Letting Schedule for June, 2019 County (FY 2019)

Last Update: Monday, January 14, 2019
June, 2019 (FY 2019)(see Links)
SEP 2018 | OCT 2018 | NOV 2018 | DEC 2018 | JAN 2019 | FEB 2019 | MAR 2019 | APR 2019 | MAY 2019 | JUN 2019 | JUL 2019 | AUG 2019 |
CCSJCounty/
District
HighwayLet StatusContract
Cost
Fund
Cat
DescriptionDBE Goal
0228-05-068Andrews/
Odessa
US 385Tentative$388,5368INSTALL INTERSECTION FLASHING BEACON, INSTALL ADVANCED0.0
0200-03-021Angelina/
Lufkin
US 69Tentative$34,900,0001WIDEN TO 4 LANES, DIVIDED, TRUNK SYSTEM0.0
0180-04-130Aransas/
Corpus Christi
SH 35Tentative$3,000,0001DEMOLITION OF EXISTING TIMBER STRUCTURE0.0
0291-07-034Bandera/
San Antonio
SH 16Tentative$5,252,0858INSTALL PROTECTION, WIDEN PAVEMENT SHOULDER TO 5 FT OR LESS,0.0
3115-01-011Bastrop/
Austin
FM 3000Tentative$352,3318IMPROVE GUARDRAIL, SAFETY TREAT FIXED OBJECTS0.0
2190-01-007Bastrop/
Austin
FM 2336Tentative$4,173,9828IMPROVE GUARDRAIL TO DESIGN STANDARDS, SAFETY TREAT FIXED0.0
0088-01-068Bee/
Corpus Christi
US 59Tentative$5,100,0001SPOT BASE REPAIR AND NOVACHIP ROADWAY0.0
0231-03-145Bell/
Waco
US 190Tentative$46,695,3671WIDEN FROM FOUR TO SIX LANES AND RESURFACE0.0
1198-03-010Bell/
Waco
FM 2670Tentative$2,604,0008PROVIDE ADDITIONAL PAVED SURFACE WIDTH, MILLED EDGELINE0.0
0915-12-609Bexar/
San Antonio
CSTentative$1,000,0003MULTIMODAL PLANNING STUDY ON ONE ARTERIAL TO ACCOMMODATE0.0
0915-12-601Bexar/
San Antonio
VATentative$1,500,0003INTELLIGENT TRANSPORTATION SYSTEMS - ENHANCEMENTS;0.0
0915-12-603Bexar/
San Antonio
VATentative$1,000,0003CONSTRUCT SIDEWALKS ALONG WEST SIDE OF JUDSON ROAD0.0
0915-12-509Bexar/
San Antonio
CRTentative$8,097,4803RECONSTRUCT AND WIDEN TO 4 LANES WITH SHOULDER, PEDESTRIAN0.0
0915-00-220Bexar/
San Antonio
VATentative$2,000,00010CONSTRUCT SIDEWALK, CURB RAMPS AND PEDESTRIAN IMPROVEMENTS0.0
1020-01-055Bowie/
Atlanta
FM 559Tentative$140,00010CONSTRUCT SIDEWALKS0.0
0945-01-042Bowie/
Atlanta
SH 93Tentative$400,00010CONSTRUCT SIDEWALKS0.0
0945-01-043Bowie/
Atlanta
SH 93Tentative$400,00010CONSTRUCT SIDEWALKS0.0
0111-08-100Brazoria/
Houston
SH 36Tentative$8,500,0002MWIDEN TO 4-LANE DIVIDED0.0
0912-31-303Brazoria/
Houston
CRTentative$17,062,0003RECONSTRUCT & WIDEN FROM 2 TO 4 LANES WITH RAISED MEDIAN,0.0
0475-01-056Brazos/
Bryan
OSRTentative$56,300,0001REHABILITATE EXISTING ROAD0.0
0102-07-045Brooks/
Pharr
SH 285Tentative$11,836,8941OVERLAY0.0
0220-05-079Cameron/
Pharr
US 281Tentative$195,3161OVERLAY0.0
0331-01-047Cameron/
Pharr
SH 100Tentative$449,3831OVERLAY0.0
0220-04-055Cameron/
Pharr
US 281Tentative$963,5201OVERLAY0.0
0083-08-053Camp/
Atlanta
SH 11Tentative$744,2148IMPROVE TRAFFIC SIGNALS, INSTALL PEDESTRIAN CROSSWALK0.0
1615-02-016Clay/
Wichita Falls
FM 1740Tentative$2,032,7038SAFETY TREAT FIXED OBJECTS, PROVIDE ADDL PAVED SURFACE WIDTH0.0
0280-02-040Collin/
Dallas
SH 78Tentative$12,242,0381REHABILITATE EXISTING PAVEMENT AND WIDEN SHOULDERS0.0
0470-01-028Comal/
San Antonio
FM 1863Tentative$14,992,3111SPOT BASE REPAIR, MILL, PFC INLAY AND PAVEMENT MARKINGS0.0
0016-04-117Comal/
San Antonio
IH 35Tentative$63,000,0001RAMP REVISIONS, INTERSECTION OPERATIONAL IMPROVEMENTS AND0.0
0845-03-064Cooke/
Wichita Falls
FM 922Tentative$4,548,1588SAFETY TREAT FIXED OBJECTS, PROVIDE ADDL PAVED SURFACE WIDTH0.0
2279-02-019Crockett/
San Angelo
US 190Tentative$3,000,00011REPLACE BRIDGE AND APPROACHES0.0
0003-01-055Culberson/
El Paso
IH 10Tentative$26,000,0009CONSTRUCT NEW SAFETY REST AREA0.0
0430-01-060Dallas/
Dallas
SH 352Tentative$2,794,6198IMPROVE TRAFFIC SIGNALS0.0
0581-02-152Dallas/
Dallas
SL 12Tentative$329,7091INSTALL MEDIAN CONCRETE BARRIERS0.0
0092-01-052Dallas/
Dallas
US 175Tentative$72,797,0262MRECONSTRUCT FREEWAY TO 6 LANE DIVIDED ARTERIAL0.0
0197-02-126Dallas/
Dallas
US 175Tentative$2,777,0671MILL, FULL DEPTH PVMT. REPAIR, ACP OVERLAY AND PAVEMENT0.0
0353-05-121Dallas/
Dallas
SL 12Tentative$5,974,6518INSTALL ADVANCE WARNING SIGNS AND CHEVRONS, MODERNIZE BRIDGE0.0
0081-03-063Denton/
Dallas
US 377Tentative$2,989,5421INSTALLATION OF TRAFFIC SIGNALS0.0
0007-06-264Eastland/
Brownwood
IH 20Tentative$957,4658INSTALL MEDIAN BARRIER0.0
0374-02-107El Paso/
El Paso
US 62Tentative$502,9145INTERSECTION OPERATIONAL IMPROVEMENTS MONTANA AVE AT AIRPORT0.0
0924-00-138El Paso/
El Paso
VATentative$875,00010FY 2019 GREEN RIBBON PROGRAM0.0
0172-05-115Ellis/
Dallas
US 287Tentative$24,125,56111CONSTRUCT INTERCHANGE0.0
0048-03-050Ellis/
Dallas
US 77Tentative$13,781,3106REPLACE BRIDGE AND APPROACHES0.0
0079-04-049Erath/
Ft Worth
US 67Tentative$1,200,0001REPAIR BASE FAILURES, REMOVE BRICK, MILL, HMAC OVERLAY,0.0
0259-01-036Erath/
Ft Worth
US 67Tentative$13,626,7501CONSTRUCT SUPER 2 PASSING LANES0.0
0909-38-082Falls/
Waco
CRTentative$816,0006REPLACE BRIDGE AND APPROACHES0.0
1498-01-008Fayette/
Yoakum
FM 1579Tentative$710,0006REPLACE BRIDGE AND APPROACHES0.0
0913-28-067Fayette/
Yoakum
CRTentative$763,0006REPLACE BRIDGE AND APPROACHES0.0
0317-01-037Fisher/
Abilene
FM 57Tentative$14,904,8401WIDEN ROADWAY AND STRUCTURES0.0
0188-02-029Fort Bend/
Houston
SH 36Tentative$96,057,0442MWIDEN TO 4-LANE DIVIDED RURAL0.0
0057-03-043Freestone/
Bryan
US 84Tentative$386,6608INSTALL MEDIAN BARRIER0.0
0301-06-018Frio/
San Antonio
SH 85Tentative$25,000,0001REHAB AND WIDEN TO PROVIDE PASSING LANES & OPERATIONAL0.0
0301-07-013Frio/
San Antonio
SH 85Tentative$28,720,00011REHAB AND WIDEN TO PROVIDE PASSING LANES & OPERATIONAL0.0
0301-03-027Frio/
San Antonio
SH 85Tentative$17,000,00011WIDEN TO PROVIDE PASSING LANES & OPERATIONAL IMPROVEMENTS0.0
0516-02-030Goliad/
Corpus Christi
SH 239Tentative$8,250,0001REHAB ROADWAY AND WIDEN0.0
0715-01-019Gonzales/
Yoakum
FM 108Tentative$3,900,0006REPLACE BRIDGE AND APPROACHES0.0
0901-19-193Grayson/
Paris
VATentative$999,906312-FOOT WIDE SHARED USE PATH ON AN ABANDONED UNION PACIFIC0.0
0901-19-180Grayson/
Paris
CRTentative$394,8876BRIDGE REPLACEMENT0.0
0045-03-051Grayson/
Paris
SH 56Tentative$1,341,7388IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS0.0
0366-03-068Guadalupe/
San Antonio
SH 123Tentative$20,500,0001REHABILITATE AND WIDEN TO ADD SHOULDERS0.0
0720-03-134Harris/
Houston
SH 249Tentative$4,300,0002MINSTALL ITS EQUIPMENT AND INFRASTRUCTURE0.0
0508-01-357Harris/
Houston
IH 10Tentative$2,459,0009CONSTRUCT SHARED USE PATH0.0
0389-13-061Harris/
Houston
SH 146Tentative$875,6226REPLACE BEARING PADS (NBI# 12102038903087)0.0
3256-02-095Harris/
Houston
SL 8Tentative$1,766,2121RESTORATION OF EXIST FR RD W/ FULL DEPTH REP, SC & TOM (1 ),0.0
0050-09-096Harris/
Houston
US 290Tentative$201,5386REPLACE BEARING PADS (NBI# 12102005009176)0.0
0027-13-234Harris/
Houston
IH 69Tentative$468,2216REPLACE BEARING PADS (NBI# 12102002713246)0.0
0027-13-222Harris/
Houston
IH 69Tentative$5,350,0001UPGRADE HIGH MAST LIGHTING0.0
0271-14-237Harris/
Houston
IH 610Tentative$635,3706REPLACE BEARING PADS (NBI# 12102027114386)0.0
3545-02-007Hays/
Austin
FM 110Tentative$11,924,7383CONSTRUCT TWO LANES AND SHOULDERS0.0
0039-02-063Hidalgo/
Pharr
US 83Tentative$126,000,0001CONSTRUCT CONTROLLED ACCESS FACILITY0.0
0596-01-021Hill/
Waco
FM 66Tentative$838,9578SAFETY TREAT FIXED OBJECTS0.0
0009-09-106Hopkins/
Paris
IH 30Tentative$4,291,1718IMPROVE GUARDRAIL TO DESIGN STANDARDS, SAFETY TREAT FIXED0.0
0171-01-034Jack/
Ft Worth
SH 199Tentative$6,700,0001REPAIR BASE FAILURES, OVERLAY, PAVEMENT MARKINGS0.0
1744-02-013Jackson/
Yoakum
FM 1862Tentative$4,590,0001REHABILITATE EXISTING ROADWAY0.0
0346-02-016Jackson/
Yoakum
SH 111Tentative$710,7508INCREASE SUPERELEVATION0.0
0368-02-045Jefferson/
Beaumont
SH 124Tentative$13,58410TS HARVEY EMERGENCY REPAIR DONE WITH 47Y002790.0
0100-06-065Karnes/
Corpus Christi
US 181Tentative$17,000,00011PAVEMENT REPAIR AND STRUCTURAL OVERLAY0.0
0095-05-059Kaufman/
Dallas
US 80Tentative$3,380,3831INSTALL MEDIAN CONCRETE BARRIERS0.0
0052-04-051Lamb/
Lubbock
US 84Tentative$284,6998SAFETY0.0
1145-01-044Leon/
Bryan
FM 1511Tentative$1,650,0006REPLACE EXISTING BRIDGE CONSISTING OF GRADING, STRUCTURES,0.0
0905-00-105Lubbock/
Lubbock
VATentative$2,849,23310PEDESTRIAN, SIDEWALKS, & CURB RAMPS0.0
0380-01-092Lubbock/
Lubbock
US 62Tentative$9,000,00011REHABILITATION OF EXISTING ROAD0.0
0905-00-095Lubbock/
Lubbock
VATentative$5,000,00011REHABILITATION OF EXISTING ROADWAY0.0
0222-05-048Marion/
Atlanta
SH 49Tentative$108,6488SAFETY LIGHTING AT INTERSECTION0.0
0062-05-062Marion/
Atlanta
US 59Tentative$6,434,9371REHABILITATE EXISTING 4 LANE DIVIDED HIGHWAY0.0
2311-01-041Mclennan/
Waco
SL 340Tentative$230,7808IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS0.0
0906-32-057Midland/
Odessa
CSTentative$545,2503CONSTRUCT BICYCLE LANES, CURB EXTENSIONS, AND MEDIAN AND0.0
0204-06-060Milam/
Bryan
US 79Tentative$1,388,0003SIDEWALK, RAMPS, BENCHES & LIGHT'G0.0
0262-07-041Milam/
Bryan
FM 1915Tentative$4,780,0001REHABILITATE EXISTING ROAD0.0
1767-03-018Montague/
Wichita Falls
FM 1816Tentative$2,631,4998SAFETY TREAT FIXED OBJECTS, PROVIDE ADDL PAVED SURFACE WIDTH0.0
2706-01-008Montague/
Wichita Falls
FM 2634Tentative$3,728,3998SAFETY TREAT FIXED OBJECTS, PROVIDE ADD'L PAVED SURFACE WIDT0.0
0176-01-081Nacogdoches/
Lufkin
US 59Tentative$77,247,9691CONSTRUCT 4 LANE DIRECT CONNECTION0.0
0028-09-121Orange/
Beaumont
IH 10Tentative$50,12110TS HARVEY EMERGENCY REPAIR DONE WITH 47Y002790.0
0249-08-044Palo Pinto/
Ft Worth
US 281Tentative$500,00011PEDESTRIAN & ADA IMPROVEMENTS0.0
0314-02-052Palo Pinto/
Ft Worth
IH 20Tentative$2,579,8461REPAIR BASE FAILURES, HMAC OVERLAY, PAVEMENT MARKINGS0.0
0365-01-050Parker/
Ft Worth
SH 171Tentative$356,0003REPLACE EXISTING PAVERS IN CENTER MEDIAN WITH LANDSCAPING0.0
0021-06-027Pecos/
Odessa
US 90Tentative$741,1468PROFILE EDGELINE MARKINGS, PROFILE CENTERLINE MARKINGS0.0
0901-27-045Red River/
Paris
CRTentative$381,9596BRIDGE REPLACEMENT0.0
0441-09-045Reeves/
Odessa
IH 10Tentative$368,0006UPGRADE BRIDGE AND APPROACH RAILING0.0
0908-19-025Scurry/
Abilene
CRTentative$1,371,6896REMOVE AND REPLACE EXISTING BRIDGE AND APPROACHES0.0
1682-01-014Shelby/
Lufkin
FM 1645Tentative$5,205,9161RECONSTRUCT AND WIDEN PAVEMENT0.0
0910-00-126Smith/
Tyler
VATentative$750,0001FY 2019 DISTRICT-WIDE THERMO PROGRAM #20.0
0259-03-055Somervell/
Ft Worth
US 67Tentative$7,500,0001CONSTRUCT SUPER 2 PASSING LANES0.0
3469-01-013Stephens/
Brownwood
FM 3099Tentative$2,178,0008PROVIDE ADDITIONAL PAVED SURFACE WIDTH, PROFILE PAVEMENT0.0
0172-06-093Tarrant/
Ft Worth
SS 280Tentative$2,150,1071REPAIR BASE FAILURES, OVERLAY, PAVEMENT MARKINGS0.0
0902-90-096Tarrant/
Ft Worth
CSTentative$452,8403IMPROVE TRAFFIC SIGNALS0.0
0172-02-076Tarrant/
Ft Worth
BU 287PTentative$1,537,6461REPLACE CONCRETE PAVEMENT AND STORM SEWER0.0
0094-02-134Tarrant/
Ft Worth
SH 10Tentative$770,0003INSTALLATION OF LANDSCAPING AND IRRIGATION WITHIN THE0.0
0902-00-210Tarrant/
Ft Worth
VATentative$670,0001REMOVAL/INSTALLATION OF DYNAMIC MESSAGE SIGNS ON EXISTING0.0
0008-04-050Tarrant/
Ft Worth
US 377Tentative$1,913,7031MILL AND OVERLAY0.0
0902-90-097Tarrant/
Ft Worth
CSTentative$225,7523INSTALL TRAFFIC SIGNAL0.0
0902-00-218Tarrant/
Ft Worth
VATentative$6,061,4751INSTALLATION OF CABLE BARRIER ON0.0
0902-90-099Tarrant/
Ft Worth
CSTentative$1,753,3183IMPROVE TRAFFIC SIGNALS0.0
2266-02-151Tarrant/
Ft Worth
SH 360Tentative$475,4048PROFILE EDGELINE MARKINGS0.0
1068-01-221Tarrant/
Ft Worth
IH 30Tentative$1,127,1011FRONTAGE ROADS; REPAIR BASE FAILURES, HMAC OVERLAY0.0
3559-02-009Tarrant/
Ft Worth
SH 170Tentative$137,6418CHANNELIZATION0.0
3417-01-030Travis/
Austin
FM 734Tentative$85,4118LENGTHEN LEFT TURN LANE0.0
0015-13-414Travis/
Austin
IH 35Tentative$294,81610LANDSCAPING AND IRRIGATION0.0
0113-08-088Travis/
Austin
US 290Tentative$656,7833CONSTRUCT RIGHT TURN DECEL LANE AND SIGNAL0.0
0922-11-043Val Verde/
Laredo
PWTentative$4,114,83010REHABILITATION OF EXISTING STATE PARK ROAD0.0
0108-02-034Van Zandt/
Tyler
SH 19Tentative$786,8648INSTALL SAFETY LIGHTING0.0
0913-09-088Wharton/
Yoakum
CRTentative$900,5006REPLACE BRIDGE AND APPROACHES0.0
0903-00-089Wichita/
Wichita Falls
VATentative$100,0001LANDSCAPE0.0
0327-07-043Willacy/
Pharr
BU 77-WTentative$1,500,0601OVERLAY0.0
1201-01-014Williamson/
Austin
FM 970Tentative$5,726,5398WIDENING & SAFETY IMPROVEMENTS_TO INCLUDE IMPROVE GUARDRAIL0.0
0683-01-056Williamson/
Austin
RM 620Tentative$23,418,2662MCONSTRUCT NEW 4-LN OVERPASS AT GEORGETOWN RR AND LAKE0.0
0320-04-027Williamson/
Austin
US 79Tentative$1,272,58910LANDSCAPING AND IRRIGATION OF THREE INTERCHANGES ON US 790.0
0902-20-097Wise/
Ft Worth
CRTentative$639,2206REPLACE BRIDGE AND APPROACHES0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract