Letting Schedule for Lufkin District (FY 2019)

Last Update: Monday, December 16, 2019

Bid Tabulations Dashboard

Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months.

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Lufkin District (FY 2019)
Angelina | Houston | Nacogdoches | Polk | Sabine | San Augustine | San Jacinto | Shelby |

Angelina County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0911-00-078VAActualOct 2018$1,340,3331INSTALL PROFILE PAVEMENT MARKINGS0.0
0200-01-091US 69ActualMar 2019$122,3611INSTALL TRAFFIC SIGNAL0.0
0336-05-061SH 103ActualDec 2018$1,290,9791RESURFACE WITH THIN OVERLAY MIXTURE0.0
0390-03-035SH 147ActualDec 2018$823,2228SAFETY TREAT FIXED OBJECTS (IMPROVE GUARDRAIL TO SAFETY6.0
0336-03-071SH 103ActualMar 2019$1,219,82111WIDENING EXISTING PAVING FOR ADDITIONAL TURNING LANES5.0
0911-00-076VAActualJul 2019$4,277,91910CONSTRUCT PEDESTRIAN INFRASTRUCTURE12.0
0200-03-021US 69ActualJun 2019$32,816,7311HIGHWAY IMPROVEMENT4.5
2115-01-018FM 2251ActualAug 2019$72,00010RAILROAD CROSSING IMPROVEMENTS0.0
2507-01-020FM 326ActualJul 2019$3,876,89011HIGHWAY IMPROVEMENT8.0
0336-05-066SH 103ActualJul 2019$2,137,1536BRIDGE MAINTENANCE2.0

Houston County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0109-03-037US 287ActualMay 2019$1,125,5068HIGHWAY IMPROVEMENT0.0
0937-02-030FM 227ActualJul 2019$1,363,4506BRIDGE REPLACEMENT4.0
2813-01-008FM 2781ActualOct 2018$4,279,8431RECONSTRUCT & WIDEN EXISTING PAVEMENT7.0
0635-03-025FM 228ActualNov 2018$3,635,5591RESURFACE WITH SEALCOAT0.0

Nacogdoches County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
2560-01-083SL 224ActualFeb 2019$1,603,3571RESURFACE WITH THIN OVERLAY MIXTURE0.0
0138-06-044US 259ActualJan 2019$3,723,2581PLANE, OCST AND PERMEABLE FRICTION COURSE0.0
0176-01-081US 59ActualJul 2019$78,199,8781HIGHWAY IMPROVEMENT8.5
1407-01-028FM 1275ActualMar 2019$783,0958SAFETY TREAT FIXED OBJECTS3.0
2590-02-010FM 2609ActualFeb 2019$3,997,74911RECONSTRUCT AND WIDEN PAVEMENT5.0

Polk County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0177-01-112US 59ActualAug 2019$1,821,7246BRIDGE MAINTENANCE6.0
1876-01-037FM 1988ActualNov 2018$27,31010PLACE FLOWABLE FILL UNDER RIPRAP SLOPE TO FILL VOID AND TO0.0
0176-05-187US 59ActualAug 2019$31,01810EMERGENCY RELIEF0.0
0177-01-108US 59ActualAug 2019$430,59410EMERGENCY RELIEF0.0
1408-01-025FM 1276ActualNov 2018$128,13310EMERGENCY ROADWAY REPAIRS0.0
0176-05-184US 59ActualNov 2018$8,46810EMERGENCY EROSION REPAIRS0.0
0911-04-055VAActualAug 2019$1,552,86810HIGHWAY IMPROVEMENT0.0
1876-01-036FM 1988ActualNov 2018$116,15410REESTABLISH SLOPE NEAR COLUMNS, REPLACE STONE RIPRAP IN THE0.0
0176-05-185US 59ActualFeb 2019$14,54410REESTABLISH THE EMBANKMENT TO PREVENT FURTHER EROSION0.0
0177-01-106US 59ActualFeb 2019$18,96210EMERGENCY RELIEF0.0
0177-01-104US 59ActualFeb 2019$23,72410EMERGENCY RELIEF0.0
0176-05-186US 59ActualJul 2019$1,85810EMERGENCY RELIEF0.0
0911-04-076CRActualJul 2019$1,595,6546BRIDGE REPLACEMENT6.0
0176-05-183US 59ActualJan 2019$9,14210REPLACE ERODED EMBANKMENT AND REPLACE THE DAMAGED CONCRETE0.0
1408-01-026FM 1276ActualFeb 2019$106,78810REPAVE AND RETREAT FLEX BASE (ROUGHLY 1000 FT LONG)0.0
0176-05-181US 59ActualJan 2019$3,685,5211PLANE, HMA & PERMEABLE FRICTION COURSE0.0

Sabine County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
1679-01-015FM 276ActualNov 2018$11,41610EMERGENCY EROSION REPAIRS0.0
0064-06-055US 96ActualMay 2019$195,0706HIGHWAY IMPROVEMENT0.0
1510-01-022FM 1592ActualFeb 2019$3,91810EMERGENCY EROSION REPAIRS0.0
1679-01-016FM 276ActualFeb 2019$7,50910REESTABLISH THE SLOPE AT THE EAST ABUTMENT0.0
1510-01-023FM 1592ActualFeb 2019$23,01610REESTABLISH THE FRONT SLOPE ON THE WEST SIDE OF THE0.0
0064-05-061FM 1ActualDec 2018$2,056,9358SAFETY TREAT FIXED OBJECTS; PROVIDE ADDITIONAL PAVED SURFACE6.5

San Augustine County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
1079-01-036FM 705ActualSep 2018$72,13210BRIDGE EMBANKMENT AND CONCRETE RIPRAP RESTORED0.0
0911-30-030CRActualJul 2019$1,073,3246BRIDGE REPLACEMENT5.0
0118-12-019FM 353ActualJan 2019$212,88410EMERGENCY REPAIR ON CULVERT0.0
0064-03-021SH 147ActualOct 2018$2,214,4018PROFILE EDGELINE MARKINGS0.0

San Jacinto County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
2829-02-008FM 2693ActualNov 2018$46,30510EMERGENCY ROADWAY REPAIRS0.0
0403-01-048SH 156ActualFeb 2019$15,99110EMERGENCY RELIEF0.0
0395-02-044SH 150ActualNov 2018$90,64210EMERGENCY ROADWAY REPAIRS0.0
3038-01-013FM 222ActualSep 2018$87110EMERGENCY EROSION REPAIRS0.0
0395-02-046SH 150ActualNov 2018$9,22210EMERGENCY EROSION REPAIRS0.0
0177-02-099US 59ActualSep 2018$12,73710EMERGENCY RELIEF0.0
3038-01-014FM 222ActualSep 2018$16,85310REPLACE RIPRAP UNDER BRIDGE AND FILL VOIDS BEHIND RIPRAP0.0
0177-02-102US 59ActualAug 2019$624,38610EMERGENCY RELIEF0.0
0177-02-098US 59ActualNov 2018$15,74610REPLACED FLOWABLE BACKFILL IN THE VOID AT THE ABUTMENT0.0
2829-02-009FM 2693ActualFeb 2019$128,01110REPLACE GUARDRAIL, REPLACE BASE MATERIAL AND PAVEMENT0.0
0395-02-047SH 150ActualSep 2018$66,57910EMERGENCY RELIEF0.0
0395-03-045SH 150ActualSep 2018$13,51610REPLACE RIPRAPUNDER BRIDGE AND REPLACE FLEXBASE ON ACCESS0.0
0395-02-041SH 150ActualOct 2018$11,874,7331RECONSTRUCT PAVEMENT AND ADD PASSING LANES4.0
0395-02-045SH 150ActualFeb 2019$34,98610REPLACE OR RESET GUARDRAIL, REPLACE FAILED MOW STRIP/REPLACE0.0
0403-01-047SH 156ActualJul 2019$2,71010EMERGENCY RELIEF0.0

Shelby County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0059-05-045SH 7ActualNov 2018$10,988,0491HIGHWAY IMPROVEMENT0.0
1682-01-015FM 1645ActualJun 2019$5,798,1891HIGHWAY IMPROVEMENT5.0
0175-02-093US 84ActualMay 2019$1,390,8811RESURFACE ROADWAY0.0
0063-06-099US 96ActualAug 2019$3,692,3286BRIDGE MAINTENANCE6.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract