Letting Schedule for Houston District (FY 2019)

Last Update: Tuesday, August 13, 2024

Bid Tabulations Dashboard

This report will no longer be updated, please access links on the Contract Letting page.

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Houston District (FY 2019)
Brazoria | Fort Bend | Galveston | Harris | Montgomery | Waller |

Brazoria County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0912-31-303CRApprovedJun 2019$17,062,0003RECONSTRUCT & WIDEN FROM 2 TO 4 LANES WITH RAISED MEDIAN,0.0
1003-01-100FM 523TentativeAug 2019$010REPLANK EXISTING RR CROSSING SURFACE0.0
0912-31-311CRActualOct 2018$33,184,0003RECONSTRUCT & WIDEN FROM 2 TO 4 LANES, ADD MEDIAN &0.0
0912-31-296CRApprovedMay 2019$2,537,0696REPLACE BRIDGE AND APPROACHES (NBI #12020AA0652001)7.0
0111-08-122BS 288BActualFeb 2019$11,00010REMOVE AND INSTALL NEW CABINET0.0
0912-31-291VAActualDec 2018$3,632,8163CONSTRUCT GREEN TEE TERRACE BIKE AND PEDESTRIAN TRAIL0.0
2524-02-025FM 2611ApprovedAug 2019$9,628,4001Surfacing/Roadway Restoration0.0
1524-01-083SH 288TentativeAug 2019$391,83710BENCH SLOPE FAILURE,INSTALL SUITABLE FILL MATERIAL AND0.0
1003-01-099FM 523TentativeAug 2019$010REPLANK EXISTING RR CROSSING SURFACE0.0
0598-02-110SH 288ActualMar 2019$2,993,1481CONSTRUCT U-TURNS AND ACCELERATION/DECELERATION LANES2.5
0912-31-292VAActualOct 2018$1,624,7553CONSTRUCT SHADOW CREEK BIKE AND PEDESTRIAN TRAIL0.0
0586-01-067SH 332ActualOct 2018$468,9711REMOVE AND REPLACE DRAINAGE STRUCTURE0.0
1414-02-017FM 528TentativeAug 2019$010REMOVE EXISTING RIP RAP BRINGING IN FILL MATERIAL TO REPAIR0.0
0111-09-043BS 288BActualJan 2019$296,77310LANDSCAPE DEVELOPMENT0.0
0587-01-063FM 1495ActualSep 2018$1,227,7371MILLING, 1.5" ACP OVERLAY AND PAVEMENT MARKINGS0.0
0179-02-086SH 35TentativeAug 2019$7,73010REMOVAL OF THE EXISTING ASPHALT SHOULDER AND REWORK SUBGRADE0.0
0188-06-055SH 36TentativeAug 2019$294,50010INSTALL NEW GROUPS OF PILES AND REINSTALL DOLPHINS0.0
0178-03-157SH 35TentativeAug 2019$122,22510STABILIZE DITCH0.0
0587-01-066FM 1495TentativeAug 2019$010REPLANK EXISTING RR CROSSING SURFACE0.0
0188-03-019SH 36ApprovedAug 2019$77,656,9612MWiden Road - Add Lanes0.0
0587-01-065FM 1495TentativeAug 2019$010REPLANK EXISTING RR CROSSING SURFACE0.0

Fort Bend County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
2817-01-010FM 2759ActualNov 2018$5,461,2361ADD 4' SHOULDERS, BASE REPAIR, 1.5" ACP OVERLAY, PAVEMENT7.0
0188-02-029SH 36ApprovedAug 2019$96,239,3242MWiden Road - Add Lanes0.0
0912-34-198CRTentativeAug 2019$250,0008FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 743731H)0.0
0271-05-044IH 10ActualSep 2018$349,0291INSTALL PAVEMENT MARKINGS0.0
0838-03-024FM 361ApprovedMay 2019$7,168,3651ADD 4' SHOULDERS, BASE REPAIR, 2.0" ACP OVERLAY AND PAVEMENT7.0
3048-01-017FM 2977ApprovedAug 2019$2,461,0001Surfacing/Roadway Restoration0.0
0188-09-042FM 723ApprovedAug 2019$1,772,4502MWIDEN ROAD - ADD LANES0.0
0188-02-036SH 36ApprovedAug 2019$49,664,4982MWiden Road - Add Lanes0.0
0188-01-039SH 36ApprovedMay 2019$770,8421SPALL REPAIR, SEAL COAT, ? TOM OVERLAY, SIGNING AND3.0
0027-12-155IH 69TentativeAug 2019$18,65810HAUL IN MATERIAL TO FILL IN ERODED AREAS0.0
0027-08-181US 90AActualSep 2018$11,00010REMOVED DAMAGED CABINET AND INSTALLED NEW CABINET0.0
0027-12-154IH 69TentativeAug 2019$62,27210RAISE ROADWAY ELEVATION BACK TO GRADE0.0
0543-03-077FM 762TentativeAug 2019$497,51110REPLACE CULVERT & EROSION REPAIR0.0
0912-34-194VATentativeAug 2019$3,500,0005REIMBURSEMENT FOR FORT BEND COUNTY TRANSNIT ADMINISTRATION0.0

Galveston County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0367-05-050SH 87ApprovedMay 2019$26,142,00010CONSTRUCT NEW FERRY BOAT0.0
0686-01-050FM 1765ActualFeb 2019$11,00010REMOVE AND INSTALL NEW CABINET0.0
0976-03-108FM 518ActualFeb 2019$11,00010REMOVE AND INSTALL NEW CABINET AND RISER0.0
0686-02-027FM 1765ActualFeb 2019$11,00010REMOVE AND INSTALL NEW CABINET0.0
0976-03-107FM 518ActualFeb 2019$11,45510REMOVE AND INSTALL NEW CABINET AND RISER0.0
0051-03-112SH 3ActualFeb 2019$11,00010REMOVE AND INSTALL NEW CABINET0.0
0051-09-120FM 3005ActualFeb 2019$3,307,6571BASE REPAIR, MILLING, SEAL COAT, 3/4 INCH TOM-F, 1 INCH0.0
1844-02-023FM 2351ActualFeb 2019$11,45510REMOVE AND INSTALL NEW CABINET AND RISER0.0
1607-01-053FM 1764ActualFeb 2019$11,00010REMOVE AND INSTALL NEW CABINET0.0
0912-73-208VATentativeAug 2019$2,454,0003CONSTRUCT PARK AND RIDE WITH 400 AUTO AND 40 BUS PARKING0.0
0367-03-037SH 87ActualFeb 2019$7,058,4221BASE REPAIR, MILLING AND 1.5" ACP OVERLAY0.0
0686-02-028FM 1765ActualFeb 2019$11,00010REMOVE AND INSTALL NEW CABINET0.0
0978-02-080FM 517TentativeAug 2019$010REPLANK EXISTING RR CROSSING SURFACE0.0
0389-06-108SH 146ActualSep 2018$2,665,1651BASE REPAIR, MILLING, 1" THIN OVER MIXTURE AND 1.5" ACP1.5
0051-04-067SH 87ApprovedJul 2019$8,127,2331BASE REPAIR, MILLING, SEAL COAT, CULVERTS REPAIR, 2.0 IN ACP0.0
0051-03-115SH 3ActualSep 2018$11,00010REMOVE AND INSTALL NEW CABINET0.0
0051-03-111SH 3ActualApr 2019$1,680,4311BASE REPAIR, SEAL COAT, 0 .75 IN TOM-F AND 1 IN TOM-C0.0
3049-01-034FM 646ActualFeb 2019$11,45510REMOVE AND INSTALL NEW CABINET WITH RISER0.0
0051-09-024FM 3005ApprovedMay 2019$43,674,4571SURFACING/ROADWAY RESTORATION7.0
0912-73-207CSApprovedMay 2019$1,756,0003MILL AND OVERLAY0.0
3595-01-021SH 275TentativeAug 2019$010REPLANK EXISTING RR CROSSING SURFACE0.0
3595-01-019SH 275TentativeAug 2019$1,535,2073REHABILITATION OF EXISTING RD AND INTERSECTION IMPROVEMENTS0.0
0978-01-041FM 517ActualFeb 2019$11,00010REMOVE AND INSTALL NEW CABINET0.0
0912-73-183CRApprovedMay 2019$5,831,58510CONSTRUCT NEW ROADS,PARKING LOTS AND CAMPSITE PULLOUTS FOR0.0
0367-06-063SH 87ApprovedAug 2019$874,27110Landscape Development0.0
0389-11-060SL 197TentativeAug 2019$302,40010REPLANK EXISTING RR CROSSING SURFACE0.0
0912-73-216VAApprovedMay 2019$3,949,3181UPGRADE MBGF0.0
1607-01-052FM 1764ActualFeb 2019$11,00010REMOVE AND INSTALL NEW CABINET0.0
0051-03-118SH 3TentativeAug 2019$187,20010REPLANK EXISTING RR CROSSING SURFACE0.0
0500-04-105IH 45ApprovedAug 2019$135,428,3872MWiden Road - Add Lanes0.0
0367-06-062SH 87TentativeAug 2019$6,65510REPLACE DAMAGED LIGHTNING ROD PROTECTION AND MICROWAVE0.0
0192-04-108SH 6TentativeAug 2019$11,00010REPLACED TRAFFIC SIGNAL CABINET0.0
0976-04-021FM 2094ActualFeb 2019$11,00010REMOVE AND INSTALL NEW CABINET0.0
0192-04-107SH 6TentativeAug 2019$18,06610REMOVED AND INSTALLED NEW CABINET AND BBS0.0
0978-01-040FM 517ActualFeb 2019$11,00010REMOVE AND INSTALL NEW CABINET0.0

Harris County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0598-01-103SH 288ActualApr 2019$21,03610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-363CSActualApr 2019$16,233,3363RECON ROADWAY INCLUDING CURB, GUTTER SIDEWALKS, LANDSCAPING,9.0
0500-03-621IH 45ActualApr 2019$21,03610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0028-02-096US 90TentativeAug 2019$18,53610EMERGENCY RELIEF0.0
0912-72-427CRActualApr 2019$28,26810REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-428CRActualApr 2019$22,10010REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-425CRActualApr 2019$17,20210REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-423CRActualApr 2019$16,62610REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-424CRActualApr 2019$17,20210REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0177-07-114IH 69ActualJan 2019$1,106,3231BRIDGE DECK REPLACEMENT0.0
0912-70-122CSTentativeAug 2019$583,5908FY 2016 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 758 518E)0.0
1062-04-022FM 2100ActualMar 2019$44,177,8292MWIDEN TO 4-LANE DIVIDED9.0
0912-70-123CRTentativeAug 2019$250,0008FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 089370C)0.0
0051-02-101SH 3ActualApr 2019$12,726,9411ADD BIKE LANES, MILLING W/ ASPHALT OVERLAY, PAVEMENT8.0
0178-09-029SS 5ActualApr 2019$21,03610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0271-16-148IH 610ActualApr 2019$21,03610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0110-06-146IH 45ActualApr 2019$18,53610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0912-72-371VAActualMar 2019$8,869,1863TURN LNS, AUX LNS, RAISED MEDIANS & GEOMETRIC IMPROVEMENTS7.5
0912-70-126CRTentativeAug 2019$250,0008FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 758192R)0.0
0027-13-212IH 69ActualFeb 2019$5,319,8841UPGRADE HIGH MAST & UNDERPASS LIGHTING0.0
0271-15-090IH 610ActualFeb 2019$1,096,6303UPGRADE STORM SEWERS0.0
3256-01-113SL 8ActualJan 2019$18,53610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
1685-05-110SH 6ActualJan 2019$3,002,72110CONSTRUCT SIDEWALKS7.0
1685-05-121SH 6ActualJan 2019$22,46310REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0912-72-445CRActualFeb 2019$29,05610REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-539CRActualFeb 2019$914,45410REPAIR WASHOUT0.0
0912-72-453CRActualFeb 2019$28,26910REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-450CRActualFeb 2019$20,43510REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-448CRActualFeb 2019$30,17610REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-449CRActualFeb 2019$17,25210REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-00-530VAActualJan 2019$3,000,0001ITS SUPPORT0.0
0912-00-596VAActualJan 2019$2,082,4993CONDUCT 9 LIVABLE CENTER STUDIES (NON-LETTING)0.0
0500-03-594IH 45ActualJan 2019$1,772,3671MILLING, 2 ACP OVERLAY, PAVEMENT MARKINGS AND GUARDFENCE0.0
0912-00-539VATentativeAug 2019$8,000,0007REGIONAL FREEWAY INCIDENT MANAGEMENT-TOWINIG (FY2017/2018)0.0
0271-07-322IH 10ActualJan 2019$682,8891INSTALL STRIPING0.0
0912-70-145CSActualJan 2019$18,53610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0912-72-500CSActualJan 2019$21,03610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-70-131CSTentativeAug 2019$18,53610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0912-72-499CSActualJan 2019$22,46310REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-497CSActualJan 2019$18,53610REMOVED DAMAGED CABINET, INSTALLED NEW CABINET0.0
0912-72-498CSActualJan 2019$22,46310REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-501CSActualApr 2019$21,03610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
1258-04-063FM 1093ApprovedJul 2019$12,820,00012 INCH PLANING, UNDERSEAL, 1 INCH TOM-F, 1 INCH TOM-C,0.0
0912-00-556VATentativeAug 2019$8,000,0003REGIONAL FREEWAY INCIDENT MANAGEMENT - MOTORIST ASSISTANCE,0.0
0912-72-373CSApprovedJul 2019$13,587,3883RECONSTRUCT ROADWAY TO INCLUDE DRAINAGE IMPROVEMENTS,0.0
1062-04-058FM 2100ApprovedJul 2019$23,895,7252MWIDEN TO 4-LANE DIVIDED0.0
0027-10-074US 90ATentativeAug 2019$988,69510INSTALL NEW SHEET PILE PROTECTION0.0
0027-13-233IH 69TentativeAug 2019$46,64610REBUILD RETAINING WALL AND REPLACE FILL BEHIND DRILL SHAFT0.0
0027-09-106US 90ATentativeAug 2019$18,53610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0027-09-108US 90ATentativeAug 2019$18,53610REPLACED THE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS,0.0
0912-72-340CRApprovedJul 2019$19,892,0003WIDEN TO 4-LANE DIVIDED ROADWAY INCLUDING BRIDGE ACROSS0.0
0912-00-595VATentativeAug 2019$1,391,25111Transportation System Sensors0.0
0110-05-132IH 45ApprovedJul 2019$1,700,10410SCENIC ENHANCEMENTS0.0
0177-07-116IH 69TentativeAug 2019$21,03610EMERGENCY RELIEF0.0
0050-09-095US 290ApprovedJul 2019$1,986,61810LANDSCAPE DEVELOPMENT0.0
0912-70-093CSApprovedJul 2019$3,770,4656REPLACE BRIDGE AND APPROACHES (NBI# 12102B11625561)0.0
0912-72-299VAApprovedJul 2019$1,261,4473MISSOURI KANSAS TEXAS TRAIL SPUR CONNECTOR0.0
0271-14-235IH 610ApprovedJul 2019$1,820,09510LANDSCAPE DEVELOPMENT0.0
0508-01-372IH 10TentativeAug 2019$300,14110RECONSTRUCT FRONTAGE ROAD,DRAINAGE AND REPAIR BRIDGE0.0
0028-01-102BU 90-UTentativeAug 2019$11,00010REMOVE AND INSTALL NEW CABINET0.0
0177-06-087IH 69TentativeAug 2019$11,00010REMOVE AND INSTALL NEW CABINET0.0
0912-00-541VATentativeAug 2019$2,000,0007REGIONAL ITS INFRASTRUCTURE - HARDWARE/SOFTWARE, UTILITIES0.0
0500-03-631IH 45ApprovedAug 2019$1,142,88810Landscape Development0.0
0500-03-624IH 45TentativeAug 2019$11,00010REMOVE AND INSTALL NEW CABINET0.0
0178-01-039SH 35TentativeAug 2019$30,00010REMOVE DAMAGED BOX CULVERTS AND RIP RAP,BRINGING IN FILL0.0
0177-06-088IH 69TentativeAug 2019$86,24310MOVE AND REPLACE CTB TO ITS ORIGINAL LOCATION0.0
0271-16-150IH 610TentativeAug 2019$11,00010REMOVE AND INSTALL NEW CABINET0.0
0271-14-238IH 610TentativeAug 2019$1,579,49010INSTALL SHEET PILING TO PROTECT THE SLOPE0.0
0508-01-367IH 10TentativeAug 2019$11,00010REMOVED DAMAGED CABINET AND INSTALLED NEW CABINET0.0
0508-01-371IH 10TentativeAug 2019$6,177,97610RECONSTRUCT FRONTAGE ROAD,DRAINAGE AND REPAIR BRIDGE0.0
0051-02-107SH 3TentativeAug 2019$11,00010REMOVE AND INSTALL NEW CABINET0.0
0028-01-103BU 90-UTentativeAug 2019$1,302,42810REPAIR RIPRAP AND SLOPE FAILURES0.0
0028-01-104BU 90-UTentativeAug 2019$18,06610REMOVED CABINET AND BBS AND INSTALLED NEW CABINET0.0
0912-00-547VATentativeAug 2019$2,400,0003METRO STAR VANPOOL PROGRAM (FY 2018)0.0
0912-00-546VATentativeAug 2019$3,750,0003METRO STAR VANPOOL PROGRAM (FY 2017)0.0
0508-01-370IH 10TentativeAug 2019$57,46810REMOVED UNDERWATER DEBRIS0.0
0110-05-131IH 45TentativeAug 2019$11,00010REMOVE AND INSTALL NEW CABINET0.0
0912-72-517CSActualApr 2019$21,03610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-518CSActualApr 2019$21,03610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-515CSActualApr 2019$22,46310REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-516CSActualApr 2019$21,03610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-523CSActualApr 2019$22,46310REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0912-72-526CSActualApr 2019$21,03610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0912-72-519CSActualApr 2019$21,03610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-520CSActualApr 2019$18,53610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-514CSActualApr 2019$18,53610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-507CSActualApr 2019$18,53610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-508CSActualApr 2019$21,03610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-505CSActualApr 2019$21,03610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-506CSActualApr 2019$21,03610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-511CSActualApr 2019$18,53610REMOVE DAMAGED TRAFFIC SIGNAL AND INSTALL NEW SIGNAL0.0
0912-72-512CSActualApr 2019$21,03610REMOVE DAMAGED TRAFFIC SIGNAL AND INSTALL NEW SIGNAL0.0
0912-72-509CSActualApr 2019$22,46310REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-510CSActualApr 2019$18,53610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-527CSActualApr 2019$21,03610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
0912-00-476VATentativeAug 2019$2,500,0005COMMUTE SOLUTIONS PROGRAM IMPLEMENTATION (COMMUTER AND0.0
0271-14-237IH 610ApprovedJun 2019$767,0956BRIDGE MAINTENANCE0.0
0027-13-234IH 69ApprovedJun 2019$1,057,7216BRIDGE MAINTENANCE0.0
0028-01-098BU 90-UApprovedJun 2019$2,209,1781UPGRADE DRAINAGE STRUCTURES (EB)0.0
0720-03-142SH 249TentativeAug 2019$010REMOVE AND INSTALL NEW CABINET AND RISER0.0
3256-02-095SL 8ApprovedJun 2019$1,922,7021SURFACING/ROADWAY RESTORATION0.0
0389-13-061SH 146ApprovedJun 2019$1,705,5446BRIDGE MAINTENANCE0.0
0720-03-145SH 249TentativeAug 2019$18,52110REMOVED AND INSTALLED NEW CABINET AND BBS0.0
0027-13-222IH 69ApprovedJun 2019$6,113,5321INSTALL/UPGRADE ROADWAY LIGHTING0.0
3256-01-114SL 8ActualApr 2019$21,03610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-00-534VATentativeAug 2019$1,000,0001REHAB DMS BOARDS0.0
0912-70-120CSTentativeAug 2019$622,8028FY 2016 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 758 517X)0.0
1685-05-120SH 6ActualApr 2019$21,03610REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
1812-01-023FM 1942ApprovedMay 2019$3,829,6301SURFACING/ROADWAY RESTORATION7.0
3510-05-042SH 99ApprovedMay 2019$207,0591INTERSECTION IMPROVEMENTS0.0
0720-03-134SH 249ApprovedMay 2019$3,583,5322MADVANCED TRAFFIC MANAGEMENT SYSTEM0.0
0720-03-137SH 249ApprovedMay 2019$2,303,1108IMPROVE TRAFFIC SIGNALS2.5
0912-72-549CRTentativeAug 2019$68,67210REPAIR WASHOUTRAIL0.0
0912-72-550CRTentativeAug 2019$310,58610EROSION REPAIR (NBI 12102AA0234002)0.0
0912-72-548CRTentativeAug 2019$32,25010REPLACE GUARD RAIL0.0
0912-72-546CRTentativeAug 2019$57,37910REPAIR TOLL BOOTH AND PUMP0.0
0912-72-547CRTentativeAug 2019$52,24610REPAIR ROADWAY0.0
0912-72-551CRTentativeAug 2019$72,60510EROSION REPAIR (NBI 12102AA0143001 & 12102AA0143002)0.0
0912-72-556VATentativeAug 2019$15,88310REPAIR FIBER DAMAGE0.0
0912-72-562CSTentativeAug 2019$37,80010REPLACE FIBER OPTIC CABLE0.0
0912-72-555VATentativeAug 2019$52,28310IMPLEMENTATION OF ROADWAY DETOURS AND SIGNAL TIMING BECAUSE0.0
0912-72-552CRTentativeAug 2019$147,04610EROSION REPAIR (NBI 12102AA2111008)0.0
0912-72-554VATentativeAug 2019$60,56610REPAIR TRAFFIC SIGNAL CONTROL CABINETS0.0
0912-72-545CRTentativeAug 2019$106,71910REPAIR PUMP AND CONTROL PANEL0.0
0912-72-529CRTentativeAug 2019$17,20210EMERGENCY RELIEF0.0
0912-72-530CRTentativeAug 2019$010REPLACE TRAFFIC SIGNAL CONTROLLER AND ALL ITS COMPONENTS0.0
0912-72-525CSTentativeAug 2019$18,53610EMERGENCY RELIEF0.0
0912-72-522CSTentativeAug 2019$21,03610EMERGENCY RELIEF0.0
0912-72-524CSTentativeAug 2019$22,46310EMERGENCY RELIEF0.0
0912-72-531CRTentativeAug 2019$55,8013EROSION REPAIR (NBI #121020AA2430001 & 121020AA2430002)0.0
0912-72-540CRTentativeAug 2019$1,714,38710REPAIR WASHOUT0.0
0912-72-544CRTentativeAug 2019$27,62210REPAIR PUMP AND PLAZA0.0
0912-72-538CRTentativeAug 2019$1,010,70310REPAIR ROAD AND PUMP 20.0
0912-72-532CRTentativeAug 2019$82,1093EROSION REPAIR (NBI 121020AA0756002)0.0
0912-72-537CRTentativeAug 2019$745,57210REPAIR TOLL BOOTHS0.0
3256-03-099SL 8TentativeAug 2019$11,00010REMOVED DAMAGED CABINET AND INSTALLED NEW CABINET0.0
3256-03-100SL 8TentativeAug 2019$160,57610RESTORE SATELLITE BUILDING0.0
3256-01-117SL 8TentativeAug 2019$156,85010SOUND WALL AND SLOPE FAILURE REPAIR0.0
1685-05-131SH 6TentativeAug 2019$18,52010REMOVED CABINET AND BBS AND INSTALLED NEW CABINET0.0
3256-01-116SL 8TentativeAug 2019$147,26210SINK HOLE REPAIR AND REMOVAL OF DEBRIS0.0
3256-03-101SL 8TentativeAug 2019$20,98210REPLACE WATER DAMAGED COMMUNICATION FIELD EQUIPMENT AND0.0
3510-06-017SH 99TentativeAug 2019$11,00010REMOVE AND INSTALL NEW CABINET0.0
0912-72-528CSActualApr 2019$22,46310REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND0.0
3510-06-016SH 99TentativeAug 2019$11,45510REMOVE AND INSTALL NEW CABINET WITH RISER0.0
3510-05-043SH 99ApprovedAug 2019$16,000,0003Install Illumination0.0
3510-05-045SH 99ApprovedAug 2019$4,294,7183LANDSCAPE DEVELOPMENT0.0
1685-05-129SH 6TentativeAug 2019$18,06510REMOVED DAMAGED CABINET AND BBS AND INSTALLED NEW CABINET0.0
0981-01-111NASA 1TentativeAug 2019$11,00010REMOVE AND INSTALL NEW CABINET0.0
0981-01-112NASA 1TentativeAug 2019$11,00010REMOVE AND INSTALL NEW CABINET0.0
0976-01-040FM 865ApprovedAug 2019$143,3408Highway Improvement0.0
0912-72-563CSTentativeAug 2019$33,70510REPAIR WASHOUT & HEADWALLS OF WOOD TIMBER BRIDGE AND0.0
0912-72-566VAApprovedAug 2019$2,300,0001Surfacing/Roadway Restoration0.0
0981-01-113NASA 1TentativeAug 2019$11,00010REMOVE AND INSTALL NEW CABINET0.0
1685-02-051FM 1960TentativeAug 2019$18,06610REMOVED AND INSTALLED NEW CABINET AND BBS0.0
1685-03-102FM 1960TentativeAug 2019$11,00010REMOVE AND INSTALL NEW CABINET0.0
0981-01-116FM 528TentativeAug 2019$11,00010REMOVE AND INSTALL NEW CABINET0.0
0981-01-114FM 528TentativeAug 2019$11,00010REMOVE AND INSTALL NEW CABINET0.0
0981-01-115FM 528TentativeAug 2019$11,00010REMOVE AND INSTALL NEW CABINET0.0
0912-72-521CSTentativeAug 2019$18,53610EMERGENCY RELIEF0.0
0912-00-552VAActualSep 2018$15,000,0003CLEAN CITIES/CLEAN VEHICLES PROGRAM (ENGINE/VEHICLE0.0
0508-01-368IH 10ActualSep 2018$10,771,02810REMOVED UNDERWATER DEBRIS0.0
0912-00-554VAActualSep 2018$2,000,0007REGIONAL ITS INFRASTRUCTURE - HARDWARE/SOFTWARE, UTILITIES0.0
0912-70-125CRActualSep 2018$250,0008FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755624C)0.0
0912-70-124CRActualSep 2018$250,0008FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755622N)0.0
0271-16-140IH 610ActualSep 2018$125,776,7871RECONSTRUCT MAINLANES, FRONTAGE ROAD AND CONSTRUCT OVERPASS8.0
0912-70-153CSTentativeAug 2019$80,94410REPLACE WATER DAMAGED COMMUNICATION FIELD EQUIPMENT AND0.0
0912-70-154CSTentativeAug 2019$58,44710REPLACE WATER DAMAGED COMMUNICATION FIELD EQUIPMENT AND0.0
0912-70-152CSTentativeAug 2019$31,68210REPLACE WATER DAMAGED COMMUNICATION FIELD EQUIPMENT AND0.0
0912-70-150CSTentativeAug 2019$8,28310REPLACE WATER DAMAGED COMMUNICATION FIELD EQUIPMENT AND0.0
0912-70-151CSTentativeAug 2019$133,31710REPLACE WATER DAMAGED COMMUNICATION FIELD EQUIPMENT AND0.0
0912-72-314VAActualSep 2018$6,019,4623CONSTRUCT MULTI-USE PATH7.0
0912-70-147CRTentativeAug 2019$21,18510INSTALL NEW CMP (NBI#121020A49377001)0.0
2941-02-055FM 2920ActualNov 2018$8,623,6321BASE REPAIR, 1.25 INCH MILLING, THIN OVERLAY MIX, METAL0.0
0912-00-532VAActualDec 2018$2,055,2781INSTALL NEW TRAFFIC SIGNALS0.0
0912-72-417VAActualDec 2018$5,252,5003CONSTRUCT GEOMETRIC IMPROVEMENTS AND TRAFFIC SIGNAL &0.0
0912-00-549VAActualDec 2018$4,438,0003TRAVEL DEMAND MANAGEMENT, MARKETING, OUTREACH AND PUBLIC0.0
0912-00-597VAActualNov 2018$125,00010MULTIMODAL NETWORK CONNECTIVITY PILOT STUDIES (NON-LET)0.0
0912-72-372VAActualOct 2018$5,253,7503CONSTRUCT GEOMETRIC IMPROVEMENTS AND TRAFFIC SIGNAL &0.0
0912-70-149CSTentativeAug 2019$25,16910REPLACE WATER DAMAGED COMMUNICATION FIELD EQUIPMENT AND0.0
0912-72-374CRActualOct 2018$12,738,8123WIDEN ROADWAY AND INSTALL SIX RAIL CROSSINGS0.0
0389-05-124SH 146ActualNov 2018$2,153,8271REMOVE MEDIAN RAIL W/FENCING & REPL W/ CONC TRAFFIC BARRIER0.0
0912-72-416VAActualOct 2018$6,653,7503CONSTRUCT GEOMETRIC IMPROVEMENTS AND TRAFFIC SIGNAL &0.0
0912-70-157CSTentativeAug 2019$18,53610REPLACED THE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS,0.0
0912-72-441CRTentativeAug 2019$18,73710EMERGENCY RELIEF0.0
0912-72-442CRTentativeAug 2019$16,37910EMERGENCY RELIEF0.0
0912-72-443CRTentativeAug 2019$28,26810REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-438CRTentativeAug 2019$17,28910EMERGENCY RELIEF0.0
0912-72-439CRTentativeAug 2019$17,25210EMERGENCY RELIEF0.0
0912-72-440CRTentativeAug 2019$15,43410EMERGENCY RELIEF0.0
0912-72-459CRTentativeAug 2019$17,20110REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-460CSTentativeAug 2019$17,20110REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-513CSTentativeAug 2019$18,53610EMERGENCY RELIEF0.0
0912-72-451CRTentativeAug 2019$28,26810REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-452CRTentativeAug 2019$010REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-458CRTentativeAug 2019$010REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-431CRTentativeAug 2019$28,81710EMERGENCY RELIEF0.0
0912-72-432CRTentativeAug 2019$17,20110EMERGENCY RELIEF0.0
0912-72-430CRTentativeAug 2019$28,52810EMERGENCY RELIEF0.0
0912-72-426CRTentativeAug 2019$27,15010EMERGENCY RELIEF0.0
0912-72-429CRTentativeAug 2019$27,15010EMERGENCY RELIEF0.0
0912-72-433CRTentativeAug 2019$17,24510EMERGENCY RELIEF0.0
0912-72-436CRTentativeAug 2019$17,25210REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-437CRTentativeAug 2019$28,26810REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET0.0
0912-72-434CRTentativeAug 2019$17,25210EMERGENCY RELIEF0.0
0912-72-435CRTentativeAug 2019$17,25210EMERGENCY RELIEF0.0

Montgomery County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0338-04-081SH 105TentativeAug 2019$11,00010REPLACED TRAFFIC SIGNAL CABINET0.0
3538-01-035SH 242ApprovedMay 2019$40,989,5842MWiden Road - Add Lanes8.5
3538-01-053SH 242ApprovedJul 2019$307,6246REPLACE BEARING PADS (NBI# 121700353801008)0.0
0912-37-235CRTentativeAug 2019$250,0008FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755892M)0.0
3538-01-036SH 242ApprovedAug 2019$60,788,9632MWiden Road - Add Lanes0.0
1062-01-217FM 1485TentativeAug 2019$135,56010BRIDGE APPROACH SLAB REPAIR0.0
0912-37-234CRTentativeAug 2019$250,0008FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755879Y)0.0
3538-01-052SH 242ApprovedMay 2019$441,4911CONSTRUCT NEW SIGNAL AT GREAT OAKS DRIVE AND CLOSURE OF0.0
0912-37-236CRTentativeAug 2019$250,0008FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755882G)0.0
0110-02-027SH 75ApprovedJul 2019$3,180,0006REPLACE BRIDGE AND APPROACHES (NBI# 12170011002001)0.0
2897-01-017FM 830ActualMar 2019$2,642,3861FULL DEPTH REPAIR, PAVEMENT MARKINGS AND 2 IN OVERLAY6.0
0177-05-117IH 69TentativeAug 2019$219,32210REPLACED TRAFFIC SIGNAL CABINET0.0
1912-02-015FM 2090TentativeAug 2019$010REPLANK EXISTING RR CROSSING SURFACE0.0
1912-01-023FM 2090TentativeAug 2019$11,45510REPLACED TRAFFIC SIGNAL CABINET0.0
0177-05-113IH 69ActualSep 2018$1,602,3351CONSTRUCT DETENTION POND7.5
0177-05-119IH 69TentativeAug 2019$92,14310INSTALL FLEXIBLE RIP RAP PROTECTION SYSTEM0.0
1912-02-014FM 2090ActualMar 2019$2,387,7331FULL DEPTH REPAIR, PAVEMENT MARKINGS AND 2 IN OVERLAY5.0
0523-10-043FM 1488ActualDec 2018$703,5031ADD RIGHT TURN LANE0.0
1416-03-019FM 1486TentativeAug 2019$010REPLANK EXISTING RR CROSSING SURFACE0.0

Waller County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0944-02-011FM 362ApprovedAug 2019$619,2958Hazard Elimination & Safety0.0
0912-56-052VAActualOct 2018$1,276,5943CONSTRUCT INTERSECTION IMPROVEMENTS, SIDEWALKS, PEDESTRIAN6.0
1418-01-012FM 1489ActualJan 2019$1,444,82211.5 IN ACP OVERLAY0.0
0114-11-080US 290ActualMar 2019$280,0008INSTALL MEDIAN BARRIER0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract