Letting Schedule for Ft Worth District (FY 2019)

Last Update: Monday, May 20, 2019

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Ft Worth District (FY 2019)
Erath | Jack | Johnson | Palo Pinto | Parker | Somervell | Tarrant | Wise |

Erath County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0258-01-030SH 6TentativeAug 2019$0102017 RAILROAD GRADE CROSSING REPLANKING PROGRAM0.0
0902-49-071CSTentativeAug 2019$082017 FEDERAL RR SIGNAL PROGRAM0.0
0257-06-027SH 6ActualFeb 2019$5,363,1581CONSTRUCT SUPER 2 PASSING LANES0.0

Jack County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0171-01-034SH 199ApprovedJun 2019$4,904,8721RESURFACE ROADWAY3.0
0249-07-075US 281ApprovedJul 2019$2,661,4961RESURFACE ROADWAY0.0

Johnson County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0014-03-100IH 35WApprovedAug 2019$4,232,4318RESURFACE ROADWAY0.0
1513-02-042FM 4ApprovedAug 2019$2,637,5408CONSTRUCT FRONTAGE ROADS0.0
1094-04-016FM 731ActualSep 2018$1,974,1441REPAIR BASE FAILURES, HMAC OVERLAY, PAVEMENT MARKINGS1.5
0172-10-015US 287ActualFeb 2019$838,2661REPAIR BASE FAILURES, MILL, OVERLAY, PAVEMENT MARKINGS0.0

Palo Pinto County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0314-02-052IH 20ApprovedJun 2019$2,614,4501RESURFACE ROADWAY4.0
2839-01-012SH 337ActualSep 2018$152,0408MILLED EDGELINE & CENTERLINE RUMBLE STRIPS0.0
0007-10-066US 180ActualJan 2019$579,28011CLEAN DITCH AND LINE WITH ROCK GABION MATTRESS0.0
0249-08-044US 281ApprovedJun 2019$568,56611BICYCLE AND PEDESTRIAN IMPROVEMENTS3.0
2839-01-010SH 337ActualDec 2018$14,104,1971SEAL COAT MAIN LANES0.0
0362-07-009FM 2951ApprovedAug 2019$5,100,0001RESURFACE ROADWAY0.0

Parker County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0365-01-050SH 171ApprovedJul 2019$397,7903LANDSCAPE DEVELOPMENT0.0
1601-01-034FM 730ApprovedJun 2019$2,994,1781REHABILITATE EXISTING ROADWAY0.0
0902-38-126VAActualSep 2018$2,7713INSTALL MEMORIAL BRIDGE SIGNS (HUNTER CHASE CORZINE)0.0
1601-01-033FM 730ActualFeb 2019$567,8361SIGNAL IMPROVEMENTS INCLUDING CORRIDOR RETIMING &0.0
0314-07-069IH 20ActualApr 2019$1,223,2101FRONTAGE ROADS- REPAIR BASE FAILURES, MILL, HMAC OVERLAY,3.0
0313-02-059FM 51ActualMar 2019$6,808,8131REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS5.0
0313-02-061FM 51ApprovedMay 2019$0ROWCONSTRUCT NEW ROAD0.0
0313-02-057FM 51ActualMay 2019$21,001,8411CONSTRUCT NEW ROAD9.0

Somervell County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0259-02-051US 67ApprovedJul 2019$9,371,1548CONSTRUCT NEW ROAD7.0
0259-03-057US 67ActualJan 2019$2,052,6571REPAIR BASE FAILURES, MILL, TOM OVERLAY, PAVEMENT MARKINGS2.0

Tarrant County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0094-01-040SH 183ApprovedAug 2019$7,566,4591RESURFACE ROADWAY0.0
1068-01-218IH 30ApprovedJul 2019$0ROWCONSTRUCT CURB AND GUTTER0.0
1068-01-222IH 30ApprovedJul 2019$3,910,2346REHABILITATE BRIDGE0.0
0902-00-208VATentativeAug 2019$78,0007MAINTENANCE & OPERATIONS PROJECT0.0
0902-90-101VATentativeAug 2019$1,720,0003CONDUCT PLANNING STUDIES FOR REGION'S GOODS MOVEMENT PROGRAM0.0
0902-00-219VATentativeAug 2019$800,0001DEVELOPMENT OF A TRANSPORTATION SYSTEMS MANAGEMENT PROGRAM0.0
0902-90-118VATentativeAug 2019$500,0005PILOT PROGRAM TO IMPLEMENT FIXED AND FLEXIBLE STOP ROUTE0.0
0171-05-098SH 199ApprovedAug 2019$1,121,3701RESURFACE ROADWAY0.0
0902-90-037CSApprovedAug 2019$200,4448INSTALL TRAFFIC SIGNAL0.0
0902-90-100VAActualSep 2018$1,250,0003MAINTENANCE & OPERATIONS PROJECT0.0
0014-15-075US 81ApprovedAug 2019$534,9318HAZARD ELIMINATION & SAFETY0.0
0902-48-864CSTentativeAug 2019$2,240,4003SNIDER STREET EXTENSION/CONNECTION (2 LANES) WITH PEDESTRIAN0.0
1068-02-149IH 30ApprovedJul 2019$7,584,9631RESURFACE ROADWAY0.0
0902-00-216VAApprovedAug 2019$2,500,00010CONSTRUCT RAMPS5.0
2374-05-086IH 20ApprovedJul 2019$1,415,2911RESURFACE ROADWAY0.0
0081-01-051US 377ApprovedAug 2019$450,0001PREVENTIVE MAINTENANCE0.0
0902-90-056VATentativeAug 2019$50,0007ITS QUALITY IMPLEMENTATION - ENSURE EFFECTIVE USE OF ITS0.0
0902-90-090CSTentativeAug 2019$250,00082018 FEDERAL RR SIGNAL PROGRAM0.0
0902-90-039CSApprovedAug 2019$703,4088INSTALL TRAFFIC SIGNAL0.0
0902-90-042VATentativeAug 2019$25,0003DIRECT STATE CHARGES FOR TEX RAIL CONNECTION_PROJECTS0.0
0902-00-163VAApprovedAug 2019$1,918,7751REHABILITATE EXISTING ROADWAY0.0
0902-90-077VAApprovedAug 2019$7,246,1353BICYCLE AND PEDESTRIAN IMPROVEMENTS0.0
0902-90-089CSApprovedAug 2019$7,934,0873RECONSTRUCT EXISTING ROADWAY0.0
0902-90-074VATentativeAug 2019$5,000,0003MAINTENANCE & OPERATIONS PROJECT0.0
0902-90-091CSTentativeAug 2019$250,00082018 FEDERAL RR SIGNAL PROGRAM0.0
0353-03-102SH 114TentativeAug 2019$62,3343RELOCATE ITS FIBER OPTIC CABLE DUE TO CONFLICT WITH TEX RAIL0.0
0902-90-038CSApprovedAug 2019$2,739,5958INSTALL TRAFFIC SIGNAL0.0
0172-02-076BU 287-ApprovedAug 2019$1,537,6461RESURFACE ROADWAY0.0
0902-00-178VATentativeAug 2019$312,5007PROGRAM OVERSIGHT COORDINATION, INCLUDING DEPT STREAMLINING0.0
0902-90-093CSTentativeAug 2019$250,00082018 FEDERAL RR SIGNAL PROGRAM0.0
0902-90-092CSTentativeAug 2019$250,00082018 FEDERAL RR SIGNAL PROGRAM0.0
0902-90-088VAApprovedAug 2019$503,45711INSTALL/REPLACE SIGNS0.0
0902-90-094CSTentativeAug 2019$250,00082018 FEDERAL RR SIGNAL PROGRAM0.0
0902-00-175VAActualSep 2018$291,3503CONGESTION MGMT OPERATIONS & DATA ARCHIVING, REG ITS ARCH,0.0
0902-00-157VAActualSep 2018$1,120,0003CTRL STR DEV & ENF, TECH/FUEL EVAL, DATA/FEAS ANALYSES,0.0
0902-00-177VAActualSep 2018$1,000,0003TRAVEL SURVEY & DATA COLLECTION EFFORT TO PROVIDE TRAVEL0.0
0008-04-050US 377ApprovedJun 2019$1,785,0951RESURFACE ROADWAY0.0
0094-02-134SH 10ApprovedJun 2019$770,0003LANDSCAPE DEVELOPMENT0.0
0008-07-035SH 180ActualJan 2019$5,919,0841REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS0.0
0008-16-046IH 20ApprovedJul 2019$2,016,1431INSTALL ILLUMINATION0.0
0013-10-086BU 287-ApprovedJul 2019$465,3553LANDSCAPE DEVELOPMENT0.0
1068-01-221IH 30ApprovedJun 2019$1,575,6101RESURFACE ROADWAY5.0
0364-01-148SH 121ActualSep 2018$19,298,5141RECONSTRUCT SHOULDER FOR PEAK HOUR UTILIZATION6.0
0902-00-218VAApprovedJun 2019$5,156,7061REPLACE GUARDRAIL0.0
1068-01-229IH 30ActualMay 2019$71,2711BRIDGE MAINTENANCE0.0
0902-00-220VAActualFeb 2019$1,700,0001MANAGED LANE SYSTEM, IMPLEMENT TECHNOLOGY TO DETECT AUTO0.0
0363-01-143SH 26ActualMar 2019$2,662,5131REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS0.0
0902-90-114VAActualJan 2019$2,530,3833MOBILITY ASST PATROL THAT PROVIDES ASST TO STRANDED MOTORIST0.0
0902-90-052VAActualSep 2018$300,0003ITS EQUIPMENT UPGRADE FOR TECHNOLOGY ADVANCES0.0
0902-90-051VAActualSep 2018$300,0003ITS EQUIPMENT UPGRADES FOR TECHNOLOGY ADVANCES0.0
0902-90-113VAActualMar 2019$3,846,9311LONGLINE MULTIPOLYMER STRIPING (60 & 90 MIL); RAISED PVMT0.0
0902-00-215VAActualSep 2018$3,000,0003MANAGED LANE SYSTEM, IMPLEMENT TECHNOLOGY TO DETECT AUTO0.0
0902-00-214VAActualSep 2018$660,0003MULTIPURPOSE AUTOMATID VEHICLE DESIGN, DEVELOPMENT, TESTING,0.0
0902-00-186VAActualJan 2019$650,0007LAND USE/TRANS & BIKE/PED INIT INCL BIKE/PED PLANNING,0.0
0902-90-116CSActualMar 2019$4,378,9933INTERSECTION AND SIGNAL IMPROVEMENTS ALONG TRINITY BLVD &0.0
0008-13-238IH 20ActualApr 2019$2,240,58011REMOVE METAL BEAM GUARD FENCE AND INSTALL CONCRETE TRAFFIC4.5
0172-06-093SS 280ApprovedJul 2019$1,104,7341RESURFACE ROADWAY0.0
0902-00-188VAActualDec 2018$1,175,0003DEVELOP AND IMPLEMENT 511 TRAVELER INFORMATION SYSTEM0.0
1603-03-038FM 1709ApprovedAug 2019$947,3658INSTALL TRAFFIC SIGNAL0.0
0081-12-051IH 35WActualSep 2018$25,4353ROADWAY SIGN INSTALLATION0.0
0008-13-239IH 820ActualSep 2018$740,1511RECONSTRUCT DAMAGED RIPRAPS0.0
0902-90-097CSApprovedJul 2019$335,3743INSTALL TRAFFIC SIGNAL0.0
0364-01-154SH 121ApprovedJul 2019$1,283,8203LANDSCAPE DEVELOPMENT0.0
0902-00-166VAActualNov 2018$5,307,2001NON-SITE SPECIFIC TRAFFIC SIGNAL INSTALLATION3.5
0902-90-106VAApprovedJul 2019$4,347,3261INSTALL/REHABILITATE ITS0.0
1603-03-039FM 1709ApprovedAug 2019$5,151,3521RESURFACE ROADWAY0.0
1068-01-215IH 30ApprovedJul 2019$339,1061CONSTRUCT CURB AND GUTTER0.0
0902-90-107VAActualSep 2018$437,5003REDUCE AUTO TRIPS TO/AROUND CAMPUS, SUPPORT REMOTE PRKG LOTS0.0
0902-00-210VAApprovedJul 2019$670,0001UPGRADE DYNAMIC MESSAGE SIGN BOARDS0.0
0902-90-103VAActualDec 2018$3,035,8431NON SITE SPECIFIC ILLUMINATION0.0

Wise County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0902-20-099CRApprovedJul 2019$652,8296BRIDGE REPLACEMENT0.0
0134-06-052FM 1810ApprovedAug 2019$8,002,9281RESURFACE ROADWAY0.0
0816-01-014FM 455ApprovedJul 2019$3,408,0291REHABILITATE EXISTING ROADWAY0.0
1751-01-030FM 1655ActualMay 2019$242,1938HAZARD ELIMINATION & SAFETY0.0
0013-08-135US 81ApprovedJul 2019$1,108,3151RESURFACE ROADWAY0.0
1606-01-034FM 1658ApprovedAug 2019$91,6658HAZARD ELIMINATION & SAFETY0.0
0134-07-074US 380ActualSep 2018$3,1873INSTALL MEMORIAL HIGHWAY SIGNS (JAMES BENNETT)0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract