Letting Schedule for Austin District (FY 2019)

Last Update: Wednesday, May 23, 2018
Austin District (FY 2019)
Bastrop | Blanco | Caldwell | Hays | Lee | Llano | Mason | Travis | Williamson |

Bastrop County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0573-01-037SH 304ApprovedSep 2018$818,6878PROFILE EDGELINE MARKINGS AND PROFILE CENTERLINE MARKINGS0.0
0114-05-037US 290TentativeOct 2018$37,992,7371RECONSTRUCT EXISTING 4-LN UNDIVIDED ROADWAY TO A 4-LN0.0
0471-05-046SH 21TentativeNov 2018$570,2958INSTALL TRAFFIC SIGNAL0.0
0265-04-062SH 21TentativeMar 2019$42,706,5162MCONSTRUCT TWO NEW COLORADO RIVER 2-LN FRONTAGE ROAD BRIDGES0.0
2190-01-007FM 2336TentativeJun 2019$5,000,0008IMPROVE GUARDRAIL TO DESIGN STANDARDS, SAFETY TREAT FIXED0.0
3115-01-011FM 3000TentativeJun 2019$483,6238IMPROVE GUARDRAIL, SAFETY TREAT FIXED OBJECTS0.0
0914-18-110CRTentativeDec 2018$450,0006REPLACE BRIDGE AND APPROACHES0.0
0114-06-029US 290TentativeDec 2018$16,845,5891RECONSTRUCT EXISTING 4-LN UNDIVIDED ROADWAY TO A 4-LN0.0

Blanco County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0285-01-004RM 2325TentativeDec 2018$370,0001SEAL COAT0.0
0914-23-012VAApprovedSep 2018$881,4923INSTALL BIKE AND PEDESTRIAN PATHWAY/SIDEWALKS0.0
0253-01-060US 281TentativeDec 2018$550,0001SEAL COAT0.0
0113-03-031US 290TentativeDec 2018$2,120,0001FULL DEPTH REPAIR, UNDERSEAL AND TOM0.0

Caldwell County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0471-04-030SH 21TentativeAug 2019$9,479,0001PROVIDE SUPER 2 PASSING LANES0.0
0914-22-061VATentativeMay 2019$2,120,6487CALDWELL COUNTY STPMM SET-ASIDE0.0
0152-03-061US 183TentativeJan 2019$6,930,0001TOM OVERLAY0.0

Hays County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
3545-02-008FM 110TentativeMay 2019$17,900,0003CONSTRUCT TWO LANES AND SHOULDERS0.0
0366-01-076SL 82TentativeFeb 2019$2,196,3001MILL, SEAL AND INLAY0.0
0683-03-039RM 12TentativeJun 2019$1,420,0008ADD 1'-4' SHOULDERS AND CENTER TURN WITH LEFT TURN LANES0.0
0113-07-066US 290TentativeOct 2018$473,2588PROFILE EDGELINE & CENTERLINE MARKINGS0.0
0016-16-028RM 967TentativeNov 2018$1,675,0631ADD SHOULDERS AND RESURFACE0.0
0471-02-070SH 21TentativeAug 2019$15,014,8001PROVIDE SUPER 2 PASSING LANES0.0
3545-02-007FM 110TentativeMay 2019$12,200,0003CONSTRUCT TWO LANES AND SHOULDERS0.0
0914-33-074CSTentativeApr 2019$9,922,5003RECONSTUCT THE STREET, MULTI-USE PATH, SIDEWALKS, CURB AND0.0
3545-01-005FM 110TentativeMay 2019$47,999,400DACONSTRUCT TWO LANES AND SHOULDERS0.0
0914-33-068CRTentativeMay 2019$17,144,0423CONSTRUCT NEW 2-LANE ROADWAY WITH A GRADE SEPARATION AT0.0

Lee County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0473-02-038SH 21TentativeDec 2018$2,691,0001LEVEL-UP, REPAIR, STRUCT OVERLAY TY D & TOM0.0

Llano County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0547-01-026SH 261TentativeJul 2019$881,4008PROVIDE ADDITIONAL PAVED SURFACE WIDTH, MILLED EDGELINE0.0
0150-04-047SH 29TentativeMar 2019$5,000,00011CONSTRUCT SUPER 2 PASSING LANES0.0
0577-04-022SH 71TentativeDec 2018$1,652,2001LEVEL-UP AND SEAL COAT0.0

Mason County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0150-01-028SH 29TentativeNov 2018$650,0001FULL DEPTH REPAIR, SEAL AND TOM0.0
1753-01-019RM 1871TentativeDec 2018$420,0001REPAIL, LEVEL-UP & TOM0.0
0914-26-008CSTentativeApr 2019$1,060,0006REPLACE BRIDGE AND APPROACHES0.0

Travis County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0683-02-070RM 620TentativeNov 2018$1,264,3078INTERCONNECT SIGNALS & INSTALL FLASHING YELLOW ARROW0.0
0914-04-243CSTentativeMay 2019$1,905,0003CONST BIKE/PED TRAIL WEST OF LAMAR TO IH 350.0
0914-04-248CRTentativeJul 2019$700,0006REPLACE BRIDGE AND APPROACHES0.0
0914-00-416VATentativeDec 2018$896,4571RESTRIPING & REPLACEMENT OF RAISED PAVEMENT MARKINGS ON IH350.0
0015-13-396IH 35TentativeApr 2019$22,980,7151RECONSTRUCT INTERSECTION0.0
2102-01-071RM 2244TentativeJan 2019$890,0001OVERLAY ROAD WITH EDGE MILLING0.0
0151-06-143US 183TentativeAug 2019$500,000,0003ADD 2 EXPRESS LANES IN EACH DIRECTION0.0
2689-01-023FM 2304TentativeJul 2019$7,775,4887RECONSTRUCT EXISTING 2-LN DIVIDED ROADWAY WITH CLTL TO A0.0
0152-01-083US 183TentativeJan 2019$1,890,0001TOM OVERLAY0.0
1378-01-041RM 1431TentativeJul 2019$2,477,4001SLOW MOVING VEHICLE TURNOUTS0.0
0113-13-162SL 360TentativeMar 2019$915,0006UPGRADE BRIDGE AND APPROACH RAILING0.0
0914-00-411VATentativeFeb 2019$2,850,0001INSTALL OR REBUILD TRAFFIC SIGNALS0.0
3417-01-030FM 734TentativeJun 2019$85,4118LENGTHEN LEFT TURN LANE0.0
0683-02-071RM 620TentativeAug 2019$138,700PAFEAISBILITY STUDY TO WIDEN FROM FOUR LANE TO SIX LANE0.0
0914-00-399VATentativeMar 2019$1,750,0001FY 2019 NON-SITE SPECIFIC SIGNALS0.0
2210-01-007RM 2322TentativeJun 2019$71,6008INSTALL EDGE/CENTERLINE PROFILE MARKINGS0.0
0914-00-414VATentativeDec 2018$1,820,0001RESTRIPING & REPLACEMENT OF RAISED PAVEMENT MARKS ON US 2810.0
0914-00-413VATentativeDec 2018$2,400,0001RESTRIPING & REPLACEMENT OF RAISED PAVEMENT MARKINGS ON0.0
1535-01-012FM 1625TentativeJul 2019$1,127,0593REALIGN ROADWAY AND RELOCATE HIGHWAY INTERSECTION0.0
0914-00-415VATentativeNov 2018$1,700,0001RESTRIPING & REPLACEMENT OF RAISED PAVEMENT MARKS ON US 183,0.0
0152-01-082US 183TentativeJan 2019$1,312,0001TOM OVERLAY0.0
0914-00-418VATentativeNov 2018$2,500,0001ASPHALT PAVEMENT REPAIR0.0
0016-01-125SL 275TentativeJan 2019$556,4001TOM OVERLAY WITH EDGE MILLING0.0
1378-01-038RM 1431TentativeNov 2018$725,0008INSTALL CONTINUOUS TURN LANE, CONSTRUCT PAVED SHOULDERS0.0
0113-08-088US 290TentativeDec 2018$656,7833CONSTRUCT RIGHT TURN DECEL LANE AND SIGNAL0.0
0914-00-400VATentativeMay 2019$1,750,0001FY 2019 SITE SPECIFIC SIGNALS0.0
0113-08-090US 290TentativeDec 2018$2,180,0001PFC-F OVERLAY0.0
2100-01-060RM 2222TentativeJul 2019$9,974,0122MCONSTRUCT NEW 3-LANE CONNECTOR ROAD WITH INTERSECTION AND0.0
0914-04-273VATentativeMay 2019$2,714,9993CONSTRUCT BLAKE-MANOR SHARED USE PATH FOR USE BY BICYCLES &0.0
0914-04-271CRTentativeMay 2019$200,0006REHAB BRIDGE & APPROACHES0.0

Williamson County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0151-04-070US 183TentativeJun 2019$600,0003CONSTRUCT MEDIAN AND LEFT TURN LANE0.0
1378-02-054RM 1431TentativeDec 2018$79,3233CONSTRUCT RIGHT TURN LANE0.0
0204-02-032US 79TentativeDec 2018$600,0003INSTALL CENTER RAISED MEDIAN AND TURN LANES0.0
0440-01-042SH 138TentativeDec 2018$8,659,4051ADD SHOULDERS & REHAB0.0
0914-05-190VAApprovedSep 2018$320,4853SHARED USE PATH: ADJACENT TO ROADWAY0.0
2211-02-030FM 1460TentativeOct 2018$122,0003INSTALL MEDIAN BREAK AND LEFT TURN LANE0.0
2211-01-027RM 2338TentativeDec 2018$188,0003WIDENING FOR ADDITION OF CENTER TURN LANE0.0
0015-08-403IH 35TentativeNov 2018$462,3628IMPROVE TRAFFIC SIGNAL0.0
0914-05-187CSTentativeMay 2019$7,100,0003RECONSTRUCT THE NORTH AND SOUTH AUSTIN AVENUE BRIDGES0.0
0015-08-152IH 35TentativeOct 2018$2,500,0003CONSTRUCT NEW OVERPASS CROSSING IH 35 AT NORTHWEST BOULEVARD0.0
0914-05-191VAApprovedSep 2018$1,449,8383CONSTRUCT 10 FT WIDE SHARED USE PATH IN ROUND ROCK WITH0.0
2103-01-033RM 2243TentativeOct 2018$394,0003ADDITION OF LEFT TURN LANE0.0
0914-05-132CRTentativeMay 2019$1,620,0006REHABILITATE BRIDGE AND APPROACHES0.0
0015-09-193IH 35TentativeApr 2019$8,905,3282MWIDEN NB FRONTAGE RD TO 3 LANES WITH ASSOCIATED PAVING, GRAD0.0
0151-05-115US 183TentativeMar 2019$12,670,4623REALIGNMENT OF EXISTING US 183 TO OLD HWY 183. OLD 183 TO BE0.0
2103-01-035RM 2243TentativeJan 2019$1,809,6111DEPTH REPAIR, UNDERSEAL AND THIN OVERLAY0.0
3417-02-031FM 734TentativeJan 2019$100,0003INSTALL MEDIAN BREAK FOR NB LEFT TURN LANE & EXTEND EXISTING0.0
0683-01-097RM 620TentativeAug 2019$138,700PAFEASIBILITY STUDY TO WIDEN FROM FOUR LANE TO SIX LANE0.0
0683-01-056RM 620TentativeApr 2019$26,796,0342MCONSTRUCT NEW 4-LN OVERPASS AT GEORGETOWN RR AND LAKE0.0
1201-01-014FM 970TentativeJun 2019$4,697,5168WIDENING & SAFETY IMPROVEMENTS_TO INCLUDE IMPROVE GUARDRAIL0.0
0015-08-142IH 35TentativeMar 2019$11,141,0572MCONVERT EXISTING 2-LANE NB & SB 2-WAY FRONTAGE ROADS TO 2-LN0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract