM ( )CSJ:0918-47-243
Description:INTERSECTION IMPROVEMENTS INCLUDING TRAFFIC SIGNAL UPGRADESHandling
Code:
LC
Limits From:ON PARK LANE AT US 75 AND ON WALNUTFund Cat:3
Limits To:ST AT GREENVILLE,ABRAMS,& RICHLANDESTIMATE:$1,055,855
Length:0.1Actual$0
 
Back...
Totals for 0918-47-243
Length:0.1
Estimate:$1,055,855
Actual:

CCSJ: 2208-02-022

District:DALLASLet Date:Jan 2019
Highway:SS 303Let Status:Approved
Project ID:C 2208-2-22CSJ:2208-02-022
Description:FULL DEPTH REPAIR CONCRETE PAVEMENT, OVERLAY AND PAVEMENTHandling
Code:
 
Limits From:MOUNTAIN CREEK PARKWAYFund Cat:1
Limits To:SPUR 408ESTIMATE:$1,394,824
Length:1.1Actual$0
 
District:DALLASLet Date:Jan 2019
Highway:SH 161Let Status:Approved
Project ID:C 2964-1-46CSJ:2964-01-046
Description:FULL DEPTH CONCRETE REPAIR OF FRONTAGE ROADSHandling
Code:
 
Limits From:SH 183Fund Cat:1
Limits To:IH 635ESTIMATE:$1,737,595
Length:7.3Actual$0
 
Back...
Totals for 2208-02-022
Length:8.4
Estimate:$3,132,419
Actual:

CCSJ: 2374-01-137

District:DALLASLet Date:Jul 2019
Highway:IH 635Let Status:Tentative
Project ID:NH ( )CSJ:2374-01-137
Description:WIDEN 8 TO 10 GENERAL PURPOSE LANES AND RECONSTRUCT 4/6Handling
Code:
DB
Limits From:MILLER ROADFund Cat:2M
Limits To:WEST OF THE KCS RR (WEST OF SH 78)ESTIMATE:230,221,536
Length:2.6Actual$0
 
District:DALLASLet Date:Jul 2019
Highway:IH 635Let Status:Tentative
Project ID:NH ( )CSJ:2374-01-171
Description:INTERCHANGE IMPROVEMENTSHandling
Code:
DB
Limits From:AT SKILLMAN / AUDELIA INTERCHANGEFund Cat:2M
Limits To:.ESTIMATE:$69,377,000
Length:0.3Actual$0
 
District:DALLASLet Date:Jul 2019
Highway:IH 635Let Status:Tentative
Project ID:NH ( )CSJ:2374-01-183
Description:WIDEN 8 TO 10 GENERAL PURPOSE LANES AND RECONSTRUCT 4/8Handling
Code:
DB
Limits From:EAST OF US 75Fund Cat:1
Limits To:MILLER ROADESTIMATE:385,988,661
Length:3.2Actual$0
 
District:DALLASLet Date:Jul 2019
Highway:IH 635Let Status:Tentative
Project ID:NH ( )CSJ:2374-01-190
Description:RECONSTRUCT EXISTING 2 MANAGED LANES TO 2 MANAGED LANESHandling
Code:
DB
Limits From:EAST OF US 75Fund Cat:2M
Limits To:MILLER ROADESTIMATE:$50,956,661
Length:3.2Actual$0
 
District:DALLASLet Date:Jul 2019
Highway:IH 635Let Status:Tentative
Project ID:NH ( )CSJ:2374-01-191
Description:RECONSTRUCT EXISTING 2 HOV/EXPRESS TO 2 HOV/EXPRESS LANESHandling
Code:
DB
Limits From:MILLER ROADFund Cat:2M
Limits To:WEST OF THE KCS RR (WEST OF SH 78)ESTIMATE:$35,650,161
Length:2.6Actual$0
 
District:DALLASLet Date:Jul 2019
Highway:IH 635Let Status:Tentative
Project ID:NH ( )CSJ:2374-02-053
Description:WIDEN 8 TO 10 GENERAL PURPOSE LANES AND RECONSTRUCT 4/6Handling
Code:
DB
Limits From:WEST OF THE KCS RR (WEST OF SH 78)Fund Cat:7
Limits To:IH 30ESTIMATE:215,019,615
Length:5.2Actual$0
 
District:DALLASLet Date:Jul 2019
Highway:IH 635Let Status:Tentative
Project ID:STP ( )MMCSJ:2374-02-152
Description:RECONSTRUCT EXISTING 2 HOV/EXPRESS TO 2 HOV/EXPRESS LANESHandling
Code:
DB
Limits From:WEST OF THE KCS RR (WEST OF SH 78)Fund Cat:7
Limits To:IH 30ESTIMATE:186,119,772
Length:5.2Actual$0
 
District:DALLASLet Date:Jul 2019
Highway:IH 635Let Status:Tentative
Project ID:NH ( )CSJ:2374-02-153
Description:RECONSTRUCT INTERCHANGEHandling
Code:
DB
Limits From:AT IH 30Fund Cat:7
Limits To:.ESTIMATE:153,566,595
Length:1.0Actual$0
 
Back...
Totals for 2374-01-137
Length:23.3
Estimate:$1,326,900,001
Actual:

CCSJ: 2374-04-060

District:DALLASLet Date:Dec 2018
Highway:IH 20Let Status:Approved
Project ID:STP 2019(256)MMCSJ:2374-04-060
Description:CONSTRUCT 0 TO 4 LANE FRONTAGE ROADSHandling
Code:
 
Limits From:NORTH MAIN STREETFund Cat:7
Limits To:CAMP WISDOM ROAD IN DUNCANVILLEESTIMATE:$8,241,137
Length:0.8Actual$0
 
Back...
Totals for 2374-04-060
Length:0.8
Estimate:$8,241,137
Actual:

CCSJ: 2964-06-024

District:DALLASLet Date:Aug 2019
Highway:SH 190Let Status:Tentative
Project ID:CRX 2964-6-24CSJ:2964-06-024
Description:INSTALL RAILROAD CROSSING SURFACEHandling
Code:
XX
Limits From:NB FRTG RD AT DGNO RRFund Cat:10
Limits To:DOT #415224WESTIMATE:$22,144
Length:0.2Actual$0
 
Back...
Totals for 2964-06-024
Length:0.2
Estimate:$22,144
Actual:

CCSJ: 2964-06-025

District:DALLASLet Date:Oct 2018
Highway:SH 190Let Status:Actual
Project ID:C 2964-6-25CSJ:2964-06-025
Description:INSTALL NOISE BARRIER ON FRONTAGE ROADSHandling
Code:
 
Limits From:NORTH OF LAKE RAY HUBBARDFund Cat:1
Limits To:SOUTH OF MILLER ROADESTIMATE:$1,769,691
Length:0.8Actual$1,735,987
 
Proposal Request
List Showing Order
Bid List
Bid Tabulations
Back...
Totals for 2964-06-025
Length:0.8
Estimate:$1,769,691
Actual:$1,735,987

Handling CodeDefinition
XXProject not processed through statewide letting
TRTransfer of funds
LCProject let through local entity
LCProject not charged against district apportionment



Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract