Letting Schedule for May, 2019 County (FY 2019)

Last Update: Monday, October 22, 2018
May, 2019 (FY 2019)(see Links)
SEP 2018 | OCT 2018 | NOV 2018 | DEC 2018 | JAN 2019 | FEB 2019 | MAR 2019 | APR 2019 | MAY 2019 | JUN 2019 | JUL 2019 | AUG 2019 |
CCSJCounty/
District
HighwayLet StatusContract
Cost
Fund
Cat
DescriptionDBE Goal
0548-01-034Andrews/
Odessa
SH 176Tentative$11,457,4118CONSTRUCT OVERPASS0.0
0915-13-029Atascosa/
San Antonio
CRTentative$124,0326REPLACE BRIDGE AND APPROACHES0.0
1721-01-009Austin/
Yoakum
FM 1094Tentative$11,452,0001ADD SHOULDER0.0
0015-05-050Bell/
Waco
SH 317Tentative$158,7898IMPROVE AND INTERCONNECT TRAFFIC SIGNALS0.0
0398-04-074Bell/
Waco
SH 317Tentative$384,3228IMPROVE AND INTERCONNECT TRAFFIC SIGNALS0.0
0915-12-580Bexar/
San Antonio
VATentative$1,500,0003INTELLIGENT TRANSPORTATION SYSTEMS - ENHANCEMENTS0.0
3544-04-002Bexar/
San Antonio
SH 211Tentative$18,100,0013CONSTRUCT TWO LANE RURAL HIGHWAY ON NEW LOCATION0.0
0915-12-544Bexar/
San Antonio
CSTentative$7,323,3513EXPAND FROM 2 TO 4 LANES, INCLUDING DRAINAGE IMPROVEMENTS,0.0
0915-12-520Bexar/
San Antonio
CSTentative$7,800,0003REHAB AND REALIGN ROADWAY, INTERSECTION AND FLOOD CONTROL0.0
0915-12-578Bexar/
San Antonio
CSTentative$8,632,5613WIDEN TO PROVIDE OPERATIONAL IMPROVEMENTS, BIKE LANES,0.0
0915-12-566Bexar/
San Antonio
CSTentative$1,816,6258IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTION0.0
0915-12-562Bexar/
San Antonio
CRTentative$4,886,1163EXPAND FROM 2 TO 4 LANES, INCLUDING DRAINAGE IMPROVEMENTS,0.0
0915-12-595Bexar/
San Antonio
VATentative$6,000,0003EXTEND THE ALAZAN CREEK SECTION OF THE GREENWAY TRAIL SYSTEM0.0
0915-12-550Bexar/
San Antonio
CSTentative$17,177,0003CONSTRUCT ENTRANCE & EXIT RAMPS BETWEEN HARRY WURZBACH AND0.0
0915-12-579Bexar/
San Antonio
VATentative$2,000,0003CONSTRUCT CITYWIDE PEDESTRIAN AND BICYCLE IMPROVEMENTS0.0
0915-00-211Bexar/
San Antonio
VATentative$1,817,9507INSTALL ADVANCED SIGNAL CONTROLLERS, NETWORKING EQUIPMENT0.0
0915-00-200Bexar/
San Antonio
VATentative$2,000,0001DISTRICTWIDE ITS OPERATION AND MAINTENANCE FY 20190.0
0915-00-209Bexar/
San Antonio
VATentative$3,000,0001INTERSECTION OPERATIONAL IMPROVEMENTS0.0
0915-00-210Bexar/
San Antonio
VATentative$7,000,0001INTERSECTION OPERATIONAL IMPROVEMENTS0.0
0912-31-290Brazoria/
Houston
CSTentative$32,000,0003CONSTRUCT 4 LANES DIVIDED ON NEW LOCATION0.0
0912-31-296Brazoria/
Houston
CRTentative$1,623,0006REPLACE BRIDGE AND APPROACHES (NBI #12020AA0652001)0.0
1414-02-017Brazoria/
Houston
FM 528Tentative$010REMOVE EXISTING RIP RAP BRINGING IN FILL MATERIAL TO REPAIR0.0
0914-22-061Caldwell/
Austin
VATentative$2,120,6487CALDWELL COUNTY STPMM SET-ASIDE0.0
0006-07-080Callahan/
Abilene
IH 20Tentative$6,700,0001MILL & SMA OVRLAY0.0
1065-02-040Cameron/
Pharr
FM 1846Tentative$010UPGRADE RAILROAD CROSSING PLANKING0.0
0198-07-015Cherokee/
Tyler
SH 204Tentative$1,818,9298INSTALL PROFILE EDGELINE MARKINGS0.0
0816-05-022Collin/
Dallas
FM 2862Tentative$2,803,0958PROVIDE ADDITIONAL PAVED SURFACE0.0
1392-01-041Collin/
Dallas
FM 1378Tentative$5,774,2298PROVIDE ADDITIONAL PAVED SURFACE WIDTH0.0
0915-17-066Comal/
San Antonio
CSTentative$1,516,7113CONSTRUCT SIDEWALKS, RAMPS, & OTHER PEDESTRIAN RELATED0.0
8408-15-006Comal/
San Antonio
MHTentative$4,493,1106REHABILITATE BRIDGE & APPROACHES0.0
0915-17-067Comal/
San Antonio
CSTentative$357,0006REPLACE BRIDGE AND APPROACHES0.0
0903-15-103Cooke/
Wichita Falls
CRTentative$610,0006REPLACE BRIDGE AND APPROACHES0.0
0229-03-037Crane/
Odessa
US 385Tentative$30,000,00011WIDENING TO AN ULTIMATE 4-LANE DIVIDED HIGHWAY0.0
0003-01-055Culberson/
El Paso
IH 10Tentative$26,000,0009CONSTRUCT NEW SAFETY REST AREA0.0
0918-00-287Dallas/
Dallas
VATentative$685,4101WRONG WAY DRIVING IMPLEMENTATION TO PREVENT WRONG WAY0.0
0092-07-060Dallas/
Dallas
SH 356Tentative$2,012,1311MILL, OVERLAY, AND FLEXIBLE PAVEMENT REPAIR ON FRONTAGE ROAD0.0
0092-02-129Dallas/
Dallas
IH 45Tentative$975,1331INSTALL GUIDE SIGNS0.0
0228-06-087Ector/
Odessa
US 385Tentative$602,0378IMPROVE TRAFFIC SIGNALS0.0
0924-06-560El Paso/
El Paso
CSTentative$2,143,9133CONSTRUCTION OF SHARED USE PEDESTRIAN AND BICYCLE FACILITY A0.0
1281-02-007El Paso/
El Paso
FM 1110Tentative$15,500,0003CONSTRUCT AND UPGRADE TO 4 LANE DIVIDED ARTERIAL7.5
0924-06-548El Paso/
El Paso
VATentative$736,6783PEDESTRIAN ENHANCEMENTS TO INCLUDE SIDEWALKS, ADA PEDESTRIAN0.0
0924-06-542El Paso/
El Paso
VATentative$1,259,9143BICYCLE CONNECTIVITY INFRASTRUCTURE, PHASE 10.0
2552-02-028El Paso/
El Paso
SL 375Tentative$46,926,3951WIDEN FROM 4 TO 6 LANES ON MAINLANES AND CONSTRUCT 2 LANE0.0
2552-01-057El Paso/
El Paso
SL 375Tentative$6,990,0001FULL DEPTH REHAB0.0
0924-06-539El Paso/
El Paso
CSTentative$1,297,0003CONSTRUCTION OF ROUNDABOUT AT PAESO DEL NORTE POE0.0
0909-38-080Falls/
Waco
CRTentative$1,070,0006REPLACE BRIDGE AND APPROACHES0.0
0174-04-033Fannin/
Paris
FM 100Tentative$1,483,8708TEXTURIZE SHOULDERS, PROFILE PAVEMENT MARKERS0.0
0913-28-067Fayette/
Yoakum
CRTentative$763,0006REPLACE BRIDGE AND APPROACHES0.0
0838-03-024Fort Bend/
Houston
FM 361Tentative$6,050,0001ADD 4' SHOULDERS, BASE REPAIR, 2.0" ACP OVERLAY AND PAVEMENT0.0
0205-06-032Freestone/
Bryan
US 79Tentative$377,5278INSTALL INTERSECTION FLASHING BEACON0.0
0367-06-062Galveston/
Houston
SH 87Tentative$6,65510REPLACE DAMAGED LIGHTNING ROD PROTECTION AND MICROWAVE0.0
0367-05-050Galveston/
Houston
SH 87Tentative$25,000,00010CONSTRUCT NEW FERRY BOAT0.0
0051-09-024Galveston/
Houston
FM 3005Tentative$42,000,0011INSTALL CROSS CULVERTS, DRIVEWAY ADJUSTMENTS, OUTFALL0.0
0051-03-111Galveston/
Houston
SH 3Tentative$1,280,0001BASE REPAIR, SEAL COAT, .75 IN TOM-F AND 1 IN TOM-C OVERLAY0.0
0912-73-216Galveston/
Houston
VATentative$2,400,0001UPGRADE MBGF0.0
0912-73-207Galveston/
Houston
CSTentative$1,756,0003MILL AND OVERLAY0.0
0912-73-183Galveston/
Houston
CRTentative$5,351,07110CONSTRUCT NEW ROADS,PARKING LOTS AND CAMPSITE PULLOUTS FOR0.0
0913-22-046Gonzales/
Yoakum
CRTentative$420,0596REPLACE BRIDGE AND APPROACHES0.0
0047-02-147Grayson/
Paris
SH 91Tentative$780,3848IMPROVE TRAFFIC SIGNALS0.0
0047-02-139Grayson/
Paris
SS 503Tentative$474,4178MILLED EDGELINE RUMBLE STRIPS, MILLED CENTERLINE RUMBLE0.0
0495-07-082Gregg/
Tyler
IH 20Tentative$500,0001REHABILITATE SOUTH FRONTAGE ROAD0.0
0366-12-030Guadalupe/
San Antonio
BS 123BTentative$1,090,8208IMPROVE TRAFFIC SIGNALS0.0
0915-46-046Guadalupe/
San Antonio
VATentative$2,801,2463EXTEND WALNUT SPRINGS MULTI USE TRAIL, INCLUDING RETAINING0.0
0508-01-371Harris/
Houston
IH 10Tentative$010RECONSTRUCT FRONTAGE ROAD,DRAINAGE AND REPAIR BRIDGE0.0
0508-01-369Harris/
Houston
IH 10Tentative$4,740,63310REPLACE/REPAIR FENDER, DOLPHINS, HIGHMAST POLES AND BRIDGE0.0
0912-72-534Harris/
Houston
CRTentative$554,05910REPAIR BRIDGE (NBI#121020AA6100001)0.0
0912-72-533Harris/
Houston
CRTentative$240,5453EROSION REPAIR (NBI 121020AA6999002 & 121020AA6999001)0.0
0912-72-562Harris/
Houston
CSTentative$37,80010REPLACE FIBER OPTIC CABLE0.0
0912-70-148Harris/
Houston
CRTentative$86,50810REPLACE DAMAGED GENERATOR TUNNEL NO. 12-102-0AA9-96-0010.0
0720-03-137Harris/
Houston
SH 249Tentative$2,995,0078IMPROVE TRAFFIC SIGNALS0.0
0912-00-476Harris/
Houston
VATentative$2,500,0005COMMUTE SOLUTIONS PROGRAM IMPLEMENTATION (COMMUTER AND0.0
0912-70-093Harris/
Houston
CSTentative$2,932,1316REPLACE BRIDGE AND APPROACHES (NBI# 12102B11625561)0.0
0912-00-556Harris/
Houston
VATentative$8,000,0003REGIONAL FREEWAY INCIDENT MANAGEMENT - MOTORIST ASSISTANCE,0.0
0508-01-359Harris/
Houston
IH 10Tentative$5,500,0003EB RAMPS REVERSAL0.0
0271-14-238Harris/
Houston
IH 610Tentative$1,579,49010INSTALL SHEET PILING TO PROTECT THE SLOPE0.0
0027-13-233Harris/
Houston
IH 69Tentative$46,64610REBUILD RETAINING WALL AND REPLACE FILL BEHIND DRILL SHAFT0.0
0912-72-563Harris/
Houston
CSTentative$33,70510REPAIR WASHOUT & HEADWALLS OF WOOD TIMBER BRIDGE AND0.0
3256-03-100Harris/
Houston
SL 8Tentative$160,57610RESTORE SATELLITE BUILDING0.0
3510-05-042Harris/
Houston
SH 99Tentative$200,0001INTERSECTION IMPROVEMENTS0.0
1812-01-023Harris/
Houston
FM 1942Tentative$2,667,9451BASE REPAIR, MILLING, 1.5" ACP OVERLAY AND STRIPING0.0
0208-02-045Harrison/
Atlanta
SH 43Tentative$7,425,0001REHABILITATION & WIDEN EXISTING 2-LANE ROADWAY0.0
0495-08-117Harrison/
Atlanta
IH 20Tentative$1,011,6316BRIDGE PREVENTATIVE MAINTENANCE0.0
0495-08-116Harrison/
Atlanta
IH 20Tentative$1,700,0001REHABILITATE SOUTH FRONTAGE ROAD0.0
3545-02-008Hays/
Austin
FM 110Tentative$14,435,8513CONSTRUCT TWO LANES AND SHOULDERS0.0
3545-02-007Hays/
Austin
FM 110Tentative$11,924,7383CONSTRUCT TWO LANES AND SHOULDERS0.0
3545-01-005Hays/
Austin
FM 110Tentative$32,056,5673CONSTRUCT NEW 2 LANE ROADWAY AND SHOULDERS0.0
0914-33-068Hays/
Austin
CRTentative$17,144,0423CONSTRUCT NEW 2-LANE ROADWAY WITH A GRADE SEPARATION AT0.0
0039-02-070Hidalgo/
Pharr
US 83Tentative$5,600,0001REHABILITATE ROADWAY0.0
0864-01-078Hidalgo/
Pharr
FM 494Tentative$113,40010UPGRADE RAILROAD CROSSING PLANKING0.0
0048-09-029Hill/
Waco
IH 35ETentative$92,978,4671RECONSTRUCT AND WIDEN FROM 4 LANES TO 6 LANES, RECONSTRUCT0.0
0109-03-037Houston/
Lufkin
US 287Tentative$1,051,4768INSTALL WARNING SIGNS/STOPSIGNS AND INSTALL PAVEMENT0.0
0002-06-055Hudspeth/
El Paso
IH 10Tentative$1,809,6908INSTALL LED FLASHING CHEVRONS (CURVE), IMPROVE GUARDRAIL TO0.0
0009-13-171Hunt/
Paris
IH 30Tentative$250,4138IMPROVE GUARDRAIL TO DESIGN STANDARDS0.0
0065-04-079Jasper/
Beaumont
US 96Tentative$567,5966UPGRADE BRIDGE AND APPROACH RAILING0.0
0065-07-062Jefferson/
Beaumont
US 69Tentative$22,000,0012UWIDEN FREEWAY FROM 4 TO 6 LANES0.0
0014-03-100Johnson/
Ft Worth
IH 35WTentative$2,673,0031RAMP ADJUSTMENTS, DRAINAGE, SEAL COAT, PAVEMENT MARKINGS;0.0
2249-01-008Kaufman/
Dallas
FM 460Tentative$1,721,1291REHABILITATION OF EXISTING PAVEMENT AND ADD SHOULDERS0.0
0142-15-026Kendall/
San Antonio
IH 10Tentative$5,500,0001COMPLETE EB/WB FRONTAGE RDS & CONVERT TO ONE WAY OPERATION,0.0
0102-04-105Kleberg/
Corpus Christi
US 77Tentative$5,900,0001OVERLAY ROADWAY0.0
0133-03-046Knox/
Childress
US 82Tentative$4,426,92511REHABILITATION OF EXISTING ROADWAY0.0
0045-09-101Lamar/
Paris
US 82Tentative$1,191,9088IMPROVE GUARDRAIL TO DESIGN STANDARDS0.0
1690-01-120Lamar/
Paris
US 271Tentative$261,1568CLOSE CROSSOVER, ADD LEFT TURN LANE0.0
0920-02-091Liberty/
Beaumont
CRTentative$176,2556REPLACE BRIDGE AND APPROACHES0.0
0166-07-062Madison/
Bryan
SH 75Tentative$458,8548INSTALL CONTINUOUS LEFT TURN LANE0.0
0675-05-087Madison/
Bryan
IH 45Tentative$266,1128MODERNIZE INTERSECTION FLASHING BEACON, ADD LEFT TURN LANE0.0
0179-04-099Matagorda/
Yoakum
SH 35Tentative$6,000,0001ACP OVERLAY0.0
0833-03-045Mclennan/
Waco
FM 1637Tentative$9,968,7078SAFETY TREAT FIXED OBJECTS0.0
3538-01-036Montgomery/
Houston
SH 242Tentative$54,300,0002MWIDEN FROM 2 TO 4 LANES0.0
0177-05-119Montgomery/
Houston
IH 69Tentative$010INSTALL FLEXIBLE RIP RAP PROTECTION SYSTEM0.0
3538-01-035Montgomery/
Houston
SH 242Tentative$38,100,0002MWIDEN FROM 2 TO 4 LANES0.0
0053-15-024Nolan/
Abilene
FM 608Tentative$2,450,9828SAFETY TREAT FIXED OBJECTS, PROVIDE ADDITIONAL PAVED SURFACE0.0
1558-01-019Nueces/
Corpus Christi
FM 70Tentative$3,200,0001RESTORATION OF EXISTING ROADWAY0.0
0916-35-206Nueces/
Corpus Christi
VATentative$522,5003DESIGNATION OF BICYCLE BOULEVARDS WITH PAVEMENT MARKINGS AND0.0
0916-00-068Nueces/
Corpus Christi
VATentative$1,200,0007PEDESTRIAN & BIKE FACILITIES IMPROVEMENTS0.0
0090-09-006Oldham/
Amarillo
BI 40-CTentative$2,790,00062018 BMIP REPAIR BRIDGE0.0
0365-01-049Parker/
Ft Worth
SH 171Tentative$715,6001MILL AND OVERLAY, RPMS, ADD RIGHT TURN LANE0.0
0313-02-057Parker/
Ft Worth
FM 51Tentative$18,358,0001WIDEN 2 LN RDWAY TO 3 LNS URBAN; INTERSECTION IMPROVEMENTS0.0
0168-01-030Parmer/
Lubbock
US 60Tentative$23,300,0001REHABILITATION OF EXISTING ROADWAY0.0
0911-04-055Polk/
Lufkin
VATentative$1,750,00010REHABILITATE ROADS, PARKING LOTS, AND CAMPSITE PULLOUTS IN0.0
0041-05-052Potter/
Amarillo
US 87Tentative$1,317,7396REPLACE BRIDGE RAIL0.0
0904-00-183Potter/
Amarillo
VATentative$2,000,00010CONSTRUCT CURB RAMPS AT VARIOUS LOCATIONS0.0
0924-07-013Presidio/
El Paso
VATentative$230,2403IMPROVE 3 PED BRIDGES ON COLUMBIA, ABBOT & AUSTIN ST AND CON0.0
0924-07-014Presidio/
El Paso
CSTentative$2,545,6603ADD SIDEWALKS, CURB & GUTTER AND BIKE LANES ON FOOTHILL BLVD0.0
0558-09-035Reagan/
San Angelo
SH 137Tentative$12,548,45511GRADING, BASE AND SURFACING0.0
0035-01-035Runnels/
San Angelo
US 83Tentative$3,455,4558SAFETY TREATED FIXED OBJECTS0.0
0064-06-055Sabine/
Lufkin
US 96Tentative$320,0006SCOUR REPAIRS CONSISTING OF ADDING TIE-BEAM AND ROCK RIPRAP0.0
0087-06-030San Patricio/
Corpus Christi
BS 359BTentative$03INSTALLATION OF SIDEWALKS AND BIKE LANES IN MATHIS0.0
0916-28-073San Patricio/
Corpus Christi
CSTentative$03INSTALLATION OF SIDEWALKS IN TAFT0.0
0180-10-083San Patricio/
Corpus Christi
SH 361Tentative$3,700,0001MILL AND INLAY0.0
0039-01-094Starr/
Pharr
US 83Tentative$267,6298CLOSE CROSSOVER & CONSTRUCT MEDIAN CROSSOVER0.0
0256-02-031Stephens/
Brownwood
SH 67Tentative$7,500,00011ACP OVERLAY0.0
2266-02-154Tarrant/
Ft Worth
SH 360Tentative$335,5201REPAIR BASE FAILURES, HMAC OVERLAY, PAVEMENT MARKINGS0.0
2079-01-042Tarrant/
Ft Worth
FM 1220Tentative$2,018,9178CONVERT FOUR LANE ROADWAY WITH TWLTL TO A 4 LANE ROADWAY0.0
0902-00-188Tarrant/
Ft Worth
VATentative$1,175,0003DEVELOP AND IMPLEMENT 511 TRAVELER INFORMATION SYSTEM0.0
0171-05-098Tarrant/
Ft Worth
SH 199Tentative$1,121,3701REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS0.0
1076-01-038Throckmorton/
Wichita Falls
FM 209Tentative$1,635,0006REPLACE BRIDGE AND APPROACHES0.0
0907-00-171Tom Green/
San Angelo
VATentative$500,0001REPLACE GUARD FENCE, BRIDGE RAIL, AND SAFETY END TREATMENTS0.0
2102-01-074Travis/
Austin
RM 2244Tentative$350,00010LANDSCAPING AND IRRIGATION0.0
0914-00-400Travis/
Austin
VATentative$1,450,0001FY 2019 SITE SPECIFIC SIGNALS0.0
0113-13-178Travis/
Austin
SL 360Tentative$1,025,0006REHABILITATE BRIDGE0.0
0914-00-419Travis/
Austin
VATentative$2,500,00010CONSTRUCT ADA RAMPS & SIDEWALKS ON SL1, 82, 109, 150, 275,0.0
0914-04-271Travis/
Austin
CRTentative$200,0006REHABILITATE BRIDGE AND APPROACHES0.0
0095-06-071Van Zandt/
Tyler
US 80Tentative$1,422,4438INSTALL PROFILE EDGELINE MARKINGS0.0
0114-09-080Washington/
Bryan
US 290Tentative$1,125,0006DECK REHABILITATION0.0
0903-03-116Wichita/
Wichita Falls
CSTentative$2,251,7353CONSTRUCT HIKE & BIKE TRAIL0.0
0320-03-100Williamson/
Austin
SH 95Tentative$290,0006REHABILITATE BRIDGE0.0
0134-15-013Wise/
Ft Worth
SL 373Tentative$3,386,3901REPAIR BASE FAILURES, MILL, OVERLAY, AND PAVEMENT MARKINGS0.0
1751-01-030Wise/
Ft Worth
FM 1655Tentative$411,1128SAFETY TREAT FIXED OBJECTS, CONSTRUCT PAVED SHOULDERS 1-4FT,0.0
0902-20-099Wise/
Ft Worth
CRTentative$652,8296REPLACE BRIDGE AND APPROACHES0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract