Letting Schedule for Austin District (FY 2019)

Last Update: Monday, September 16, 2019

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Austin District (FY 2019)
Bastrop | Blanco | Burnet | Caldwell | Hays | Lee | Llano | Mason | Travis | Williamson |

Bastrop County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0114-06-029US 290ActualDec 2018$21,209,8221RECONSTRUCT EXISTING 4-LN UNDIVIDED ROADWAY TO A 4-LN5.0
0471-05-046SH 21ActualJan 2019$549,8518INSTALL TRAFFIC SIGNAL0.0
0265-04-062SH 21ActualMay 2019$48,884,3482MCONSTRUCT TWO NEW COLORADO RIVER 2-LN FRONTAGE ROAD BRIDGES12.0
3115-01-011FM 3000ActualJun 2019$425,7911HAZARD ELIMINATION & SAFETY4.0
0914-18-110CRActualNov 2018$451,6796REPLACE BRIDGE AND APPROACHES0.0
2686-01-014FM 2571ActualAug 2019$5,276,4538ROADWAY REHABILITATION/RECONSTRUCTION WITH NO ADDED CAPACITY0.0
0573-01-037SH 304ActualSep 2018$461,7708PROFILE EDGELINE MARKINGS AND PROFILE CENTERLINE MARKINGS0.0
0114-05-037US 290ActualNov 2018$34,643,1541RECONSTRUCT EXISTING 4-LN UNDIVIDED ROADWAY TO A 4-LN8.5

Blanco County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0914-23-012VAActualDec 2018$881,4923INSTALL BIKE AND PEDESTRIAN PATHWAY/SIDEWALKS0.0
0113-03-031US 290ActualJan 2019$1,648,0001FULL DEPTH REPAIR, UNDERSEAL AND TOM0.0

Burnet County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0252-01-085US 281ActualJun 2019$477,2481HAZARD ELIMINATION & SAFETY0.0

Caldwell County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0914-22-072VAActualMay 2019$2,156,2503FEASIBILITY STUDY0.0

Hays County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0113-07-066US 290ActualJan 2019$518,6398PROFILE EDGELINE & CENTERLINE MARKINGS0.0
3545-02-007FM 110ActualJul 2019$14,103,4213CONSTRUCT NEW ROAD0.0
0016-16-030RM 967ActualAug 2019$1,254,8103REHABILITATE EXISTING ROADWAY9.5
0016-03-119IH 35ActualMar 2019$11,314,4331MILL, SEAL AND PFC-C INLAY0.0
0366-01-076SL 82ActualFeb 2019$1,006,0231MILL, SEAL AND INLAY0.0
0113-07-069US 290ActualJan 2019$493,7638INTERCONNECT SIGNALS & INSTALL FLASHING YELLOW ARROW0.0

Lee County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0114-07-036US 290ActualMar 2019$30,993,7481RECONSTRUCT EXISTING 4-LN UNDIVIDED ROADWAY TO A 4-LN4.5
0473-02-038SH 21ActualJan 2019$2,284,5461LEVEL-UP, REPAIR, STRUCT OVERLAY TY-D & TOM OVERLAY0.0
0114-07-084US 290ActualJun 2019$250,0008HIGHWAY/RAILROAD IMPROVEMENT0.0

Llano County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
3101-01-007RM 2900ActualJun 2019$19,000,00010BRIDGE REPLACEMENT0.0
0547-01-026SH 261ActualJul 2019$604,0138CONSTRUCT FRONTAGE ROADS0.0
0150-04-047SH 29ActualMar 2019$3,688,17811CONSTRUCT SUPER 2 PASSING LANES7.0
0577-04-022SH 71ActualSep 2018$1,489,0471SEAL COAT0.0

Mason County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0150-01-028SH 29ActualNov 2018$703,5161FULL DEPTH REPAIR, SEAL AND TOM OVERLAY0.0

Travis County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0914-00-419VAActualMay 2019$575,04910CONSTRUCT PEDESTRIAN INFRASTRUCTURE6.0
0914-00-400VAActualMay 2019$1,448,8251FY 2019 SITE SPECIFIC SIGNALS0.0
0914-00-416VAActualDec 2018$820,3261RESTRIPING & REPLACEMENT OF RAISED PAVEMENT MARKINGS ON IH350.0
2102-01-074RM 2244ActualMay 2019$256,88210LANDSCAPE DEVELOPMENT0.0
0914-00-418VAActualNov 2018$1,910,1501ASPHALT PAVEMENT REPAIR0.0
0113-08-090US 290ActualDec 2018$2,473,3341PFC-C OVERLAY4.0
0914-04-271CRActualMay 2019$950,8146REPLACE BRIDGE & APPROACHES5.0
0914-00-415VAActualNov 2018$873,3081RESTRIPING & REPLACEMENT OF RAISED PAVEMENT MARKS ON US 183,0.0
1186-01-097FM 969ActualJan 2019$368,6281IMPROVE TRAFFIC SIGNAL, INSTALL FLASHING YELLOW ARROW0.0
0914-00-411VAActualJan 2019$2,470,5621INSTALL OR REBUILD TRAFFIC SIGNALS0.0
0683-02-075RM 620ActualApr 2019$620,30211HAZARD ELIMINATION & SAFETY0.0
0914-00-399VAActualMar 2019$1,944,3931FY 2019 NON-SITE SPECIFIC SIGNALS2.5
0015-13-396IH 35ActualApr 2019$01HIGHWAY IMPROVEMENT7.0
0440-06-018SH 130ActualOct 2018$60,418,4113ADD ONE LANE IN EACH DIRECTION0.0
0914-00-414VAActualNov 2018$1,991,3591RESTRIPING & REPLACEMENT OF RAISED PAVEMENT MARKS ON US 2810.0
0016-01-125SL 275ActualJan 2019$1,111,0371TOM OVERLAY WITH EDGE MILLING0.0
0113-13-178SL 360ActualMay 2019$2,271,5816BRIDGE MAINTENANCE6.0
0152-01-083US 183ActualJan 2019$2,839,8961TOM OVERLAY0.0
0914-00-423VAActualJul 2019$312,5003REGIONAL COMMUTE ALTERNATIVES PROGRAM0.0
0914-00-420VAActualJul 2019$1,972,02310CONSTRUCT PEDESTRIAN INFRASTRUCTURE8.0
1378-01-038RM 1431ActualNov 2018$620,6018INSTALL CONTINUOUS TURN LANE, CONSTRUCT PAVED SHOULDERS0.0
1378-01-041RM 1431ActualJul 2019$1,388,0161HIGHWAY IMPROVEMENT0.0
0914-04-309CSActualAug 2019$158,56310STATE PARK IMPROVEMENTS0.0
2100-01-060RM 2222ActualJul 2019$11,670,4861HIGHWAY IMPROVEMENT7.5
2689-01-023FM 2304ActualAug 2019$10,254,9803WIDEN ROAD - ADD LANES11.0
0914-00-424VAActualJun 2019$89,1003REGIONAL TRAVEL MANAGEMENT PROGRAM0.0
0015-13-414IH 35ActualJun 2019$232,80210LANDSCAPE DEVELOPMENT0.0
0914-00-421VAActualJun 2019$24,461,3632MHERO PROGRAM0.0
0914-04-312VAActualJun 2019$3,850,0003REGIONAL TRAVEL MANAGEMENT PROGRAM0.0
0113-13-181SH 71ActualJul 2019$3,422,6501HAZARD ELIMINATION & SAFETY7.0
3417-01-030FM 734ActualJun 2019$153,9641INFRASTRUCTURE IMPROVEMENTS0.0

Williamson County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0015-08-141IH 35ActualMar 2019$12,596,5122MBRIDGE REPLACEMENT6.0
0683-01-056RM 620ActualAug 2019$27,103,5221CONSTRUCT BRIDGE12.0
1201-01-014FM 970ActualJul 2019$5,213,7281HAZARD ELIMINATION & SAFETY9.0
2211-01-027RM 2338ActualJul 2019$239,7103INFRASTRUCTURE IMPROVEMENTS0.0
0273-04-036US 183ActualJan 2019$4,373,0961FULL DEPTH REPAIR & OVERLAY0.0
0151-03-041SH 29ActualOct 2018$1,983,2753INTERSECTION IMPROVEMENTS TO ADD TURN LANES AND IMPROVE0.0
0015-08-142IH 35ActualJan 2019$11,390,4042MCONVERT EXISTING 2-LANE NB & SB 2-WAY FRONTAGE ROADS TO 2-LN9.0
0914-05-199VAActualAug 2019$244,6109HIKE AND/OR BIKE0.0
0914-05-191VAActualDec 2018$1,449,8383CONSTRUCT 10 FT WIDE SHARED USE PATH IN ROUND ROCK WITH0.0
0914-05-190VAActualJan 2019$320,4853SHARED USE PATH: ADJACENT TO ROADWAY0.0
2211-02-030FM 1460ActualFeb 2019$197,3383INSTALL MEDIAN BREAK AND LEFT TURN LANE0.0
0320-04-027US 79ActualJun 2019$1,290,21410LANDSCAPE DEVELOPMENT0.0
0914-05-181CRActualApr 2019$181,3006REHABILITATE EXISTING HISTORICAL STEEL TRUSS BRIDGE0.0
0320-03-100SH 95ActualMay 2019$1,481,9206BRIDGE MAINTENANCE0.0
0015-09-193IH 35ActualApr 2019$9,188,8852MCONSTRUCT NEW ROAD8.0
3417-02-032FM 734ActualApr 2019$159,7893INFRASTRUCTURE IMPROVEMENTS0.0
0440-01-042SH 138ActualFeb 2019$6,838,4581ADD SHOULDERS AND REHABILITATE ROADWAY8.0
0015-08-151IH 35ActualMar 2019$5,094,0961MILL, SEAL AND OVERLAY SOUTHBOUND MAIN LANES0.0
2103-01-035RM 2243ActualJan 2019$1,414,9561DEPTH REPAIR, UNDERSEAL AND THIN OVERLAY0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract