Letting Schedule for March, 2019 County (FY 2019)

Last Update: Monday, December 16, 2019

Bid Tabulations Dashboard

Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months.

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

March, 2019 (FY 2019)(see Links)
SEP 2018 | OCT 2018 | NOV 2018 | DEC 2018 | JAN 2019 | FEB 2019 | MAR 2019 | APR 2019 | MAY 2019 | JUN 2019 | JUL 2019 | AUG 2019 |
CCSJCounty/
District
HighwayLet StatusContract
Cost
Fund
Cat
DescriptionDBE Goal
0910-08-068Anderson/
Tyler
CRActual$643,6846REPLACE BRIDGE AND APPROACHES4.0
0200-01-091Angelina/
Lufkin
US 69Actual$122,3611INSTALL TRAFFIC SIGNAL0.0
0336-03-071Angelina/
Lufkin
SH 103Actual$1,219,82111WIDENING EXISTING PAVING FOR ADDITIONAL TURNING LANES5.0
0017-04-042Atascosa/
San Antonio
IH 35Actual$14,318,9671BASE REPAIR, SEALCOAT, OVERLAY & PAVEMENT MARKINGS ON5.0
0915-13-028Atascosa/
San Antonio
CRActual$639,7966REPLACE BRIDGE AND APPROACHES5.0
0184-03-040Bell/
Waco
SH 53Actual$1,473,4501PREVENTIVE MAINTENANCE3.0
2452-03-123Bexar/
San Antonio
SL 1604Actual$3,967,4361BASE REPAIR, SEALCOAT, OVERLAY & PAVEMENT MARKINGS ON0.0
0598-02-110Brazoria/
Houston
SH 288Actual$2,993,1481CONSTRUCT U-TURNS AND ACCELERATION/DECELERATION LANES2.5
0050-01-086Brazos/
Bryan
BS 6-RActual$8,773,6031CONCRETE PAVEMENT REPAIR0.0
2242-02-022Chambers/
Beaumont
FM 2354Actual$5,959,8691ADD CENTER LEFT TURN LANE AND WIDEN SHOULDERS, ADD NB LEFT8.0
0367-01-069Chambers/
Beaumont
SH 124Actual$1,948,8401SURFACING/ROADWAY RESTORATION0.0
0047-06-165Collin/
Dallas
US 75Actual$1,691,4521FULL DEPTH CONCRETE REPAIR0.0
0183-01-045Comanche/
Brownwood
SH 36Actual$1,497,7441MILL AND OVERLAY0.0
0903-15-085Cooke/
Wichita Falls
CRActual$1,063,5076REPLACE BRIDGE AND APPROACHES4.0
0918-00-287Dallas/
Dallas
VAActual$700,4091WRONG WAY DRIVING IMPLEMENTATION TO PREVENT WRONG WAY0.0
0095-13-043Dallas/
Dallas
IH 20Actual$28,484,1991FULL DEPTH CONCRETE REPAIR AND OVERLAY EB AND WB4.0
1905-01-009Dawson/
Lubbock
FM 2052Actual$3,561,0491WIDENING AND RESTORING PAVEMENT3.0
0941-02-019Dewitt/
Yoakum
FM 952Actual$1,199,2996REPLACE BRIDGE AND APPROACHES4.0
0906-00-177Ector/
Odessa
VAActual$5,023,1041PAVEMENT MARKINGS0.0
0906-00-176Ector/
Odessa
VAActual$505,8501PAVEMENT MARKINGS0.0
0172-05-122Ellis/
Dallas
US 287Actual$9,679,9741PAVEMENT REPAIR AND OVERLAY5.0
0909-38-081Falls/
Waco
CRActual$1,400,6506REPLACE BRIDGE AND APPROACHES0.0
0558-06-016Glasscock/
San Angelo
RM 33Actual$5,712,5441RESTORATION OF EXISTING ROAD3.0
0047-18-081Grayson/
Paris
US 75Actual$1,838,6531REPAIR SLOPE FAILURE AND ROADWAY4.0
0097-02-039Hardeman/
Childress
SH 6Actual$4,678,7471REHABILITATION OF EXISTING ROAD0.0
0912-72-371Harris/
Houston
VAActual$8,869,1863TURN LNS, AUX LNS, RAISED MEDIANS & GEOMETRIC IMPROVEMENTS7.5
1062-04-022Harris/
Houston
FM 2100Actual$44,177,8292MWIDEN TO 4-LANE DIVIDED9.0
0096-09-077Harrison/
Atlanta
US 80Actual$427,8248IMPROVE TRAFIC SIGNAL0.0
0632-04-032Harrison/
Atlanta
FM 451Actual$5,283,8821PROVIDE ADDITIONAL PAVED SURFACE WIDTH, MILLED EDGELINE0.0
0016-03-119Hays/
Austin
IH 35Actual$11,314,4331MILL, SEAL AND PFC-C INLAY0.0
0342-01-074Hidalgo/
Pharr
SH 107Actual$20,670,1421CONSTRUCT 6 LANE DIVIDED RURAL6.0
0698-03-095Hidalgo/
Pharr
FM 88Actual$1,875,4328INSTALL/UPGRADE ROADWAY LIGHTING4.0
0069-01-057Howard/
Abilene
US 87Actual$1,165,07511DRAINAGE WORK4.5
0200-14-086Jefferson/
Beaumont
US 69Actual$2,357,35611REMOVE EXISTING CONCRETE, RECONSTRUCT3.0
2249-01-008Kaufman/
Dallas
FM 460Actual$1,573,3101REHABILITATE EXISTING ROADWAY5.0
0142-02-029Kerr/
San Antonio
IH 10Actual$15,113,4631BASE REPAIR, SEALCOAT, OVERLAY & PAVEMENT MARKINGS ON0.0
0913-29-054Lavaca/
Yoakum
CSActual$199,2773CONSTRUCT PEDESTRIAN INFRASTRUCTURE0.0
0114-07-036Lee/
Austin
US 290Actual$30,993,7481RECONSTRUCT EXISTING 4-LN UNDIVIDED ROADWAY TO A 4-LN4.5
0177-03-104Liberty/
Beaumont
US 59Actual$1,639,62111PFC MILL AND INLAY0.0
0074-01-055Live Oak/
Corpus Christi
IH 37Actual$1,957,0131REHAB AND WIDEN-WEST FRTG LANES ONLY0.0
0150-04-047Llano/
Austin
SH 29Actual$3,688,17811CONSTRUCT SUPER 2 PASSING LANES7.0
0905-00-096Lubbock/
Lubbock
VAActual$300,7451SAFETY0.0
0913-21-050Matagorda/
Yoakum
CRActual$1,283,3553HIGHWAY IMPROVEMENT0.0
2897-01-017Montgomery/
Houston
FM 830Actual$2,642,3861FULL DEPTH REPAIR, PAVEMENT MARKINGS AND 2 IN OVERLAY6.0
1912-02-014Montgomery/
Houston
FM 2090Actual$2,387,7331FULL DEPTH REPAIR, PAVEMENT MARKINGS AND 2 IN OVERLAY5.0
1407-01-028Nacogdoches/
Lufkin
FM 1275Actual$783,0958SAFETY TREAT FIXED OBJECTS3.0
0006-02-115Nolan/
Abilene
IH 20Actual$10,712,9981MILL AND FILL WITH SPOT PAVEMENT REPAIR5.5
0074-06-219Nueces/
Corpus Christi
IH 37Actual$10,134,3371MILL,UNDERSEAL,OVERLAY AND NOVACHIP3.0
0916-00-212Nueces/
Corpus Christi
VAActual$2,165,86012019 DISTRICT WIDE SIGN REPLACEMENT0.0
0030-02-052Ochiltree/
Amarillo
US 83Actual$14,178,59011OVERLAY0.0
0030-02-053Ochiltree/
Amarillo
US 83Actual$1,949,94211IMPROVE TRAFFIC SIGNALS & INTERCONNECT SIGNALS0.0
0784-04-023Orange/
Beaumont
FM 1131Actual$1,003,0508MODERNIZE BRIDGE RAIL AND APPROACH GUARDRAIL, SAFETY TREAT6.0
0313-02-059Parker/
Ft Worth
FM 51Actual$6,808,8131RESURFACE ROADWAY5.0
0168-01-030Parmer/
Lubbock
US 60Actual$23,320,8291REHABILITATION OF EXISTING ROADWAY2.0
0206-07-062Rusk/
Tyler
US 79Actual$2,171,4151REHABILITATE AND RESURFACE ROADWAY0.0
0203-08-016Smith/
Tyler
FM 1253Actual$1,185,9368INSTALL PROFILE EDGELINE & CENTERLINE MARKINGS0.0
0910-16-140Smith/
Tyler
CRActual$819,0416REPLACE BRIDGE AND APPROACHES4.0
0910-16-039Smith/
Tyler
CSActual$501,8596REPLACE BRIDGE AND APPROACHES0.0
0902-90-113Tarrant/
Ft Worth
VAActual$3,846,9311LONGLINE MULTIPOLYMER STRIPING (60 & 90 MIL); RAISED PVMT0.0
0363-01-143Tarrant/
Ft Worth
SH 26Actual$2,662,5131REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS0.0
0699-01-055Taylor/
Abilene
FM 89Actual$1,877,9591MILL AND OVERLAY0.0
1176-02-019Titus/
Atlanta
FM 899Actual$1,275,4646REPLACE BRIDGE AND APPROACHES3.0
0010-06-042Titus/
Atlanta
US 67Actual$3,235,8318SAFETY TREAT FIXED OBJECTS0.0
0914-00-399Travis/
Austin
VAActual$1,944,3931FY 2019 NON-SITE SPECIFIC SIGNALS2.5
0114-11-080Waller/
Houston
US 290Actual$280,0008INSTALL MEDIAN BARRIER0.0
0275-12-074Wheeler/
Childress
IH 40Actual$4,818,9946BRIDGE MAINTENANCE (ADD VEHICLE DEFLECTION WALLS)0.0
0043-20-021Wilbarger/
Wichita Falls
BU 287FActual$518,3118INSTALL SIDEWALKS5.0
0015-08-141Williamson/
Austin
IH 35Actual$12,596,5122MBRIDGE REPLACEMENT6.0
0015-08-151Williamson/
Austin
IH 35Actual$5,094,0961MILL, SEAL AND OVERLAY SOUTHBOUND MAIN LANES0.0
0910-35-033Wood/
Tyler
CRActual$389,7346REPLACE BRIDGE AND APPROACHES0.0
0401-03-026Wood/
Tyler
SH 154Actual$897,1518INSTALL PROFILE EDGELINE MARKINGS0.0
1390-03-005Wood/
Tyler
FM 1254Actual$1,673,5126REPLACE BRIDGE & APPROACHES6.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract