Letting Schedule for Dallas District (FY 2019)

Last Update: Tuesday, April 24, 2018
Dallas District (FY 2019)
Collin | Dallas | Denton | Ellis | Kaufman | Navarro | Rockwall |

Collin County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0047-06-158US 75TentativeOct 2018$12,844,6847REMOVE HOV LANES AND ADD PEAK HOUR TRAVEL LANES
0091-05-059SH 289TentativeJul 2019$3,780,5795WIDEN BRIDGE TO PROVIDE 2 LEFT TURN LANES FOR PGBT ENTRANCE
1392-01-041FM 1378TentativeMay 2019$3,815,7098PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0918-24-241VATentativeAug 2019$444,7303BICYCLE AND PEDESTRIAN IMPROVEMENTS
0816-05-022FM 2862TentativeMay 2019$2,803,0958PROVIDE ADDITIONAL PAVED SURFACE
0816-04-096FM 455TentativeJan 2019$2,379,0831RECONSTRUCT EXISTING PAVEMENT AND ADD SHOULDERS
0816-04-050FM 455TentativeSep 2018$3,740,4046REPLACE BRIDGE AND APPROACHES
0047-09-036SH 5TentativeOct 2018$15,746,9481SEAL COAT AND PAVEMENT MARKINGS
0918-24-242CSTentativeAug 2019$487,8723CONSTRUCT INTERSECTION IMPROVEMENT
0918-24-239CSTentativeAug 2019$700,0003CREATE A TMA THAT REDUCES DEMAND FOR AN OVER CAPACITY

Dallas County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0092-14-092IH 345TentativeNov 2018$2,803,1611FULL DEPTH CONCRETE REPAIR ON FRONTAGE ROADS
0918-47-115VATentativeAug 2019$2,313,57310CONSTRUCT CURB RAMPS IN THE CITY OF DALLAS, ALONG SH 78,
0918-47-165CSTentativeAug 2019$2,570,5483PLEASANT RUN ROAD TRAIL - INSTALL BIKE/PEDESTRIAN TRAIL
2374-04-060IH 20TentativeDec 2018$5,277,0157CONSTRUCT 0 TO 4 LANE FRONTAGE ROADS
0918-00-218VATentativeApr 2019$892,8193SUSTAINABLE DEVELOPMENT INITIATIVES; SAFETY AUDIT AND
0918-00-276VATentativeJan 2019$1,072,6881DMS REHABILITATION
0009-02-069SH 78TentativeJan 2019$7,699,93859 INTERSECTION IMPROVEMENTS
0918-47-208CSTentativeAug 2019$17,500,0003RECONSTRUCT AND WIDEN 2 LANE UNDIVIDED RURAL TO 4 LANE
0918-47-210VATentativeAug 2019$762,6873ON-STREET BIKEWAY FACILITIES
0918-47-236VATentativeAug 2019$3,750,0003SHARED USE PATH & RELATED PED/BIKE IMPROVEMENTS IN PROXIMITY
0918-47-206VATentativeAug 2019$7,095,6183SHARED-USE PATH FOR BICYCLISTS AND PEDESTRIANS PHASE 2A & 2B
0918-47-204VATentativeAug 2019$859,1003SAFETY LIGHTING ALONG EXISTING RIDGEWOOD TRL
0918-47-205VATentativeAug 2019$6,250,0003SHARED-USE PATH AND BICYCLE AND PEDESTRIAN IMPROVEMENTS
2208-02-022SS 303TentativeNov 2018$3,190,6841FULL DEPTH REPAIR CONCRETE PAVEMENT, OVERLAY AND PAVEMENT
0918-00-282VATentativeAug 2019$500,0007CONDUCT A PILOT STUDY ON PARKING DEMAND & INNOVATIVE PARKING
0918-45-372CSTentativeJul 2019$2,584,1073RECONST 4 LANE UNDIVIDED TO 4 LANE DIVIDED WITH INTERSECTION
0430-01-057SH 352TentativeApr 2019$10,223,75411RECONSTRUCT 4 LANE UNDIVIDED RURAL TO 4 LANE DIVIDED URBAN
0047-07-228US 75TentativeApr 2019$6,000,0005CONSTRUCT BIKE/PEDESTRIAN BRIDGE OVER US 75
0196-03-278IH 35ETentativeApr 2019$3,874,5731MILL, FULL DEPTH CONCRETE PAVEMENT REPAIR, OVERLAY ON THE
0197-02-124US 175TentativeApr 2019$4,000,0001RAMP MODIFICATIONS
2374-01-171IH 635TentativeMay 2019$69,377,0002MINTERCHANGE IMPROVEMENTS
0918-00-206VATentativeMay 2019$1,150,0005REGIONAL ITS FUNDING POOL
0009-11-243IH 30TentativeMay 2019$1,401,5111FULL DEPTH CONCRETE REPAIR ON EB FRONTAGE ROADS
0918-47-142CSTentativeJun 2019$2,220,1093DELAWARE CREEK TRAIL CONNECTOR - CONSTRUCT HIKE & BIKE TRAIL
0430-01-060SH 352TentativeJun 2019$2,794,8468IMPROVE TRAFFIC SIGNALS
0353-05-121SL 12TentativeJun 2019$5,974,6518INSTALL ADVANCE WARNING SIGNS AND CHEVRONS, MODERNIZE BRIDGE
0092-01-052US 175TentativeMar 2019$74,453,6822MRECONSTRUCT FREEWAY TO 6 LANE DIVIDED ARTERIAL
0918-47-139CSTentativeFeb 2019$4,284,9893TRINITY SKYLINE TRAIL - CONSTRUCT HIKE AND BIKE TRAIL
0918-47-062CSTentativeApr 2019$642,2146REPLACE BRIDGE AND APPROACHES
2374-01-185IH 635TentativeMar 2019$600,0003CONSTRUCT 2 LANE CROSSOVER BETWEEN EB AND WB FRONTAGE ROADS
0581-01-137SL 12TentativeFeb 2019$3,950,0006REPLACE BRIDGE AND APPROACHES
0047-07-230US 75TentativeFeb 2019$1,780,6058IMPROVE TRAFFIC SIGNALS
0918-47-178CSTentativeApr 2019$1,346,2603IMPROVE TRAFFIC SIGNALS

Denton County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
1310-01-027FM 407TentativeJun 2019$3,870,3046REPLACE BRIDGE AND APPROACHES
0081-13-064IH 35WTentativeJul 2019$1,230,2916REPLACE BRIDGE AND APPROACH RAILING
0918-46-306CSTentativeAug 2019$953,1353SYCAMORE - WELCH ACTIVE TRANSPORTATION CONNECTION
0918-46-279VATentativeAug 2019$2,000,00010CONSTRUCT CURB RAMP IMPROVEMENTS IN DENTON COUNTY
0918-46-267CSTentativeAug 2019$471,1205DENTON SCHOOL CONNECTION SIDEWALKS; NEW SIDEWALK SEGMENTS
0918-46-305CSTentativeAug 2019$952,8883SAFE ROUTES TO SCHOOL PEDESTRIAN IMPROVEMENTS IN PROXIMITY

Ellis County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0918-22-158CSTentativeJun 2019$011COMPENSATORY MITIGATION FOR REMOVAL OF HISTORIC US 77
0048-03-050US 77TentativeJun 2019$17,711,9026REPLACE BRIDGE AND APPROACHES
0172-05-115US 287TentativeJun 2019$26,706,23911CONSTRUCT INTERCHANGE
1211-02-019FM 984TentativeDec 2018$14,427,6301RECONSTRUCT EXISTING PAVEMENT AND ADD SHOULDERS
0092-05-051IH 45TentativeOct 2018$3,000,0007CONSTRUCT INTERSECTION IMPROVEMENTS

Kaufman County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0751-02-026FM 148TentativeDec 2018$5,250,9831RECONSTRUCT EXISTING PAVEMENT AND ADD SHOULDERS
0918-11-089CRTentativeJan 2019$758,5346REPLACE BRIDGE AND APPROACHES
2249-01-008FM 460TentativeMay 2019$1,721,1291RECONSTRUCT EXISTING PAVEMENT AND ADD SHOULDERS
0197-04-082US 175TentativeSep 2018$160,0001BRIDGE RAIL REPLACEMENT, STRUCTURE REPAIR, MILL AND INLAY
0197-04-080US 175TentativeSep 2018$5,619,5501MILL OVERLAY AND PAVEMENT MARKINGS (MAINLANES ONLY)
0751-01-046FM 148TentativeDec 2018$12,737,0003WIDEN EXISTING HIGHWAY FROM TWO LANE RURAL
0197-05-058US 175TentativeDec 2018$646,23311CONSTRUCT AT GRADE CROSSING
2815-01-008FM 2757TentativeFeb 2019$4,564,9811RECONSTRUCT EXISTING PAVEMENT AND SHOULDERS
0918-11-090CRTentativeJan 2019$1,402,0426REPLACE BRIDGE AND APPROACHES
0918-11-099VATentativeAug 2019$667,9753SAFE ROUTES TO SCHOOL PEDESTRIAN IMPROVEMENTS IN PROXIMITY
0918-11-103VATentativeMar 2019$8,600,0003INTERSECTION IMPROVEMENTS, SIGNAL IMPROVEMENTS, AND NEW

Navarro County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0121-08-019FM 55TentativeOct 2018$13,794,0871RESTORE EXISTING PAVEMENT AND ADD SHOULDERS
0092-13-024BI 45-FTentativeNov 2018$9,092,5436REPLACE BRIDGE AND APPROACHES

Rockwall County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
2363-01-006FM 2453TentativeJan 2019$1,011,2008PROVIDE ADDITIONAL PAVED SURFACE WIDTH, MILLED EDGELINE
0918-25-025CSTentativeAug 2019$475,2863SHARED-USE PATH FOR BICYCLISTS AND PEDESTRIANS ALONG
1290-03-024SH 276TentativeJan 2019$3,326,3291MILL, OVERLAY, FULL DEPTH REPAIR AND PAVEMENT MARKINGS


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract