The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Dallas District (FY 2019)
Collin | Dallas | Denton | Ellis | Kaufman | Navarro | Rockwall |

Collin County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0047-09-036SH 5ActualOct 2018$15,403,6921SEAL COAT AND PAVEMENT MARKINGS0.0
0091-05-059SH 289ActualJul 2019$4,087,2495CONSTRUCT NEW ROAD5.0
0816-04-050FM 455ActualSep 2018$4,030,3136REPLACE BRIDGE AND APPROACHES6.5
0280-02-040SH 78ActualJun 2019$13,711,0091REHABILITATE EXISTING ROADWAY7.5
1392-01-041FM 1378ActualMay 2019$5,429,3631REPAIR ROADWAY8.0
0091-04-064SH 289ActualAug 2019$1,169,92710LANDSCAPE DEVELOPMENT0.0
0918-24-240CRActualAug 2019$250,0008RAILROAD CROSSING IMPROVEMENTS0.0
0047-06-165US 75ActualMar 2019$1,691,4521FULL DEPTH CONCRETE REPAIR0.0
0816-05-022FM 2862ActualMay 2019$3,304,4221REPAIR ROADWAY7.5
0047-09-033SH 5ActualDec 2018$1,950,1661MILL, BASE REPAIR, OVERLAY0.0
0816-04-096FM 455ActualJan 2019$2,537,8801RESTORE EXISTING PAVEMENT AND ADD SHOULDERS0.0
0918-24-239CSActualJul 2019$700,0003TRANSPORTATION NON-ROADWAY0.0

Dallas County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
2964-06-025SH 190ActualOct 2018$1,769,6911INSTALL NOISE BARRIER ON FRONTAGE ROADS0.0
0918-00-287VAActualMar 2019$700,4091WRONG WAY DRIVING IMPLEMENTATION TO PREVENT WRONG WAY0.0
0430-01-060SH 352ActualJun 2019$2,671,2693TRAFFIC SIGNAL IMPROVEMENTS3.0
0918-47-165CSActualOct 2018$2,570,5483PLEASANT RUN ROAD TRAIL - INSTALL BIKE/PEDESTRIAN TRAIL0.0
0918-47-099CSActualFeb 2019$3,900,0003BIKE AND PEDESTRAIN FACILITY; CONCRETE TRAIL; LIGHTING AND0.0
0918-47-069VAActualFeb 2019$1,541,8803RAILROAD ADVANCED PREEMPTION0.0
0918-47-140CSActualFeb 2019$621,7973BROOKHAVEN COLLEGE CAMPUS - INTERCITY CONNECTIONS -CONSTRUCT0.0
0918-00-291CSActualJun 2019$21,281,2503FEDERAL TRANSIT ADMINISTRATION TRANSFER0.0
0095-13-043IH 20ActualMar 2019$28,484,1991FULL DEPTH CONCRETE REPAIR AND OVERLAY EB AND WB4.0
0197-02-126US 175ActualJun 2019$2,957,8091REHABILITATE EXISTING ROADWAY0.0
0092-07-060SH 356ActualMay 2019$2,555,7561REHABILITATE EXISTING ROADWAY0.0
0092-02-129IH 45ActualMay 2019$1,069,4411INSTALL/REPLACE SIGNS0.0
0092-14-092IH 345ActualJun 2019$4,213,2001REHABILITATE EXISTING ROADWAY0.0
0918-00-295VAActualMay 2019$3,252,0961HIGHWAY IMPROVEMENT0.0
0092-14-096IH 45ActualJun 2019$5,756,5936REHABILITATE BRIDGE3.5
0353-05-121SL 12ActualJun 2019$4,489,7221INSTALL/REPLACE SIGNS5.0
0009-02-040SH 78ActualApr 2019$4,031,2825INTERSECTION IMPROVEMENT7.0
0008-08-076SH 180ActualApr 2019$1,522,4501REHABILITATE EXISTING ROADWAY3.0
0918-47-178CSActualApr 2019$1,059,8773IMPROVE TRAFFIC SIGNALS3.0
0918-47-062CSActualApr 2019$739,0736REPLACE BRIDGE AND APPROACHES8.0
0353-04-106SS 348ActualApr 2019$9,342,3711REHABILITATE EXISTING ROADWAY0.0
0918-00-286VAActualOct 2018$2,976,0001INSTALLATION OF TRAFFIC SIGNALS5.0
0918-45-817CSActualDec 2018$1,100,0003CITYWIDE SIGNAL SYSTEM UPGRADE0.0
2374-04-060IH 20ActualDec 2018$10,519,7747CONSTRUCT 0 TO 4 LANE FRONTAGE ROADS7.0
0918-47-139CSActualOct 2018$4,284,9893TRINITY SKYLINE TRAIL - CONSTRUCT HIKE AND BIKE TRAIL0.0
0581-01-137SL 12ActualJan 2019$5,597,8306REPLACE BRIDGE AND APPROACHES8.0
2964-06-024SH 190ActualAug 2019$22,14410RAILROAD CROSSING IMPROVEMENTS0.0
2374-01-137IH 635ActualAug 2019$1,326,900,00111CONSTRUCT NEW ROAD0.0
0009-02-069SH 78ActualJan 2019$14,933,12859 INTERSECTION IMPROVEMENTS6.5
0918-00-288VAActualJul 2019$2,550,0001TRAFFIC SIGNAL IMPROVEMENTS3.0
0009-11-245IH 30ActualJan 2019$1,499,7921FULL DEPTH CONCRETE REPAIR0.0
0196-03-278IH 35EActualJul 2019$4,776,1411REHABILITATE EXISTING ROADWAY0.0
0918-00-290VAActualNov 2018$4,155,8447MOBILITY ASSISTANCE PATROL THAT PROVIDES ASSISTANCE TO0.0
1047-02-050FM 1382ActualJun 2019$1,808,6441TRAFFIC SIGNAL IMPROVEMENTS0.0
0918-45-372CSActualOct 2018$2,584,1073INTERSECTION IMPROVEMENT0.0
0009-11-243IH 30ActualFeb 2019$1,108,1141FULL DEPTH CONCRETE PAVEMENT REPAIR ON EB FRONTAGE ROADS0.0
0918-47-233VAActualNov 2018$625,0003PRELIMINARY ENGINEERING FOR VELOWEB SHARED-USE PATH0.0
2208-02-022SS 303ActualJan 2019$2,647,3741FULL DEPTH REPAIR CONCRETE PAVEMENT, OVERLAY AND PAVEMENT0.0
0918-00-292CSActualJun 2019$12,500,0005FEDERAL TRANSIT ADMINISTRATION TRANSFER0.0
0047-07-230US 75ActualFeb 2019$1,520,2208IMPROVE TRAFFIC SIGNALS6.0
0918-47-115VAActualSep 2018$2,416,54110CONSTRUCT CURB RAMPS AND SIDEWALKS IN THE CITY OF DALLAS,7.0

Denton County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0918-46-283CSActualFeb 2019$2,024,4733GARDEN RIDGE TRAIL - CONSTRUCT HIKE AND BIKE TRAIL0.0
0195-02-077IH 35ActualFeb 2019$1,158,7381FULL DEPTH CONCRETE REPAIR0.0
0918-46-292CSActualDec 2018$2,605,1073DCTA A-TRAIN BIKE AND PEDESTRIAN TRAIL - EAGLE POINT SECTION0.0
1310-01-027FM 407ActualJan 2019$3,863,0436REPLACE BRIDGE AND APPROACHES5.5
0817-01-026FM 428ActualMay 2019$1,690,6051REHABILITATE EXISTING ROADWAY0.0
2250-02-017SL 288ActualApr 2019$3,440,2701INSTALL MEDIAN CONCRETE BARRIERS4.0
1567-02-035FM 423ActualJun 2019$1,105,04710LANDSCAPE DEVELOPMENT0.0
0134-09-066US 380ActualAug 2019$1,868,12710LANDSCAPE DEVELOPMENT0.0
0918-46-309VAActualJun 2019$11,301,0563FEDERAL TRANSIT ADMINISTRATION TRANSFER0.0
0918-46-279VAActualJul 2019$3,061,43710CONSTRUCT RAMPS11.0

Ellis County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0172-05-115US 287ActualApr 2019$25,797,53611INTERCHANGE IMPROVEMENT6.0
1211-02-019FM 984ActualDec 2018$8,135,4371RECONSTRUCT EXISTING PAVEMENT AND ADD SHOULDERS6.0
0048-08-051IH 35EActualJan 2019$1,538,2291FULL DEPTH CONCRETE REPAIR0.0
0172-05-122US 287ActualMar 2019$9,679,9741PAVEMENT REPAIR AND OVERLAY5.0
0092-05-051IH 45ActualFeb 2019$1,165,3977CONSTRUCT INTERSECTION IMPROVEMENTS6.0
0048-03-050US 77ActualJun 2019$20,317,9506BRIDGE REPLACEMENT9.0

Kaufman County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0918-11-089CRActualJan 2019$792,3366REPLACE BRIDGE AND APPROACHES6.0
0918-11-090CRActualJan 2019$1,638,7156REPLACE BRIDGE AND APPROACHES5.0
0197-04-080US 175ActualSep 2018$6,748,8761MILL OVERLAY AND PAVEMENT MARKINGS (MAINLANES ONLY)2.0
0197-05-058US 175ActualDec 2018$865,89111CONSTRUCT AT GRADE CROSSING4.0
0095-14-029IH 20ActualMay 2019$15,990,4391REHABILITATE EXISTING ROADWAY5.0
0095-05-059US 80ActualJun 2019$3,463,1591INSTALL RAISED MEDIAN6.0
3190-01-012FM 2860ActualJun 2019$1,027,3551SURFACING/ROADWAY RESTORATION0.0
0173-02-071SH 34ActualApr 2019$34,966,5231REHABILITATE EXISTING ROADWAY5.0
2815-01-008FM 2757ActualFeb 2019$4,228,0981REHABILITATE EXISTING PAVEMENT AND ADD SHOULDERS0.0
0561-01-024SH 274ActualApr 2019$3,831,9621REHABILITATE EXISTING PAVEMENT AND SLOPE FAILURE REPAIR2.0
2249-01-008FM 460ActualMar 2019$1,573,3101REHABILITATE EXISTING ROADWAY5.0

Navarro County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0121-08-019FM 55ActualOct 2018$10,033,1001REHABILITATE EXISTING PAVEMENT AND ADD SHOULDERS8.0
0093-02-021SH 14ActualApr 2019$4,032,5081PAVEMENT REPAIR, OVERLAY AND PAVEMENT MARKINGS0.0
0092-06-104IH 45ActualJan 2019$1,664,8551FULL DEPTH CONCRETE PAVEMENT REPAIR0.0
0092-13-024BI 45-FActualNov 2018$8,498,5111REPLACE BRIDGE AND APPROACHES7.5
0162-03-042SH 31ActualMay 2019$7,007,3071INSTALL RAISED MEDIAN0.0
3325-01-015FM 3243ActualAug 2019$22,14410RAILROAD CROSSING IMPROVEMENTS0.0

Rockwall County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0009-04-071SH 66ActualFeb 2019$1,122,1081FULL DEPTH CONCRETE PAVEMENT REPAIR0.0
2363-01-007FM 2453ActualJan 2019$2,937,2091RECONSTRUCT EXISTING PAVEMENT AND ADD SHOULDERS0.0
1290-03-024SH 276ActualSep 2018$1,394,7771MILL, OVERLAY, FULL DEPTH REPAIR AND PAVEMENT MARKINGS0.0