Letting Schedule for Dallas District (FY 2019)

Last Update: Monday, June 18, 2018
Dallas District (FY 2019)
Collin | Dallas | Denton | Ellis | Kaufman | Navarro | Rockwall |

Collin County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0047-09-036SH 5ApprovedOct 2018$15,361,4601SEAL COAT AND PAVEMENT MARKINGS0.0
0047-09-033SH 5TentativeDec 2018$1,286,9251MILL, BASE REPAIR, OVERLAY0.0
0047-06-165US 75TentativeMar 2019$902,5001FULL DEPTH CONCRETE REPAIR0.0
0816-04-096FM 455TentativeJan 2019$2,379,0831RECONSTRUCT EXISTING PAVEMENT AND ADD SHOULDERS0.0
0091-05-059SH 289TentativeJul 2019$3,780,5795WIDEN BRIDGE TO PROVIDE 2 LEFT TURN LANES FOR PGBT ENTRANCE0.0
0816-05-022FM 2862TentativeMay 2019$2,803,0958PROVIDE ADDITIONAL PAVED SURFACE0.0
0280-02-040SH 78TentativeJun 2019$12,602,7441RECONSTRUCT EXISTING PAVEMENT AND WIDEN SHOULDERS0.0
0816-04-050FM 455ApprovedSep 2018$3,740,4046REPLACE BRIDGE AND APPROACHES0.0
1392-01-041FM 1378TentativeMay 2019$3,815,7098PROVIDE ADDITIONAL PAVED SURFACE WIDTH0.0
0918-24-239CSTentativeAug 2019$700,0003CREATE A TMA THAT REDUCES DEMAND FOR AN OVER CAPACITY0.0

Dallas County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0918-00-206VATentativeMay 2019$1,150,0005REGIONAL ITS FUNDING POOL0.0
2208-02-022SS 303TentativeJan 2019$3,132,4191FULL DEPTH REPAIR CONCRETE PAVEMENT, OVERLAY AND PAVEMENT0.0
2374-04-060IH 20TentativeDec 2018$5,277,0157CONSTRUCT 0 TO 4 LANE FRONTAGE ROADS0.0
0918-00-287VATentativeMay 2019$685,4101WRONG WAY DRIVING IMPLEMENTATION TO PREVENT WRONG WAY0.0
0918-00-286VATentativeNov 2018$2,500,0001INSTALLATION OF TRAFFIC SIGNALS0.0
0047-07-230US 75TentativeFeb 2019$1,780,6058IMPROVE TRAFFIC SIGNALS0.0
0009-11-243IH 30TentativeFeb 2019$1,401,5111FULL DEPTH CONCRETE REPAIR ON EB FRONTAGE ROADS0.0
0918-47-115VAApprovedSep 2018$2,313,57310CONSTRUCT CURB RAMPS IN THE CITY OF DALLAS, ALONG SH 78,0.0
0095-13-043IH 20TentativeJun 2019$18,432,7651RUBBILIZE EXISTING CONCRETE PAVEMENT, OVERLAY, & PAVEMENT0.0
0430-01-060SH 352TentativeJun 2019$2,794,8468IMPROVE TRAFFIC SIGNALS0.0
0581-01-137SL 12TentativeJan 2019$3,950,0006REPLACE BRIDGE AND APPROACHES0.0
0047-07-235US 75TentativeJan 2019$305,5161FULL DEPTH CONCRETE REPAIR0.0
0353-05-121SL 12TentativeJun 2019$5,974,6518INSTALL ADVANCE WARNING SIGNS AND CHEVRONS, MODERNIZE BRIDGE0.0
0197-02-126US 175TentativeJun 2019$2,777,0671MILL, FULL DEPTH PVMT. REPAIR, ACP OVERLAY AND PAVEMENT0.0
2374-01-171IH 635TentativeJul 2019$69,377,0002MINTERCHANGE IMPROVEMENTS0.0
0009-02-069SH 78TentativeJan 2019$7,699,93859 INTERSECTION IMPROVEMENTS0.0
0009-11-245IH 30TentativeJan 2019$830,7911FULL DEPTH CONCRETE REPAIR0.0
0196-03-278IH 35ETentativeJul 2019$3,874,5731MILL, FULL DEPTH CONCRETE PAVEMENT REPAIR, OVERLAY ON THE0.0
0008-08-076SH 180TentativeApr 2019$1,165,0021MILL, OVERLAY AND FLEXIBLE PAVEMENT REPAIR ON FRONTAGE ROADS0.0
0918-47-243CSTentativeAug 2019$1,200,0003INTERSECTION IMPROVEMENTS INCLUDING TRAFFIC SIGNAL UPGRADES0.0
0918-47-139CSTentativeFeb 2019$4,284,9893TRINITY SKYLINE TRAIL - CONSTRUCT HIKE AND BIKE TRAIL0.0
0092-14-092IH 345TentativeFeb 2019$2,723,7701FULL DEPTH CONCRETE REPAIR ON FRONTAGE ROADS0.0
0092-01-052US 175TentativeMar 2019$74,453,6822MRECONSTRUCT FREEWAY TO 6 LANE DIVIDED ARTERIAL0.0
0918-47-062CSTentativeApr 2019$642,2146REPLACE BRIDGE AND APPROACHES5.5
0918-00-218VATentativeApr 2019$892,8193SUSTAINABLE DEVELOPMENT INITIATIVES; SAFETY AUDIT AND0.0
0918-47-178CSTentativeApr 2019$1,346,2603IMPROVE TRAFFIC SIGNALS0.0
0918-47-165CSTentativeAug 2019$2,570,5483PLEASANT RUN ROAD TRAIL - INSTALL BIKE/PEDESTRIAN TRAIL0.0
0092-02-129IH 45TentativeMay 2019$975,1331INSTALL GUIDE SIGNS0.0
0197-02-124US 175TentativeApr 2019$4,000,0001RAMP MODIFICATIONS0.0
2374-01-183IH 635TentativeJul 2019$385,988,6611WIDEN 8 TO 10 GENERAL PURPOSE LANES AND RECONSTRUCT 4/80.0
0918-00-282VATentativeAug 2019$500,0007CONDUCT A PILOT STUDY ON PARKING DEMAND & INNOVATIVE PARKING0.0
0092-07-060SH 356TentativeMay 2019$2,012,1311MILL, OVERLAY, AND FLEXIBLE PAVEMENT REPAIR ON FRONTAGE ROAD0.0
0353-04-106SS 348TentativeApr 2019$4,052,7301CONCRETE FULL DEPTH REPAIR, OVERLAY, & PAVEMENT MARKINGS0.0
0353-05-122SL 12TentativeApr 2019$9,030,1451MILL, CONCRETE FULL DEPTH REPAIR AND OVERLAY0.0
0918-47-142CSTentativeAug 2019$2,220,1093DELAWARE CREEK TRAIL CONNECTOR - CONSTRUCT HIKE & BIKE TRAIL0.0

Denton County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0081-03-063US 377TentativeJun 2019$2,252,1421CONSTRUCT GRADE SEPARATION ON PRAIRIE CREEK ROAD AT UPRR0.0
0918-46-283CSTentativeAug 2019$2,024,4733GARDEN RIDGE TRAIL - CONSTRUCT HIKE AND BIKE TRAIL0.0
0195-02-077IH 35TentativeFeb 2019$1,431,1171FULL DEPTH CONCRETE REPAIR0.0
0081-13-064IH 35WTentativeJul 2019$1,230,2916REPLACE BRIDGE AND APPROACH RAILING0.0
1310-01-027FM 407TentativeJun 2019$3,870,3046REPLACE BRIDGE AND APPROACHES0.0

Ellis County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0172-05-122US 287TentativeMar 2019$16,559,0941PAVEMENT REPAIR AND OVERLAY0.0
1211-02-019FM 984TentativeDec 2018$14,427,6301RECONSTRUCT EXISTING PAVEMENT AND ADD SHOULDERS0.0
0048-03-050US 77TentativeJun 2019$17,711,9026REPLACE BRIDGE AND APPROACHES0.0
0048-04-095IH 35ETentativeJan 2019$875,0001FULL DEPTH CONCRETE REPAIR0.0
0918-22-158CSTentativeJun 2019$011COMPENSATORY MITIGATION FOR REMOVAL OF HISTORIC US 770.0
0172-05-115US 287TentativeJun 2019$26,706,23911CONSTRUCT INTERCHANGE0.0
0092-05-051IH 45TentativeFeb 2019$3,000,0007CONSTRUCT INTERSECTION IMPROVEMENTS0.0

Kaufman County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0561-01-024SH 274TentativeApr 2019$3,901,2881MILL AND OVERLAY EXISTING ROADWAY0.0
0918-11-089CRTentativeJan 2019$649,0006REPLACE BRIDGE AND APPROACHES0.0
0197-05-058US 175TentativeDec 2018$646,23311CONSTRUCT AT GRADE CROSSING0.0
2815-01-008FM 2757TentativeFeb 2019$4,564,9811REHABILITATE EXISTING PAVEMENT AND ADD SHOULDERS0.0
0918-11-103VATentativeMar 2019$8,600,0003INTERSECTION IMPROVEMENTS, SIGNAL IMPROVEMENTS, AND NEW0.0
0918-11-090CRTentativeJan 2019$1,402,0426REPLACE BRIDGE AND APPROACHES0.0
2249-01-008FM 460TentativeMay 2019$1,721,1291RECONSTRUCT EXISTING PAVEMENT AND ADD SHOULDERS0.0
0095-14-029IH 20TentativeJun 2019$01RUBBILIZE EXISTING PAVEMENT AND OVERLAY0.0
0197-04-080US 175ApprovedSep 2018$6,243,3431MILL OVERLAY AND PAVEMENT MARKINGS (MAINLANES ONLY)0.0

Navarro County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0092-13-024BI 45-FTentativeNov 2018$10,088,6106REPLACE BRIDGE AND APPROACHES0.0
0121-08-019FM 55ApprovedOct 2018$13,794,0871REHABILITATE EXISTING PAVEMENT AND ADD SHOULDERS0.0
0918-18-132CSTentativeJan 2019$653,5243HUMPHREY SAFE ROUTES TO SCHOOL - CONSTRUCT SIDEWALKS0.0
0092-06-104IH 45TentativeJan 2019$1,268,3121FULL DEPTH CONCRETE PAVEMENT REPAIR0.0
0093-02-021SH 14TentativeApr 2019$4,970,2531PAVEMENT REPAIR, OVERLAY AND PAVEMENT MARKINGS0.0

Rockwall County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0009-04-071SH 66TentativeFeb 2019$1,000,0001FULL DEPTH CONCRETE PAVEMENT REPAIR0.0
2363-01-006FM 2453TentativeJan 2019$1,011,2008PROVIDE ADDITIONAL PAVED SURFACE WIDTH, MILLED EDGELINE0.0
1290-03-024SH 276ApprovedSep 2018$3,326,3291MILL, OVERLAY, FULL DEPTH REPAIR AND PAVEMENT MARKINGS0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract