Letting Schedule for Lufkin District (FY 2019)

Last Update: Monday, May 20, 2019

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Lufkin District (FY 2019)
Angelina | Houston | Nacogdoches | Polk | Sabine | San Augustine | San Jacinto | Shelby |

Angelina County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
2115-01-018FM 2251TentativeAug 2019$010REPLANK EXISTING RAILROAD CROSSING SURFACE0.0
0911-00-078VAActualOct 2018$1,340,3331INSTALL PROFILE PAVEMENT MARKINGS0.0
0200-03-028US 69ApprovedJun 2019$0ROWHIGHWAY IMPROVEMENT0.0
0911-00-076VAApprovedJul 2019$4,072,36110CONSTRUCT PEDESTRIAN INFRASTRUCTURE0.0
2507-01-020FM 326ApprovedJul 2019$4,818,60311HIGHWAY IMPROVEMENT0.0
0336-05-066SH 103ApprovedJul 2019$2,205,0516BRIDGE MAINTENANCE0.0
0200-01-091US 69ActualMar 2019$122,3611INSTALL TRAFFIC SIGNAL0.0
0336-03-071SH 103ActualMar 2019$1,219,82111WIDENING EXISTING PAVING FOR ADDITIONAL TURNING LANES5.0
0390-03-035SH 147ActualDec 2018$823,2228SAFETY TREAT FIXED OBJECTS (IMPROVE GUARDRAIL TO SAFETY6.0
0200-03-021US 69ApprovedJun 2019$32,735,7501HIGHWAY IMPROVEMENT4.0
0336-05-061SH 103ActualDec 2018$1,290,9791RESURFACE WITH THIN OVERLAY MIXTURE0.0

Houston County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0937-02-034FM 227ApprovedJul 2019$0ROWBRIDGE REPLACEMENT0.0
0937-02-030FM 227ApprovedJul 2019$1,363,0406BRIDGE REPLACEMENT0.0
2813-01-008FM 2781ActualOct 2018$4,279,8431RECONSTRUCT & WIDEN EXISTING PAVEMENT7.0
0635-03-025FM 228ActualNov 2018$3,635,5591RESURFACE WITH SEALCOAT0.0
0109-03-037US 287ActualMay 2019$1,125,5068HIGHWAY IMPROVEMENT0.0

Nacogdoches County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0911-08-047CRTentativeAug 2019$250,0008RAILROAD CROSSING IMPROVEMENTS0.0
0176-01-081US 59ApprovedJul 2019$159,532,1581HIGHWAY IMPROVEMENT0.0
2560-01-083SL 224ActualFeb 2019$1,603,3571RESURFACE WITH THIN OVERLAY MIXTURE0.0
1407-01-028FM 1275ActualMar 2019$783,0958SAFETY TREAT FIXED OBJECTS3.0
2590-02-010FM 2609ActualFeb 2019$3,997,74911RECONSTRUCT AND WIDEN PAVEMENT5.0
0138-06-044US 259ActualJan 2019$3,723,2581PLANE, OCST AND PERMEABLE FRICTION COURSE0.0

Polk County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0176-05-181US 59ActualJan 2019$3,685,5211PLANE, HMA & PERMEABLE FRICTION COURSE0.0
0176-05-183US 59ActualJan 2019$9,14210REPLACE ERODED EMBANKMENT AND REPLACE THE DAMAGED CONCRETE0.0
1876-01-037FM 1988ActualNov 2018$27,31010PLACE FLOWABLE FILL UNDER RIPRAP SLOPE TO FILL VOID AND TO0.0
1408-01-025FM 1276ActualNov 2018$128,13310EMERGENCY ROADWAY REPAIRS0.0
1408-01-026FM 1276ActualFeb 2019$106,78810REPAVE AND RETREAT FLEX BASE (ROUGHLY 1000 FT LONG)0.0
0177-01-104US 59ActualFeb 2019$23,72410EMERGENCY ROADWAY REPAIRS0.0
0177-01-106US 59ActualFeb 2019$18,96210REPLACE THRIEBEAM AND REESTABLISH THE SLOPE0.0
0911-04-092CSTentativeAug 2019$250,0008RAILROAD CROSSING IMPROVEMENTS0.0
0176-05-185US 59ActualFeb 2019$14,54410REESTABLISH THE EMBANKMENT TO PREVENT FURTHER EROSION0.0
1876-01-036FM 1988ActualNov 2018$116,15410REESTABLISH SLOPE NEAR COLUMNS, REPLACE STONE RIPRAP IN THE0.0
0176-05-187US 59TentativeAug 2019$31,01810REESTABLISH THE SLOPE, GRADE EDGE OF CHANNEL TO PREVENT0.0
0177-01-112US 59ApprovedAug 2019$155,4856BRIDGE MAINTENANCE0.0
0911-04-055VAApprovedAug 2019$1,718,56410HIGHWAY IMPROVEMENT0.0
0177-01-108US 59TentativeAug 2019$430,59410REPLACE DAMAGED RIPRAP AND REPAIR SLOPE FAILURE NEXT TO RIPR0.0
0176-05-184US 59ActualNov 2018$8,46810EMERGENCY EROSION REPAIRS0.0
0176-05-186US 59ActualNov 2018$1,85810EMERGENCY EROSION REPAIRS0.0
0213-04-048US 190TentativeAug 2019$250,0008RAILROAD CROSSING IMPROVEMENTS0.0
0341-02-048US 287TentativeAug 2019$600,0008RAILROAD CROSSING IMPROVEMENTS0.0
0911-04-076CRApprovedJul 2019$1,605,1446BRIDGE REPLACEMENT0.0

Sabine County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0064-05-061FM 1ActualDec 2018$2,056,9358SAFETY TREAT FIXED OBJECTS; PROVIDE ADDITIONAL PAVED SURFACE6.5
1510-01-022FM 1592ActualFeb 2019$3,91810EMERGENCY EROSION REPAIRS0.0
1510-01-023FM 1592ActualFeb 2019$23,01610REESTABLISH THE FRONT SLOPE ON THE WEST SIDE OF THE0.0
1679-01-015FM 276ActualNov 2018$11,41610EMERGENCY EROSION REPAIRS0.0
1679-01-016FM 276ActualFeb 2019$7,50910REESTABLISH THE SLOPE AT THE EAST ABUTMENT0.0
0064-06-055US 96ActualMay 2019$195,0706HIGHWAY IMPROVEMENT0.0

San Augustine County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
1079-01-036FM 705ActualSep 2018$72,13210BRIDGE EMBANKMENT AND CONCRETE RIPRAP RESTORED0.0
0064-03-021SH 147ActualOct 2018$2,214,4018PROFILE EDGELINE MARKINGS0.0
0118-12-019FM 353ActualJan 2019$212,88410EMERGENCY REPAIR ON CULVERT0.0
0911-30-030CRApprovedJul 2019$1,068,7346BRIDGE REPLACEMENT0.0

San Jacinto County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
3038-01-014FM 222ActualSep 2018$16,85310REPLACE RIPRAP UNDER BRIDGE AND FILL VOIDS BEHIND RIPRAP0.0
3038-01-013FM 222ActualSep 2018$87110EMERGENCY EROSION REPAIRS0.0
2829-02-008FM 2693ActualNov 2018$46,30510EMERGENCY ROADWAY REPAIRS0.0
0395-02-041SH 150ActualOct 2018$11,874,7331RECONSTRUCT PAVEMENT AND ADD PASSING LANES4.0
2829-02-009FM 2693ActualFeb 2019$128,01110REPLACE GUARDRAIL, REPLACE BASE MATERIAL AND PAVEMENT0.0
0395-02-044SH 150ActualNov 2018$90,64210EMERGENCY ROADWAY REPAIRS0.0
0177-02-098US 59ActualNov 2018$15,74610REPLACED FLOWABLE BACKFILL IN THE VOID AT THE ABUTMENT0.0
0177-02-099US 59ActualSep 2018$12,73710REESTABLISH THE ERODED SLOPE NEAR THE ABUTMENT AND PLACE0.0
0403-01-048SH 156ActualFeb 2019$15,99110REPAIR SLOPE FAILURES AND RESET GUARDRAIL0.0
0395-02-045SH 150ActualFeb 2019$34,98610REPLACE OR RESET GUARDRAIL, REPLACE FAILED MOW STRIP/REPLACE0.0
0395-02-046SH 150ActualNov 2018$9,22210EMERGENCY EROSION REPAIRS0.0
0403-01-049SH 156TentativeAug 2019$53,07610RE-ESTABLISH THE SLOPE AND RESET GUARDRAIL. CONCRETE RIRAP W0.0
0177-02-102US 59TentativeAug 2019$624,38610REPAIR PAVING EROSION, REPLACE DAMAGED MBGF AND REBUILD BACK0.0
0395-02-047SH 150ActualSep 2018$66,57910REPAVE SHOULDERS AND RESET GUARDRAILS POSTS.0.0
0403-01-047SH 156TentativeAug 2019$2,71010EMERGENCY ROADWAY REPAIRS_- SLOPE FAILURES0.0
0395-03-045SH 150ActualSep 2018$13,51610REPLACE RIPRAPUNDER BRIDGE AND REPLACE FLEXBASE ON ACCESS0.0

Shelby County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0059-05-045SH 7ActualNov 2018$10,363,0891HIGHWAY IMPROVEMENT0.0
0175-02-093US 84ActualMay 2019$1,390,8811RESURFACE ROADWAY0.0
0063-06-099US 96ApprovedAug 2019$1,033,1816BRIDGE MAINTENANCE0.0
1682-01-015FM 1645ApprovedJun 2019$5,798,1891HIGHWAY IMPROVEMENT5.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract