Letting Schedule for March, 2019 County (FY 2019)

Last Update: Monday, June 18, 2018
March, 2019 (FY 2019)(see Links)
SEP 2018 | OCT 2018 | NOV 2018 | DEC 2018 | JAN 2019 | FEB 2019 | MAR 2019 | APR 2019 | MAY 2019 | JUN 2019 | JUL 2019 | AUG 2019 |
CCSJCounty/
District
HighwayLet StatusContract
Cost
Fund
Cat
DescriptionDBE Goal
0910-08-068Anderson/
Tyler
CRTentative$804,8306REPLACE BRIDGE AND APPROACHES0.0
0336-03-071Angelina/
Lufkin
SH 103Tentative$1,133,89711WIDENING EXISTING PAVING FOR ADDITIONAL TURNING LANES0.0
0017-04-042Atascosa/
San Antonio
IH 35Tentative$01BASE REPAIR, SEALCOAT, OVERLAY & PAVEMENT MARKINGS ON0.0
0265-04-062Bastrop/
Austin
SH 21Tentative$42,706,5162MCONSTRUCT TWO NEW COLORADO RIVER 2-LN FRONTAGE ROAD BRIDGES0.0
1835-02-056Bell/
Waco
FM 1741Tentative$2,100,0001MILL AND OVERLAY0.0
0184-03-040Bell/
Waco
SH 53Tentative$2,500,0001MILL AND INLAY0.0
2452-03-123Bexar/
San Antonio
SL 1604Tentative$01BASE REPAIR, SEALCOAT, OVERLAY & PAVEMENT MARKINGS ON0.0
2523-02-068Brazoria/
Houston
FM 2004Tentative$32,000,0001ADD SHOULDERS, WIDEN BRIDGES, REPLACE BRIDGE AT CHOCOLATE0.0
0598-02-110Brazoria/
Houston
SH 288Tentative$3,300,0001CONSTRUCT U-TURNS AND ACCELERATION/DECELERATION LANES0.0
0515-03-051Calhoun/
Yoakum
FM 1090Tentative$1,000,0001PAVEMENT REPAIR AND RESURFACING0.0
0921-06-313Cameron/
Pharr
CSTentative$11,300,0007EXPANSION OF PRIMARY LANES FOR PASSENGER VEHICLES0.0
0921-06-314Cameron/
Pharr
CSTentative$350,00074 LNNE URBAN ROADWAY0.0
0921-06-315Cameron/
Pharr
CSTentative$1,786,5157ROADWAY STUDY0.0
0047-06-165Collin/
Dallas
US 75Tentative$902,5001FULL DEPTH CONCRETE REPAIR0.0
0016-04-115Comal/
San Antonio
IH 35Tentative$01BASE REPAIR, SEALCOAT, OVERLAY & PAVEMENT MARKINGS ON0.0
0903-15-085Cooke/
Wichita Falls
CRTentative$1,140,0006REPLACE BRIDGE AND APPROACHES0.0
3128-01-013Coryell/
Waco
FM 116Tentative$975,0003ADDITION OF ADA COMPLIANT SIDEWALKS AND BICYCLE LANES0.0
0092-01-052Dallas/
Dallas
US 175Tentative$74,453,6822MRECONSTRUCT FREEWAY TO 6 LANE DIVIDED ARTERIAL0.0
0941-02-019Dewitt/
Yoakum
FM 952Tentative$1,200,0006REPLACE BRIDGE AND APPROACHES0.0
0906-00-176Ector/
Odessa
VATentative$1,000,0001PAVEMENT MARKINGS0.0
0906-00-177Ector/
Odessa
VATentative$1,000,0001PAVEMENT MARKINGS0.0
0172-05-122Ellis/
Dallas
US 287Tentative$16,559,0941PAVEMENT REPAIR AND OVERLAY0.0
0079-04-049Erath/
Ft Worth
US 67Tentative$1,200,0001REPAIR BASE FAILURES, REMOVE BRICK, MILL, HMAC OVERLAY,0.0
0909-38-081Falls/
Waco
CRTentative$1,604,0006REPLACE BRIDGE AND APPROACHES0.0
0323-02-034Fayette/
Yoakum
SH 95Tentative$10,000,0001REHABILITATE ROADWAY; ACP OVERLAY AND ADD SHOULDERS0.0
0913-28-066Fayette/
Yoakum
CRTentative$273,0006REPLACE BRIDGE AND APPROACHES0.0
3510-04-055Fort Bend/
Houston
SH 99Tentative$4,000,0003ADD 2 LANE SOUTH BOUND FRONTAGE ROAD0.0
3510-04-054Fort Bend/
Houston
SH 99Tentative$10,000,0003ADD 2 LANE SOUTH BOUND FRONTAGE ROAD0.0
0228-02-048Gaines/
Lubbock
US 62Tentative$10,000,0001RESTORATION OF ROADWAY0.0
0558-06-016Glasscock/
San Angelo
RM 33Tentative$3,800,5981RESTORATION OF EXISTING ROAD0.0
0047-18-081Grayson/
Paris
US 75Tentative$1,250,0001REPAIR SLOPE FAILURE AND ROADWAY0.0
1062-04-022Harris/
Houston
FM 2100Tentative$39,000,0002MWIDEN TO 4-LANE DIVIDED0.0
0912-72-371Harris/
Houston
VATentative$9,417,0003TURN LNS, AUX LNS, RAISED MEDIANS & GEOMETRIC IMPROVEMENTS0.0
0096-09-077Harrison/
Atlanta
US 80Tentative$635,6828IMPROVE TRAFIC SIGNAL0.0
0632-04-032Harrison/
Atlanta
FM 451Tentative$2,482,8008PROVIDE ADDITIONAL PAVED SURFACE WIDTH, MILLED EDGELINE0.0
0698-03-095Hidalgo/
Pharr
FM 88Tentative$2,132,3808SAFETY LIGHTING0.0
0080-04-097Hood/
Ft Worth
US 377Tentative$1,913,7031REPAIR BASE FAILURES, OVERLAY, PAVEMENT MARKINGS0.0
0200-14-086Jefferson/
Beaumont
US 69Tentative$2,000,00011REMOVE EXISTING CONCRETE, RECONSTRUCT, OVERLAY WITH SMA0.0
0100-05-001Karnes/
Corpus Christi
US 181Tentative$06BRIDGE MAINTENANCE0.0
0918-11-103Kaufman/
Dallas
VATentative$8,600,0003INTERSECTION IMPROVEMENTS, SIGNAL IMPROVEMENTS, AND NEW0.0
0142-02-029Kerr/
San Antonio
IH 10Tentative$01BASE REPAIR, SEALCOAT, OVERLAY & PAVEMENT MARKINGS ON0.0
0142-12-019Kerr/
San Antonio
IH 10Tentative$01BASE REPAIR, SEALCOAT, OVERLAY & PAVEMENT MARKINGS ON0.0
0136-07-050Lamar/
Paris
BU 271BTentative$2,333,4531MILL AND OVERLAY0.0
0273-01-065Lampasas/
Brownwood
US 183Tentative$011REHAB ROADWAY0.0
0251-05-062Lampasas/
Brownwood
US 183Tentative$011MILL AND ACP OVERLAY0.0
0177-03-104Liberty/
Beaumont
US 59Tentative$1,500,00011PFC MILL AND INLAY0.0
0074-01-055Live Oak/
Corpus Christi
IH 37Tentative$1,600,0001REHAB AND WIDEN-WEST FRTG LANES ONLY0.0
0916-29-014Live Oak/
Corpus Christi
CRTentative$1,100,0006REPLACE BRIDGE AND APPROACHES0.0
0150-04-047Llano/
Austin
SH 29Tentative$5,000,00011CONSTRUCT SUPER 2 PASSING LANES0.0
0909-22-181Mclennan/
Waco
VATentative$515,8003CONSTRUCTION OF SIDEWALKS AND STRIPING OF BICYCLE LANES0.0
0017-05-094Medina/
San Antonio
IH 35Tentative$01BASE REPAIR, SEALCOAT, OVERLAY & PAVEMENT MARKINGS ON0.0
2897-01-017Montgomery/
Houston
FM 830Tentative$3,236,5301FULL DEPTH REPAIR, PAVEMENT MARKINGS AND 1.5 IN OVERLAY0.0
1912-02-014Montgomery/
Houston
FM 2090Tentative$1,930,4251FULL DEPTH REPAIR, PAVEMENT MARKINGS AND 2 IN OVERLAY0.0
1407-01-028Nacogdoches/
Lufkin
FM 1275Tentative$807,4368SAFETY TREAT FIXED OBJECTS0.0
0006-03-135Nolan/
Abilene
IH 20Tentative$4,100,0001OVERLAY0.0
0006-02-115Nolan/
Abilene
IH 20Tentative$7,000,0001MILL AND FILL WITH SPOT PAVEMENT REPAIR0.0
0006-03-136Nolan/
Abilene
IH 20Tentative$926,6408INSTALL MEDIAN BARRIER0.0
0916-00-212Nueces/
Corpus Christi
VATentative$1,500,0001DISTRICT WIDE SMALL SIGN REPLACEMENT 2019 PLAN CSJ0.0
0030-02-052Ochiltree/
Amarillo
US 83Tentative$15,380,00011OVERLAY0.0
0030-02-053Ochiltree/
Amarillo
US 83Tentative$2,056,0228IMPROVE TRAFFIC SIGNALS & INTERCONNECT SIGNALS0.0
0784-04-023Orange/
Beaumont
FM 1131Tentative$1,112,8278MODERNIZE BRIDGE RAIL AND APPROACH GUARDRAIL, SAFETY TREAT0.0
0247-03-032Panola/
Atlanta
US 79Tentative$4,252,3838INSTALL CONTINUOUS TURN LANE, MILLED EDGELINE RUMBLE STRIPS0.0
0313-02-059Parker/
Ft Worth
FM 51Tentative$7,275,7991REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS0.0
0246-01-034Rusk/
Tyler
US 79Tentative$5,000,0001REPAIR & RESURFACE ROADWAY0.0
0910-16-140Smith/
Tyler
CRTentative$800,0006REPLACE BRIDGE AND APPROACHES0.0
0203-08-016Smith/
Tyler
FM 1253Tentative$1,777,6168INSTALL PROFILE EDGELINE & CENTERLINE MARKINGS0.0
0910-16-039Smith/
Tyler
CSTentative$681,3806REPLACE BRIDGE AND APPROACHES0.0
0363-03-052Tarrant/
Ft Worth
SH 121Tentative$7,203,4481REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS0.0
0902-48-893Tarrant/
Ft Worth
CSTentative$779,0216BRIDGE REPLACEMENT0.0
0172-06-093Tarrant/
Ft Worth
SS 280Tentative$2,150,1071REPAIR BASE FAILURES, OVERLAY, PAVEMENT MARKINGS0.0
0363-01-143Tarrant/
Ft Worth
SH 26Tentative$727,5831REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS0.0
0014-01-025Tarrant/
Ft Worth
BU 287PTentative$309,4878IMPROVE TRAFFIC SIGNALS0.0
0699-01-055Taylor/
Abilene
FM 89Tentative$2,500,0001MILL AND OVERLAY0.0
0010-06-042Titus/
Atlanta
US 67Tentative$4,704,3528SAFETY TREAT FIXED OBJECTS0.0
0914-00-399Travis/
Austin
VATentative$1,750,0001FY 2019 NON-SITE SPECIFIC SIGNALS0.0
0113-13-162Travis/
Austin
SL 360Tentative$915,0006UPGRADE BRIDGE AND APPROACH RAILING0.0
0520-05-050Upshur/
Atlanta
SH 155Tentative$5,000,0001RESURFACE EXSTING 2-LANE ROADWAY0.0
0114-11-080Waller/
Houston
US 290Tentative$311,4198INSTALL MEDIAN BARRIER0.0
0043-08-078Wichita/
Wichita Falls
US 287Tentative$589,3808INSTALL ADVANCE WARNING SIGNS (CURVE), HIGH FRICTION SURFACE0.0
0043-20-021Wilbarger/
Wichita Falls
BU 287FTentative$156,2738INSTALL SIDEWALKS0.0
2211-02-030Williamson/
Austin
FM 1460Tentative$122,0003INSTALL MEDIAN BREAK AND LEFT TURN LANE0.0
0015-08-142Williamson/
Austin
IH 35Tentative$11,023,0102MCONVERT EXISTING 2-LANE NB & SB 2-WAY FRONTAGE ROADS TO 2-LN0.0
0401-03-026Wood/
Tyler
SH 154Tentative$1,441,7268INSTALL PROFILE EDGELINE MARKINGS0.0
1390-03-005Wood/
Tyler
FM 1254Tentative$1,318,8006REPLACE BRIDGE & APPROACHES0.0
0910-35-033Wood/
Tyler
CRTentative$412,1256REPLACE BRIDGE AND APPROACHES0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract