Letting Schedule for Houston District (FY 2019)
Bid Tabulations Dashboard
This report will no longer be updated, please access links on the Contract Letting page. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
Houston District (FY 2019) |
Brazoria | Fort Bend | Galveston | Harris | Montgomery | Waller | | |||||||
Brazoria County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
---|---|---|---|---|---|---|---|
0912-31-303 | CR | Approved | Jun 2019 | $17,062,000 | 3 | RECONSTRUCT & WIDEN FROM 2 TO 4 LANES WITH RAISED MEDIAN, | 0.0 |
1003-01-100 | FM 523 | Tentative | Aug 2019 | $0 | 10 | REPLANK EXISTING RR CROSSING SURFACE | 0.0 |
0912-31-311 | CR | Actual | Oct 2018 | $33,184,000 | 3 | RECONSTRUCT & WIDEN FROM 2 TO 4 LANES, ADD MEDIAN & | 0.0 |
0912-31-296 | CR | Approved | May 2019 | $2,537,069 | 6 | REPLACE BRIDGE AND APPROACHES (NBI #12020AA0652001) | 7.0 |
0111-08-122 | BS 288B | Actual | Feb 2019 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0912-31-291 | VA | Actual | Dec 2018 | $3,632,816 | 3 | CONSTRUCT GREEN TEE TERRACE BIKE AND PEDESTRIAN TRAIL | 0.0 |
2524-02-025 | FM 2611 | Approved | Aug 2019 | $9,628,400 | 1 | Surfacing/Roadway Restoration | 0.0 |
1524-01-083 | SH 288 | Tentative | Aug 2019 | $391,837 | 10 | BENCH SLOPE FAILURE,INSTALL SUITABLE FILL MATERIAL AND | 0.0 |
1003-01-099 | FM 523 | Tentative | Aug 2019 | $0 | 10 | REPLANK EXISTING RR CROSSING SURFACE | 0.0 |
0598-02-110 | SH 288 | Actual | Mar 2019 | $2,993,148 | 1 | CONSTRUCT U-TURNS AND ACCELERATION/DECELERATION LANES | 2.5 |
0912-31-292 | VA | Actual | Oct 2018 | $1,624,755 | 3 | CONSTRUCT SHADOW CREEK BIKE AND PEDESTRIAN TRAIL | 0.0 |
0586-01-067 | SH 332 | Actual | Oct 2018 | $468,971 | 1 | REMOVE AND REPLACE DRAINAGE STRUCTURE | 0.0 |
1414-02-017 | FM 528 | Tentative | Aug 2019 | $0 | 10 | REMOVE EXISTING RIP RAP BRINGING IN FILL MATERIAL TO REPAIR | 0.0 |
0111-09-043 | BS 288B | Actual | Jan 2019 | $296,773 | 10 | LANDSCAPE DEVELOPMENT | 0.0 |
0587-01-063 | FM 1495 | Actual | Sep 2018 | $1,227,737 | 1 | MILLING, 1.5" ACP OVERLAY AND PAVEMENT MARKINGS | 0.0 |
0179-02-086 | SH 35 | Tentative | Aug 2019 | $7,730 | 10 | REMOVAL OF THE EXISTING ASPHALT SHOULDER AND REWORK SUBGRADE | 0.0 |
0188-06-055 | SH 36 | Tentative | Aug 2019 | $294,500 | 10 | INSTALL NEW GROUPS OF PILES AND REINSTALL DOLPHINS | 0.0 |
0178-03-157 | SH 35 | Tentative | Aug 2019 | $122,225 | 10 | STABILIZE DITCH | 0.0 |
0587-01-066 | FM 1495 | Tentative | Aug 2019 | $0 | 10 | REPLANK EXISTING RR CROSSING SURFACE | 0.0 |
0188-03-019 | SH 36 | Approved | Aug 2019 | $77,656,961 | 2M | Widen Road - Add Lanes | 0.0 |
0587-01-065 | FM 1495 | Tentative | Aug 2019 | $0 | 10 | REPLANK EXISTING RR CROSSING SURFACE | 0.0 |
Fort Bend County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
2817-01-010 | FM 2759 | Actual | Nov 2018 | $5,461,236 | 1 | ADD 4' SHOULDERS, BASE REPAIR, 1.5" ACP OVERLAY, PAVEMENT | 7.0 |
0188-02-029 | SH 36 | Approved | Aug 2019 | $96,239,324 | 2M | Widen Road - Add Lanes | 0.0 |
0912-34-198 | CR | Tentative | Aug 2019 | $250,000 | 8 | FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 743731H) | 0.0 |
0271-05-044 | IH 10 | Actual | Sep 2018 | $349,029 | 1 | INSTALL PAVEMENT MARKINGS | 0.0 |
0838-03-024 | FM 361 | Approved | May 2019 | $7,168,365 | 1 | ADD 4' SHOULDERS, BASE REPAIR, 2.0" ACP OVERLAY AND PAVEMENT | 7.0 |
3048-01-017 | FM 2977 | Approved | Aug 2019 | $2,461,000 | 1 | Surfacing/Roadway Restoration | 0.0 |
0188-09-042 | FM 723 | Approved | Aug 2019 | $1,772,450 | 2M | WIDEN ROAD - ADD LANES | 0.0 |
0188-02-036 | SH 36 | Approved | Aug 2019 | $49,664,498 | 2M | Widen Road - Add Lanes | 0.0 |
0188-01-039 | SH 36 | Approved | May 2019 | $770,842 | 1 | SPALL REPAIR, SEAL COAT, ? TOM OVERLAY, SIGNING AND | 3.0 |
0027-12-155 | IH 69 | Tentative | Aug 2019 | $18,658 | 10 | HAUL IN MATERIAL TO FILL IN ERODED AREAS | 0.0 |
0027-08-181 | US 90A | Actual | Sep 2018 | $11,000 | 10 | REMOVED DAMAGED CABINET AND INSTALLED NEW CABINET | 0.0 |
0027-12-154 | IH 69 | Tentative | Aug 2019 | $62,272 | 10 | RAISE ROADWAY ELEVATION BACK TO GRADE | 0.0 |
0543-03-077 | FM 762 | Tentative | Aug 2019 | $497,511 | 10 | REPLACE CULVERT & EROSION REPAIR | 0.0 |
0912-34-194 | VA | Tentative | Aug 2019 | $3,500,000 | 5 | REIMBURSEMENT FOR FORT BEND COUNTY TRANSNIT ADMINISTRATION | 0.0 |
Galveston County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
0367-05-050 | SH 87 | Approved | May 2019 | $26,142,000 | 10 | CONSTRUCT NEW FERRY BOAT | 0.0 |
0686-01-050 | FM 1765 | Actual | Feb 2019 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0976-03-108 | FM 518 | Actual | Feb 2019 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET AND RISER | 0.0 |
0686-02-027 | FM 1765 | Actual | Feb 2019 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0976-03-107 | FM 518 | Actual | Feb 2019 | $11,455 | 10 | REMOVE AND INSTALL NEW CABINET AND RISER | 0.0 |
0051-03-112 | SH 3 | Actual | Feb 2019 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0051-09-120 | FM 3005 | Actual | Feb 2019 | $3,307,657 | 1 | BASE REPAIR, MILLING, SEAL COAT, 3/4 INCH TOM-F, 1 INCH | 0.0 |
1844-02-023 | FM 2351 | Actual | Feb 2019 | $11,455 | 10 | REMOVE AND INSTALL NEW CABINET AND RISER | 0.0 |
1607-01-053 | FM 1764 | Actual | Feb 2019 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0912-73-208 | VA | Tentative | Aug 2019 | $2,454,000 | 3 | CONSTRUCT PARK AND RIDE WITH 400 AUTO AND 40 BUS PARKING | 0.0 |
0367-03-037 | SH 87 | Actual | Feb 2019 | $7,058,422 | 1 | BASE REPAIR, MILLING AND 1.5" ACP OVERLAY | 0.0 |
0686-02-028 | FM 1765 | Actual | Feb 2019 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0978-02-080 | FM 517 | Tentative | Aug 2019 | $0 | 10 | REPLANK EXISTING RR CROSSING SURFACE | 0.0 |
0389-06-108 | SH 146 | Actual | Sep 2018 | $2,665,165 | 1 | BASE REPAIR, MILLING, 1" THIN OVER MIXTURE AND 1.5" ACP | 1.5 |
0051-04-067 | SH 87 | Approved | Jul 2019 | $8,127,233 | 1 | BASE REPAIR, MILLING, SEAL COAT, CULVERTS REPAIR, 2.0 IN ACP | 0.0 |
0051-03-115 | SH 3 | Actual | Sep 2018 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0051-03-111 | SH 3 | Actual | Apr 2019 | $1,680,431 | 1 | BASE REPAIR, SEAL COAT, 0 .75 IN TOM-F AND 1 IN TOM-C | 0.0 |
3049-01-034 | FM 646 | Actual | Feb 2019 | $11,455 | 10 | REMOVE AND INSTALL NEW CABINET WITH RISER | 0.0 |
0051-09-024 | FM 3005 | Approved | May 2019 | $43,674,457 | 1 | SURFACING/ROADWAY RESTORATION | 7.0 |
0912-73-207 | CS | Approved | May 2019 | $1,756,000 | 3 | MILL AND OVERLAY | 0.0 |
3595-01-021 | SH 275 | Tentative | Aug 2019 | $0 | 10 | REPLANK EXISTING RR CROSSING SURFACE | 0.0 |
3595-01-019 | SH 275 | Tentative | Aug 2019 | $1,535,207 | 3 | REHABILITATION OF EXISTING RD AND INTERSECTION IMPROVEMENTS | 0.0 |
0978-01-041 | FM 517 | Actual | Feb 2019 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0912-73-183 | CR | Approved | May 2019 | $5,831,585 | 10 | CONSTRUCT NEW ROADS,PARKING LOTS AND CAMPSITE PULLOUTS FOR | 0.0 |
0367-06-063 | SH 87 | Approved | Aug 2019 | $874,271 | 10 | Landscape Development | 0.0 |
0389-11-060 | SL 197 | Tentative | Aug 2019 | $302,400 | 10 | REPLANK EXISTING RR CROSSING SURFACE | 0.0 |
0912-73-216 | VA | Approved | May 2019 | $3,949,318 | 1 | UPGRADE MBGF | 0.0 |
1607-01-052 | FM 1764 | Actual | Feb 2019 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0051-03-118 | SH 3 | Tentative | Aug 2019 | $187,200 | 10 | REPLANK EXISTING RR CROSSING SURFACE | 0.0 |
0500-04-105 | IH 45 | Approved | Aug 2019 | $135,428,387 | 2M | Widen Road - Add Lanes | 0.0 |
0367-06-062 | SH 87 | Tentative | Aug 2019 | $6,655 | 10 | REPLACE DAMAGED LIGHTNING ROD PROTECTION AND MICROWAVE | 0.0 |
0192-04-108 | SH 6 | Tentative | Aug 2019 | $11,000 | 10 | REPLACED TRAFFIC SIGNAL CABINET | 0.0 |
0976-04-021 | FM 2094 | Actual | Feb 2019 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0192-04-107 | SH 6 | Tentative | Aug 2019 | $18,066 | 10 | REMOVED AND INSTALLED NEW CABINET AND BBS | 0.0 |
0978-01-040 | FM 517 | Actual | Feb 2019 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
Harris County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
0598-01-103 | SH 288 | Actual | Apr 2019 | $21,036 | 10 | REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-363 | CS | Actual | Apr 2019 | $16,233,336 | 3 | RECON ROADWAY INCLUDING CURB, GUTTER SIDEWALKS, LANDSCAPING, | 9.0 |
0500-03-621 | IH 45 | Actual | Apr 2019 | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0028-02-096 | US 90 | Tentative | Aug 2019 | $18,536 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-427 | CR | Actual | Apr 2019 | $28,268 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-428 | CR | Actual | Apr 2019 | $22,100 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-425 | CR | Actual | Apr 2019 | $17,202 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-423 | CR | Actual | Apr 2019 | $16,626 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-424 | CR | Actual | Apr 2019 | $17,202 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0177-07-114 | IH 69 | Actual | Jan 2019 | $1,106,323 | 1 | BRIDGE DECK REPLACEMENT | 0.0 |
0912-70-122 | CS | Tentative | Aug 2019 | $583,590 | 8 | FY 2016 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 758 518E) | 0.0 |
1062-04-022 | FM 2100 | Actual | Mar 2019 | $44,177,829 | 2M | WIDEN TO 4-LANE DIVIDED | 9.0 |
0912-70-123 | CR | Tentative | Aug 2019 | $250,000 | 8 | FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 089370C) | 0.0 |
0051-02-101 | SH 3 | Actual | Apr 2019 | $12,726,941 | 1 | ADD BIKE LANES, MILLING W/ ASPHALT OVERLAY, PAVEMENT | 8.0 |
0178-09-029 | SS 5 | Actual | Apr 2019 | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0271-16-148 | IH 610 | Actual | Apr 2019 | $21,036 | 10 | REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0110-06-146 | IH 45 | Actual | Apr 2019 | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-72-371 | VA | Actual | Mar 2019 | $8,869,186 | 3 | TURN LNS, AUX LNS, RAISED MEDIANS & GEOMETRIC IMPROVEMENTS | 7.5 |
0912-70-126 | CR | Tentative | Aug 2019 | $250,000 | 8 | FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 758192R) | 0.0 |
0027-13-212 | IH 69 | Actual | Feb 2019 | $5,319,884 | 1 | UPGRADE HIGH MAST & UNDERPASS LIGHTING | 0.0 |
0271-15-090 | IH 610 | Actual | Feb 2019 | $1,096,630 | 3 | UPGRADE STORM SEWERS | 0.0 |
3256-01-113 | SL 8 | Actual | Jan 2019 | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
1685-05-110 | SH 6 | Actual | Jan 2019 | $3,002,721 | 10 | CONSTRUCT SIDEWALKS | 7.0 |
1685-05-121 | SH 6 | Actual | Jan 2019 | $22,463 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-72-445 | CR | Actual | Feb 2019 | $29,056 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-539 | CR | Actual | Feb 2019 | $914,454 | 10 | REPAIR WASHOUT | 0.0 |
0912-72-453 | CR | Actual | Feb 2019 | $28,269 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-450 | CR | Actual | Feb 2019 | $20,435 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-448 | CR | Actual | Feb 2019 | $30,176 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-449 | CR | Actual | Feb 2019 | $17,252 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-00-530 | VA | Actual | Jan 2019 | $3,000,000 | 1 | ITS SUPPORT | 0.0 |
0912-00-596 | VA | Actual | Jan 2019 | $2,082,499 | 3 | CONDUCT 9 LIVABLE CENTER STUDIES (NON-LETTING) | 0.0 |
0500-03-594 | IH 45 | Actual | Jan 2019 | $1,772,367 | 1 | MILLING, 2 ACP OVERLAY, PAVEMENT MARKINGS AND GUARDFENCE | 0.0 |
0912-00-539 | VA | Tentative | Aug 2019 | $8,000,000 | 7 | REGIONAL FREEWAY INCIDENT MANAGEMENT-TOWINIG (FY2017/2018) | 0.0 |
0271-07-322 | IH 10 | Actual | Jan 2019 | $682,889 | 1 | INSTALL STRIPING | 0.0 |
0912-70-145 | CS | Actual | Jan 2019 | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-72-500 | CS | Actual | Jan 2019 | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-70-131 | CS | Tentative | Aug 2019 | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-72-499 | CS | Actual | Jan 2019 | $22,463 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-497 | CS | Actual | Jan 2019 | $18,536 | 10 | REMOVED DAMAGED CABINET, INSTALLED NEW CABINET | 0.0 |
0912-72-498 | CS | Actual | Jan 2019 | $22,463 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-501 | CS | Actual | Apr 2019 | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
1258-04-063 | FM 1093 | Approved | Jul 2019 | $12,820,000 | 1 | 2 INCH PLANING, UNDERSEAL, 1 INCH TOM-F, 1 INCH TOM-C, | 0.0 |
0912-00-556 | VA | Tentative | Aug 2019 | $8,000,000 | 3 | REGIONAL FREEWAY INCIDENT MANAGEMENT - MOTORIST ASSISTANCE, | 0.0 |
0912-72-373 | CS | Approved | Jul 2019 | $13,587,388 | 3 | RECONSTRUCT ROADWAY TO INCLUDE DRAINAGE IMPROVEMENTS, | 0.0 |
1062-04-058 | FM 2100 | Approved | Jul 2019 | $23,895,725 | 2M | WIDEN TO 4-LANE DIVIDED | 0.0 |
0027-10-074 | US 90A | Tentative | Aug 2019 | $988,695 | 10 | INSTALL NEW SHEET PILE PROTECTION | 0.0 |
0027-13-233 | IH 69 | Tentative | Aug 2019 | $46,646 | 10 | REBUILD RETAINING WALL AND REPLACE FILL BEHIND DRILL SHAFT | 0.0 |
0027-09-106 | US 90A | Tentative | Aug 2019 | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0027-09-108 | US 90A | Tentative | Aug 2019 | $18,536 | 10 | REPLACED THE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, | 0.0 |
0912-72-340 | CR | Approved | Jul 2019 | $19,892,000 | 3 | WIDEN TO 4-LANE DIVIDED ROADWAY INCLUDING BRIDGE ACROSS | 0.0 |
0912-00-595 | VA | Tentative | Aug 2019 | $1,391,251 | 11 | Transportation System Sensors | 0.0 |
0110-05-132 | IH 45 | Approved | Jul 2019 | $1,700,104 | 10 | SCENIC ENHANCEMENTS | 0.0 |
0177-07-116 | IH 69 | Tentative | Aug 2019 | $21,036 | 10 | EMERGENCY RELIEF | 0.0 |
0050-09-095 | US 290 | Approved | Jul 2019 | $1,986,618 | 10 | LANDSCAPE DEVELOPMENT | 0.0 |
0912-70-093 | CS | Approved | Jul 2019 | $3,770,465 | 6 | REPLACE BRIDGE AND APPROACHES (NBI# 12102B11625561) | 0.0 |
0912-72-299 | VA | Approved | Jul 2019 | $1,261,447 | 3 | MISSOURI KANSAS TEXAS TRAIL SPUR CONNECTOR | 0.0 |
0271-14-235 | IH 610 | Approved | Jul 2019 | $1,820,095 | 10 | LANDSCAPE DEVELOPMENT | 0.0 |
0508-01-372 | IH 10 | Tentative | Aug 2019 | $300,141 | 10 | RECONSTRUCT FRONTAGE ROAD,DRAINAGE AND REPAIR BRIDGE | 0.0 |
0028-01-102 | BU 90-U | Tentative | Aug 2019 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0177-06-087 | IH 69 | Tentative | Aug 2019 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0912-00-541 | VA | Tentative | Aug 2019 | $2,000,000 | 7 | REGIONAL ITS INFRASTRUCTURE - HARDWARE/SOFTWARE, UTILITIES | 0.0 |
0500-03-631 | IH 45 | Approved | Aug 2019 | $1,142,888 | 10 | Landscape Development | 0.0 |
0500-03-624 | IH 45 | Tentative | Aug 2019 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0178-01-039 | SH 35 | Tentative | Aug 2019 | $30,000 | 10 | REMOVE DAMAGED BOX CULVERTS AND RIP RAP,BRINGING IN FILL | 0.0 |
0177-06-088 | IH 69 | Tentative | Aug 2019 | $86,243 | 10 | MOVE AND REPLACE CTB TO ITS ORIGINAL LOCATION | 0.0 |
0271-16-150 | IH 610 | Tentative | Aug 2019 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0271-14-238 | IH 610 | Tentative | Aug 2019 | $1,579,490 | 10 | INSTALL SHEET PILING TO PROTECT THE SLOPE | 0.0 |
0508-01-367 | IH 10 | Tentative | Aug 2019 | $11,000 | 10 | REMOVED DAMAGED CABINET AND INSTALLED NEW CABINET | 0.0 |
0508-01-371 | IH 10 | Tentative | Aug 2019 | $6,177,976 | 10 | RECONSTRUCT FRONTAGE ROAD,DRAINAGE AND REPAIR BRIDGE | 0.0 |
0051-02-107 | SH 3 | Tentative | Aug 2019 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0028-01-103 | BU 90-U | Tentative | Aug 2019 | $1,302,428 | 10 | REPAIR RIPRAP AND SLOPE FAILURES | 0.0 |
0028-01-104 | BU 90-U | Tentative | Aug 2019 | $18,066 | 10 | REMOVED CABINET AND BBS AND INSTALLED NEW CABINET | 0.0 |
0912-00-547 | VA | Tentative | Aug 2019 | $2,400,000 | 3 | METRO STAR VANPOOL PROGRAM (FY 2018) | 0.0 |
0912-00-546 | VA | Tentative | Aug 2019 | $3,750,000 | 3 | METRO STAR VANPOOL PROGRAM (FY 2017) | 0.0 |
0508-01-370 | IH 10 | Tentative | Aug 2019 | $57,468 | 10 | REMOVED UNDERWATER DEBRIS | 0.0 |
0110-05-131 | IH 45 | Tentative | Aug 2019 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0912-72-517 | CS | Actual | Apr 2019 | $21,036 | 10 | REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-518 | CS | Actual | Apr 2019 | $21,036 | 10 | REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-515 | CS | Actual | Apr 2019 | $22,463 | 10 | REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-516 | CS | Actual | Apr 2019 | $21,036 | 10 | REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-523 | CS | Actual | Apr 2019 | $22,463 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-72-526 | CS | Actual | Apr 2019 | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-72-519 | CS | Actual | Apr 2019 | $21,036 | 10 | REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-520 | CS | Actual | Apr 2019 | $18,536 | 10 | REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-514 | CS | Actual | Apr 2019 | $18,536 | 10 | REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-507 | CS | Actual | Apr 2019 | $18,536 | 10 | REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-508 | CS | Actual | Apr 2019 | $21,036 | 10 | REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-505 | CS | Actual | Apr 2019 | $21,036 | 10 | REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-506 | CS | Actual | Apr 2019 | $21,036 | 10 | REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-511 | CS | Actual | Apr 2019 | $18,536 | 10 | REMOVE DAMAGED TRAFFIC SIGNAL AND INSTALL NEW SIGNAL | 0.0 |
0912-72-512 | CS | Actual | Apr 2019 | $21,036 | 10 | REMOVE DAMAGED TRAFFIC SIGNAL AND INSTALL NEW SIGNAL | 0.0 |
0912-72-509 | CS | Actual | Apr 2019 | $22,463 | 10 | REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-510 | CS | Actual | Apr 2019 | $18,536 | 10 | REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-527 | CS | Actual | Apr 2019 | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
0912-00-476 | VA | Tentative | Aug 2019 | $2,500,000 | 5 | COMMUTE SOLUTIONS PROGRAM IMPLEMENTATION (COMMUTER AND | 0.0 |
0271-14-237 | IH 610 | Approved | Jun 2019 | $767,095 | 6 | BRIDGE MAINTENANCE | 0.0 |
0027-13-234 | IH 69 | Approved | Jun 2019 | $1,057,721 | 6 | BRIDGE MAINTENANCE | 0.0 |
0028-01-098 | BU 90-U | Approved | Jun 2019 | $2,209,178 | 1 | UPGRADE DRAINAGE STRUCTURES (EB) | 0.0 |
0720-03-142 | SH 249 | Tentative | Aug 2019 | $0 | 10 | REMOVE AND INSTALL NEW CABINET AND RISER | 0.0 |
3256-02-095 | SL 8 | Approved | Jun 2019 | $1,922,702 | 1 | SURFACING/ROADWAY RESTORATION | 0.0 |
0389-13-061 | SH 146 | Approved | Jun 2019 | $1,705,544 | 6 | BRIDGE MAINTENANCE | 0.0 |
0720-03-145 | SH 249 | Tentative | Aug 2019 | $18,521 | 10 | REMOVED AND INSTALLED NEW CABINET AND BBS | 0.0 |
0027-13-222 | IH 69 | Approved | Jun 2019 | $6,113,532 | 1 | INSTALL/UPGRADE ROADWAY LIGHTING | 0.0 |
3256-01-114 | SL 8 | Actual | Apr 2019 | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-00-534 | VA | Tentative | Aug 2019 | $1,000,000 | 1 | REHAB DMS BOARDS | 0.0 |
0912-70-120 | CS | Tentative | Aug 2019 | $622,802 | 8 | FY 2016 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 758 517X) | 0.0 |
1685-05-120 | SH 6 | Actual | Apr 2019 | $21,036 | 10 | REPLACE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
1812-01-023 | FM 1942 | Approved | May 2019 | $3,829,630 | 1 | SURFACING/ROADWAY RESTORATION | 7.0 |
3510-05-042 | SH 99 | Approved | May 2019 | $207,059 | 1 | INTERSECTION IMPROVEMENTS | 0.0 |
0720-03-134 | SH 249 | Approved | May 2019 | $3,583,532 | 2M | ADVANCED TRAFFIC MANAGEMENT SYSTEM | 0.0 |
0720-03-137 | SH 249 | Approved | May 2019 | $2,303,110 | 8 | IMPROVE TRAFFIC SIGNALS | 2.5 |
0912-72-549 | CR | Tentative | Aug 2019 | $68,672 | 10 | REPAIR WASHOUTRAIL | 0.0 |
0912-72-550 | CR | Tentative | Aug 2019 | $310,586 | 10 | EROSION REPAIR (NBI 12102AA0234002) | 0.0 |
0912-72-548 | CR | Tentative | Aug 2019 | $32,250 | 10 | REPLACE GUARD RAIL | 0.0 |
0912-72-546 | CR | Tentative | Aug 2019 | $57,379 | 10 | REPAIR TOLL BOOTH AND PUMP | 0.0 |
0912-72-547 | CR | Tentative | Aug 2019 | $52,246 | 10 | REPAIR ROADWAY | 0.0 |
0912-72-551 | CR | Tentative | Aug 2019 | $72,605 | 10 | EROSION REPAIR (NBI 12102AA0143001 & 12102AA0143002) | 0.0 |
0912-72-556 | VA | Tentative | Aug 2019 | $15,883 | 10 | REPAIR FIBER DAMAGE | 0.0 |
0912-72-562 | CS | Tentative | Aug 2019 | $37,800 | 10 | REPLACE FIBER OPTIC CABLE | 0.0 |
0912-72-555 | VA | Tentative | Aug 2019 | $52,283 | 10 | IMPLEMENTATION OF ROADWAY DETOURS AND SIGNAL TIMING BECAUSE | 0.0 |
0912-72-552 | CR | Tentative | Aug 2019 | $147,046 | 10 | EROSION REPAIR (NBI 12102AA2111008) | 0.0 |
0912-72-554 | VA | Tentative | Aug 2019 | $60,566 | 10 | REPAIR TRAFFIC SIGNAL CONTROL CABINETS | 0.0 |
0912-72-545 | CR | Tentative | Aug 2019 | $106,719 | 10 | REPAIR PUMP AND CONTROL PANEL | 0.0 |
0912-72-529 | CR | Tentative | Aug 2019 | $17,202 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-530 | CR | Tentative | Aug 2019 | $0 | 10 | REPLACE TRAFFIC SIGNAL CONTROLLER AND ALL ITS COMPONENTS | 0.0 |
0912-72-525 | CS | Tentative | Aug 2019 | $18,536 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-522 | CS | Tentative | Aug 2019 | $21,036 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-524 | CS | Tentative | Aug 2019 | $22,463 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-531 | CR | Tentative | Aug 2019 | $55,801 | 3 | EROSION REPAIR (NBI #121020AA2430001 & 121020AA2430002) | 0.0 |
0912-72-540 | CR | Tentative | Aug 2019 | $1,714,387 | 10 | REPAIR WASHOUT | 0.0 |
0912-72-544 | CR | Tentative | Aug 2019 | $27,622 | 10 | REPAIR PUMP AND PLAZA | 0.0 |
0912-72-538 | CR | Tentative | Aug 2019 | $1,010,703 | 10 | REPAIR ROAD AND PUMP 2 | 0.0 |
0912-72-532 | CR | Tentative | Aug 2019 | $82,109 | 3 | EROSION REPAIR (NBI 121020AA0756002) | 0.0 |
0912-72-537 | CR | Tentative | Aug 2019 | $745,572 | 10 | REPAIR TOLL BOOTHS | 0.0 |
3256-03-099 | SL 8 | Tentative | Aug 2019 | $11,000 | 10 | REMOVED DAMAGED CABINET AND INSTALLED NEW CABINET | 0.0 |
3256-03-100 | SL 8 | Tentative | Aug 2019 | $160,576 | 10 | RESTORE SATELLITE BUILDING | 0.0 |
3256-01-117 | SL 8 | Tentative | Aug 2019 | $156,850 | 10 | SOUND WALL AND SLOPE FAILURE REPAIR | 0.0 |
1685-05-131 | SH 6 | Tentative | Aug 2019 | $18,520 | 10 | REMOVED CABINET AND BBS AND INSTALLED NEW CABINET | 0.0 |
3256-01-116 | SL 8 | Tentative | Aug 2019 | $147,262 | 10 | SINK HOLE REPAIR AND REMOVAL OF DEBRIS | 0.0 |
3256-03-101 | SL 8 | Tentative | Aug 2019 | $20,982 | 10 | REPLACE WATER DAMAGED COMMUNICATION FIELD EQUIPMENT AND | 0.0 |
3510-06-017 | SH 99 | Tentative | Aug 2019 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0912-72-528 | CS | Actual | Apr 2019 | $22,463 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
3510-06-016 | SH 99 | Tentative | Aug 2019 | $11,455 | 10 | REMOVE AND INSTALL NEW CABINET WITH RISER | 0.0 |
3510-05-043 | SH 99 | Approved | Aug 2019 | $16,000,000 | 3 | Install Illumination | 0.0 |
3510-05-045 | SH 99 | Approved | Aug 2019 | $4,294,718 | 3 | LANDSCAPE DEVELOPMENT | 0.0 |
1685-05-129 | SH 6 | Tentative | Aug 2019 | $18,065 | 10 | REMOVED DAMAGED CABINET AND BBS AND INSTALLED NEW CABINET | 0.0 |
0981-01-111 | NASA 1 | Tentative | Aug 2019 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0981-01-112 | NASA 1 | Tentative | Aug 2019 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0976-01-040 | FM 865 | Approved | Aug 2019 | $143,340 | 8 | Highway Improvement | 0.0 |
0912-72-563 | CS | Tentative | Aug 2019 | $33,705 | 10 | REPAIR WASHOUT & HEADWALLS OF WOOD TIMBER BRIDGE AND | 0.0 |
0912-72-566 | VA | Approved | Aug 2019 | $2,300,000 | 1 | Surfacing/Roadway Restoration | 0.0 |
0981-01-113 | NASA 1 | Tentative | Aug 2019 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
1685-02-051 | FM 1960 | Tentative | Aug 2019 | $18,066 | 10 | REMOVED AND INSTALLED NEW CABINET AND BBS | 0.0 |
1685-03-102 | FM 1960 | Tentative | Aug 2019 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0981-01-116 | FM 528 | Tentative | Aug 2019 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0981-01-114 | FM 528 | Tentative | Aug 2019 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0981-01-115 | FM 528 | Tentative | Aug 2019 | $11,000 | 10 | REMOVE AND INSTALL NEW CABINET | 0.0 |
0912-72-521 | CS | Tentative | Aug 2019 | $18,536 | 10 | EMERGENCY RELIEF | 0.0 |
0912-00-552 | VA | Actual | Sep 2018 | $15,000,000 | 3 | CLEAN CITIES/CLEAN VEHICLES PROGRAM (ENGINE/VEHICLE | 0.0 |
0508-01-368 | IH 10 | Actual | Sep 2018 | $10,771,028 | 10 | REMOVED UNDERWATER DEBRIS | 0.0 |
0912-00-554 | VA | Actual | Sep 2018 | $2,000,000 | 7 | REGIONAL ITS INFRASTRUCTURE - HARDWARE/SOFTWARE, UTILITIES | 0.0 |
0912-70-125 | CR | Actual | Sep 2018 | $250,000 | 8 | FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755624C) | 0.0 |
0912-70-124 | CR | Actual | Sep 2018 | $250,000 | 8 | FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755622N) | 0.0 |
0271-16-140 | IH 610 | Actual | Sep 2018 | $125,776,787 | 1 | RECONSTRUCT MAINLANES, FRONTAGE ROAD AND CONSTRUCT OVERPASS | 8.0 |
0912-70-153 | CS | Tentative | Aug 2019 | $80,944 | 10 | REPLACE WATER DAMAGED COMMUNICATION FIELD EQUIPMENT AND | 0.0 |
0912-70-154 | CS | Tentative | Aug 2019 | $58,447 | 10 | REPLACE WATER DAMAGED COMMUNICATION FIELD EQUIPMENT AND | 0.0 |
0912-70-152 | CS | Tentative | Aug 2019 | $31,682 | 10 | REPLACE WATER DAMAGED COMMUNICATION FIELD EQUIPMENT AND | 0.0 |
0912-70-150 | CS | Tentative | Aug 2019 | $8,283 | 10 | REPLACE WATER DAMAGED COMMUNICATION FIELD EQUIPMENT AND | 0.0 |
0912-70-151 | CS | Tentative | Aug 2019 | $133,317 | 10 | REPLACE WATER DAMAGED COMMUNICATION FIELD EQUIPMENT AND | 0.0 |
0912-72-314 | VA | Actual | Sep 2018 | $6,019,462 | 3 | CONSTRUCT MULTI-USE PATH | 7.0 |
0912-70-147 | CR | Tentative | Aug 2019 | $21,185 | 10 | INSTALL NEW CMP (NBI#121020A49377001) | 0.0 |
2941-02-055 | FM 2920 | Actual | Nov 2018 | $8,623,632 | 1 | BASE REPAIR, 1.25 INCH MILLING, THIN OVERLAY MIX, METAL | 0.0 |
0912-00-532 | VA | Actual | Dec 2018 | $2,055,278 | 1 | INSTALL NEW TRAFFIC SIGNALS | 0.0 |
0912-72-417 | VA | Actual | Dec 2018 | $5,252,500 | 3 | CONSTRUCT GEOMETRIC IMPROVEMENTS AND TRAFFIC SIGNAL & | 0.0 |
0912-00-549 | VA | Actual | Dec 2018 | $4,438,000 | 3 | TRAVEL DEMAND MANAGEMENT, MARKETING, OUTREACH AND PUBLIC | 0.0 |
0912-00-597 | VA | Actual | Nov 2018 | $125,000 | 10 | MULTIMODAL NETWORK CONNECTIVITY PILOT STUDIES (NON-LET) | 0.0 |
0912-72-372 | VA | Actual | Oct 2018 | $5,253,750 | 3 | CONSTRUCT GEOMETRIC IMPROVEMENTS AND TRAFFIC SIGNAL & | 0.0 |
0912-70-149 | CS | Tentative | Aug 2019 | $25,169 | 10 | REPLACE WATER DAMAGED COMMUNICATION FIELD EQUIPMENT AND | 0.0 |
0912-72-374 | CR | Actual | Oct 2018 | $12,738,812 | 3 | WIDEN ROADWAY AND INSTALL SIX RAIL CROSSINGS | 0.0 |
0389-05-124 | SH 146 | Actual | Nov 2018 | $2,153,827 | 1 | REMOVE MEDIAN RAIL W/FENCING & REPL W/ CONC TRAFFIC BARRIER | 0.0 |
0912-72-416 | VA | Actual | Oct 2018 | $6,653,750 | 3 | CONSTRUCT GEOMETRIC IMPROVEMENTS AND TRAFFIC SIGNAL & | 0.0 |
0912-70-157 | CS | Tentative | Aug 2019 | $18,536 | 10 | REPLACED THE TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, | 0.0 |
0912-72-441 | CR | Tentative | Aug 2019 | $18,737 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-442 | CR | Tentative | Aug 2019 | $16,379 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-443 | CR | Tentative | Aug 2019 | $28,268 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-438 | CR | Tentative | Aug 2019 | $17,289 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-439 | CR | Tentative | Aug 2019 | $17,252 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-440 | CR | Tentative | Aug 2019 | $15,434 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-459 | CR | Tentative | Aug 2019 | $17,201 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-460 | CS | Tentative | Aug 2019 | $17,201 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-513 | CS | Tentative | Aug 2019 | $18,536 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-451 | CR | Tentative | Aug 2019 | $28,268 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-452 | CR | Tentative | Aug 2019 | $0 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-458 | CR | Tentative | Aug 2019 | $0 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-431 | CR | Tentative | Aug 2019 | $28,817 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-432 | CR | Tentative | Aug 2019 | $17,201 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-430 | CR | Tentative | Aug 2019 | $28,528 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-426 | CR | Tentative | Aug 2019 | $27,150 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-429 | CR | Tentative | Aug 2019 | $27,150 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-433 | CR | Tentative | Aug 2019 | $17,245 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-436 | CR | Tentative | Aug 2019 | $17,252 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-437 | CR | Tentative | Aug 2019 | $28,268 | 10 | REMOVE AND REPLACE TRAFFIC SIGNALL CONTROLLER CABINET | 0.0 |
0912-72-434 | CR | Tentative | Aug 2019 | $17,252 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-435 | CR | Tentative | Aug 2019 | $17,252 | 10 | EMERGENCY RELIEF | 0.0 |
Montgomery County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
0338-04-081 | SH 105 | Tentative | Aug 2019 | $11,000 | 10 | REPLACED TRAFFIC SIGNAL CABINET | 0.0 |
3538-01-035 | SH 242 | Approved | May 2019 | $40,989,584 | 2M | Widen Road - Add Lanes | 8.5 |
3538-01-053 | SH 242 | Approved | Jul 2019 | $307,624 | 6 | REPLACE BEARING PADS (NBI# 121700353801008) | 0.0 |
0912-37-235 | CR | Tentative | Aug 2019 | $250,000 | 8 | FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755892M) | 0.0 |
3538-01-036 | SH 242 | Approved | Aug 2019 | $60,788,963 | 2M | Widen Road - Add Lanes | 0.0 |
1062-01-217 | FM 1485 | Tentative | Aug 2019 | $135,560 | 10 | BRIDGE APPROACH SLAB REPAIR | 0.0 |
0912-37-234 | CR | Tentative | Aug 2019 | $250,000 | 8 | FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755879Y) | 0.0 |
3538-01-052 | SH 242 | Approved | May 2019 | $441,491 | 1 | CONSTRUCT NEW SIGNAL AT GREAT OAKS DRIVE AND CLOSURE OF | 0.0 |
0912-37-236 | CR | Tentative | Aug 2019 | $250,000 | 8 | FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755882G) | 0.0 |
0110-02-027 | SH 75 | Approved | Jul 2019 | $3,180,000 | 6 | REPLACE BRIDGE AND APPROACHES (NBI# 12170011002001) | 0.0 |
2897-01-017 | FM 830 | Actual | Mar 2019 | $2,642,386 | 1 | FULL DEPTH REPAIR, PAVEMENT MARKINGS AND 2 IN OVERLAY | 6.0 |
0177-05-117 | IH 69 | Tentative | Aug 2019 | $219,322 | 10 | REPLACED TRAFFIC SIGNAL CABINET | 0.0 |
1912-02-015 | FM 2090 | Tentative | Aug 2019 | $0 | 10 | REPLANK EXISTING RR CROSSING SURFACE | 0.0 |
1912-01-023 | FM 2090 | Tentative | Aug 2019 | $11,455 | 10 | REPLACED TRAFFIC SIGNAL CABINET | 0.0 |
0177-05-113 | IH 69 | Actual | Sep 2018 | $1,602,335 | 1 | CONSTRUCT DETENTION POND | 7.5 |
0177-05-119 | IH 69 | Tentative | Aug 2019 | $92,143 | 10 | INSTALL FLEXIBLE RIP RAP PROTECTION SYSTEM | 0.0 |
1912-02-014 | FM 2090 | Actual | Mar 2019 | $2,387,733 | 1 | FULL DEPTH REPAIR, PAVEMENT MARKINGS AND 2 IN OVERLAY | 5.0 |
0523-10-043 | FM 1488 | Actual | Dec 2018 | $703,503 | 1 | ADD RIGHT TURN LANE | 0.0 |
1416-03-019 | FM 1486 | Tentative | Aug 2019 | $0 | 10 | REPLANK EXISTING RR CROSSING SURFACE | 0.0 |
Waller County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
0944-02-011 | FM 362 | Approved | Aug 2019 | $619,295 | 8 | Hazard Elimination & Safety | 0.0 |
0912-56-052 | VA | Actual | Oct 2018 | $1,276,594 | 3 | CONSTRUCT INTERSECTION IMPROVEMENTS, SIDEWALKS, PEDESTRIAN | 6.0 |
1418-01-012 | FM 1489 | Actual | Jan 2019 | $1,444,822 | 1 | 1.5 IN ACP OVERLAY | 0.0 |
0114-11-080 | US 290 | Actual | Mar 2019 | $280,000 | 8 | INSTALL MEDIAN BARRIER | 0.0 |
|