Letting Schedule for March, 2019 County (FY 2019)

Last Update: Monday, November 20, 2017
March, 2019 (FY 2019)(see Links)
SEP 2018 | OCT 2018 | NOV 2018 | DEC 2018 | JAN 2019 | FEB 2019 | MAR 2019 | APR 2019 | MAY 2019 | JUN 2019 | JUL 2019 | AUG 2019 |
CCSJCounty/
District
HighwayLet StatusContract
Cost
Fund
Cat
Description
0910-08-068Anderson/
Tyler
CRTentative$804,8306REPLACE BRIDGE AND APPROACHES
0265-04-062Bastrop/
Austin
SH 21Tentative$53,717,3442MCONSTRUCT FRONTAGE ROADS AND BRIDGE
1835-02-056Bell/
Waco
FM 1741Tentative$2,100,0001MILL AND OVERLAY
2523-02-068Brazoria/
Houston
FM 2004Tentative$32,000,0001ADD SHOULDERS, WIDEN BRIDGES, REPLACE BRIDGE AT CHOCOLATE
0515-03-051Calhoun/
Yoakum
FM 1090Tentative$1,000,0001REHABILITATE ROADWAY
1024-01-076Chambers/
Beaumont
FM 565Tentative$599,8868PROVIDE ADDITIONAL PAVED SURFACE WIDTH. INSTALL MILLED
3128-01-013Coryell/
Waco
FM 116Tentative$975,0003ADDITION OF ADA COMPLIANT SIDEWALKS AND BICYCLE LANES
0092-01-052Dallas/
Dallas
US 175Tentative$74,453,6822MRECONSTRUCT FREEWAY TO 6 LANE DIVIDED ARTERIAL
2374-01-185Dallas/
Dallas
IH 635Tentative$600,0003CONSTRUCT 2 LANE CROSSOVER BETWEEN EB AND WB FRONTAGE ROADS
0906-00-176Ector/
Odessa
VATentative$1,000,0001PAVEMENT MARKINGS
0906-00-177Ector/
Odessa
VATentative$1,000,0001PAVEMENT MARKINGS
0079-04-049Erath/
Ft Worth
US 67Tentative$1,200,0001REPAIR BASE FAILURES, REMOVE BRICK, MILL, HMAC OVERLAY,
0913-28-072Fayette/
Yoakum
CRTentative$585,0006REPLACE BRIDGE AND APPROACHES
0323-02-034Fayette/
Yoakum
SH 95Tentative$10,000,0001REHABILITATE ROADWAY AND ADD SHOULDERS
0913-28-066Fayette/
Yoakum
CRTentative$546,0006REPLACE BRIDGE AND APPROACHES
0558-06-016Glasscock/
San Angelo
RM 33Tentative$3,800,59811RESTORATION OF EXISTING ROAD
0047-18-081Grayson/
Paris
US 75Tentative$1,250,0001REPAIR SLOPE FAILURE AND ROADWAY
0096-09-077Harrison/
Atlanta
US 80Tentative$635,6828IMPROVE TRAFIC SIGNAL
0632-04-032Harrison/
Atlanta
FM 451Tentative$2,482,8008PROVIDE ADDITIONAL PAVED SURFACE WIDTH, MILLED EDGELINE
1064-01-032Hidalgo/
Pharr
FM 676Tentative$14,956,1701WIDEN TO 4 LANE DIVIDED
0921-02-194Hidalgo/
Pharr
CSTentative$9,448,85834 LANE WITH LEFT TURN LANE
0254-07-007Jim Wells/
Corpus Christi
US 281Tentative$6,300,0001SPOT BASE REPIAR AND OVERLAY
2417-02-016Johnson/
Ft Worth
FM 2331Tentative$2,246,9201REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS,
0712-01-041Johnson/
Ft Worth
FM 4Tentative$1,900,7031RESTORE AND PRESERVE BRICK PAVEMENT
0136-07-050Lamar/
Paris
BU 271BTentative$1,936,3811MILL AND OVERLAY
0916-29-014Live Oak/
Corpus Christi
CRTentative$806,5806REPLACE BRIDGE AND APPROACHES
0006-02-115Nolan/
Abilene
IH 20Tentative$7,000,0001MILL AND FILL WITH SPOT PAVEMENT REPAIR
0916-00-212Nueces/
Corpus Christi
VATentative$1,500,0001DISTRICT WIDE SMALL SIGN REPLACEMENT 2019 PLAN CSJ
0007-10-061Palo Pinto/
Ft Worth
US 180Tentative$2,700,0001REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS
0247-03-032Panola/
Atlanta
US 79Tentative$3,328,4018INSTALL CONTINUOUS TURN LANE, MILLED EDGELINE RUMBLE STRIPS
0176-04-083Polk/
Lufkin
US 59Tentative$37,9908INSTALL ADVANCE INTERSECTION WARNING SIGNALS-EXISTING
0904-11-061Randall/
Amarillo
VATentative$42,000,0001B-2 FRT RDS PHASE I: CONSTRUCT FRT RDS FOR FUTURE FREEWAY
0246-01-034Rusk/
Tyler
US 79Tentative$5,000,0001REPAIR & RESURFACE ROADWAY
0911-30-030San Augustine/
Lufkin
CRTentative$1,312,8606REPLACE BRIDGE AND APPROACHES
0203-08-016Smith/
Tyler
FM 1253Tentative$1,777,6168INSTALL PROFILE EDGELINE & CENTERLINE MARKINGS
0910-16-140Smith/
Tyler
CRTentative$605,2006REPLACE BRIDGE AND APPROACHES
0910-16-039Smith/
Tyler
CSTentative$681,3806REPLACE BRIDGE AND APPROACHES
0902-48-893Tarrant/
Ft Worth
CSTentative$779,0216BRIDGE REPLACEMENT
0363-03-052Tarrant/
Ft Worth
SH 121Tentative$7,203,4481REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS
0363-01-143Tarrant/
Ft Worth
SH 26Tentative$727,5831REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS
0699-01-055Taylor/
Abilene
FM 89Tentative$2,500,0001MILL AND OVERLAY
0699-01-054Taylor/
Abilene
FM 89Tentative$500,0001SEALCOAT
3404-01-016Titus/
Atlanta
FM 3417Tentative$1,472,6498PROVIDE ADDITIONAL PAVED SURFACE WIDTH, MILLED EDGELINE
0010-06-042Titus/
Atlanta
US 67Tentative$2,457,4608SAFETY TREAT FIXED OBJECTS
0914-00-399Travis/
Austin
VATentative$1,750,0001FY 2019 NON-SITE SPECIFIC SIGNALS
0113-13-162Travis/
Austin
SL 360Tentative$915,0006UPGRADE BRIDGE AND APPROACH RAILING
0015-11-064Travis/
Austin
SL 275Tentative$2,265,7901MILL, SEAL AND INLAY
0341-04-070Tyler/
Beaumont
US 287Tentative$4,250,0001OVERLAY EXISTING ROADWAY
0903-00-094Wichita/
Wichita Falls
VATentative$450,00011SIGNS, SIGNALS AND ILLUMINATION
0015-08-142Williamson/
Austin
IH 35Tentative$12,243,1582MCONSTRUCT RAMPS AND CONVERT TO ONE WAY FRONTAGE ROADS
0151-05-115Williamson/
Austin
US 183Tentative$10,710,0003REALIGNMENT OF EXISTING US 183 TO OLD HWY 183. OLD 183 TO BE
0401-03-026Wood/
Tyler
SH 154Tentative$1,441,7268INSTALL PROFILE EDGELINE MARKINGS
0910-35-033Wood/
Tyler
CRTentative$412,1256REPLACE BRIDGE AND APPROACHES
1390-03-005Wood/
Tyler
FM 1254Tentative$1,318,8006REPLACE BRIDGE & APPROACHES


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract