Letting Schedule for Houston District (FY 2019)

Last Update: Monday, November 20, 2017
Houston District (FY 2019)
Brazoria | Fort Bend | Galveston | Harris | Montgomery |

Brazoria County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0188-03-019SH 36TentativeNov 2018$45,000,0002MWIDEN TO 4-LANE DIVIDED RURAL
0912-31-293CSTentativeJun 2019$4,948,2423WIDEN TO 4 LANES
0598-02-110SH 288TentativeNov 2018$3,300,0001CONSTRUCT U-TURNS AND ACCELERATION/DECELERATION LANES
0912-31-303CRTentativeNov 2018$17,062,0003RECONSTRUCT & WIDEN FROM 2 TO 4 LANES WITH RAISED MEDIAN,
0587-01-060FM 1495TentativeApr 2019$15,000,0001REPLACE BRIDGE AND APPROACHES (NBI# 12020058701003)
2523-02-068FM 2004TentativeMar 2019$32,000,0001ADD SHOULDERS, WIDEN BRIDGES, REPLACE BRIDGE AT CHOCOLATE
0912-31-290CSTentativeMay 2019$32,000,0003CONSTRUCT 4 LANES DIVIDED ON NEW LOCATION
0178-02-089SH 35TentativeJan 2019$3,485,0001DIAMOND GRINDING MAINLANES AND 1.5" ACP OVERLAY ON SHOULDERS
0111-08-100SH 36TentativeSep 2018$8,500,0002MWIDEN TO 4-LANE DIVIDED RURAL
2938-02-022FM 2917TentativeSep 2018$3,663,0001PAVEMENT REPAIR, SEAL COAT AND 1.5 IN ACP OVERLAY
0587-01-063FM 1495TentativeSep 2018$1,270,0001MILLING, 1.5" ACP OVERLAY AND PAVEMENT MARKINGS
0912-31-296CRTentativeOct 2018$1,623,0006REPLACE BRIDGE AND APPROACHES (NBI #12020AA0652001)

Fort Bend County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0188-02-036SH 36TentativeNov 2018$38,300,0002MWIDEN TO 4-LANE DIVIDED RURAL
0192-01-099SH 6TentativeFeb 2019$5,826,0002MINSTALL ITS EQUIPMENT & INFRASTRUCTURE - 144-STRAND FIBER
0188-10-021FM 1463TentativeJan 2019$33,400,0002MWIDEN FROM 2 TO 4 AND 6 LANES URBAN DIVIDED
0912-34-192VATentativeJan 2019$6,092,0003INSTALL WIRELESS TRAFFIC SIGNAL COMMUNICATION SYSTEM
0912-34-188CSTentativeSep 2018$970,0006REPLACE BRIDGE AND APPROACHES (NBI #12080C00700001
2093-01-010FM 2218TentativeAug 2019$35,228,3742MWIDEN FROM 2 LANES TO 4-LANE DIVIDED
0271-05-044IH 10TentativeSep 2018$850,0001INSTALL PAVEMENT MARKINGS
0089-18-003SL 540TentativeSep 2018$1,840,0001SEAL COAT AND 1.5 IN ACP OVERLAY
0188-02-029SH 36TentativeSep 2018$59,400,0002MWIDEN TO 4-LANE DIVIDED RURAL
0188-09-042FM 723TentativeAug 2019$10,000,0002MWIDEN FROM 2 TO 4 LANES

Galveston County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0912-73-207CSTentativeJan 2019$1,756,0003MILL AND OVERLAY
0367-03-037SH 87TentativeFeb 2019$4,720,0001BASE REPAIR, MILLING AND 1.5" ACP OVERLAY
0389-06-108SH 146TentativeSep 2018$2,580,0001BASE REPAIR, MILLING, 1" CAM AND 1.5" ACP OVERLAY
0500-04-105IH 45TentativeAug 2019$117,800,0002MRECONSTRUCT TO 8 MAIN LANES AND 2 2-LANE FRONTAGE ROADS
0912-73-183CRTentativeMay 2019$5,351,07110CONSTRUCT NEW ROADS,PARKING LOTS AND CAMPSITE PULLOUTS FOR
0051-09-024FM 3005TentativeSep 2018$7,010,2391INSTALL CROSS CULVERTS, DRIVEWAY ADJUSTMENTS, OUTFALL
0367-05-050SH 87TentativeMay 2019$25,000,00010CONSTRUCT NEW FERRY BOAT
3595-01-019SH 275TentativeApr 2019$1,535,2073REHABILITATION OF EXISTING RD AND INTERSECTION IMPROVEMENTS

Harris County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0912-00-531VATentativeOct 2018$2,000,0001INSTALL NEW TRAFFIC SIGNALS
0389-05-130SH 146TentativeJun 2019$34,9128PROFILE CENTERLINE MARKINGS
0912-00-530VATentativeOct 2018$3,000,0001ITS SUPPORT
0912-00-556VATentativeMay 2019$5,000,0003REGIONAL FREEWAY INCIDENT MANAGEMENT - MOTORIST ASSISTANCE,
0912-00-533VATentativeSep 2018$1,000,0001INTERSECTION IMPROVEMENTS
0508-01-357IH 10TentativeJun 2019$2,459,0009CONSTRUCT SHARED USE PATH
0051-02-101SH 3TentativeApr 2019$8,426,0009MILL AND ASPHALT OVERLAY OF SHOULDERS, SHOULDER WIDENING,
0912-00-558VATentativeMay 2019$10,000,0003REGIONAL FREEWAY INCIDENT MANAGEMENT - TOWING (FY 2019)
3256-02-093SL 8TentativeSep 2018$10,500,0001RECONSTRUCT EB AND WB FRONTAGE ROADS
1685-05-110SH 6TentativeSep 2018$2,000,00011CONSTRUCT SIDEWALKS
0912-72-395CSTentativeSep 2018$1,700,00011CONSTRUCT DETENTION POND
0508-01-353IH 10TentativeSep 2018$8,700,0006REPLACE BRIDGE AND APPROACHES
1006-01-073FM 529TentativeMay 2019$2,120,0001UPGRADE TRAFFIC SIGNAL SYSTEMS
1258-04-065FM 1093TentativeMay 2019$12,901,0003RECONST BACK OF CURB INFRASTRUCTURE (WIDER SIDEWALKS, STREET
0271-15-090IH 610TentativeOct 2018$425,2343UPGRADE STORM SEWERS
0271-17-164IH 610TentativeSep 2018$4,431,2791PLANING, SEAL COAT, 1" CAM AND 1" TOM
0912-72-347CSTentativeJan 2019$598,0006REPLACE BRIDGE & APPROACHES (NBI# 12102B31961177)
0912-72-352CSTentativeJan 2019$327,0006REPLACE BRIDGE & APPROACHES NBI# 12102B38857153
0912-72-360CSTentativeJan 2019$10,750,0003RECONSTRUCT ROADWAY
0720-03-134SH 249TentativeApr 2019$4,300,0002MINSTALL ITS EQUIPMENT AND INFRASTRUCTURE
0912-00-526VATentativeJan 2019$1,000,0001UPGRADE LIGHTING SYSTEMS
0912-00-554VATentativeJan 2019$2,000,0003REGIONAL ITS INFRASTRUCTURE - HARDWARE/SOFTWARE, UTILITIES
0912-72-388VATentativeJan 2019$40,225,6313CONSTRUCT RAILROAD UNDERPASS AT NAVIGATION/COMMERCE AND
0027-13-213IH 69TentativeFeb 2019$3,425,0001UPGRADE HIGH MAST & UNDERPASS LIGHTING
0500-03-594IH 45TentativeFeb 2019$2,500,0001MILLING, SEAL COAT, 1.5" LEVEL-UP AND 2" ACP OVERLAY
0912-72-391CSTentativeFeb 2019$17,132,0003RECONSTRUCT ROADWAY INCLUDING DRAINAGE, ACCESS MANAGEMENT &
1062-04-022FM 2100TentativeJan 2019$39,000,0002MWIDEN TO 4-LANE DIVIDED
1685-01-090FM 1960TentativeJan 2019$31,367,0001INTERSECTION IMPROVEMENTS
0027-13-212IH 69TentativeFeb 2019$2,024,0001UPGRADE HIGH MAST & UNDERPASS LIGHTING
0720-03-137SH 249TentativeMay 2019$3,346,9568IMPROVE TRAFFIC SIGNALS
0912-71-836CSTentativeNov 2018$16,000,0003WIDEN TO 4 LANE DIVIDED
0912-72-401VATentativeFeb 2019$36,530,3693CONSTRUCT RAILROAD UNDERPASS AT YORK ST AND CLOSE AT-GRADE
0389-05-124SH 146TentativeNov 2018$3,300,0001REMOVE MEDIAN RAIL W/FENCING AND REPLACE WITH CONCRETE
0912-00-476VATentativeMay 2019$2,500,0005COMMUTE SOLUTIONS PROGRAM IMPLEMENTATION (COMMUTER AND
0912-00-534VATentativeNov 2018$1,000,0001REHAB DMS BOARDS
0912-00-532VATentativeDec 2018$1,200,0001TRAFFIC SIGNAL UPGRADES
1812-01-023FM 1942TentativeDec 2018$2,667,9451BASE REPAIR, MILLING, 1.5" ACP OVERLAY AND STRIPING
0028-01-098BU 90-UTentativeJan 2019$1,400,0001UPGRADE DRAINAGE STRUCTURES (EB & WB)
3256-02-098SL 8TentativeApr 2019$600,0001CRCP MAINLANE WIDENING AND FRONTAGE ROAD RECONSTRUCTION TO
0912-72-340CRTentativeDec 2018$19,892,0003WIDEN TO 4-LANE DIVIDED ROADWAY INCLUDING BRIDGE ACROSS
0912-72-363CSTentativeDec 2018$11,507,0003RECON ROADWAY INCLUDING CURB, GUTTER SIDEWALKS, LANDSCAPING,
0912-72-373CSTentativeDec 2018$4,302,0003RECONSTRUCT ROADWAY TO INCLUDE DRAINAGE IMPROVEMENTS,
0912-72-397VATentativeJun 2019$1,552,0003CONSTRUCT NEW 5 FT SIDEWALKS ALONG CITY OWNED ROADWAYS
0050-09-095US 290TentativeJul 2019$1,000,00010LANDSCAPE DEVELOPMENT
0981-01-110SH NASATentativeJun 2019$26,7498PROFILE CENTERLINE MARKINGS
1062-04-058FM 2100TentativeJul 2019$22,000,0002MWIDEN TO 4-LANE DIVIDED
1685-01-102FM 1960TentativeAug 2019$299,9208IMPROVE TRAFFIC SIGNALS
0976-01-040FM 865TentativeAug 2019$302,5008ADD LEFT TURN LANE
0912-72-387CSTentativeNov 2018$1,989,0003RECONSTRUCT BACK OF CURB INFRASTRUCTURE - SIDEWALKS, CURBS,

Montgomery County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0110-02-024SH 75TentativeJan 2019$1,180,0001HOT MIX OVERLAY AND ADD SHOULDERS
0177-05-113IH 69TentativeSep 2018$800,0004CONSTRUCT DETENTION POND
0523-10-043FM 1488TentativeDec 2018$585,0001ADD RIGHT TURN LANE
1986-01-063FM 1314TentativeSep 2018$1,350,0001BASE REPAIR, OCST, 1.5IN HMA LEVEL-UP, 1.5IN HMA OVERLAY
3158-01-032FM 3083TentativeSep 2018$7,800,0002MWIDEN TO 4-LANE DIVIDED URBAN


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract