Detail Letting Schedule for Fannin County (FY 2019)
Bid Tabulations Dashboard
Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
Fannin County (FY 2019) |
CCSJ: 0045-05-048 |
|||
District: | PARIS | Let Date: | Feb 2019 |
Highway: | SH 56 | Let Status: | Actual |
Project ID: | STP 2019(502)HES | CSJ: | 0045-05-048 |
Description: | IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS | Handling Code: | |
Limits From: | AT SH 78 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $35,114 |
Length: | 0.2 | Actual | $20,596 |
District: | PARIS | Let Date: | Feb 2019 |
Highway: | US 82 | Let Status: | Actual |
Project ID: | STP 2019(502)HES | CSJ: | 0045-20-022 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | AT SH 78 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $146,186 |
Length: | 0.2 | Actual | $156,835 |
District: | PARIS | Let Date: | Feb 2019 |
Highway: | FM 691 | Let Status: | Actual |
Project ID: | STP 2019(502)HES | CSJ: | 0666-01-030 |
Description: | IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS | Handling Code: | |
Limits From: | AT FM 1417 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $49,159 |
Length: | 0.2 | Actual | $28,423 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0045-05-048 | ||
---|---|---|---|
Length: | 0.6 | ||
Estimate: | $230,459 | ||
Actual: | $205,853 | ||
CCSJ: 0174-04-033 |
|||
District: | PARIS | Let Date: | May 2019 |
Highway: | FM 100 | Let Status: | Actual |
Project ID: | STP 2019(941)HES | CSJ: | 0174-04-033 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | FM 79 | Fund Cat: | 8 |
Limits To: | 3.158 MI S OF FM 2216 | ESTIMATE: | $232,298 |
Length: | 11.1 | Actual | $85,625 |
District: | PARIS | Let Date: | May 2019 |
Highway: | SH 34 | Let Status: | Actual |
Project ID: | STP 2019(941)HES | CSJ: | 0174-01-046 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | 1.68 MI S OF SH 11 | Fund Cat: | 8 |
Limits To: | 1.038 MI N OF SH 224 | ESTIMATE: | $92,747 |
Length: | 13.3 | Actual | $89,175 |
District: | PARIS | Let Date: | May 2019 |
Highway: | US 69 | Let Status: | Actual |
Project ID: | STP 2019(941)HES | CSJ: | 0202-13-011 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | 0.519 MI S OF SH 11 | Fund Cat: | 8 |
Limits To: | FANNIN COUNTY LINE | ESTIMATE: | $4,844 |
Length: | 0.8 | Actual | $4,640 |
District: | PARIS | Let Date: | May 2019 |
Highway: | US 69 | Let Status: | Actual |
Project ID: | STP 2019(941)HES | CSJ: | 0203-01-059 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | 1.017 MI SE OF BU 69D | Fund Cat: | 8 |
Limits To: | 3.27 MI E OF BU 69D | ESTIMATE: | $18,934 |
Length: | 2.1 | Actual | $18,392 |
District: | PARIS | Let Date: | May 2019 |
Highway: | US 69 | Let Status: | Actual |
Project ID: | STP 2019(941)HES | CSJ: | 0203-02-044 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | 3.27 MI E OF BU 69D | Fund Cat: | 8 |
Limits To: | CR 3401 | ESTIMATE: | $50,096 |
Length: | 6.7 | Actual | $49,277 |
District: | PARIS | Let Date: | May 2019 |
Highway: | US 271 | Let Status: | Actual |
Project ID: | STP 2019(941)HES | CSJ: | 0221-03-066 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | 0.966 MI S OF BU 271D | Fund Cat: | 8 |
Limits To: | FRANKLIN COUNTY LINE | ESTIMATE: | $60,881 |
Length: | 6.5 | Actual | $59,208 |
District: | PARIS | Let Date: | May 2019 |
Highway: | SH 78 | Let Status: | Actual |
Project ID: | STP 2019(941)HES | CSJ: | 0279-02-042 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | OKLAHOMA STATE LINE | Fund Cat: | 8 |
Limits To: | 1.1 MI N US 82 | ESTIMATE: | $59,960 |
Length: | 3.8 | Actual | $68,431 |
District: | PARIS | Let Date: | May 2019 |
Highway: | SH 78 | Let Status: | Actual |
Project ID: | STP 2019(941)HES | CSJ: | 0279-03-036 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | 2.582 MI S OF US 82 | Fund Cat: | 8 |
Limits To: | SH 11 | ESTIMATE: | $65,902 |
Length: | 9.8 | Actual | $75,530 |
District: | PARIS | Let Date: | May 2019 |
Highway: | SH 78 | Let Status: | Actual |
Project ID: | STP 2019(941)HES | CSJ: | 0279-04-024 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | SH 11 | Fund Cat: | 8 |
Limits To: | FM 1553 | ESTIMATE: | $33,406 |
Length: | 5.0 | Actual | $38,260 |
District: | PARIS | Let Date: | May 2019 |
Highway: | SH 78 | Let Status: | Actual |
Project ID: | STP 2019(941)HES | CSJ: | 0280-01-020 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | 0.108 MI E OF CR 5066 | Fund Cat: | 8 |
Limits To: | COLLIN COUNTY LINE | ESTIMATE: | $44,731 |
Length: | 7.5 | Actual | $51,318 |
District: | PARIS | Let Date: | May 2019 |
Highway: | US 69 | Let Status: | Actual |
Project ID: | STP 2019(941)HES | CSJ: | 0410-01-030 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | SS 503 AND US 69 INTERSECTION | Fund Cat: | 8 |
Limits To: | 2.661 MI N OF SH 56 | ESTIMATE: | $63,078 |
Length: | 9.2 | Actual | $61,232 |
District: | PARIS | Let Date: | May 2019 |
Highway: | US 69 | Let Status: | Actual |
Project ID: | STP 2019(941)HES | CSJ: | 0410-02-034 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | 1.27 MI S OF SH 56 | Fund Cat: | 8 |
Limits To: | 1.217 MI N OF SH 11 | ESTIMATE: | $27,180 |
Length: | 4.9 | Actual | $27,843 |
District: | PARIS | Let Date: | May 2019 |
Highway: | FM 71 | Let Status: | Actual |
Project ID: | STP 2019(941)HES | CSJ: | 0546-06-021 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | FM 3236 | Fund Cat: | 8 |
Limits To: | FRANKLIN COUNTY LINE | ESTIMATE: | $85,260 |
Length: | 12.9 | Actual | $97,713 |
District: | PARIS | Let Date: | May 2019 |
Highway: | FM 71 | Let Status: | Actual |
Project ID: | STP 2019(941)HES | CSJ: | 0546-07-015 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | HOPKINS COUNTY LINE | Fund Cat: | 8 |
Limits To: | SH 37 | ESTIMATE: | $9,385 |
Length: | 3.8 | Actual | $10,656 |
District: | PARIS | Let Date: | May 2019 |
Highway: | SH 276 | Let Status: | Actual |
Project ID: | STP 2019(941)HES | CSJ: | 0641-01-036 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | FM 751 | Fund Cat: | 8 |
Limits To: | 3.795 MI E OF FM 751 | ESTIMATE: | $24,693 |
Length: | 3.8 | Actual | $24,223 |
District: | PARIS | Let Date: | May 2019 |
Highway: | FM 900 | Let Status: | Actual |
Project ID: | STP 2019(941)HES | CSJ: | 0680-05-013 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | IH 30 S FRONTAGE ROAD | Fund Cat: | 8 |
Limits To: | FRANKLIN COUNTY LINE | ESTIMATE: | $46,322 |
Length: | 5.5 | Actual | $52,664 |
District: | PARIS | Let Date: | May 2019 |
Highway: | FM 900 | Let Status: | Actual |
Project ID: | STP 2019(941)HES | CSJ: | 0680-06-019 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | HOPKINS COUNTY LINE | Fund Cat: | 8 |
Limits To: | SH 37 | ESTIMATE: | $22,471 |
Length: | 3.1 | Actual | $25,663 |
District: | PARIS | Let Date: | May 2019 |
Highway: | FM 1699 | Let Status: | Actual |
Project ID: | STP 2019(941)HES | CSJ: | 0722-01-023 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | FM 114 | Fund Cat: | 8 |
Limits To: | US 82 | ESTIMATE: | $36,419 |
Length: | 4.9 | Actual | $41,894 |
District: | PARIS | Let Date: | May 2019 |
Highway: | FM 911 | Let Status: | Actual |
Project ID: | STP 2019(941)HES | CSJ: | 0722-03-013 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | 0.557 MI S OF BU 82K | Fund Cat: | 8 |
Limits To: | FM 44 | ESTIMATE: | $72,549 |
Length: | 7.2 | Actual | $82,547 |
District: | PARIS | Let Date: | May 2019 |
Highway: | FM 197 | Let Status: | Actual |
Project ID: | STP 2019(941)HES | CSJ: | 0769-01-027 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | FM 79 | Fund Cat: | 8 |
Limits To: | US 271 | ESTIMATE: | $111,045 |
Length: | 19.9 | Actual | $126,475 |
District: | PARIS | Let Date: | May 2019 |
Highway: | SH 276 | Let Status: | Actual |
Project ID: | STP 2019(941)HES | CSJ: | 1017-03-033 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | FM 35 | Fund Cat: | 8 |
Limits To: | FM 36 | ESTIMATE: | $37,775 |
Length: | 4.1 | Actual | $35,996 |
District: | PARIS | Let Date: | May 2019 |
Highway: | FM 910 | Let Status: | Actual |
Project ID: | STP 2019(941)HES | CSJ: | 1177-01-023 |
Description: | TEXTURIZE SHOULDERS, PROFILE PAVEMENT MARKERS | Handling Code: | |
Limits From: | 0.658 MI E OF FM 909 | Fund Cat: | 8 |
Limits To: | 3.662 MI N OF FM 1487 | ESTIMATE: | $42,077 |
Length: | 5.8 | Actual | $47,975 |
District: | PARIS | Let Date: | May 2019 |
Highway: | SH 276 | Let Status: | Actual |
Project ID: | STP 2019(941)HES | CSJ: | 1290-05-018 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | ROCKWALL COUNTY LINE | Fund Cat: | 8 |
Limits To: | FM 1565 | ESTIMATE: | $26,898 |
Length: | 2.9 | Actual | $25,530 |
District: | PARIS | Let Date: | May 2019 |
Highway: | FM 1502 | Let Status: | Actual |
Project ID: | STP 2019(941)HES | CSJ: | 1456-01-013 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | FM 196 | Fund Cat: | 8 |
Limits To: | US 82 | ESTIMATE: | $76,868 |
Length: | 12.2 | Actual | $87,753 |
District: | PARIS | Let Date: | May 2019 |
Highway: | FM 1536 | Let Status: | Actual |
Project ID: | STP 2019(941)HES | CSJ: | 1475-01-014 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | SH 19 | Fund Cat: | 8 |
Limits To: | FM 71 | ESTIMATE: | $59,057 |
Length: | 7.5 | Actual | $67,105 |
District: | PARIS | Let Date: | May 2019 |
Highway: | FM 1699 | Let Status: | Actual |
Project ID: | STP 2019(941)HES | CSJ: | 1618-01-011 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | CR 3340 | Fund Cat: | 8 |
Limits To: | FM 114 | ESTIMATE: | $42,811 |
Length: | 3.3 | Actual | $48,526 |
District: | PARIS | Let Date: | May 2019 |
Highway: | FM 2297 | Let Status: | Actual |
Project ID: | STP 2019(941)HES | CSJ: | 2275-01-008 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | 0.369 MI S SH 11 | Fund Cat: | 8 |
Limits To: | FM 1567 | ESTIMATE: | $17,688 |
Length: | 6.7 | Actual | $19,933 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0174-04-033 | ||
Length: | 184.3 | ||
Estimate: | $1,465,374 | ||
Actual: | $1,423,585 | ||
CCSJ: 0279-02-040 |
|||
District: | PARIS | Let Date: | May 2019 |
Highway: | SH 78 | Let Status: | Actual |
Project ID: | BR 1902(096) | CSJ: | 0279-02-040 |
Description: | BRIDGE REPLACEMENT | Handling Code: | CX |
Limits From: | AT RED RIVER | Fund Cat: | 6 |
Limits To: | . | ESTIMATE: | $5,428,581 |
Length: | 0.1 | Actual | $5,869,290 |
District: | PARIS | Let Date: | May 2019 |
Highway: | SH 78 | Let Status: | Actual |
Project ID: | BR 1902(096) | CSJ: | 0279-02-041 |
Description: | BRIDGE REPLACEMENT | Handling Code: | CX |
Limits From: | AT RED RIVER | Fund Cat: | 6 |
Limits To: | . | ESTIMATE: | $1,493,666 |
Length: | 0.1 | Actual | $1,487,760 |
Back... | Totals for 0279-02-040 | ||
Length: | 0.2 | ||
Estimate: | $6,922,247 | ||
Actual: | $7,357,049 | ||
CCSJ: 0510-04-013 |
|||
District: | PARIS | Let Date: | Jan 2019 |
Highway: | FM 898 | Let Status: | Actual |
Project ID: | STP 2019(302) | CSJ: | 0510-04-013 |
Description: | REHABILITATION OF EXISTING ROAD | Handling Code: | |
Limits From: | GRAYSON COUNTY LINE | Fund Cat: | 1 |
Limits To: | SH 56 | ESTIMATE: | $9,627,414 |
Length: | 10.5 | Actual | $7,374,236 |
District: | PARIS | Let Date: | Jan 2019 |
Highway: | FM 898 | Let Status: | Actual |
Project ID: | C 510-5-16 | CSJ: | 0510-05-016 |
Description: | REHABILITATE EXISTING ROADWAY | Handling Code: | |
Limits From: | SH 56 NORTH RADII | Fund Cat: | 1 |
Limits To: | SH 121 | ESTIMATE: | $5,802,465 |
Length: | 8.0 | Actual | $4,835,574 |
Proposal Request Bid List List Showing Order Addenda Bid Tabulations Award Status Back... | Totals for 0510-04-013 | ||
Length: | 18.5 | ||
Estimate: | $15,429,879 | ||
Actual: | $12,209,810 | ||
CCSJ: 0901-32-085 |
|||
District: | PARIS | Let Date: | Jul 2019 |
Highway: | CR | Let Status: | Actual |
Project ID: | BR 2015(754) | CSJ: | 0901-32-085 |
Description: | BRIDGE REPLACEMENT | Handling Code: | |
Limits From: | CR 298-1 | Fund Cat: | 6 |
Limits To: | AT FREEMAN CREEK | ESTIMATE: | $314,957 |
Length: | 0.1 | Actual | $308,730 |
District: | PARIS | Let Date: | Jul 2019 |
Highway: | CR | Let Status: | Actual |
Project ID: | BR 2015(758) | CSJ: | 0901-32-087 |
Description: | BRIDGE REPLACEMENT | Handling Code: | |
Limits From: | CR 474-1 | Fund Cat: | 6 |
Limits To: | AT LEE CREEK | ESTIMATE: | $262,203 |
Length: | 0.1 | Actual | $266,257 |
District: | PARIS | Let Date: | Jul 2019 |
Highway: | CR | Let Status: | Actual |
Project ID: | BR 2015(759) | CSJ: | 0901-32-088 |
Description: | BRIDGE REPLACEMENT | Handling Code: | |
Limits From: | CR 680-1 | Fund Cat: | 6 |
Limits To: | AT TRIBUTARY OF INDIAN CREEK | ESTIMATE: | $198,477 |
Length: | 0.1 | Actual | $187,117 |
District: | PARIS | Let Date: | Jul 2019 |
Highway: | CR | Let Status: | Actual |
Project ID: | BR 2015(763) | CSJ: | 0901-32-092 |
Description: | BRIDGE REPLACEMENT | Handling Code: | |
Limits From: | CR 634-1 | Fund Cat: | 6 |
Limits To: | @ LORING CREEK | ESTIMATE: | $302,324 |
Length: | 0.1 | Actual | $289,964 |
District: | PARIS | Let Date: | Jul 2019 |
Highway: | CR | Let Status: | Actual |
Project ID: | BR 2016(438) | CSJ: | 0901-32-097 |
Description: | BRIDGE REPLACEMENT | Handling Code: | |
Limits From: | CR 678-1 | Fund Cat: | 6 |
Limits To: | AT DELBA CREEK | ESTIMATE: | $305,919 |
Length: | 0.1 | Actual | $306,528 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0901-32-085 | ||
Length: | 0.5 | ||
Estimate: | $1,383,879 | ||
Actual: | $1,358,596 | ||
CCSJ: 2139-03-021 |
|||
District: | PARIS | Let Date: | Nov 2018 |
Highway: | SH 11 | Let Status: | Actual |
Project ID: | STP 2019(216) | CSJ: | 2139-03-021 |
Description: | OVERLAY | Handling Code: | |
Limits From: | SH 78 | Fund Cat: | 1 |
Limits To: | HUNT COUNTY LINE | ESTIMATE: | $3,033,714 |
Length: | 6.1 | Actual | $3,137,337 |
District: | PARIS | Let Date: | Nov 2018 |
Highway: | SH 11 | Let Status: | Actual |
Project ID: | STP 2019(216) | CSJ: | 2139-04-022 |
Description: | OVERLAY | Handling Code: | |
Limits From: | FANNIN COUNTY LINE | Fund Cat: | 1 |
Limits To: | SH 34 | ESTIMATE: | $460,890 |
Length: | 0.9 | Actual | $529,704 |
List Showing Order Proposal Request Bid List Addenda Bid Tabulations Award Status Back... | Totals for 2139-03-021 | ||
Length: | 7 | ||
Estimate: | $3,494,604 | ||
Actual: | $3,667,040 | ||
CCSJ: 2874-01-006 |
|||
District: | PARIS | Let Date: | Aug 2019 |
Highway: | FM 2815 | Let Status: | Actual |
Project ID: | C 2874-1-6 | CSJ: | 2874-01-006 |
Description: | REHABILITATE EXISTING ROADWAY | Handling Code: | |
Limits From: | SH 11 | Fund Cat: | 1 |
Limits To: | FM 1629 | ESTIMATE: | $2,879,289 |
Length: | 3.8 | Actual | $3,077,923 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 2874-01-006 | ||
Length: | 3.8 | ||
Estimate: | $2,879,289 | ||
Actual: | $3,077,923 |
Handling Code | Definition |
---|---|
XX | Project not processed through statewide letting |
TR | Transfer of funds |
LC | Project let through local entity |
LC | Project not charged against district apportionment |
Let Status | Definition |
---|---|
Tentative | Estimated letting date for this project |
Approved | Project has administrative approval to be let |
Actual | Project was let to contract |