Letting Schedule for Austin District (FY 2019)

Last Update: Monday, November 13, 2017
Austin District (FY 2019)
Bastrop | Blanco | Burnet | Caldwell | Gillespie | Hays | Lee | Llano | Mason | Travis | Williamson |

Bastrop County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
1186-02-017FM 969TentativeJun 2019$263,6578PROFILE PAVEMENT MARKINGS
2190-01-007FM 2336TentativeJun 2019$5,000,0008IMPROVE GUARDRAIL TO DESIGN STANDARDS, SAFETY TREAT FIXED
0265-13-023SL 230TentativeAug 2019$2,744,4503WIDENING
0265-04-062SH 21TentativeMar 2019$53,717,3442MCONSTRUCT FRONTAGE ROADS AND BRIDGE
0114-06-029US 290TentativeDec 2018$16,845,2891WIDEN TO 4 LANE DIVIDED
0114-05-037US 290TentativeOct 2018$36,596,1271WIDEN TO 4 LANE DIVIDED
3115-01-011FM 3000TentativeJun 2019$481,6238IMPROVE GUARDRAIL, SAFETY TREAT FIXED OBJECTS
0914-18-107CRTentativeJan 2019$600,0006REHABILITATE BRIDGE & APPROACHES

Blanco County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0914-23-012VATentativeOct 2018$881,4923INSTALL BIKE AND PEDESTRIAN PATHWAY/SIDEWALKS
0252-04-002SS 356TentativeNov 2018$268,7811SPOT REPAIR AND TY D OVERLAY

Burnet County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0533-01-020PR 4TentativeNov 2018$679,2001LEVEL-UP AND SEAL COAT
1378-04-051RM 1431TentativeJan 2019$475,0001FULL DEPTH REPAIR & SEAL COAT
2207-01-007RM 2342TentativeNov 2018$575,2001LEVEL-UP AND SEAL COAT

Caldwell County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0286-03-017SH 80TentativeFeb 2019$7,513,8971LEVEL-UP, FULL DEPTH REPAIR AND TOM
0914-22-061VATentativeMay 2019$2,120,6487CALDWELL COUNTY STPMM SET-ASIDE

Gillespie County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0071-06-059US 87TentativeDec 2018$2,809,0001LEVEL-UP & SEAL COAT

Hays County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0366-01-076SL 82TentativeFeb 2019$2,196,3001MILL, SEAL AND INLAY
2293-01-030FM 2439TentativeSep 2018$475,0001RESURFACE ROADWAY
0113-07-066US 290TentativeOct 2018$442,8258PROFILE EDGELINE & CENTERLINE MARKINGS
0683-03-039RM 12TentativeJun 2019$1,052,0008ADD 1'-4' SHOULDERS AND CENTER TURN WITH LEFT TURN LANES
3545-02-007FM 110TentativeMay 2019$14,541,7003CONSTRUCT TWO LANES AND SHOULDERS
0914-33-068CRTentativeMay 2019$17,144,0423CONSTRUCT NEW ROADWAY
3545-02-008FM 110TentativeMay 2019$15,819,3003CONSTRUCT TWO LANES AND SHOULDERS
0914-33-074CSTentativeApr 2019$9,922,5003RECONSTUCT THE STREET, MULTI-USE PATH, SIDEWALKS, CURB AND
3545-01-005FM 110TentativeMay 2019$38,343,4003CONSTRUCT TWO LANES AND SHOULDERS

Lee County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0473-02-037SH 21TentativeFeb 2019$4,108,8621LEVEL-UP, FULL DEPTH REPAIR AND TOM
0211-05-019US 77TentativeMay 2019$6,000,0001PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0334-05-031FM 141TentativeJan 2019$341,3601REPAIR, LEVEL-UP & SEAL COAT

Llano County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0547-01-026SH 261TentativeJul 2019$881,4008PROVIDE ADDITIONAL PAVED SURFACE WIDTH, MILLED EDGELINE

Mason County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0150-01-028SH 29TentativeNov 2018$650,0001FULL DEPTH REPAIR, SEAL AND TOM
0914-26-008CSTentativeApr 2019$1,060,0006REPLACE BRIDGE AND APPROACHES
0396-02-028SH 29TentativeSep 2018$1,198,2001REPAIR AND SEAL COAT
0071-05-030US 87TentativeNov 2018$3,572,0021FLEXIBLE BASE OVERLAY

Travis County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
1378-01-038RM 1431TentativeNov 2018$505,6008INSTALL CONTINUOUS TURN LANE, CONSTRUCT PAVED SHOULDERS
1535-01-012FM 1625TentativeJul 2019$860,0003REALIGN ROADWAY AND RELOCATE HIGHWAY INTERSECTION
1378-01-041RM 1431TentativeJul 2019$1,576,1001SLOW MOVING VEHICLE TURNOUTS
2689-01-023FM 2304TentativeJul 2019$10,000,0017RECONSTRUCT 5 LANE URBAN ROADWAY
2100-01-060RM 2222TentativeJul 2019$8,352,8562MOPERATIONAL IMPROVEMENTS & NEW CONNECTOR ROAD
2210-01-007RM 2322TentativeJun 2019$71,6008INSTALL EDGE/CENTERLINE PROFILE MARKINGS
0914-04-271CRTentativeMay 2019$200,0006REHAB BRIDGE & APPROACHES
0914-04-248CRTentativeJul 2019$700,0006REPLACE BRIDGE AND APPROACHES
3417-01-030FM 734TentativeJun 2019$85,4118LENGTHEN LEFT TURN LANE
2102-01-071RM 2244TentativeJan 2019$451,0001OVERLAY ROAD WITH EDGE MILLING
0151-06-141SL 111TentativeFeb 2019$1,820,9121MILL, SEAL AND 1.5" TY D
0015-11-064SL 275TentativeMar 2019$2,265,7901MILL, SEAL AND INLAY
0016-01-125SL 275TentativeJan 2019$560,0001TOM OVERLAY WITH EDGE MILLING
0914-00-411VATentativeFeb 2019$2,850,0001INSTALL OR REBUILD TRAFFIC SIGNALS
0914-04-243CSTentativeMay 2019$1,905,0003CONST BIKE/PED TRAIL WEST OF LAMAR TO IH 35
3417-01-029FM 734TentativeFeb 2019$2,633,6941PAVEMENT REPAIR, UNDERSEAL & OVERLAY
0914-00-400VATentativeMay 2019$1,750,0001FY 2019 SITE SPECIFIC SIGNALS
0151-06-143US 183TentativeAug 2019$500,000,0003ADD 2 EXPRESS LANES IN EACH DIRECTION
0113-13-162SL 360TentativeMar 2019$915,0006UPGRADE BRIDGE AND APPROACH RAILING
0683-04-020RM 3238TentativeDec 2018$4,645,0008PROVIDE ADDITIONAL PAVED SURFACE WIDTH,MILLED EDGELINE
0914-00-399VATentativeMar 2019$1,750,0001FY 2019 NON-SITE SPECIFIC SIGNALS
3417-03-021FM 734TentativeJul 2019$5,000,0001RECONSTRUCT EXISTING ROADWAY
0015-13-396IH 35TentativeApr 2019$23,595,4751RECONSTRUCT INTERSECTION
0914-04-273VATentativeMay 2019$2,818,5523CONSTRUCT BLAKE-MANOR SHARED USE PATH FOR USE BY BICYCLES &

Williamson County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0015-08-142IH 35TentativeMar 2019$12,243,1582MCONSTRUCT RAMPS AND CONVERT TO ONE WAY FRONTAGE ROADS
0683-01-056RM 620TentativeApr 2019$25,544,4052MCONSTRUCT RAILROAD GRADE SEPARATION STRUCTURE
2690-01-036FM 971TentativeJul 2019$17,585,0001REBUILD ROADWAY
0151-05-115US 183TentativeMar 2019$10,710,0003REALIGNMENT OF EXISTING US 183 TO OLD HWY 183. OLD 183 TO BE
0015-09-193IH 35TentativeApr 2019$10,427,2102MWIDEN NB FRONTAGE RD TO 3 LANES WITH ASSOCIATED PAVING, GRAD
0914-05-187CSTentativeMay 2019$7,100,0003RECONSTRUCT THE NORTH AND SOUTH AUSTIN AVENUE BRIDGES
1201-01-014FM 970TentativeJun 2019$4,697,5168WIDENING & SAFETY IMPROVEMENTS_TO INCLUDE IMPROVE GUARDRAIL
0914-05-191CRTentativeSep 2018$1,930,4153CONSTRUCT SHARED USE PATH
0914-05-190VATentativeSep 2018$418,7153SHARED USE PATH: ADJACENT TO ROADWAY
0151-04-070US 183TentativeJun 2019$600,0003CONSTRUCT MEDIAN AND LEFT TURN LANE
1566-01-011FM 1660TentativeFeb 2019$3,373,4791DEPTH REPAIR, UNDERSEAL & THIN OV
0914-05-132CRTentativeMay 2019$1,620,0006REHABILITATE BRIDGE AND APPROACHES
2103-01-033RM 2243TentativeOct 2018$394,0003ADDITION OF LEFT TURN LANE
0440-01-042SH 138TentativeDec 2018$7,633,3321ADD SHOULDERS & REHAB
0015-08-152IH 35TentativeOct 2018$2,500,0003CONSTRUCT NEW OVERPASS CROSSING IH 35 AT NORTHWEST BOULEVARD


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract