Detail Letting Schedule for El Paso County (FY 2019)

Last Update: Tuesday, August 13, 2024

Bid Tabulations Dashboard

This report will no longer be updated, please access links on the Contract Letting page.

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

El Paso County (FY 2019)

CCSJ: 0001-02-055

District:EL PASOLet Date:Aug 2019
Highway:SH 20Let Status:Approved
Project ID:NH 2019(781)CSJ:0001-02-055
Description:Surfacing/Roadway RestorationHandling
Code:
 
Limits From:SUNLAND PARK DRIVEFund Cat:1
Limits To:750 FT S OF IH 10ESTIMATE:$13,001,146
Length:4.0Actual$0
 
District:EL PASOLet Date:Aug 2019
Highway:SH 20Let Status:Approved
Project ID:STP 2019(705)HESCSJ:0001-02-060
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:1.466 MI N OF IH 10Fund Cat:8
Limits To:1.231 MI N OF IH 10ESTIMATE:$137,204
Length:0.2Actual$0
 
District:EL PASOLet Date:Aug 2019
Highway:SH 20Let Status:Approved
Project ID:STP 2019(705)HESCSJ:0001-02-061
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:AT MESA HILLS DRIVEFund Cat:8
Limits To:.ESTIMATE:$410,994
Length:0.2Actual$0
 
District:EL PASOLet Date:Aug 2019
Highway:SH 20Let Status:Approved
Project ID:STP 2019(705)HESCSJ:0001-02-062
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:AT ARGONAUT DRFund Cat:8
Limits To:.ESTIMATE:$344,993
Length:0.2Actual$0
 
District:EL PASOLet Date:Aug 2019
Highway:SH 20Let Status:Approved
Project ID:STP 2019(705)HESCSJ:0001-03-056
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:1.231 MI N OF IH 10Fund Cat:8
Limits To:1.085 MI N OF IH 10ESTIMATE:$10,000
Length:0.1Actual$0
 
Bid List
Back...
Totals for 0001-02-055
Length:4.7
Estimate:$13,904,336
Actual:

CCSJ: 0001-03-058

District:EL PASOLet Date:May 2019
Highway:SH 20Let Status:Approved
Project ID:STP 2019(963)HESCSJ:0001-03-058
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:AT MISSOURI AVEFund Cat:8
Limits To:.ESTIMATE:
Length:0.2Actual$0
 
District:EL PASOLet Date:May 2019
Highway:US 85Let Status:Approved
Project ID:STP 2019(963)HESCSJ:0001-04-095
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:0.575 MI W OF US 62Fund Cat:8
Limits To:0.155 MI W OF US 62ESTIMATE:
Length:0.4Actual$0
 
District:EL PASOLet Date:May 2019
Highway:BU 54--Let Status:Approved
Project ID:STP 2019(963)HESCSJ:0167-02-061
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:US 54A/US 54 GATEWAY BLVD SOUTHFund Cat:8
Limits To:0.1 MI E OF US 54 GATEWAY NORTHESTIMATE:
Length:0.2Actual$0
 
District:EL PASOLet Date:May 2019
Highway:SL 478Let Status:Approved
Project ID:STP 2019(963)HESCSJ:0167-02-062
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:AT MONTANA AVEFund Cat:8
Limits To:.ESTIMATE:
Length:0.2Actual$0
 
District:EL PASOLet Date:May 2019
Highway:US 62Let Status:Approved
Project ID:STP 2019(963)HESCSJ:0374-02-110
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:AT AIRWAYFund Cat:8
Limits To:.ESTIMATE:
Length:0.2Actual$0
 
District:EL PASOLet Date:May 2019
Highway:US 62Let Status:Approved
Project ID:STP 2019(963)HESCSJ:0374-02-112
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:AT KRAG STFund Cat:8
Limits To:.ESTIMATE:
Length:0.2Actual$0
 
District:EL PASOLet Date:May 2019
Highway:FM 76Let Status:Approved
Project ID:STP 2019(963)HESCSJ:0674-01-068
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:AT HAWKINS BLVDFund Cat:8
Limits To:.ESTIMATE:
Length:0.2Actual$0
 
District:EL PASOLet Date:May 2019
Highway:FM 659Let Status:Approved
Project ID:STP 2019(963)HESCSJ:1046-01-035
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:AT VISTA DEL SOL DRFund Cat:8
Limits To:.ESTIMATE:
Length:0.2Actual$0
 
District:EL PASOLet Date:May 2019
Highway:FM 2529Let Status:Approved
Project ID:STP 2019(963)HESCSJ:2326-01-028
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:AT DYER STFund Cat:8
Limits To:.ESTIMATE:
Length:0.2Actual$0
 
District:EL PASOLet Date:May 2019
Highway:SL 375Let Status:Approved
Project ID:STP 2019(963)HESCSJ:2552-03-064
Description:TRAFFIC SIGNAL IMPROVEMENTSHandling
Code:
 
Limits From:AT BOB HOPE DRFund Cat:8
Limits To:.ESTIMATE:
Length:0.2Actual$0
 
Back...
Totals for 0001-03-058
Length:2.2
Estimate:$0
Actual:

CCSJ: 0167-01-113

District:EL PASOLet Date:Nov 2018
Highway:US 54Let Status:Actual
Project ID:NH 2019(166)CSJ:0167-01-113
Description:US 54/IH10/IH110/LOOP 375 INTERCHANGE IMPROVEMENTSHandling
Code:
 
Limits From:LP 375 (CESAR CHAVEZ BORDER HWY)Fund Cat:11
Limits To:YANDELL DRESTIMATE:$93,777,203
Length:1.2Actual$89,861,277
 
District:EL PASOLet Date:Nov 2018
Highway:IH 110Let Status:Actual
Project ID:NH 2019(167)CSJ:0167-01-118
Description:INSTALLATION OF SIGNS ON I110Handling
Code:
 
Limits From:US 62Fund Cat:1
Limits To:I 10ESTIMATE:$258,502
Length:0.9Actual$357,297
 
District:EL PASOLet Date:Nov 2018
Highway:IH 110Let Status:Actual
Project ID:ROW 167-1-119CSJ:0167-01-119
Description:ACQUISITIONHandling
Code:
 
Limits From:US 62Fund Cat:ROW
Limits To:I 10ESTIMATE:$5,132,393
Length:0.9Actual$948,024
 
Back...
Totals for 0167-01-113
Length:3
Estimate:$99,168,098
Actual:$91,166,598

CCSJ: 0374-02-097

District:EL PASOLet Date:Oct 2018
Highway:US 62Let Status:Actual
Project ID:NH 2019(063)CSJ:0374-02-097
Description:BUILD FRONTAGE ROADS AND MAINLANES WITH GRADE SEPARATIONSHandling
Code:
 
Limits From:GLOBAL REACH DRFund Cat:11
Limits To:FM 659 (ZARAGOZA RD)ESTIMATE:122,523,490
Length:7.8Actual138,160,814
 
District:EL PASOLet Date:Oct 2018
Highway:US 62Let Status:Actual
Project ID:ROW 374-2-103CSJ:0374-02-103
Description:ROW ACQUISITIONHandling
Code:
 
Limits From:GLOBAL REACH DRFund Cat:ROW
Limits To:FM 659 (ZARAGOZA RD)ESTIMATE:$26,951,717
Length:4.6Actual$5,593,434
 
District:EL PASOLet Date:Oct 2018
Highway:US 62Let Status:Actual
Project ID:STP 2019(064)HESCSJ:0374-02-111
Description:IMPROVE TRAFFIC SIGNALS, INSTALL SIDEWALKSHandling
Code:
 
Limits From:AT TIERRA ESTEFund Cat:8
Limits To:.ESTIMATE:$367,724
Length:0.2Actual$453,663
 
Back...
Totals for 0374-02-097
Length:12.6
Estimate:$149,842,931
Actual:$144,207,911

CCSJ: 0374-02-107

District:EL PASOLet Date:Jun 2019
Highway:US 62Let Status:Approved
Project ID:CM 2019(991)CSJ:0374-02-107
Description:INFRASTRUCTURE IMPROVEMENTSHandling
Code:
 
Limits From:GERONIMO DRFund Cat:5
Limits To:SIOUX DRESTIMATE:$502,914
Length:0.7Actual$0
 
Back...
Totals for 0374-02-107
Length:0.7
Estimate:$502,914
Actual:

CCSJ: 0924-00-100

District:EL PASOLet Date:Feb 2019
Highway:VALet Status:Actual
Project ID:STP 2019(575)CSJ:0924-00-100
Description:FY 2019 STRIPING PROJECTHandling
Code:
 
Limits From:DISTRICTWIDEFund Cat:1
Limits To:.ESTIMATE:$1,052,730
Length:85.5Actual$1,037,447
 
District:EL PASOLet Date:Feb 2019
Highway:US 67Let Status:Actual
Project ID:STP 2019(573)HESCSJ:0020-08-045
Description:RAISED EDGELINE & CENTERLINE RUMBLE STRIPSHandling
Code:
 
Limits From:BREWSTER/PRESIDIO COUNTY LINEFund Cat:8
Limits To:W SAN ANTONIO STESTIMATE:$157,538
Length:14.1Actual$136,571
 
District:EL PASOLet Date:Feb 2019
Highway:US 90Let Status:Actual
Project ID:STP 2019(573)HESCSJ:0021-02-025
Description:INSTALL ADVANCED WARNING SIGNS (CURVE), INSTALL CHEVRONS (CUHandling
Code:
 
Limits From:7.761 MI E OF US 67Fund Cat:8
Limits To:6.497 MI W OF US 385ESTIMATE:$108,697
Length:8.3Actual$95,780
 
District:EL PASOLet Date:Feb 2019
Highway:US 67Let Status:Actual
Project ID:STP 2019(573)HESCSJ:0104-07-024
Description:RAISED EDGELINE & CENTERLINE RUMBLE STRIPSHandling
Code:
 
Limits From:15.15 MI S OF JCT US 67/90Fund Cat:8
Limits To:32.19 MI S OF JCT US 67/90ESTIMATE:$165,306
Length:17.0Actual$145,476
 
District:EL PASOLet Date:Feb 2019
Highway:US 67Let Status:Actual
Project ID:STP 2019(573)HESCSJ:0104-09-032
Description:RAISED EDGELINE & CENTERLINE RUMBLE STRIPSHandling
Code:
 
Limits From:12.79 MI N OF FM 170Fund Cat:8
Limits To:0.278 MI W OF BU 67AESTIMATE:$145,294
Length:14.6Actual$127,038
 
District:EL PASOLet Date:Feb 2019
Highway:US 62Let Status:Actual
Project ID:STP 2019(573)HESCSJ:0374-05-028
Description:PROFILE EDGELINE MARKINGS, PROFILE CENERLINE MARKINGSHandling
Code:
 
Limits From:04.108 MI E OF HUDSPETH COUNTY LINEFund Cat:8
Limits To:1.767 MI W OF RM 2317ESTIMATE:$196,545
Length:15.9Actual$171,399
 
District:EL PASOLet Date:Feb 2019
Highway:SH 118Let Status:Actual
Project ID:STP 2019(573)HESCSJ:0415-02-027
Description:INSTALL ADVANCED WARNING SIGNS (CURVE), INSTALL CHEVRONSHandling
Code:
 
Limits From:0.127 MI S OF SH 166Fund Cat:8
Limits To:5.925 MI S OF SH 166ESTIMATE:$99,269
Length:5.8Actual$96,377
 
District:EL PASOLet Date:Feb 2019
Highway:RM 652Let Status:Actual
Project ID:STP 2019(573)HESCSJ:1314-02-015
Description:Hazard Elimination & SafetyHandling
Code:
 
Limits From:US 62Fund Cat:8
Limits To:FM 1165ESTIMATE:$164,319
Length:3.7Actual$155,071
 
Back...
Totals for 0924-00-100
Length:164.9
Estimate:$2,089,697
Actual:$1,965,160

CCSJ: 0924-06-064

District:EL PASOLet Date:Aug 2019
Highway:CSLet Status:Approved
Project ID:STP 2019(580)TPCSJ:0924-06-064
Description:Construct Pedestrian InfrastructureHandling
Code:
LC
Limits From:(ON UNIVERSITY) 1,035' W OF KANSASFund Cat:3
Limits To:1,485' W OF KANSAS STESTIMATE:$1,482,914
Length:0.1Actual$0
 
Back...
Totals for 0924-06-064
Length:0.1
Estimate:$1,482,914
Actual:

CCSJ: 0924-06-496

District:EL PASOLet Date:Sep 2018
Highway:CSLet Status:Actual
Project ID:STP 2017(786)CSJ:0924-06-496
Description:DOWNTOWN PEDESTRIAN WAYFINDING PROGRAMHandling
Code:
LC
Limits From:DOWNTOWN EL PASOFund Cat:3
Limits To:.ESTIMATE:$625,000
Length:1.0Actual$488,319
 
Back...
Totals for 0924-06-496
Length:1
Estimate:$625,000
Actual:$488,319

CCSJ: 0924-06-498

District:EL PASOLet Date:Oct 2018
Highway:CSLet Status:Actual
Project ID:STP 2017(799)CSJ:0924-06-498
Description:STREET MEDIAN/PARKWAY LANDSCAPINGHandling
Code:
LC
Limits From:CITYWIDEFund Cat:3
Limits To:.ESTIMATE:$5,200,000
Length:1.0Actual$6,112,690
 
Back...
Totals for 0924-06-498
Length:1
Estimate:$5,200,000
Actual:$6,112,690

CCSJ: 0924-06-534

District:EL PASOLet Date:Aug 2019
Highway:CSLet Status:Tentative
Project ID:CBI 2019(782)CSJ:0924-06-534
Description:RECONSTRUCT/WIDEN FROM 2 TO 6 LANE DIVIDED (MEDIAN, CURB/RAMHandling
Code:
LC
Limits From:(ON PELLICANO DR) JOE BATTLE BLVDFund Cat:3
Limits To:DARRINGTON (BERRYVILLE ST)ESTIMATE:$23,000,000
Length:3.0Actual$0
 
Back...
Totals for 0924-06-534
Length:3
Estimate:$23,000,000
Actual:

CCSJ: 0924-06-537

District:EL PASOLet Date:Aug 2019
Highway:VALet Status:Tentative
Project ID:CM 2019(514)CSJ:0924-06-537
Description:Federal Transit Administration TransferHandling
Code:
TR
Limits From:DWT TERMINAL SANTA FE/FOURTHFund Cat:5
Limits To:NORTHGATE TERMINAL DYER/WRENESTIMATE:$1,000,000
Length:1.0Actual$0
 
Back...
Totals for 0924-06-537
Length:1
Estimate:$1,000,000
Actual:

CCSJ: 0924-06-538

District:EL PASOLet Date:Aug 2019
Highway:VALet Status:Tentative
Project ID:CM 2019(515)CSJ:0924-06-538
Description:PROCUREMENT OF 3 BUSES (FOR SERVICES AROUND THE MONTECILLO DHandling
Code:
TR
Limits From:PROCUREMENT OF 3 BUSESFund Cat:5
Limits To:.ESTIMATE:$1,800,000
Length:1.0Actual$0
 
Back...
Totals for 0924-06-538
Length:1
Estimate:$1,800,000
Actual:

CCSJ: 0924-06-539

District:EL PASOLet Date:Jul 2019
Highway:CSLet Status:Approved
Project ID:CM 1802(731)CSJ:0924-06-539
Description:CONSTRUCTION OF ROUNDABOUT AT PAESO DEL NORTE POEHandling
Code:
LC
Limits From:AT EL PASO ST/6TH AVEFund Cat:3
Limits To:.ESTIMATE:$1,297,000
Length:0.1Actual$0
 
Back...
Totals for 0924-06-539
Length:0.1
Estimate:$1,297,000
Actual:

CCSJ: 0924-06-542

District:EL PASOLet Date:Jul 2019
Highway:VALet Status:Approved
Project ID:CM 1902(111)CSJ:0924-06-542
Description:Construct Pedestrian InfrastructureHandling
Code:
LC
Limits From:CITYWIDEFund Cat:3
Limits To:.ESTIMATE:$1,259,914
Length:10.7Actual$0
 
Back...
Totals for 0924-06-542
Length:10.7
Estimate:$1,259,914
Actual:

CCSJ: 0924-06-546

District:EL PASOLet Date:Oct 2018
Highway:CSLet Status:Actual
Project ID:STP 2018(877)TPCSJ:0924-06-546
Description:CONSTRUCTION OF BICYCLE FACILITIES, SIDEWALKS, ADA PEDESTRIAHandling
Code:
LC
Limits From:(ON UNIVERSITY AVE) STANTON STFund Cat:3
Limits To:OREGON STESTIMATE:$623,908
Length:0.1Actual$1,108,971
 
Back...
Totals for 0924-06-546
Length:0.1
Estimate:$623,908
Actual:$1,108,971

CCSJ: 0924-06-548

District:EL PASOLet Date:May 2019
Highway:VALet Status:Approved
Project ID:STP 2019(292)TPCSJ:0924-06-548
Description:PEDESTRIAN ENHANCEMENTS TO INCLUDE SIDEWALKS, ADA PEDESTRIANHandling
Code:
LC
Limits From:CITYWIDEFund Cat:3
Limits To:.ESTIMATE:$736,678
Length:1.1Actual$0
 
Back...
Totals for 0924-06-548
Length:1.1
Estimate:$736,678
Actual:

CCSJ: 0924-06-550

District:EL PASOLet Date:Aug 2019
Highway:VALet Status:Tentative
Project ID:CM 2019(574)CSJ:0924-06-550
Description:FIRST YEAR OF ALAMEDA BRT-RTS OPERATIONSHandling
Code:
TR
Limits From:DWT TERMINAL SANTA FE/FOURTHFund Cat:5
Limits To:MV TERMINAL ALAMEDA/ZARAGOZAESTIMATE:$1,000,000
Length:1.0Actual$0
 
Back...
Totals for 0924-06-550
Length:1
Estimate:$1,000,000
Actual:

CCSJ: 0924-06-552

District:EL PASOLet Date:Aug 2019
Highway:VALet Status:Tentative
Project ID:CM 2019(739)CSJ:0924-06-552
Description:OPERATING ASSISTANCE FOR FIRST YEAR OF NEW TRANSIT SERVICEHandling
Code:
TR
Limits From:FATHER RAHM AVENUEFund Cat:5
Limits To:GLORY ROADESTIMATE:$1,000,000
Length:1.0Actual$0
 
Back...
Totals for 0924-06-552
Length:1
Estimate:$1,000,000
Actual:

CCSJ: 0924-06-560

District:EL PASOLet Date:Aug 2019
Highway:CSLet Status:Approved
Project ID:STP 2019(961)TAPSCSJ:0924-06-560
Description:Construct Pedestrian InfrastructureHandling
Code:
LC
Limits From:ON O.T. SMITH RD/SH 20(ALAMEDA AVE)Fund Cat:3
Limits To:IH 10ESTIMATE:$2,143,913
Length:2.5Actual$0
 
Back...
Totals for 0924-06-560
Length:2.5
Estimate:$2,143,913
Actual:

CCSJ: 2121-04-111

District:EL PASOLet Date:Jul 2019
Highway:IH 10Let Status:Approved
Project ID:NH 1902(112)CSJ:2121-04-111
Description:Landscape DevelopmentHandling
Code:
 
Limits From:BILL BURNETT DRFund Cat:10
Limits To:1 MI E OF FM 1281ESTIMATE:$875,000
Length:3.0Actual$0
 
District:EL PASOLet Date:Jul 2019
Highway:IH 10Let Status:Approved
Project ID:NH 1902(112)CSJ:2121-04-118
Description:Drainage ImprovementsHandling
Code:
 
Limits From:BILL BURNETT DRFund Cat:1
Limits To:0.50 MI EAST OF EASTLAKEESTIMATE:$415,000
Length:0.7Actual$0
 
Back...
Totals for 2121-04-111
Length:3.7
Estimate:$1,290,000
Actual:

CCSJ: 2552-01-057

District:EL PASOLet Date:Jul 2019
Highway:SL 375Let Status:Approved
Project ID:NH 1902(113)CSJ:2552-01-057
Description:Surfacing/Roadway RestorationHandling
Code:
 
Limits From:0.08 MI E OF TOM MAYS PARK ACCESSFund Cat:1
Limits To:0.62 MI W OF US 54ESTIMATE:$7,315,767
Length:6.5Actual$0
 
District:EL PASOLet Date:Jul 2019
Highway:SL 375Let Status:Approved
Project ID:STP 1902(114)HESCSJ:2552-01-058
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:0.4 MI W OF RESLER DRFund Cat:8
Limits To:0.55 MI W OF US 54ESTIMATE:$946,242
Length:9.5Actual$0
 
Back...
Totals for 2552-01-057
Length:16
Estimate:$8,262,009
Actual:

CCSJ: 2552-03-058

District:EL PASOLet Date:Oct 2018
Highway:SL 375Let Status:Actual
Project ID:NH 1802(575)CSJ:2552-03-058
Description:LP 375 (AMERICAS) RAMPS RECONFIGURATION AND FRONTAGE ROADHandling
Code:
 
Limits From:FM 76 NORTH LOOPFund Cat:1
Limits To:ZARAGOZA POEESTIMATE:$30,554,719
Length:2.5Actual$32,640,631
 
Back...
Totals for 2552-03-058
Length:2.5
Estimate:$30,554,719
Actual:$32,640,631

Handling CodeDefinition
XXProject not processed through statewide letting
TRTransfer of funds
LCProject let through local entity
LCProject not charged against district apportionment



Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract