Letting Schedule for Lufkin District (FY 2019)
Bid Tabulations Dashboard
This report will no longer be updated, please access links on the Contract Letting page. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
Lufkin District (FY 2019) |
Angelina | Houston | Nacogdoches | Polk | Sabine | San Augustine | San Jacinto | Shelby | | |||||||
Angelina County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
---|---|---|---|---|---|---|---|
2507-01-020 | FM 326 | Approved | Jul 2019 | $3,900,000 | 11 | Rehabilitate Existing Roadway | 0.0 |
2115-01-018 | FM 2251 | Tentative | Aug 2019 | $0 | 10 | REPLANK EXISTING RAILROAD CROSSING SURFACE | 0.0 |
0336-05-066 | SH 103 | Approved | Jul 2019 | $2,600,000 | 6 | Bridge Maintenance | 0.0 |
0911-00-078 | VA | Actual | Oct 2018 | $1,340,333 | 1 | INSTALL PROFILE PAVEMENT MARKINGS | 0.0 |
0911-00-076 | VA | Approved | Jul 2019 | $4,921,783 | 10 | Construct Pedestrian Infrastructure | 0.0 |
0336-03-071 | SH 103 | Actual | Mar 2019 | $1,219,821 | 11 | WIDENING EXISTING PAVING FOR ADDITIONAL TURNING LANES | 5.0 |
0336-05-061 | SH 103 | Actual | Dec 2018 | $1,290,979 | 1 | RESURFACE WITH THIN OVERLAY MIXTURE | 0.0 |
0390-03-035 | SH 147 | Actual | Dec 2018 | $823,222 | 8 | SAFETY TREAT FIXED OBJECTS (IMPROVE GUARDRAIL TO SAFETY | 6.0 |
0200-01-091 | US 69 | Actual | Mar 2019 | $122,361 | 1 | INSTALL TRAFFIC SIGNAL | 0.0 |
0200-03-021 | US 69 | Approved | Jun 2019 | $0 | 1 | WIDEN ROAD - ADD LANES AND SHOULDERS | 0.0 |
Houston County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
0635-03-025 | FM 228 | Actual | Nov 2018 | $3,635,559 | 1 | RESURFACE WITH SEALCOAT | 0.0 |
2813-01-008 | FM 2781 | Actual | Oct 2018 | $4,279,843 | 1 | RECONSTRUCT & WIDEN EXISTING PAVEMENT | 7.0 |
0109-03-037 | US 287 | Approved | May 2019 | $1,125,506 | 8 | Install/Replace Signs | 0.0 |
0937-02-030 | FM 227 | Approved | Jul 2019 | $0 | 6 | Bridge Replacement | 0.0 |
Nacogdoches County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
1407-01-028 | FM 1275 | Actual | Mar 2019 | $783,095 | 8 | SAFETY TREAT FIXED OBJECTS | 3.0 |
0176-01-081 | US 59 | Approved | Jun 2019 | $159,532,158 | 1 | CONSTRUCT DIRECT CONNECTORS | 0.0 |
2560-01-083 | SL 224 | Actual | Feb 2019 | $1,603,357 | 1 | RESURFACE WITH THIN OVERLAY MIXTURE | 0.0 |
2590-02-010 | FM 2609 | Actual | Feb 2019 | $3,997,749 | 11 | RECONSTRUCT AND WIDEN PAVEMENT | 5.0 |
0138-06-044 | US 259 | Actual | Jan 2019 | $3,723,258 | 1 | PLANE, OCST AND PERMEABLE FRICTION COURSE | 0.0 |
0911-08-047 | CR | Tentative | Aug 2019 | $0 | 8 | INSTALL NEW LIGHTS & GATES | 0.0 |
Polk County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
0177-01-106 | US 59 | Actual | Feb 2019 | $18,962 | 10 | REPLACE THRIEBEAM AND REESTABLISH THE SLOPE | 0.0 |
1408-01-026 | FM 1276 | Actual | Feb 2019 | $106,788 | 10 | REPAVE AND RETREAT FLEX BASE (ROUGHLY 1000 FT LONG) | 0.0 |
0177-01-108 | US 59 | Tentative | Aug 2019 | $430,594 | 10 | REPLACE DAMAGED RIPRAP AND REPAIR SLOPE FAILURE NEXT TO RIPR | 0.0 |
0177-01-112 | US 59 | Approved | Aug 2019 | $155,485 | 6 | Bridge Maintenance | 0.0 |
0213-04-048 | US 190 | Tentative | Aug 2019 | $0 | 8 | INSTALL NEW LIGHTS & GATES | 0.0 |
0176-05-185 | US 59 | Actual | Feb 2019 | $14,544 | 10 | REESTABLISH THE EMBANKMENT TO PREVENT FURTHER EROSION | 0.0 |
0911-04-092 | CS | Tentative | Aug 2019 | $0 | 8 | INSTALL NEW LIGHT & GATES | 0.0 |
0911-04-055 | VA | Approved | Aug 2019 | $1,718,564 | 10 | Highway Improvement | 0.0 |
0341-02-048 | US 287 | Tentative | Aug 2019 | $0 | 8 | UPGRADE LIGHTS & GATES | 0.0 |
0176-05-186 | US 59 | Actual | Nov 2018 | $1,858 | 10 | EMERGENCY EROSION REPAIRS | 0.0 |
0176-05-184 | US 59 | Actual | Nov 2018 | $8,468 | 10 | EMERGENCY EROSION REPAIRS | 0.0 |
0911-04-076 | CR | Approved | Jul 2019 | $1,614,560 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
0176-05-187 | US 59 | Tentative | Aug 2019 | $31,018 | 10 | REESTABLISH THE SLOPE, GRADE EDGE OF CHANNEL TO PREVENT | 0.0 |
1876-01-036 | FM 1988 | Actual | Nov 2018 | $116,154 | 10 | REESTABLISH SLOPE NEAR COLUMNS, REPLACE STONE RIPRAP IN THE | 0.0 |
0176-05-181 | US 59 | Actual | Jan 2019 | $3,685,521 | 1 | PLANE, HMA & PERMEABLE FRICTION COURSE | 0.0 |
1876-01-037 | FM 1988 | Actual | Nov 2018 | $27,310 | 10 | PLACE FLOWABLE FILL UNDER RIPRAP SLOPE TO FILL VOID AND TO | 0.0 |
1408-01-025 | FM 1276 | Actual | Nov 2018 | $128,133 | 10 | EMERGENCY ROADWAY REPAIRS | 0.0 |
0177-01-104 | US 59 | Actual | Feb 2019 | $23,724 | 10 | EMERGENCY ROADWAY REPAIRS | 0.0 |
0176-05-183 | US 59 | Actual | Jan 2019 | $9,142 | 10 | REPLACE ERODED EMBANKMENT AND REPLACE THE DAMAGED CONCRETE | 0.0 |
Sabine County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
1510-01-023 | FM 1592 | Actual | Feb 2019 | $23,016 | 10 | REESTABLISH THE FRONT SLOPE ON THE WEST SIDE OF THE | 0.0 |
1679-01-015 | FM 276 | Actual | Nov 2018 | $11,416 | 10 | EMERGENCY EROSION REPAIRS | 0.0 |
0064-05-061 | FM 1 | Actual | Dec 2018 | $2,056,935 | 8 | SAFETY TREAT FIXED OBJECTS; PROVIDE ADDITIONAL PAVED SURFACE | 6.5 |
1510-01-022 | FM 1592 | Actual | Feb 2019 | $3,918 | 10 | EMERGENCY EROSION REPAIRS | 0.0 |
1679-01-016 | FM 276 | Actual | Feb 2019 | $7,509 | 10 | REESTABLISH THE SLOPE AT THE EAST ABUTMENT | 0.0 |
0064-06-055 | US 96 | Approved | May 2019 | $195,070 | 6 | Bridge Maintenance | 0.0 |
San Augustine County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
0118-12-019 | FM 353 | Actual | Jan 2019 | $212,884 | 10 | EMERGENCY REPAIR ON CULVERT | 0.0 |
1079-01-036 | FM 705 | Actual | Sep 2018 | $72,132 | 10 | BRIDGE EMBANKMENT AND CONCRETE RIPRAP RESTORED | 0.0 |
0064-03-021 | SH 147 | Actual | Oct 2018 | $2,214,401 | 8 | PROFILE EDGELINE MARKINGS | 0.0 |
0911-30-030 | CR | Approved | Jul 2019 | $1,485,760 | 6 | Bridge Replacement | 0.0 |
San Jacinto County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
0395-02-041 | SH 150 | Actual | Oct 2018 | $11,874,733 | 1 | RECONSTRUCT PAVEMENT AND ADD PASSING LANES | 4.0 |
3038-01-013 | FM 222 | Actual | Sep 2018 | $871 | 10 | EMERGENCY EROSION REPAIRS | 0.0 |
3038-01-014 | FM 222 | Actual | Sep 2018 | $16,853 | 10 | REPLACE RIPRAP UNDER BRIDGE AND FILL VOIDS BEHIND RIPRAP | 0.0 |
0395-03-045 | SH 150 | Actual | Sep 2018 | $13,516 | 10 | REPLACE RIPRAPUNDER BRIDGE AND REPLACE FLEXBASE ON ACCESS | 0.0 |
0395-02-047 | SH 150 | Actual | Sep 2018 | $66,579 | 10 | REPAVE SHOULDERS AND RESET GUARDRAILS POSTS. | 0.0 |
0403-01-049 | SH 156 | Tentative | Aug 2019 | $53,076 | 10 | RE-ESTABLISH THE SLOPE AND RESET GUARDRAIL. CONCRETE RIRAP W | 0.0 |
0177-02-099 | US 59 | Actual | Sep 2018 | $12,737 | 10 | REESTABLISH THE ERODED SLOPE NEAR THE ABUTMENT AND PLACE | 0.0 |
0395-02-045 | SH 150 | Actual | Feb 2019 | $34,986 | 10 | REPLACE OR RESET GUARDRAIL, REPLACE FAILED MOW STRIP/REPLACE | 0.0 |
2829-02-008 | FM 2693 | Actual | Nov 2018 | $46,305 | 10 | EMERGENCY ROADWAY REPAIRS | 0.0 |
2829-02-009 | FM 2693 | Actual | Feb 2019 | $128,011 | 10 | REPLACE GUARDRAIL, REPLACE BASE MATERIAL AND PAVEMENT | 0.0 |
0403-01-048 | SH 156 | Actual | Feb 2019 | $15,991 | 10 | REPAIR SLOPE FAILURES AND RESET GUARDRAIL | 0.0 |
0177-02-102 | US 59 | Tentative | Aug 2019 | $624,386 | 10 | REPAIR PAVING EROSION, REPLACE DAMAGED MBGF AND REBUILD BACK | 0.0 |
0177-02-098 | US 59 | Actual | Nov 2018 | $15,746 | 10 | REPLACED FLOWABLE BACKFILL IN THE VOID AT THE ABUTMENT | 0.0 |
0403-01-047 | SH 156 | Tentative | Aug 2019 | $2,710 | 10 | EMERGENCY ROADWAY REPAIRS_- SLOPE FAILURES | 0.0 |
0395-02-046 | SH 150 | Actual | Nov 2018 | $9,222 | 10 | EMERGENCY EROSION REPAIRS | 0.0 |
0395-02-044 | SH 150 | Actual | Nov 2018 | $90,642 | 10 | EMERGENCY ROADWAY REPAIRS | 0.0 |
Shelby County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
0063-06-099 | US 96 | Approved | Aug 2019 | $1,033,181 | 6 | Bridge Maintenance | 0.0 |
0175-02-093 | US 84 | Approved | May 2019 | $1,499,893 | 1 | RESURFACE ROADWAY | 0.0 |
0059-05-045 | SH 7 | Actual | Nov 2018 | $10,363,089 | 1 | Highway Improvement | 0.0 |
1682-01-015 | FM 1645 | Approved | Jun 2019 | $5,302,000 | 8 | HIGHWAY IMPROVEMENT | 0.0 |
|