Letting Schedule for February, 2019 County (FY 2019)
Bid Tabulations Dashboard
Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
|
February, 2019 (FY 2019) | (see Links) |
SEP 2018 | OCT 2018 | NOV 2018 | DEC 2018 | JAN 2019 | FEB 2019 | MAR 2019 | APR 2019 | MAY 2019 | JUN 2019 | JUL 2019 | AUG 2019 | | |||||||
CCSJ | County/ District | Highway | Let Status | Contract Cost | Fund Cat | Description | DBE Goal |
---|---|---|---|---|---|---|---|
0180-04-151 | Aransas/ Corpus Christi | BS 35-L | Actual | $945,815 | 10 | EMERGENCY WORK REPAIR TRAFFIC SIGNALS | 0.0 |
2136-01-015 | Bell/ Waco | FM 2268 | Actual | $4,229,503 | 6 | REPLACE BRIDGE AND APPROACHES | 8.0 |
0521-03-060 | Bexar/ San Antonio | SL 13 | Actual | $3,388,793 | 1 | BASE REPAIR, MILL, SEAL COAT, OVERLAY AND PAVEMENT MARKINGS | 0.0 |
0915-00-191 | Bexar/ San Antonio | VA | Actual | $1,499,971 | 1 | DISTRICTWIDE NON-SITE SPECIFIC TRAFFIC SIGNALS-FY 2019 | 0.0 |
0465-02-026 | Bexar/ San Antonio | FM 1518 | Actual | $2,630,772 | 1 | OVERLAY & PAVEMENT MARKINGS ON MAINLANES | 0.0 |
0024-09-024 | Bexar/ San Antonio | SS 371 | Actual | $6,022,898 | 1 | OVERLAY & PAVEMENT MARKINGS | 0.0 |
0291-10-110 | Bexar/ San Antonio | SH 16 | Actual | $2,285,402 | 1 | RECONSTRUCT EXISTING CULVERT | 7.0 |
0915-12-612 | Bexar/ San Antonio | VA | Actual | $10,000,000 | 3 | TRANSIT | 0.0 |
2452-04-016 | Bexar/ San Antonio | SL 1604 | Actual | $22,594,167 | 2M | EXPAND FROM 2 LANES TO 4 LANE DIVIDED | 6.0 |
0111-08-122 | Brazoria/ Houston | BS 288B | Actual | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0923-00-060 | Brown/ Brownwood | VA | Actual | $908,556 | 1 | THERMOPLASTIC STRIPING | 0.0 |
0054-06-104 | Brown/ Brownwood | US 67 | Actual | $1,245,868 | 8 | PROFILE CENTER AND EDGELINE MARKINGS | 0.0 |
0432-01-065 | Calhoun/ Yoakum | SH 185 | Actual | $1,011,185 | 1 | ADD TURN LANES & RESURFACING | 5.0 |
0181-03-025 | Callahan/ Abilene | SH 36 | Actual | $1,958,615 | 8 | MILLED EDGELINE RUMBLE STRIPS | 0.0 |
0921-06-316 | Cameron/ Pharr | CS | Actual | $7,847,611 | 3 | STRENGTHEN PORT ROADWAYS - CEMETERY RD., PORT RD., | 0.0 |
0169-05-041 | Carson/ Amarillo | US 60 | Actual | $16,472,607 | 11 | FULL DEPTH REHAB AND OVERLAY | 0.0 |
0508-02-120 | Chambers/ Beaumont | IH 10 | Actual | $34,941,671 | 7 | CONSTRUCT BRIDGE | 6.5 |
0137-10-022 | Clay/ Wichita Falls | FM 174 | Actual | $2,112,517 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | 6.5 |
0016-05-119 | Comal/ San Antonio | IH 35 | Actual | $27,604,165 | 2M | RAMP REVISIONS, INTERSECTION AND FRONTAGE ROAD OPERATIONAL | 8.0 |
1357-01-026 | Cooke/ Wichita Falls | FM 2896 | Actual | $2,690,062 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH, MILLED EDGELINE | 0.0 |
0556-02-017 | Crockett/ Odessa | SH 349 | Actual | $80,953 | 8 | PROFILE EDGELINE AND CENTERLINE MARKINGS | 0.0 |
2451-02-012 | Culberson/ El Paso | RM 652 | Actual | $22,969,056 | 11 | SURFACING/ROADWAY RESTORATION | 3.5 |
1158-01-009 | Culberson/ El Paso | FM 2185 | Actual | $2,632,422 | 1 | ROADWAY REHABILITATION WITH WIDENING | 0.0 |
0918-47-099 | Dallas/ Dallas | CS | Actual | $3,900,000 | 3 | BIKE AND PEDESTRAIN FACILITY; CONCRETE TRAIL; LIGHTING AND | 0.0 |
0918-47-069 | Dallas/ Dallas | VA | Actual | $1,541,880 | 3 | RAILROAD ADVANCED PREEMPTION | 0.0 |
0918-47-140 | Dallas/ Dallas | CS | Actual | $621,797 | 3 | BROOKHAVEN COLLEGE CAMPUS - INTERCITY CONNECTIONS -CONSTRUCT | 0.0 |
0009-11-243 | Dallas/ Dallas | IH 30 | Actual | $1,108,114 | 1 | FULL DEPTH CONCRETE PAVEMENT REPAIR ON EB FRONTAGE ROADS | 0.0 |
0047-07-230 | Dallas/ Dallas | US 75 | Actual | $1,520,220 | 8 | IMPROVE TRAFFIC SIGNALS | 6.0 |
0918-46-283 | Denton/ Dallas | CS | Actual | $2,024,473 | 3 | GARDEN RIDGE TRAIL - CONSTRUCT HIKE AND BIKE TRAIL | 0.0 |
0195-02-077 | Denton/ Dallas | IH 35 | Actual | $1,158,738 | 1 | FULL DEPTH CONCRETE REPAIR | 0.0 |
0042-07-066 | Donley/ Childress | US 287 | Actual | $4,900,162 | 11 | ASPHALTIC CONCRETE OVERLAY | 0.0 |
0924-00-100 | El Paso/ El Paso | VA | Actual | $2,089,697 | 1 | FY 2019 STRIPING PROJECT | 0.0 |
0092-05-051 | Ellis/ Dallas | IH 45 | Actual | $1,165,397 | 7 | CONSTRUCT INTERSECTION IMPROVEMENTS | 6.0 |
0257-06-027 | Erath/ Ft Worth | SH 6 | Actual | $5,363,158 | 1 | CONSTRUCT SUPER 2 PASSING LANES | 0.0 |
0382-02-036 | Falls/ Waco | SH 7 | Actual | $7,235,206 | 1 | MILL/OVERLAY | 2.0 |
0045-05-048 | Fannin/ Paris | SH 56 | Actual | $230,459 | 8 | IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS | 0.0 |
0807-03-036 | Fayette/ Yoakum | FM 153 | Actual | $23,180 | 10 | EMERGENCY RELIEF | 0.0 |
0057-03-041 | Freestone/ Bryan | US 84 | Actual | $2,057,176 | 11 | PROFILE EDGELINE MARKINGS | 0.0 |
0915-18-024 | Frio/ San Antonio | CR | Actual | $560,192 | 6 | REPLACE BRIDGE & APPROACHES | 0.0 |
1607-01-053 | Galveston/ Houston | FM 1764 | Actual | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0367-03-037 | Galveston/ Houston | SH 87 | Actual | $7,058,422 | 1 | BASE REPAIR, MILLING AND 1.5" ACP OVERLAY | 0.0 |
3049-01-034 | Galveston/ Houston | FM 646 | Actual | $11,455 | 10 | REMOVE AND INSTALL NEW CABINET WITH RISER | 0.0 |
1844-02-023 | Galveston/ Houston | FM 2351 | Actual | $11,455 | 10 | REMOVE AND INSTALL NEW CABINET AND RISER | 0.0 |
0976-03-108 | Galveston/ Houston | FM 518 | Actual | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET AND RISER | 0.0 |
0976-03-107 | Galveston/ Houston | FM 518 | Actual | $11,455 | 10 | REMOVE AND INSTALL NEW CABINET AND RISER | 0.0 |
0978-01-040 | Galveston/ Houston | FM 517 | Actual | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0976-04-021 | Galveston/ Houston | FM 2094 | Actual | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0686-02-028 | Galveston/ Houston | FM 1765 | Actual | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0978-01-041 | Galveston/ Houston | FM 517 | Actual | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0051-03-112 | Galveston/ Houston | SH 3 | Actual | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
1607-01-052 | Galveston/ Houston | FM 1764 | Actual | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0051-09-120 | Galveston/ Houston | FM 3005 | Actual | $3,307,657 | 1 | BASE REPAIR, MILLING, SEAL COAT, 3/4 INCH TOM-F, 1 INCH | 0.0 |
0686-02-027 | Galveston/ Houston | FM 1765 | Actual | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0686-01-050 | Galveston/ Houston | FM 1765 | Actual | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0912-72-445 | Harris/ Houston | CR | Actual | $29,056 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-448 | Harris/ Houston | CR | Actual | $30,176 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0271-15-090 | Harris/ Houston | IH 610 | Actual | $1,096,630 | 3 | UPGRADE STORM SEWERS | 0.0 |
0027-13-212 | Harris/ Houston | IH 69 | Actual | $5,319,884 | 1 | UPGRADE HIGH MAST & UNDERPASS LIGHTING | 0.0 |
0912-72-449 | Harris/ Houston | CR | Actual | $17,252 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-450 | Harris/ Houston | CR | Actual | $20,435 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-453 | Harris/ Houston | CR | Actual | $28,268 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-539 | Harris/ Houston | CR | Actual | $914,454 | 10 | EMERGENCY RELIEF | 0.0 |
0366-01-076 | Hays/ Austin | SL 82 | Actual | $1,006,023 | 1 | MILL, SEAL AND INLAY | 0.0 |
0164-01-072 | Henderson/ Tyler | SH 31 | Actual | $150,860 | 10 | RECONSTRUCT PIPE ENTRANCE, ADD LANDSCAPING & LIGHTING | 0.0 |
0039-17-201 | Hidalgo/ Pharr | IH 2 | Actual | $2,388,368 | 1 | PAVEMENT REHABILITATION_(FRONTAGE RDS.) | 0.0 |
0400-02-053 | Hopkins/ Paris | SH 19 | Actual | $780,387 | 11 | CREATING A LEFT TURN LANE AND CONTINUES TURN LANE FOR | 4.0 |
0009-06-051 | Hunt/ Paris | SH 66 | Actual | $2,329,838 | 1 | SFTY TREAT FIXED OBJ, WIDEN PVD SHLD TO 5FT OR LESS, INSTALL | 5.0 |
0200-04-024 | Jasper/ Beaumont | US 69 | Actual | $8,348,396 | 11 | SURFACING/ROADWAY RESTORATION | 0.0 |
0172-10-015 | Johnson/ Ft Worth | US 287 | Actual | $838,266 | 1 | REPAIR BASE FAILURES, MILL, OVERLAY, PAVEMENT MARKINGS | 0.0 |
2815-01-008 | Kaufman/ Dallas | FM 2757 | Actual | $4,228,098 | 1 | REHABILITATE EXISTING PAVEMENT AND ADD SHOULDERS | 0.0 |
0952-01-060 | Liberty/ Beaumont | FM 1008 | Actual | $2,889,633 | 1 | CONSTRUCT FRONTAGE ROADS | 0.0 |
0783-01-098 | Lubbock/ Lubbock | SL 289 | Actual | $12,800,254 | 1 | RESTORATION | 0.0 |
0905-00-092 | Lubbock/ Lubbock | VA | Actual | $4,108,759 | 1 | TRAFFIC CONTROL DEVICES | 0.0 |
0880-04-032 | Lubbock/ Lubbock | FM 179 | Actual | $19,587,025 | 11 | WIDEN ROAD - ADD LANES | 5.0 |
1842-01-016 | Martin/ Odessa | FM 26 | Actual | $1,241,324 | 1 | CHANNEL EXCAV, PLACEMENT OF CONCRETE RIP RAP, REPLACEMENT OF | 0.0 |
0209-01-063 | Mclennan/ Waco | SL 2 | Actual | $864,347 | 11 | MILL AND OVERLAY | 0.0 |
2560-01-083 | Nacogdoches/ Lufkin | SL 224 | Actual | $1,603,357 | 1 | RESURFACE WITH THIN OVERLAY MIXTURE | 0.0 |
2590-02-010 | Nacogdoches/ Lufkin | FM 2609 | Actual | $3,997,749 | 11 | RECONSTRUCT AND WIDEN PAVEMENT | 5.0 |
1069-01-035 | Nueces/ Corpus Christi | SH 357 | Actual | $3,769,320 | 8 | IMPROVE TRAFFIC SIGNALS AND INTERCONNECT SIGNALS | 0.0 |
0916-00-067 | Nueces/ Corpus Christi | VA | Actual | $1,030,000 | 3 | UPGRADE/INSTALL TRAFFIC SIGNALS AND ADD RIGHT TURN LANE | 0.0 |
0710-02-068 | Orange/ Beaumont | FM 105 | Actual | $3,996,177 | 1 | MILL AND OVERLAY, JOINT SEAL | 0.0 |
1601-01-033 | Parker/ Ft Worth | FM 730 | Actual | $567,836 | 1 | SIGNAL IMPROVEMENTS INCLUDING CORRIDOR RETIMING & | 0.0 |
0176-05-185 | Polk/ Lufkin | US 59 | Actual | $14,544 | 10 | REESTABLISH THE EMBANKMENT TO PREVENT FURTHER EROSION | 0.0 |
0177-01-106 | Polk/ Lufkin | US 59 | Actual | $18,962 | 10 | EMERGENCY RELIEF | 0.0 |
0177-01-104 | Polk/ Lufkin | US 59 | Actual | $23,724 | 10 | EMERGENCY RELIEF | 0.0 |
1408-01-026 | Polk/ Lufkin | FM 1276 | Actual | $106,788 | 10 | REPAVE AND RETREAT FLEX BASE (ROUGHLY 1000 FT LONG) | 0.0 |
0041-07-106 | Potter/ Amarillo | US 87 | Actual | $5,067,164 | 1 | REPLACE BRIDGE AND APPROACHES | 7.5 |
0235-03-034 | Real/ San Angelo | SH 55 | Actual | $935,544 | 8 | PROFILE EDGELINE AND CENTERLINE MARKINGS | 0.0 |
0180-02-040 | Refugio/ Corpus Christi | SH 35 | Actual | $12,477,440 | 8 | SAFETY TRT FIXED OBJECTS, INSTALL PASSING LANES ON 2 LANE RD | 2.0 |
0049-14-012 | Robertson/ Bryan | FM 46 | Actual | $2,054,388 | 1 | REHABILITATE EXISTING ROAD | 6.0 |
0009-04-071 | Rockwall/ Dallas | SH 66 | Actual | $1,122,108 | 1 | FULL DEPTH CONCRETE PAVEMENT REPAIR | 0.0 |
0158-01-082 | Runnels/ San Angelo | US 67 | Actual | $14,639,666 | 1 | ACP OVERLAY | 0.0 |
1510-01-022 | Sabine/ Lufkin | FM 1592 | Actual | $3,918 | 10 | EMERGENCY EROSION REPAIRS | 0.0 |
1679-01-016 | Sabine/ Lufkin | FM 276 | Actual | $7,509 | 10 | REESTABLISH THE SLOPE AT THE EAST ABUTMENT | 0.0 |
1510-01-023 | Sabine/ Lufkin | FM 1592 | Actual | $23,016 | 10 | REESTABLISH THE FRONT SLOPE ON THE WEST SIDE OF THE | 0.0 |
0403-01-048 | San Jacinto/ Lufkin | SH 156 | Actual | $15,991 | 10 | EMERGENCY RELIEF | 0.0 |
2829-02-009 | San Jacinto/ Lufkin | FM 2693 | Actual | $128,011 | 10 | REPLACE GUARDRAIL, REPLACE BASE MATERIAL AND PAVEMENT | 0.0 |
0395-02-045 | San Jacinto/ Lufkin | SH 150 | Actual | $34,986 | 10 | REPLACE OR RESET GUARDRAIL, REPLACE FAILED MOW STRIP/REPLACE | 0.0 |
0066-03-041 | Sherman/ Amarillo | US 287 | Actual | $14,955,778 | 1 | OVERLAY | 2.0 |
0902-00-220 | Tarrant/ Ft Worth | VA | Actual | $1,700,000 | 1 | MANAGED LANE SYSTEM TECHNOLOGY | 0.0 |
0908-00-088 | Taylor/ Abilene | VA | Actual | $2,554,057 | 1 | THERMOPLASTIC PAVEMENT MARKINGS AND RAISED PAVEMENT MARKERS | 0.0 |
0200-07-054 | Tyler/ Beaumont | US 69 | Actual | $3,438,001 | 1 | SURFACING/ROADWAY RESTORATION | 0.0 |
0200-08-056 | Tyler/ Beaumont | US 69 | Actual | $348,925 | 1 | HAZARD ELIMINATION & SAFETY | 0.0 |
0520-05-050 | Upshur/ Atlanta | SH 155 | Actual | $4,133,448 | 1 | RESTORE EXISTING 2-LANE HIGHWAY | 0.0 |
3173-01-004 | Wharton/ Yoakum | FM 3086 | Actual | $3,446,328 | 1 | RESTORE EXISTING ROADWAY | 0.0 |
2211-02-030 | Williamson/ Austin | FM 1460 | Actual | $197,338 | 3 | INSTALL MEDIAN BREAK AND LEFT TURN LANE | 0.0 |
0440-01-042 | Williamson/ Austin | SH 138 | Actual | $6,838,458 | 1 | ADD SHOULDERS AND REHABILITATE ROADWAY | 8.0 |
|