Letting Schedule for Austin District (FY 2019)

Last Update: Monday, October 15, 2018
Austin District (FY 2019)
Bastrop | Blanco | Caldwell | Hays | Lee | Llano | Mason | Travis | Williamson |

Bastrop County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0914-18-110CRApprovedNov 2018$427,1376REPLACE BRIDGE AND APPROACHES0.0
0114-05-037US 290ApprovedNov 2018$39,083,5271RECONSTRUCT EXISTING 4-LN UNDIVIDED ROADWAY TO A 4-LN8.5
0114-06-029US 290ApprovedDec 2018$16,024,5111RECONSTRUCT EXISTING 4-LN UNDIVIDED ROADWAY TO A 4-LN0.0
0573-01-037SH 304ActualSep 2018$461,7708PROFILE EDGELINE MARKINGS AND PROFILE CENTERLINE MARKINGS0.0
0471-05-046SH 21ApprovedJan 2019$621,4468INSTALL TRAFFIC SIGNAL0.0
3115-01-011FM 3000TentativeJun 2019$483,6238IMPROVE GUARDRAIL, SAFETY TREAT FIXED OBJECTS0.0
0265-04-062SH 21TentativeMar 2019$43,921,2672MCONSTRUCT TWO NEW COLORADO RIVER 2-LN FRONTAGE ROAD BRIDGES0.0
2190-01-007FM 2336TentativeJun 2019$4,203,1378IMPROVE GUARDRAIL TO DESIGN STANDARDS, SAFETY TREAT FIXED0.0

Blanco County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0113-03-031US 290ApprovedJan 2019$1,855,8101FULL DEPTH REPAIR, UNDERSEAL AND TOM0.0

Caldwell County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0471-04-030SH 21TentativeAug 2019$10,326,8701PROVIDE SUPER 2 PASSING LANES0.0
0914-22-061VATentativeMay 2019$2,120,6487CALDWELL COUNTY STPMM SET-ASIDE0.0

Hays County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0471-02-070SH 21TentativeAug 2019$19,702,0401PROVIDE SUPER 2 PASSING LANES0.0
0285-03-059RM 12TentativeAug 2019$400,0023ENGINEERING, DESIGN, AND ROW PURCHASE TO ADD TURN LANES AND0.0
3545-02-008FM 110TentativeMay 2019$14,435,8513CONSTRUCT TWO LANES AND SHOULDERS0.0
3545-02-007FM 110TentativeMay 2019$11,924,7383CONSTRUCT TWO LANES AND SHOULDERS0.0
0016-03-119IH 35TentativeMar 2019$6,981,0001MILL, SEAL AND PFC-C INLAY0.0
0914-33-074CSTentativeApr 2019$9,922,5003RECONSTUCT THE STREET, MULTI-USE PATH, SIDEWALKS, CURB AND0.0
3545-01-005FM 110TentativeMay 2019$32,056,5673CONSTRUCT NEW 2 LANE ROADWAY AND SHOULDERS0.0
0914-33-068CRTentativeMay 2019$17,144,0423CONSTRUCT NEW 2-LANE ROADWAY WITH A GRADE SEPARATION AT0.0
0113-07-066US 290ActualOct 2018$566,1268PROFILE EDGELINE & CENTERLINE MARKINGS0.0
0366-01-076SL 82ApprovedFeb 2019$926,3521MILL, SEAL AND INLAY0.0
0113-07-069US 290ApprovedJan 2019$552,3918INTERCONNECT SIGNALS & INSTALL FLASHING YELLOW ARROW0.0

Lee County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0114-07-036US 290TentativeMar 2019$33,692,7811RECONSTRUCT EXISTING 4-LN UNDIVIDED ROADWAY TO A 4-LN0.0
0473-02-038SH 21ApprovedJan 2019$2,259,8601LEVEL-UP, REPAIR, STRUCT OVERLAY TY-D & TOM OVERLAY0.0

Llano County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0547-01-026SH 261TentativeJul 2019$812,1458PROVIDE ADDITIONAL PAVED SURFACE WIDTH, MILLED EDGELINE0.0
0150-04-047SH 29TentativeMar 2019$5,000,00011CONSTRUCT SUPER 2 PASSING LANES0.0
0577-04-022SH 71ActualSep 2018$1,489,0471SEAL COAT0.0

Mason County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0150-01-028SH 29ApprovedNov 2018$723,7281FULL DEPTH REPAIR, SEAL AND TOM OVERLAY0.0

Travis County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0113-08-088US 290TentativeJun 2019$656,7833CONSTRUCT RIGHT TURN DECEL LANE AND SIGNAL0.0
0016-01-125SL 275ApprovedJan 2019$1,097,9501TOM OVERLAY WITH EDGE MILLING0.0
0914-00-400VATentativeMay 2019$1,450,0001FY 2019 SITE SPECIFIC SIGNALS0.0
0152-01-083US 183ApprovedJan 2019$3,202,0001TOM OVERLAY0.0
0914-00-411VAApprovedJan 2019$2,758,1821INSTALL OR REBUILD TRAFFIC SIGNALS0.0
0914-00-399VATentativeMar 2019$1,944,3931FY 2019 NON-SITE SPECIFIC SIGNALS0.0
0113-13-178SL 360TentativeMay 2019$1,025,0006REHABILITATE BRIDGE0.0
0683-02-075RM 620TentativeApr 2019$780,0007INSTALL CONCRETE TRAFFIC BARRIER0.0
0015-13-396IH 35TentativeApr 2019$22,980,7151RECONSTRUCT INTERSECTION0.0
2102-01-074RM 2244TentativeMay 2019$350,00010LANDSCAPING AND IRRIGATION0.0
0015-13-414IH 35TentativeJun 2019$215,10810LANDSCAPING AND IRRIGATION0.0
1186-01-097FM 969ApprovedFeb 2019$413,8381IMPROVE TRAFFIC SIGNAL, INSTALL FLASHING YELLOW ARROW0.0
0914-00-419VATentativeMay 2019$2,500,00010CONSTRUCT ADA RAMPS & SIDEWALKS ON SL1, 82, 109, 150, 275,0.0
0914-04-271CRTentativeMay 2019$200,0006REHABILITATE BRIDGE AND APPROACHES0.0
3417-01-030FM 734TentativeJun 2019$85,4118LENGTHEN LEFT TURN LANE0.0
2689-01-023FM 2304TentativeJul 2019$7,941,7877RECONSTRUCT EXISTING 2-LN DIVIDED ROADWAY WITH CLTL TO A0.0
0914-00-418VAApprovedNov 2018$2,197,0101ASPHALT PAVEMENT REPAIR0.0
0113-08-090US 290ApprovedDec 2018$2,396,4001PFC-C OVERLAY0.0
1378-01-038RM 1431ApprovedNov 2018$507,9068INSTALL CONTINUOUS TURN LANE, CONSTRUCT PAVED SHOULDERS0.0
0914-00-412VATentativeAug 2019$1,000,0001FY 2018 NON-SITE SPECIFIC ITS IMPROVEMENTS_ON SL 1, IH 35 &0.0
0914-00-414VAApprovedNov 2018$1,862,6571RESTRIPING & REPLACEMENT OF RAISED PAVEMENT MARKS ON US 2810.0
0440-06-018SH 130ActualOct 2018$60,418,4113ADD ONE LANE IN EACH DIRECTION0.0
1378-01-040RM 1431TentativeAug 2019$856,5501CONSTRUCT LEFT & RIGHT TURN LANES @ BALCONES CANYONLANDS NWR0.0
0914-00-415VAApprovedNov 2018$1,110,0391RESTRIPING & REPLACEMENT OF RAISED PAVEMENT MARKS ON US 183,0.0
1535-01-012FM 1625TentativeJul 2019$1,127,0593REALIGN ROADWAY AND RELOCATE HIGHWAY INTERSECTION0.0
0914-00-416VAApprovedDec 2018$886,3731RESTRIPING & REPLACEMENT OF RAISED PAVEMENT MARKINGS ON IH350.0
0914-00-420VATentativeJul 2019$1,000,00010CONSTRUCT CURB RAMPS0.0
2100-01-060RM 2222TentativeJul 2019$11,370,4471CONSTRUCT NEW 3-LANE CONNECTOR ROAD WITH INTERSECTION AND0.0
1378-01-041RM 1431TentativeJul 2019$2,477,4001CONSTRUCT SLOW MOVING VEHICLE TURNOUTS0.0
2100-01-066RM 2222TentativeJul 2019$546,9583CONSTRUCT LEFT TURN, DECEL AND MERGE LANE ON RM 22220.0

Williamson County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0320-03-100SH 95TentativeMay 2019$290,0006REHABILITATE BRIDGE0.0
2103-01-033RM 2243ApprovedJan 2019$394,0003ADDITION OF LEFT TURN LANE0.0
2103-01-035RM 2243ApprovedJan 2019$1,396,5351DEPTH REPAIR, UNDERSEAL AND THIN OVERLAY0.0
0273-04-036US 183ApprovedJan 2019$5,168,8011FULL DEPTH REPAIR & OVERLAY0.0
1201-01-014FM 970TentativeJun 2019$5,726,5398WIDENING & SAFETY IMPROVEMENTS_TO INCLUDE IMPROVE GUARDRAIL0.0
0320-04-027US 79TentativeJun 2019$1,136,54410LANDSCAPING AND IRRIGATION OF THREE INTERCHANGES ON US 790.0
0151-04-070US 183TentativeJun 2019$844,7183CONSTRUCT MEDIAN AND LEFT TURN LANE0.0
2211-02-030FM 1460ApprovedFeb 2019$157,0443INSTALL MEDIAN BREAK AND LEFT TURN LANE0.0
0015-09-193IH 35TentativeApr 2019$10,427,2102MWIDEN NB FRONTAGE RD TO 3 LANES WITH ASSOCIATED PAVING, GRAD0.0
0015-08-142IH 35TentativeMar 2019$11,023,0102MCONVERT EXISTING 2-LANE NB & SB 2-WAY FRONTAGE ROADS TO 2-LN0.0
0683-01-056RM 620TentativeApr 2019$22,168,2662MCONSTRUCT NEW 4-LN OVERPASS AT GEORGETOWN RR AND LAKE0.0
0440-01-042SH 138ApprovedFeb 2019$6,738,1281ADD SHOULDERS AND REHABILITATE ROADWAY0.0
0914-05-181CRTentativeApr 2019$740,0006REHABILITATE EXISTING HISTORICAL STEEL TRUSS BRIDGE0.0
0683-01-092RM 620TentativeApr 2019$0ROWACQUISITION, UTILITIES AND RELOCATION ASSISTANCE0.0
0151-03-041SH 29ActualOct 2018$1,983,2753INTERSECTION IMPROVEMENTS TO ADD TURN LANES AND IMPROVE0.0
0204-02-032US 79TentativeMar 2019$600,0003INSTALL CENTER RAISED MEDIAN AND TURN LANES0.0
2211-01-027RM 2338TentativeJul 2019$188,0003WIDENING FOR ADDITION OF CENTER TURN LANE0.0
0015-08-152IH 35ApprovedDec 2018$2,500,0003CONSTRUCT NEW OVERPASS CROSSING IH 35 AT NORTHWEST BOULEVARD0.0
3417-02-032FM 734TentativeJun 2019$100,0003INSTALL MEDIAN BREAK FOR NB LEFT TURN LANE & EXTEND EXISTING0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract