Letting Schedule for Odessa District (FY 2019)

Last Update: Monday, December 16, 2019

Bid Tabulations Dashboard

Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months.

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Odessa District (FY 2019)
Andrews | Crockett | Ector | Martin | Midland | Pecos | Reeves | Ward |

Andrews County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0228-05-068US 385ActualJun 2019$501,9401HAZARD ELIMINATION & SAFETY0.0
0548-01-034SH 176ActualJul 2019$10,744,3511CONSTRUCT BRIDGE5.0

Crockett County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0556-02-017SH 349ActualFeb 2019$80,9538PROFILE EDGELINE AND CENTERLINE MARKINGS0.0

Ector County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
1717-01-010FM 1787ActualDec 2018$17,000,6191REHABILITATION OF EXISTING ROADWAY0.0
0005-01-114BI 20-EActualAug 2019$11,685,6568HAZARD ELIMINATION & SAFETY0.0
0906-00-184VAActualJul 2019$958,0921REPLACE GUARDRAIL0.0
0228-06-087US 385ActualJul 2019$660,9771TRAFFIC SIGNAL IMPROVEMENTS0.0
0906-00-177VAActualMar 2019$5,023,1041PAVEMENT MARKINGS0.0
0906-00-176VAActualMar 2019$505,8501PAVEMENT MARKINGS0.0
0906-00-185VAActualNov 2018$1,293,0741CULVERT/STRUCTURE REPAIR8.0
0906-00-186VAActualNov 2018$2,792,8981INSTALL OVER-HEIGHT BRIDGE DETECTION SYSTEMS0.0
2224-01-100SL 338ActualNov 2018$1,663,7251RECONSTRUCT INTERSECTION WITH TRAFFIC SIGNALS & ILLUMINATION5.5

Martin County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
1842-01-016FM 26ActualFeb 2019$1,241,3241CHANNEL EXCAV, PLACEMENT OF CONCRETE RIP RAP, REPLACEMENT OF0.0

Midland County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
1188-02-087SL 250ActualJan 2019$22,542,7102UCONSTRUCT NEW INTERCHANGE7.0
1188-02-107SL 250ActualOct 2018$5,732,3871WIDEN SOUTHBOUND SL 250 FRONTAGE ROAD APPROACH TO SH 1583.0
1717-02-023FM 1787ActualDec 2018$12,849,6381REHABILITATION OF EXISTING ROADWAY0.0
0906-32-057CSActualJun 2019$780,8083HIKE AND/OR BIKE5.0
0380-09-093BS 349CActualJul 2019$1,942,6061TRAFFIC SIGNAL IMPROVEMENTS0.0
0005-14-089IH 20ActualSep 2018$810,57411IH 20 AT MIDKIFF RD JOINT UTILITY DUCT BANK BORE0.0

Pecos County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0441-07-071IH 10ActualSep 2018$7,492,2271FACILITY UPGRADES TO MEET FREEWAY STANDARDS3.0
0021-06-027US 90ActualJun 2019$1,831,9171HAZARD ELIMINATION & SAFETY0.0
0076-01-029US 67ActualApr 2019$46,907,97911ROADWAY WIDENING TO A MODIFIED SUPER 25.5
0075-03-021US 67ActualApr 2019$433,8678SAFETY TREAT FIXED OBJECTS0.0

Reeves County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0139-04-050US 285ActualAug 2019$48,12810RAILROAD CROSSING IMPROVEMENTS0.0
0003-05-054IH 20ActualAug 2019$24,275,1168HAZARD ELIMINATION & SAFETY0.0
0441-09-045IH 10ActualJun 2019$309,0356BRIDGE MAINTENANCE0.0
0139-05-043US 285ActualJan 2019$23,870,07211ROADWAY REHABILITATION2.0
0003-05-050IH 20ActualSep 2018$9,735,6061PREVENTIVE MAINTENANCE0.0

Ward County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0354-02-027SH 115ActualApr 2019$717,7798SAFETY LIGHTING AT INTERSECTION0.0
0004-02-058IH 20ActualOct 2018$25,408,3661HIGHWAY IMPROVEMENT2.0
0004-02-060IH 20ActualAug 2019$23,303,9298HAZARD ELIMINATION & SAFETY0.0
0354-02-029SH 115ActualAug 2019$36,09610RAILROAD CROSSING IMPROVEMENTS0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract