Collin County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0280-02-040SH 78TentativeJun 2019$12,242,0381RECONSTRUCT EXISTING PAVEMENT AND WIDEN SHOULDERS0.0
0816-04-050FM 455ActualSep 2018$4,030,3136REPLACE BRIDGE AND APPROACHES6.5
0047-09-036SH 5ActualOct 2018$15,403,6921SEAL COAT AND PAVEMENT MARKINGS0.0
0091-05-059SH 289TentativeJul 2019$3,659,1935WIDEN BRIDGE TO PROVIDE 2 LEFT TURN LANES FOR PGBT ENTRANCE0.0
0816-05-022FM 2862TentativeMay 2019$2,803,0958PROVIDE ADDITIONAL PAVED SURFACE0.0
0047-09-033SH 5ApprovedDec 2018$1,950,1661MILL, BASE REPAIR, OVERLAY0.0
1392-01-041FM 1378TentativeMay 2019$5,774,2298PROVIDE ADDITIONAL PAVED SURFACE WIDTH0.0
0918-24-240CRTentativeAug 2019$250,0008INSTALL GRADE CROSSING WARNING DEVICES0.0
0816-04-096FM 455ApprovedJan 2019$2,381,1691RESTORE EXISTING PAVEMENT AND ADD SHOULDERS0.0
0047-06-165US 75TentativeMar 2019$902,5001FULL DEPTH CONCRETE REPAIR0.0

Dallas County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
2208-02-022SS 303ApprovedJan 2019$3,132,4191FULL DEPTH REPAIR CONCRETE PAVEMENT, OVERLAY AND PAVEMENT0.0
2964-06-025SH 190ActualOct 2018$1,769,6911INSTALL NOISE BARRIER ON FRONTAGE ROADS0.0
0009-11-245IH 30ApprovedJan 2019$1,421,3271FULL DEPTH CONCRETE REPAIR0.0
0918-47-115VAActualSep 2018$2,416,54110CONSTRUCT CURB RAMPS AND SIDEWALKS IN THE CITY OF DALLAS,7.0
0047-07-230US 75ApprovedFeb 2019$1,752,8008IMPROVE TRAFFIC SIGNALS0.0
0092-14-092IH 345ApprovedFeb 2019$3,679,4101FULL DEPTH CONCRETE REPAIR ON FRONTAGE ROADS0.0
0918-00-290VAActualNov 2018$4,155,8447MOBILITY ASSISTANCE PATROL THAT PROVIDES ASSISTANCE TO0.0
0009-02-069SH 78ApprovedJan 2019$14,880,69059 INTERSECTION IMPROVEMENTS0.0
0009-11-243IH 30ApprovedFeb 2019$1,352,7481FULL DEPTH CONCRETE REPAIR ON EB FRONTAGE ROADS0.0
0918-47-140CSApprovedDec 2018$621,7973BROOKHAVEN COLLEGE CAMPUS - INTERCITY CONNECTIONS -CONSTRUCT0.0
0918-45-372CSActualOct 2018$2,584,1073RECONST 4 LANE UNDIVIDED TO 4 LANE DIVIDED WITH INTERSECTION0.0
0918-47-233VAActualNov 2018$625,0003PRELIMINARY ENGINEERING FOR VELOWEB SHARED-USE PATH0.0
0581-01-137SL 12ApprovedJan 2019$4,480,8906REPLACE BRIDGE AND APPROACHES0.0
2374-04-060IH 20ApprovedDec 2018$8,241,1377CONSTRUCT 0 TO 4 LANE FRONTAGE ROADS7.0
0918-47-165CSActualOct 2018$2,570,5483PLEASANT RUN ROAD TRAIL - INSTALL BIKE/PEDESTRIAN TRAIL0.0
0918-00-286VAActualOct 2018$2,976,0001INSTALLATION OF TRAFFIC SIGNALS5.0
0918-47-139CSActualOct 2018$4,284,9893TRINITY SKYLINE TRAIL - CONSTRUCT HIKE AND BIKE TRAIL0.0
0918-00-258VATentativeAug 2019$2,737,9993FREEWAY INCIDENT MANAGEMENT PROGRAM; FY 2018 FUNDING;0.0
2374-01-137IH 635TentativeJul 2019$1,326,900,0012MWIDEN 8 TO 10 GENERAL PURPOSE LANES AND RECONSTRUCT 4/60.0
0353-05-121SL 12TentativeJun 2019$5,974,6518INSTALL ADVANCE WARNING SIGNS AND CHEVRONS, MODERNIZE BRIDGE0.0
0918-47-142CSTentativeAug 2019$2,220,1093DELAWARE CREEK TRAIL CONNECTOR - CONSTRUCT HIKE & BIKE TRAIL0.0
0918-47-099CSTentativeAug 2019$3,900,0003BIKE AND PEDESTRAIN FACILITY; CONCRETE TRAIL; LIGHTING AND0.0
0092-01-052US 175TentativeJun 2019$72,797,0262MRECONSTRUCT FREEWAY TO 6 LANE DIVIDED ARTERIAL0.0
0196-03-278IH 35ETentativeJul 2019$3,874,5731MILL, FULL DEPTH CONCRETE PAVEMENT REPAIR, OVERLAY ON THE0.0
0430-01-060SH 352TentativeJun 2019$2,794,6198IMPROVE TRAFFIC SIGNALS0.0
0197-02-126US 175TentativeJun 2019$2,777,0671MILL, FULL DEPTH PVMT. REPAIR, ACP OVERLAY AND PAVEMENT0.0
0095-13-043IH 20TentativeJun 2019$18,432,7651FULL DEPTH CONCRETE REPAIR AND OVERLAY EB AND WB0.0
0581-02-124SL 12TentativeJul 2019$420,000,0001RECONSTRUCT INTERCHANGE (PH 2)0.0
0918-47-168CSTentativeAug 2019$28,042,7803RECONSTRUCT 6/8 LN TO 6 LN WITH BIKE/PEDESTRIAN IMPROVEMENTS0.0
0008-08-076SH 180TentativeApr 2019$1,165,0021MILL, OVERLAY AND FLEXIBLE PAVEMENT REPAIR ON FRONTAGE ROADS0.0
0918-47-178CSTentativeApr 2019$1,346,2603IMPROVE TRAFFIC SIGNALS0.0
2964-06-024SH 190TentativeAug 2019$22,14410INSTALL RAILROAD CROSSING SURFACE0.0
0197-02-124US 175TentativeApr 2019$4,000,0001RAMP MODIFICATIONS0.0
0353-04-106SS 348TentativeApr 2019$13,082,8751CONCRETE FULL DEPTH REPAIR, OVERLAY, & PAVEMENT MARKINGS0.0
0918-47-245VATentativeAug 2019$1,000,0003DEVELOP A STRATEGIC MOBILITY PLAN FOR THE CITY OF DALLAS0.0
0092-07-060SH 356TentativeMay 2019$2,012,1311MILL, OVERLAY, AND FLEXIBLE PAVEMENT REPAIR ON FRONTAGE ROAD0.0
0918-00-287VATentativeMay 2019$685,4101WRONG WAY DRIVING IMPLEMENTATION TO PREVENT WRONG WAY0.0
0918-47-243CSTentativeAug 2019$1,055,8553INTERSECTION IMPROVEMENTS INCLUDING TRAFFIC SIGNAL UPGRADES0.0
0092-02-129IH 45TentativeMay 2019$975,1331INSTALL GUIDE SIGNS0.0

Denton County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
1310-01-027FM 407ApprovedJan 2019$4,445,4686REPLACE BRIDGE AND APPROACHES0.0
0918-46-304CRTentativeAug 2019$250,0008INSTALL GRADE CROSSING WARNING DEVICES0.0
0918-46-279VATentativeJul 2019$3,500,00010CONSTRUCT CURB RAMP IMPROVEMENTS IN DENTON COUNTY0.0
0195-02-077IH 35ApprovedFeb 2019$1,306,6251FULL DEPTH CONCRETE REPAIR0.0
0081-03-063US 377TentativeJun 2019$2,989,5421INSTALLATION OF TRAFFIC SIGNALS0.0

Ellis County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0048-03-050US 77TentativeJun 2019$16,180,1876REPLACE BRIDGE AND APPROACHES0.0
0092-05-051IH 45ApprovedFeb 2019$1,005,6617CONSTRUCT INTERSECTION IMPROVEMENTS0.0
0048-08-051IH 35EApprovedJan 2019$1,000,0001FULL DEPTH CONCRETE REPAIR0.0
0172-05-115US 287TentativeJun 2019$24,125,56111CONSTRUCT INTERCHANGE0.0
1211-02-019FM 984ApprovedDec 2018$8,735,0611RECONSTRUCT EXISTING PAVEMENT AND ADD SHOULDERS6.0

Kaufman County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0095-14-029IH 20TentativeJun 2019$9,889,8191RUBBILIZE EXISTING PAVEMENT, OVERLAY AND PAVEMENT MARKINGS0.0
2512-01-014FM 2728TentativeAug 2019$250,0008INSTALL GRADE CROSSING WARNING DEVICES0.0
0197-05-058US 175ApprovedDec 2018$865,89111CONSTRUCT AT GRADE CROSSING4.0
0197-04-080US 175ActualSep 2018$6,748,8761MILL OVERLAY AND PAVEMENT MARKINGS (MAINLANES ONLY)2.0
0918-11-090CRApprovedJan 2019$1,451,0846REPLACE BRIDGE AND APPROACHES0.0
0095-14-030IH 20ApprovedFeb 2019$500,0001FULL DEPTH CONCRETE PAVEMENT REPAIR0.0
0561-01-024SH 274TentativeApr 2019$3,901,2881MILL AND OVERLAY EXISTING ROADWAY0.0
2815-01-008FM 2757ApprovedFeb 2019$4,564,9811REHABILITATE EXISTING PAVEMENT AND ADD SHOULDERS0.0
0918-11-089CRApprovedJan 2019$705,9656REPLACE BRIDGE AND APPROACHES0.0
2249-01-008FM 460TentativeMay 2019$1,339,3871REHABILITATION OF EXISTING PAVEMENT AND ADD SHOULDERS0.0

Navarro County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0092-13-024BI 45-FActualNov 2018$8,498,5111REPLACE BRIDGE AND APPROACHES7.5
0093-02-021SH 14TentativeApr 2019$3,087,8951PAVEMENT REPAIR, OVERLAY AND PAVEMENT MARKINGS0.0
0121-08-019FM 55ActualOct 2018$10,033,1001REHABILITATE EXISTING PAVEMENT AND ADD SHOULDERS8.0
3325-01-015FM 3243TentativeAug 2019$22,14410INSTALL RAILROAD CROSSING SURFACE0.0
0092-06-104IH 45ApprovedJan 2019$1,711,0181FULL DEPTH CONCRETE PAVEMENT REPAIR0.0

Rockwall County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0009-04-071SH 66ApprovedFeb 2019$1,129,1151FULL DEPTH CONCRETE PAVEMENT REPAIR0.0
1290-03-024SH 276ActualSep 2018$1,394,7771MILL, OVERLAY, FULL DEPTH REPAIR AND PAVEMENT MARKINGS0.0
2363-01-007FM 2453ApprovedJan 2019$2,957,5541RECONSTRUCT EXISTING PAVEMENT AND ADD SHOULDERS0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract