Letting Schedule for April, 2019 County (FY 2019)

Last Update: Monday, June 18, 2018
April, 2019 (FY 2019)(see Links)
SEP 2018 | OCT 2018 | NOV 2018 | DEC 2018 | JAN 2019 | FEB 2019 | MAR 2019 | APR 2019 | MAY 2019 | JUN 2019 | JUL 2019 | AUG 2019 |
CCSJCounty/
District
HighwayLet StatusContract
Cost
Fund
Cat
DescriptionDBE Goal
0909-36-161Bell/
Waco
CSTentative$1,300,0003CONSTRUCT A SHARED USE PATH FOR PEDESTRIANS AND BICYCLISTS0.0
0231-03-145Bell/
Waco
US 190Tentative$42,804,0001WIDEN FROM FOUR TO SIX LANES AND RESURFACE0.0
0915-00-192Bexar/
San Antonio
VATentative$2,500,0001DISTRICTWIDE GUIDESIGNS FY190.0
0915-00-208Bexar/
San Antonio
VATentative$5,000,0001UPGRADE MBGF/RAIL0.0
0945-01-042Bowie/
Atlanta
SH 93Tentative$400,00010CONSTRUCT SIDEWALKS0.0
0945-01-043Bowie/
Atlanta
SH 93Tentative$400,00010CONSTRUCT SIDEWALKS0.0
1020-01-055Bowie/
Atlanta
FM 559Tentative$100,00010CONSTRUCT SIDEWALKS0.0
0587-01-060Brazoria/
Houston
FM 1495Tentative$15,000,0001REPLACE BRIDGE AND APPROACHES (NBI# 12020058701003)0.0
0050-02-101Brazos/
Bryan
SH 6Tentative$192,2166REPLACE BRIDGE AND APPROACH RAILING OR ADD END0.0
0049-12-106Brazos/
Bryan
US 190Tentative$117,3001REPLACE BRIDGE AND APPROACH RAILING OR ADD END0.0
0049-12-099Brazos/
Bryan
SH 6Tentative$845,5526REPLACE BRIDGE AND APPROACH RAILING OR ADD END0.0
0054-06-104Brown/
Brownwood
US 67Tentative$1,881,1868PROFILE CENTER AND EDGELINE MARKINGS0.0
2825-01-009Burleson/
Bryan
FM 2774Tentative$1,085,6001WIDEN PAVEMENT, EDGELINE AND CENTERLINE PROFILE MARKINGS0.0
0144-03-037Calhoun/
Yoakum
US 87Tentative$733,3148IMPROVE GUARDRAIL TO DESIGN STANDARDS0.0
0220-05-075Cameron/
Pharr
SH 48Tentative$02MPROPOSED RAISED MEDIAN0.0
0039-20-008Cameron/
Pharr
SS 54Tentative$7,341,4462UWIDEN ROADWAY, C&G, TRAFFIC MEDIANS, SIDEWALKS, LIGHTING &0.0
1024-01-076Chambers/
Beaumont
FM 565Tentative$599,8868PROVIDE ADDITIONAL PAVED SURFACE WIDTH. INSTALL MILLED0.0
0206-04-042Cherokee/
Tyler
US 79Tentative$9,000,0001REPAIR & REPAVE ROADWAY0.0
0391-04-027Clay/
Wichita Falls
SH 148Tentative$4,500,0001PROVIDE ADDITIONAL PAVED SURFACE WIDTH0.0
0016-04-116Comal/
San Antonio
IH 35Tentative$01RAMP REVISIONS, INTERSECTION AND FRONTAGE ROAD OPERATIONAL0.0
0079-03-048Comanche/
Brownwood
US 67Tentative$402,0798IMPROVE GUARDRAIL TO DESIGN STANDARDS0.0
0567-01-020Coryell/
Waco
FM 107Tentative$3,100,0001WIDEN ROADWAY AND ADD SHOULDERS0.0
0008-08-076Dallas/
Dallas
SH 180Tentative$1,165,0021MILL, OVERLAY AND FLEXIBLE PAVEMENT REPAIR ON FRONTAGE ROADS0.0
0918-47-062Dallas/
Dallas
CSTentative$642,2146REPLACE BRIDGE AND APPROACHES5.5
0918-00-218Dallas/
Dallas
VATentative$892,8193SUSTAINABLE DEVELOPMENT INITIATIVES; SAFETY AUDIT AND0.0
0918-47-178Dallas/
Dallas
CSTentative$1,346,2603IMPROVE TRAFFIC SIGNALS0.0
0197-02-124Dallas/
Dallas
US 175Tentative$4,000,0001RAMP MODIFICATIONS0.0
0353-04-106Dallas/
Dallas
SS 348Tentative$4,052,7301CONCRETE FULL DEPTH REPAIR, OVERLAY, & PAVEMENT MARKINGS0.0
0353-05-122Dallas/
Dallas
SL 12Tentative$9,030,1451MILL, CONCRETE FULL DEPTH REPAIR AND OVERLAY0.0
0924-06-534El Paso/
El Paso
CSTentative$18,000,0003RECONSTRUCT/WIDEN FROM 2 TO 6 LANE DIVIDED (MEDIAN, CURB/RAM0.0
0904-08-004Hansford/
Amarillo
CRTentative$1,070,0006REPLACE EXISTING OFF SYSTEM BRIDGE0.0
0912-72-373Harris/
Houston
CSTentative$4,302,0003RECONSTRUCT ROADWAY TO INCLUDE DRAINAGE IMPROVEMENTS,0.0
0051-02-101Harris/
Houston
SH 3Tentative$8,426,0009MILL AND ASPHALT OVERLAY OF SHOULDERS, SHOULDER WIDENING,0.0
0914-33-074Hays/
Austin
CSTentative$9,922,5003RECONSTUCT THE STREET, MULTI-USE PATH, SIDEWALKS, CURB AND0.0
0656-01-040Hill/
Waco
FM 67Tentative$5,700,0001REHABILITATE ROADWAY0.0
2631-01-006Hood/
Ft Worth
FM 3450Tentative$1,300,0001REPAIR BASE FAILURES, HMAC OVERLAY, PAVEMENT MARKINGS0.0
0249-07-075Jack/
Ft Worth
US 281Tentative$4,800,0001HMAC OVERLAY & PAVEMENT REPAIR0.0
0171-01-034Jack/
Ft Worth
SH 199Tentative$6,700,0001REPAIR BASE FAILURES, OVERLAY, PAVEMENT MARKINGS0.0
0515-05-016Jackson/
Yoakum
FM 822Tentative$01REHABILITATE EXISTING ROADYWAY0.0
0508-04-168Jefferson/
Beaumont
SH 73Tentative$2,700,0001MILL AND OVERLAY0.0
0667-02-111Jefferson/
Beaumont
FM 366Tentative$584,4418IMPROVE TRAFFIC SIGNALS0.0
0348-03-030Karnes/
Corpus Christi
SH 80Tentative$9,000,0001REHAB ROADWAY0.0
0561-01-024Kaufman/
Dallas
SH 274Tentative$3,901,2881MILL AND OVERLAY EXISTING ROADWAY0.0
1042-01-035Kendall/
San Antonio
RM 474Tentative$01BASE REPAIR, SEALCOAT, OVERLAY & PAVEMENT MARKINGS0.0
0291-03-071Kerr/
San Antonio
SH 16Tentative$01BASE REPAIR, SEALCOAT, OVERLAY & PAVEMENT MARKINGS0.0
0920-02-094Liberty/
Beaumont
CRTentative$581,0006REPLACE BRIDGE AND APPROACHES0.0
0073-07-062Live Oak/
Corpus Christi
IH 37Tentative$3,193,9008IMPROVE GUARDRAIL TO DESIGN STANDARDS0.0
0068-01-070Lubbock/
Lubbock
US 87Tentative$86,2578SAFETY - INSTALL FLASHING BEACON0.0
0914-26-008Mason/
Austin
CSTentative$1,060,0006REPLACE BRIDGE AND APPROACHES0.0
0825-02-021Mcculloch/
Brownwood
US 190Tentative$289,3278IMPROVE GUARDRAIL TO DESIGN STANDARDS, STFO0.0
0129-01-034Mcculloch/
Brownwood
US 190Tentative$289,3278IMPROVE GUARDRAIL TO DESIGN STANDARDS, STFO0.0
0380-09-093Midland/
Odessa
BS 349CTentative$2,587,3618IMPROVE TRAFFIC SIGNALS, INSTALL FLASHING YELLOW ARROW,0.0
0903-28-058Montague/
Wichita Falls
CRTentative$1,560,0006REPLACE BRIDGE AND APPROACHES0.0
0110-02-024Montgomery/
Houston
SH 75Tentative$1,180,0001HOT MIX OVERLAY AND ADD SHOULDERS0.0
0010-08-056Morris/
Atlanta
US 67Tentative$1,336,6128IMPROVE GUARDRAIL TO DESIGN STANDARDS0.0
0093-02-021Navarro/
Dallas
SH 14Tentative$4,970,2531PAVEMENT REPAIR, OVERLAY AND PAVEMENT MARKINGS0.0
0102-01-114Nueces/
Corpus Christi
SH 44Tentative$1,574,3018INSTALL MEDIAN BARRIER, MILLED EDEGLINE RUMBLE STRIPS0.0
0074-06-227Nueces/
Corpus Christi
IH 37Tentative$1,198,7008IMPROVE GUARDRAIL TO DESIGN STANDARDS0.0
2886-02-017Nueces/
Corpus Christi
FM 2826Tentative$3,500,0001REHAB ROADWAY AND WIDEN0.0
0916-00-215Nueces/
Corpus Christi
VATentative$1,000,0001DISTRICT WIDE PAVEMENT MARKING AND MARKERS 2019 PLAN CSJ0.0
0028-14-116Orange/
Beaumont
IH 10Tentative$3,799,0746DECK REPAIRS, END SPAN IMPROVEMENTS0.0
0063-03-062Panola/
Atlanta
US 59Tentative$2,274,5188PROFILE CENTERLINE & EDGELINE MARKINGS0.0
0314-07-069Parker/
Ft Worth
IH 20Tentative$2,250,1131FRONTAGE ROADS- REPAIR BASE FAILURES, MILL, HMAC OVERLAY,0.0
0075-03-021Pecos/
Odessa
US 67Tentative$821,0328SAFETY TREAT FIXED OBJECTS0.0
7106-03-001Pecos/
Odessa
RL SOTentative$15,311,9493REHABILITATION OF SOUTH ORIENT RR TO 25 MPH TRACK SPEEDS0.0
0904-00-186Potter/
Amarillo
VATentative$875,00011UPGRADE EXISTING ROADWAY ILLUMINATION TO LED0.0
0046-01-064Red River/
Paris
US 82Tentative$11,500,0001CONSTRUCT SUPER 20.0
0490-04-045Roberts/
Amarillo
SH 70Tentative$24,109,49511BASE REPAIR AND OVERLAY0.0
0889-04-078Smith/
Tyler
FM 346Tentative$736,8948IMPROVE DRAINAGE, UPGRADE GUARD RAIL0.0
0902-90-089Tarrant/
Ft Worth
CSTentative$7,934,0873CONSTRUCTION OF MAIN ST INCLUDING PAVEMENT, SIDEWALK, CURB &0.0
0008-13-238Tarrant/
Ft Worth
IH 20Tentative$907,74511REMOVE METAL BEAM GUARD FENCE AND INSTALL CONCRETE TRAFFIC0.0
0181-01-061Taylor/
Abilene
SH 36Tentative$4,650,0001MILL AND FILL0.0
2410-01-011Tom Green/
San Angelo
FM 2105Tentative$6,920,0001RESTORATION OF EXISTING ROADWAY0.0
0015-13-396Travis/
Austin
IH 35Tentative$22,980,7151RECONSTRUCT INTERSECTION0.0
0922-11-036Val Verde/
Laredo
CSTentative$1,500,0003REHABILITATION OF EXISTING HIGHWAY0.0
0370-05-052Victoria/
Yoakum
BU 77STentative$11,136,2662UCONSTRUCT CENTER MEDIAN, ACP OVERLAY, INSTALL LIGHTING &0.0
0578-02-043Walker/
Bryan
FM 247Tentative$45,0006REPLACE BRIDGE AND APPROACH RAILING OR ADD END0.0
0114-11-079Waller/
Houston
US 290Tentative$1,275,39710BANK STABILZATION, EROSION CONTROL AND SHEET PILE0.0
0354-02-027Ward/
Odessa
SH 115Tentative$753,6518SAFETY LIGHTING AT INTERSECTION0.0
0114-09-070Washington/
Bryan
US 290Tentative$135,6606REPLACE BRIDGE AND APPROACH RAILING OR ADD END0.0
0266-05-048Wharton/
Yoakum
SH 71Tentative$9,916,1651ADD 2 LANES FOR 4-LANE UNDIVIDED WITH CONTINUOUS LEFT TURN0.0
0913-09-088Wharton/
Yoakum
CRTentative$900,5006REPLACE BRIDGE AND APPROACHES0.0
0903-00-089Wichita/
Wichita Falls
VATentative$100,0001LANDSCAPE0.0
0683-01-056Williamson/
Austin
RM 620Tentative$22,168,2662MCONSTRUCT NEW 4-LN OVERPASS AT GEORGETOWN RR AND LAKE0.0
0015-09-193Williamson/
Austin
IH 35Tentative$8,905,3282MWIDEN NB FRONTAGE RD TO 3 LANES WITH ASSOCIATED PAVING, GRAD0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract