Letting Schedule for Beaumont District (FY 2019)

Last Update: Monday, August 20, 2018
Beaumont District (FY 2019)
Chambers | Hardin | Jasper | Jefferson | Liberty | Orange | Tyler |

Chambers County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0920-39-025VAApprovedNov 2018$1,297,7953CONSTRUCT SIDEWALKS0.0
2242-02-022FM 2354ApprovedNov 2018$5,847,7921ADD CENTER LEFT TURN LANE AND WIDEN SHOULDERS, ADD NB LEFT0.0
0508-02-120IH 10ApprovedNov 2018$38,262,2467CONSTRUCT OVERPASS AND RECONFIGURE INTERCHANGE0.0
0508-03-104IH 10ApprovedNov 2018$494,0068MILLED EDGELINE RUMBLE STRIPS, MILLED CENTERLINE RUMBLE0.0
0920-39-024VAApprovedNov 2018$1,296,2653INSTALL PEDESTRIAN ILLUMINATION0.0
1024-01-076FM 565TentativeApr 2019$599,8868PROVIDE ADDITIONAL PAVED SURFACE WIDTH. INSTALL MILLED0.0
1024-01-042FM 565TentativeMar 2019$5,790,00011RECONSTRUCT AND REALIGN EXISTING ROADWAY3.5
1024-01-072FM 565TentativeMar 2019$3,332,6908CONSTRUCT PAVED SHOULDERS, INSTALL CONTINUEOUS TURN LANE0.0

Hardin County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0200-10-067US 69TentativeJan 2019$2,500,0002UWIDEN EXISTING HIGHWAY TO 4 LANES WITH A CONTINUOUS LEFT2.5

Jasper County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0065-04-079US 96TentativeMay 2019$567,5966UPGRADE BRIDGE AND APPROACH RAILING0.0

Jefferson County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0508-04-168SH 73TentativeApr 2019$3,500,0001MILL AND OVERLAY0.0
0920-38-261CSTentativeMar 2019$5,087,4643CONSTRUCT OVERPASS INTO THE PORT OF BEAUMONT0.0
0065-07-062US 69TentativeMay 2019$21,471,4602UWIDEN FREEWAY FROM 4 TO 6 LANES0.0
0667-02-111FM 366TentativeApr 2019$584,4418IMPROVE TRAFFIC SIGNALS0.0
0200-14-086US 69TentativeMar 2019$2,000,00011REMOVE EXISTING CONCRETE, RECONSTRUCT, OVERLAY WITH SMA0.0
0932-02-052FM 365TentativeJun 2019$350,0006REPLACE BRIDGE AND APPROACHES0.0

Liberty County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
1061-01-032FM 1010ApprovedDec 2018$977,0608CONSTRUCT PAVED SHOULDERS(1-4'), MILLED EDGELINE RUMBLE0.0
0177-03-104US 59TentativeMar 2019$1,500,00011PFC MILL AND INLAY0.0
0028-05-054US 90ApprovedSep 2018$10,050,6411SEAL COAT (WEST BOUND)0.0
0177-03-096US 59ApprovedSep 2018$106,709,1591WIDEN TO 6 MAIN LANES WITH FRONTAGE ROADS7.5
0952-01-060FM 1008TentativeFeb 2019$3,000,0001WIDEN/TWO-COURSE SURFACE TREATMENT0.0
0920-02-094CRTentativeApr 2019$581,0006REPLACE BRIDGE AND APPROACHES0.0
0920-02-091CRTentativeMay 2019$176,2556REPLACE BRIDGE AND APPROACHES0.0

Orange County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0920-30-078CSTentativeJan 2019$3,000,0006REPLACE BRIDGE AND APPROACHES0.0
0710-02-068FM 105TentativeFeb 2019$4,400,0001MILL AND OVERLAY, JOINT SEAL0.0
0784-04-023FM 1131TentativeMar 2019$1,112,8278MODERNIZE BRIDGE RAIL AND APPROACH GUARDRAIL, SAFETY TREAT0.0

Tyler County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0200-08-056US 69TentativeFeb 2019$489,7378SAFETY TREAT FIXED OBJECTS0.0
0341-04-070US 287ApprovedDec 2018$7,000,0001OVERLAY EXISTING ROADWAY0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract