Letting Schedule for Houston District (FY 2019)

Last Update: Monday, June 18, 2018
Houston District (FY 2019)
Brazoria | Fort Bend | Galveston | Harris | Montgomery | Waller |

Brazoria County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0587-01-060FM 1495TentativeApr 2019$15,000,0001REPLACE BRIDGE AND APPROACHES (NBI# 12020058701003)0.0
2523-02-068FM 2004TentativeMar 2019$32,000,0001ADD SHOULDERS, WIDEN BRIDGES, REPLACE BRIDGE AT CHOCOLATE0.0
0178-03-157SH 35TentativeNov 2018$122,22510STABILIZE DITCH0.0
0587-01-063FM 1495ApprovedSep 2018$1,384,8821MILLING, 1.5" ACP OVERLAY AND PAVEMENT MARKINGS0.0
0188-03-019SH 36TentativeMay 2019$45,000,0002MWIDEN TO 4-LANE DIVIDED RURAL0.0
0912-31-293CSTentativeJun 2019$4,948,2423WIDEN TO 4 LANES0.0
0912-31-303CRTentativeJun 2019$17,062,0003RECONSTRUCT & WIDEN FROM 2 TO 4 LANES WITH RAISED MEDIAN,0.0
2524-02-025FM 2611TentativeAug 2019$9,628,4001ADD SHOULDERS, SEAL COAT AND 1.5 IN ACP OVERLAY0.0
0912-31-290CSTentativeMay 2019$32,000,0003CONSTRUCT 4 LANES DIVIDED ON NEW LOCATION0.0
0111-08-100SH 36TentativeJun 2019$8,500,0002MWIDEN TO 4-LANE DIVIDED RURAL0.0
0192-02-056SH 6TentativeJun 2019$321,8356REPLACE BEARING PADS (NBI# 12020019202029)0.0
0912-31-296CRTentativeJan 2019$1,623,0006REPLACE BRIDGE AND APPROACHES (NBI #12020AA0652001)0.0
0912-31-291VAApprovedOct 2018$3,632,8163CONSTRUCT GREEN TEE TERRACE BIKE AND PEDESTRIAN TRAIL0.0
0188-06-055SH 36TentativeDec 2018$010INSTALL NEW GROUPS OF PILES AND REINSTALL DOLPHINS0.0
0179-02-086SH 35TentativeDec 2018$010REMOVAL OF THE EXISTING ASPHALT SHOULDER AND REWORK SUBGRADE0.0
1524-01-083SH 288TentativeDec 2018$010BENCH SLOPE FAILURE,INSTALL SUITABLE FILL MATERIAL AND0.0
0598-02-110SH 288TentativeMar 2019$3,300,0001CONSTRUCT U-TURNS AND ACCELERATION/DECELERATION LANES0.0

Fort Bend County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0188-02-029SH 36TentativeJun 2019$59,400,0002MWIDEN TO 4-LANE DIVIDED RURAL0.0
3048-01-017FM 2977TentativeAug 2019$2,461,0001ADD LEFT TURN LANE AT SOME LOCATIONS, 1.5 IN ACP OVERLAY AND0.0
0188-01-039SH 36TentativeJun 2019$664,00013/4 IN ULTRA THIN BONDED WEAR COURSE OVERLAY0.0
0838-03-024FM 361TentativeMay 2019$6,050,0001ADD 4' SHOULDERS, BASE REPAIR, 2.0" ACP OVERLAY AND PAVEMENT0.0
0188-02-036SH 36TentativeMay 2019$38,300,0002MWIDEN TO 4-LANE DIVIDED RURAL0.0
0912-34-192VATentativeJul 2019$6,092,0003INSTALL WIRELESS TRAFFIC SIGNAL COMMUNICATION SYSTEM0.0
0271-05-048IH 10TentativeJul 2019$180,00310LANDSCAPE DEVELOPMENT0.0
2817-01-010FM 2759TentativeNov 2018$5,590,0001ADD 4' SHOULDERS, BASE REPAIR, 1.5" ACP OVERLAY, PAVEMENT0.0
0188-09-042FM 723TentativeAug 2019$10,000,0002MWIDEN FROM 2 TO 4 LANES0.0
0271-05-044IH 10ApprovedSep 2018$349,0291INSTALL PAVEMENT MARKINGS0.0
3510-04-055SH 99TentativeMar 2019$4,000,0003ADD 2 LANE SOUTH BOUND FRONTAGE ROAD0.0
0192-01-101SH 6TentativeJun 2019$06REPLACE BEARING PADS (NBI# 12080019201041)0.0
0912-34-200CSTentativeFeb 2019$010REMOVE AND REPLACE DAMAGED CONCRETE SLABS AND RIP RAP0.0
3510-04-054SH 99TentativeMar 2019$10,000,0003ADD 2 LANE SOUTH BOUND FRONTAGE ROAD0.0

Galveston County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0051-09-120FM 3005TentativeFeb 2019$3,640,0001BASE REPAIR, MILLING, SEAL COAT, 3/4 INCH TOM-F, 1 INCH0.0
0367-03-037SH 87TentativeFeb 2019$4,720,0001BASE REPAIR, MILLING AND 1.5" ACP OVERLAY0.0
0051-04-067SH 87TentativeJul 2019$4,434,0001BASE REPAIR, SEAL COAT, 1.5 IN ACP OVERLAY AND STRIPING0.0
0367-05-050SH 87TentativeMay 2019$25,000,00010CONSTRUCT NEW FERRY BOAT0.0
0500-04-105IH 45TentativeAug 2019$117,800,0002MRECONSTRUCT TO 8 MAIN LANES AND 2 2-LANE FRONTAGE ROADS0.0
0389-06-108SH 146ApprovedSep 2018$6,883,4421BASE REPAIR, MILLING, 1" CAM AND 1.5" ACP OVERLAY0.0
0912-73-183CRTentativeMay 2019$5,351,07110CONSTRUCT NEW ROADS,PARKING LOTS AND CAMPSITE PULLOUTS FOR0.0
0912-73-207CSTentativeMay 2019$1,756,0003MILL AND OVERLAY0.0
0912-73-216VATentativeMay 2019$2,400,0001UPGRADE MBGF0.0
0912-73-206CSApprovedSep 2018$499,9933CONSTRUCT DOWNTOWN PEDESTRIAN TRANSIT CONNECTIVITY0.0
0051-03-111SH 3TentativeMay 2019$1,280,0001BASE REPAIR, SEAL COAT, .75 IN TOM-F AND 1 IN TOM-C OVERLAY0.0
0051-09-024FM 3005TentativeMay 2019$42,000,0011INSTALL CROSS CULVERTS, DRIVEWAY ADJUSTMENTS, OUTFALL0.0

Harris County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0912-70-148CRTentativeDec 2018$86,50810REPLACE DAMAGED GENERATOR TUNNEL NO. 12-102-0AA9-96-0010.0
0912-72-363CSTentativeDec 2018$11,507,0003RECON ROADWAY INCLUDING CURB, GUTTER SIDEWALKS, LANDSCAPING,0.0
0912-72-534CRTentativeDec 2018$554,05910REPAIR BRIDGE (NBI#121020AA6100001)0.0
0028-01-098BU 90-UTentativeJan 2019$1,400,0001UPGRADE DRAINAGE STRUCTURES (EB & WB)0.0
0912-72-536CRTentativeAug 2019$03REHABILITATION OF EXISTING FERRY AND BERTHING FACILITIES.0.0
0912-70-093CSTentativeDec 2018$2,932,1316REPLACE BRIDGE AND APPROACHES (NBI# 12102B11625561)0.0
0912-00-554VATentativeJan 2019$2,000,0003REGIONAL ITS INFRASTRUCTURE - HARDWARE/SOFTWARE, UTILITIES0.0
0271-14-235IH 610TentativeJul 2019$750,00010LANDSCAPE DEVELOPMENT0.0
1685-05-110SH 6TentativeJan 2019$2,000,00011CONSTRUCT SIDEWALKS0.0
0720-03-141SH 249TentativeJul 2019$2,726,5531RAMP REVERSAL, TURNING IMPROVEMENTS AT NB FRTG RD AND SPRING0.0
2941-02-055FM 2920TentativeDec 2018$12,900,0001MILLING, 1.5" LEVEL-UP, 1.5" PFC, OCST AND PAVEMENT MARKINGS0.0
0027-13-212IH 69TentativeFeb 2019$5,449,0001UPGRADE HIGH MAST & UNDERPASS LIGHTING0.0
0389-05-124SH 146TentativeNov 2018$1,710,0431REMOVE MEDIAN RAIL W/FENCING AND REPLACE WITH CONCRETE0.0
0912-00-534VATentativeNov 2018$1,000,0001REHAB DMS BOARDS0.0
0912-72-299VATentativeNov 2018$1,261,4473MISSOURI KANSAS TEXAS TRAIL SPUR CONNECTOR0.0
0976-01-040FM 865TentativeAug 2019$302,5008ADD LEFT TURN LANE0.0
0912-00-530VATentativeOct 2018$3,000,0001ITS SUPPORT0.0
1258-04-063FM 1093TentativeJul 2019$14,144,00012.5" PLANING, SEAL COAT, 1" CAM, 1" TOM & PAVEMENT MARKINGS0.0
0912-72-387CSTentativeNov 2018$1,989,0003RECONSTRUCT BACK OF CURB INFRASTRUCTURE - SIDEWALKS, CURBS,0.0
0027-13-222IH 69TentativeJun 2019$5,350,0001UPGRADE HIGH MAST LIGHTING0.0
0912-72-340CRTentativeJul 2019$19,892,0003WIDEN TO 4-LANE DIVIDED ROADWAY INCLUDING BRIDGE ACROSS0.0
0912-00-532VATentativeDec 2018$1,200,0001TRAFFIC SIGNAL UPGRADES0.0
1062-04-058FM 2100TentativeJul 2019$22,000,0002MWIDEN TO 4-LANE DIVIDED0.0
0027-10-074US 90ATentativeDec 2018$010INSTALL NEW SHEET PILE PROTECTION0.0
0177-07-114IH 69TentativeDec 2018$300,0001BRIDGE DECK REPLACEMENT0.0
0050-09-095US 290TentativeJul 2019$1,000,00010LANDSCAPE DEVELOPMENT0.0
0912-00-476VATentativeMay 2019$2,500,0005COMMUTE SOLUTIONS PROGRAM IMPLEMENTATION (COMMUTER AND0.0
0912-00-556VATentativeMay 2019$8,000,0003REGIONAL FREEWAY INCIDENT MANAGEMENT - MOTORIST ASSISTANCE,0.0
0912-00-558VATentativeMay 2019$10,000,0003REGIONAL FREEWAY INCIDENT MANAGEMENT - TOWING (FY 2019)0.0
0389-13-061SH 146TentativeJun 2019$1,108,0246REPLACE BEARING PADS (NBI# 12102038903087)0.0
0508-01-369IH 10TentativeMay 2019$4,740,63310REPLACE/REPAIR FENDER, DOLPHINS, HIGHMAST POLES AND BRIDGE0.0
0508-01-353IH 10TentativeJun 2019$8,700,0006REPLACE BRIDGE AND APPROACHES0.0
0720-03-137SH 249TentativeMay 2019$2,995,0078IMPROVE TRAFFIC SIGNALS0.0
1258-04-065FM 1093TentativeMay 2019$12,901,0003RECONST BACK OF CURB INFRASTRUCTURE (WIDER SIDEWALKS, STREET0.0
1812-01-023FM 1942TentativeMay 2019$2,667,9451BASE REPAIR, MILLING, 1.5" ACP OVERLAY AND STRIPING0.0
3510-05-042SH 99TentativeMay 2019$200,0001INTERSECTION IMPROVEMENTS0.0
0027-13-234IH 69TentativeJun 2019$814,5596REPLACE BEARING PADS (NBI# 12102002713246)0.0
0271-15-090IH 610TentativeJun 2019$425,2343UPGRADE STORM SEWERS0.0
0912-72-533CRTentativeMay 2019$240,5453EROSION REPAIR (NBI 121020AA6999002 & 121020AA6999001)0.0
0271-14-237IH 610TentativeJun 2019$506,2376REPLACE BEARING PADS (NBI# 12102027114386)0.0
0508-01-359IH 10TentativeMay 2019$5,500,0003EB RAMPS REVERSAL0.0
1062-04-022FM 2100TentativeMar 2019$39,000,0002MWIDEN TO 4-LANE DIVIDED0.0
0912-72-543CRTentativeJun 2019$59,34710EROSION REPAIR (NBI 12102AA0816009)0.0
0912-72-542CRTentativeJun 2019$91,78310EROSION REPAIR (NBI 12102AA0193002 & 12102AA0193003)0.0
0912-72-371VATentativeMar 2019$9,417,0003TURN LNS, AUX LNS, RAISED MEDIANS & GEOMETRIC IMPROVEMENTS0.0
0500-03-594IH 45TentativeFeb 2019$2,500,0001MILLING, SEAL COAT, 1.5" LEVEL-UP AND 2" ACP OVERLAY0.0
3256-02-095SL 8TentativeJun 2019$4,560,1591RESTORATION OF EXIST FR S W/ PARTIAL & FULL DEPTH REP, CURB0.0
0981-01-110SH NASATentativeJun 2019$26,7498PROFILE CENTERLINE MARKINGS0.0
0912-72-360CSTentativeJun 2019$10,750,0003RECONSTRUCT ROADWAY0.0
0720-03-134SH 249TentativeJun 2019$4,300,0002MINSTALL ITS EQUIPMENT AND INFRASTRUCTURE0.0
0508-01-357IH 10TentativeJun 2019$2,459,0009CONSTRUCT SHARED USE PATH0.0
0912-72-373CSTentativeApr 2019$4,302,0003RECONSTRUCT ROADWAY TO INCLUDE DRAINAGE IMPROVEMENTS,0.0
0912-72-397VATentativeJun 2019$1,552,0003CONSTRUCT NEW 5 FT SIDEWALKS ALONG CITY OWNED ROADWAYS0.0
0051-02-101SH 3TentativeApr 2019$8,426,0009MILL AND ASPHALT OVERLAY OF SHOULDERS, SHOULDER WIDENING,0.0
0912-72-391CSTentativeJun 2019$17,132,0003RECONSTRUCT ROADWAY INCLUDING DRAINAGE, ACCESS MANAGEMENT &0.0
0912-72-314VAApprovedSep 2018$6,264,9013CONSTRUCT MULTI-USE PATH0.0

Montgomery County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
3538-01-035SH 242TentativeMay 2019$38,100,0002MWIDEN FROM 2 TO 4 LANES0.0
3538-01-053SH 242TentativeJul 2019$307,6246REPLACE BEARING PADS (NBI# 121700353801008)0.0
0110-02-024SH 75TentativeApr 2019$1,180,0001HOT MIX OVERLAY AND ADD SHOULDERS0.0
0177-05-113IH 69ApprovedSep 2018$800,0001CONSTRUCT DETENTION POND0.0
1062-01-217FM 1485TentativeDec 2018$010BRIDGE APPROACH SLAB REPAIR0.0
2897-01-017FM 830TentativeMar 2019$3,236,5301FULL DEPTH REPAIR, PAVEMENT MARKINGS AND 1.5 IN OVERLAY0.0
1912-02-014FM 2090TentativeMar 2019$1,930,4251FULL DEPTH REPAIR, PAVEMENT MARKINGS AND 2 IN OVERLAY0.0
0523-10-043FM 1488TentativeDec 2018$585,0001ADD RIGHT TURN LANE0.0
3538-01-036SH 242TentativeMay 2019$40,632,3082MWIDEN FROM 2 TO 4 LANES0.0

Waller County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0912-56-052VAApprovedOct 2018$1,598,6603CONSTUCT INSTERSECTION IMPROVEMENTS, SIDEWALKS, PEDESTRIAN0.0
0114-11-080US 290TentativeMar 2019$311,4198INSTALL MEDIAN BARRIER0.0
0114-11-079US 290TentativeApr 2019$1,275,39710BANK STABILZATION, EROSION CONTROL AND SHEET PILE0.0
1418-01-012FM 1489TentativeJul 2019$1,400,00011.5 IN ACP OVERLAY0.0
0114-11-082US 290TentativeMay 2019$1,045,5781CONSTRUCT UTURN0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract