Letting Schedule for Ft Worth District (FY 2019)
Bid Tabulations Dashboard
Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
Ft Worth District (FY 2019) |
Erath | Hood | Jack | Johnson | Palo Pinto | Parker | Somervell | Tarrant | Wise | | |||||||
Erath County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
---|---|---|---|---|---|---|---|
0257-06-027 | SH 6 | Actual | Feb 2019 | $5,363,158 | 1 | CONSTRUCT SUPER 2 PASSING LANES | 0.0 |
0258-01-030 | SH 6 | Actual | Aug 2019 | $115,200 | 10 | RAILROAD CROSSING IMPROVEMENTS | 0.0 |
0902-49-071 | CS | Actual | Aug 2019 | $281,280 | 8 | RAILROAD CROSSING IMPROVEMENTS | 0.0 |
Hood County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
0902-51-030 | CS | Actual | Aug 2019 | $250,000 | 8 | INSTALL TRAFFIC SIGNAL | 0.0 |
Jack County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
0171-01-034 | SH 199 | Actual | Jun 2019 | $4,904,872 | 1 | RESURFACE ROADWAY | 3.0 |
0249-07-075 | US 281 | Actual | Jul 2019 | $2,661,496 | 1 | RESURFACE ROADWAY | 2.0 |
Johnson County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
0172-10-015 | US 287 | Actual | Feb 2019 | $838,266 | 1 | REPAIR BASE FAILURES, MILL, OVERLAY, PAVEMENT MARKINGS | 0.0 |
0014-03-100 | IH 35W | Actual | Aug 2019 | $4,237,431 | 1 | RESURFACE ROADWAY | 6.5 |
1513-02-042 | FM 4 | Actual | Aug 2019 | $1,619,915 | 1 | CONSTRUCT FRONTAGE ROADS | 8.0 |
1094-04-016 | FM 731 | Actual | Sep 2018 | $1,974,144 | 1 | REPAIR BASE FAILURES, HMAC OVERLAY, PAVEMENT MARKINGS | 1.5 |
Palo Pinto County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
0249-08-044 | US 281 | Actual | Jun 2019 | $568,566 | 11 | BICYCLE AND PEDESTRIAN IMPROVEMENTS | 3.0 |
0007-10-066 | US 180 | Actual | Jan 2019 | $579,280 | 11 | CLEAN DITCH AND LINE WITH ROCK GABION MATTRESS | 0.0 |
2839-01-012 | SH 337 | Actual | Sep 2018 | $152,040 | 8 | MILLED EDGELINE & CENTERLINE RUMBLE STRIPS | 0.0 |
0314-02-052 | IH 20 | Actual | Jun 2019 | $2,614,450 | 1 | RESURFACE ROADWAY | 4.0 |
2839-01-010 | SH 337 | Actual | Dec 2018 | $14,104,197 | 1 | SEAL COAT MAIN LANES | 0.0 |
Parker County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
1601-01-033 | FM 730 | Actual | Feb 2019 | $567,836 | 1 | SIGNAL IMPROVEMENTS INCLUDING CORRIDOR RETIMING & | 0.0 |
0313-02-057 | FM 51 | Actual | May 2019 | $21,001,841 | 1 | CONSTRUCT NEW ROAD | 9.0 |
0313-02-059 | FM 51 | Actual | Mar 2019 | $6,808,813 | 1 | RESURFACE ROADWAY | 5.0 |
0314-07-069 | IH 20 | Actual | Apr 2019 | $1,223,210 | 1 | FRONTAGE ROADS- REPAIR BASE FAILURES, MILL, HMAC OVERLAY, | 3.0 |
0902-38-126 | VA | Actual | Sep 2018 | $2,771 | 3 | INSTALL MEMORIAL BRIDGE SIGNS (HUNTER CHASE CORZINE) | 0.0 |
0365-01-050 | SH 171 | Actual | Jul 2019 | $397,790 | 3 | LANDSCAPE DEVELOPMENT | 0.0 |
1601-01-034 | FM 730 | Actual | Jun 2019 | $2,994,178 | 1 | REHABILITATE EXISTING ROADWAY | 0.0 |
Somervell County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
0259-03-057 | US 67 | Actual | Jan 2019 | $2,052,657 | 1 | REPAIR BASE FAILURES, MILL, TOM OVERLAY, PAVEMENT MARKINGS | 2.0 |
0259-02-051 | US 67 | Actual | Jul 2019 | $10,443,745 | 1 | CONSTRUCT NEW ROAD | 7.0 |
Tarrant County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
0172-06-093 | SS 280 | Actual | Jul 2019 | $1,104,734 | 1 | RESURFACE ROADWAY | 5.0 |
0013-10-086 | BU 287P | Actual | Jul 2019 | $465,355 | 3 | LANDSCAPE DEVELOPMENT | 0.0 |
2374-05-086 | IH 20 | Actual | Jul 2019 | $1,415,291 | 1 | RESURFACE ROADWAY | 0.0 |
0081-01-051 | US 377 | Actual | Aug 2019 | $5,225,204 | 1 | PREVENTIVE MAINTENANCE | 5.0 |
0008-16-046 | IH 20 | Actual | Jul 2019 | $2,020,477 | 1 | INSTALL ILLUMINATION | 0.0 |
0902-90-113 | VA | Actual | Mar 2019 | $3,846,931 | 1 | LONGLINE MULTIPOLYMER STRIPING (60 & 90 MIL); RAISED PVMT | 0.0 |
1068-02-149 | IH 30 | Actual | Jul 2019 | $6,679,856 | 1 | RESURFACE ROADWAY | 4.0 |
0902-90-097 | CS | Actual | Jul 2019 | $335,374 | 3 | INSTALL TRAFFIC SIGNAL | 5.0 |
0902-90-078 | VA | Actual | Jul 2019 | $968,799 | 3 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | 0.0 |
0902-00-220 | VA | Actual | Feb 2019 | $1,700,000 | 1 | MANAGED LANE SYSTEM TECHNOLOGY | 0.0 |
0902-90-106 | VA | Actual | Jul 2019 | $4,347,326 | 1 | INSTALL/REHABILITATE ITS | 0.0 |
1068-01-222 | IH 30 | Actual | Jul 2019 | $3,910,234 | 6 | REHABILITATE BRIDGE | 0.0 |
0902-00-210 | VA | Actual | Jul 2019 | $1,012,205 | 1 | UPGRADE DYNAMIC MESSAGE SIGN BOARDS | 0.0 |
0363-01-143 | SH 26 | Actual | Mar 2019 | $2,662,513 | 1 | REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS | 0.0 |
0902-00-216 | VA | Actual | Aug 2019 | $1,633,565 | 10 | CONSTRUCT RAMPS | 5.0 |
0902-00-218 | VA | Actual | Jun 2019 | $5,156,706 | 1 | REPLACE GUARDRAIL | 0.0 |
0902-90-037 | CS | Actual | Aug 2019 | $234,487 | 3 | INSTALL TRAFFIC SIGNAL | 0.0 |
0172-02-076 | BU 287P | Actual | Aug 2019 | $1,108,735 | 1 | RESURFACE ROADWAY | 0.0 |
0902-90-026 | VA | Actual | May 2019 | $1,785,000 | 3 | TRAFFIC SIGNAL IMPROVEMENTS | 0.0 |
1068-01-229 | IH 30 | Actual | May 2019 | $71,271 | 1 | BRIDGE MAINTENANCE | 0.0 |
0902-00-163 | VA | Actual | Aug 2019 | $3,188,975 | 1 | REHABILITATE EXISTING ROADWAY | 0.0 |
1068-01-221 | IH 30 | Actual | Jun 2019 | $1,575,610 | 1 | RESURFACE ROADWAY | 5.0 |
0008-13-238 | IH 20 | Actual | Apr 2019 | $2,240,580 | 11 | REMOVE METAL BEAM GUARD FENCE AND INSTALL CONCRETE TRAFFIC | 4.5 |
0094-02-134 | SH 10 | Actual | Aug 2019 | $770,000 | 3 | LANDSCAPE DEVELOPMENT | 0.0 |
0902-90-118 | VA | Actual | Jun 2019 | $500,000 | 5 | COMMUTE SOLUTIONS PROGRAM | 0.0 |
0902-90-074 | VA | Actual | Jun 2019 | $5,000,000 | 3 | MAINTENANCE & OPERATIONS PROJECT | 0.0 |
0902-90-038 | CS | Actual | Aug 2019 | $3,172,855 | 3 | INSTALL TRAFFIC SIGNAL | 0.0 |
0171-05-098 | SH 199 | Actual | Aug 2019 | $1,021,739 | 1 | RESURFACE ROADWAY | 4.0 |
0902-00-157 | VA | Actual | Sep 2018 | $1,120,000 | 3 | MAINTENANCE & OPERATIONS PROJECT | 0.0 |
0902-90-100 | VA | Actual | Sep 2018 | $1,250,000 | 3 | MAINTENANCE & OPERATIONS PROJECT | 0.0 |
0902-90-052 | VA | Actual | Sep 2018 | $300,000 | 3 | INSTALL/REHABILITATE ITS | 0.0 |
0902-90-107 | VA | Actual | Sep 2018 | $437,500 | 3 | TRANSIT | 0.0 |
0902-00-166 | VA | Actual | Nov 2018 | $5,307,200 | 1 | NON-SITE SPECIFIC TRAFFIC SIGNAL INSTALLATION | 3.5 |
0364-01-148 | SH 121 | Actual | Sep 2018 | $19,298,514 | 1 | RECONSTRUCT SHOULDER FOR PEAK HOUR UTILIZATION | 6.0 |
0902-90-039 | CS | Actual | Aug 2019 | $517,921 | 3 | INSTALL TRAFFIC SIGNAL | 0.0 |
0902-00-214 | VA | Actual | Sep 2018 | $660,000 | 3 | MAINTENANCE & OPERATIONS PROJECT | 0.0 |
0902-90-131 | VA | Actual | Aug 2019 | $200,000 | 7 | ENGINEERING DESIGN/STUDY | 0.0 |
0902-90-122 | VA | Actual | Aug 2019 | $3,500,000 | 7 | TRANSPORTATION NON-ROADWAY | 0.0 |
0902-00-215 | VA | Actual | Sep 2018 | $3,000,000 | 3 | MANAGED LANE SYSTEM TECHNOLOGY | 0.0 |
0902-00-175 | VA | Actual | Sep 2018 | $291,350 | 3 | MAINTENANCE & OPERATIONS PROJECT | 0.0 |
0902-00-177 | VA | Actual | Sep 2018 | $1,000,000 | 3 | REGIONAL TRAVEL MANAGEMENT PROGRAM | 0.0 |
0902-90-051 | VA | Actual | Sep 2018 | $300,000 | 3 | INSTALL/REHABILITATE ITS | 0.0 |
1603-03-039 | FM 1709 | Actual | Aug 2019 | $3,205,548 | 1 | RESURFACE ROADWAY | 0.0 |
0081-12-051 | IH 35W | Actual | Sep 2018 | $25,435 | 3 | ROADWAY SIGN INSTALLATION | 0.0 |
0008-07-035 | SH 180 | Actual | Jan 2019 | $5,919,084 | 1 | REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS | 0.0 |
0902-00-186 | VA | Actual | Jan 2019 | $650,000 | 7 | MAINTENANCE & OPERATIONS PROJECT | 0.0 |
0008-13-239 | IH 820 | Actual | Sep 2018 | $740,151 | 1 | RECONSTRUCT DAMAGED RIPRAPS | 0.0 |
0902-90-091 | CS | Actual | Aug 2019 | $250,000 | 8 | INSTALL TRAFFIC SIGNAL | 0.0 |
0902-90-114 | VA | Actual | Jan 2019 | $2,530,383 | 3 | MOBILITY ASST PATROL THAT PROVIDES ASST TO STRANDED MOTORIST | 0.0 |
0902-90-088 | VA | Actual | Aug 2019 | $650,090 | 11 | INSTALL/REPLACE SIGNS | 0.0 |
0902-00-188 | VA | Actual | Dec 2018 | $1,175,000 | 3 | MAINTENANCE & OPERATIONS PROJECT | 0.0 |
0902-90-103 | VA | Actual | Dec 2018 | $3,035,843 | 1 | NON SITE SPECIFIC ILLUMINATION | 0.0 |
1603-03-038 | FM 1709 | Actual | Aug 2019 | $550,804 | 1 | INSTALL TRAFFIC SIGNAL | 0.0 |
Wise County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
0902-20-099 | CR | Actual | Jul 2019 | $703,995 | 6 | BRIDGE REPLACEMENT | 7.0 |
1606-01-034 | FM 1658 | Actual | Aug 2019 | $97,070 | 1 | HAZARD ELIMINATION & SAFETY | 0.0 |
0134-07-074 | US 380 | Actual | Sep 2018 | $3,187 | 3 | INSTALL MEMORIAL HIGHWAY SIGNS (JAMES BENNETT) | 0.0 |
1751-01-030 | FM 1655 | Actual | May 2019 | $242,193 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0013-08-135 | US 81 | Actual | Jul 2019 | $1,108,315 | 1 | RESURFACE ROADWAY | 6.0 |
0134-06-052 | FM 1810 | Actual | Aug 2019 | $11,289,208 | 1 | RESURFACE ROADWAY | 10.0 |
0816-01-014 | FM 455 | Actual | Jul 2019 | $3,408,029 | 1 | REHABILITATE EXISTING ROADWAY | 7.5 |
|