Letting Schedule for Odessa District (FY 2019)

Last Update: Monday, October 22, 2018
Odessa District (FY 2019)
Andrews | Crane | Crockett | Ector | Martin | Midland | Pecos | Reeves | Upton | Ward | Winkler |

Andrews County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0548-01-034SH 176TentativeMay 2019$11,457,4118CONSTRUCT OVERPASS0.0
0228-05-068US 385TentativeJun 2019$388,5368INSTALL INTERSECTION FLASHING BEACON, INSTALL ADVANCED0.0

Crane County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0229-03-037US 385TentativeMay 2019$30,000,00011WIDENING TO AN ULTIMATE 4-LANE DIVIDED HIGHWAY0.0

Crockett County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0556-02-017SH 349ApprovedFeb 2019$81,8388PROFILE EDGELINE AND CENTERLINE MARKINGS0.0

Ector County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0906-00-176VATentativeMar 2019$1,000,0001PAVEMENT MARKINGS0.0
0228-06-087US 385TentativeMay 2019$602,0378IMPROVE TRAFFIC SIGNALS0.0
0906-00-177VATentativeMar 2019$1,000,0001PAVEMENT MARKINGS0.0
0906-00-186VAApprovedNov 2018$2,869,5481INSTALL OVER-HEIGHT BRIDGE DETECTION SYSTEMS0.0
0228-06-081US 385TentativeAug 2019$17,700,00011CONSTRUCT NEW INTERCHANGE0.0
0906-00-184VATentativeJul 2019$1,000,0001GUARDRAIL UPGRADE0.0
2224-01-100SL 338ApprovedNov 2018$1,627,8211RECONSTRUCT INTERSECTION WITH TRAFFIC SIGNALS & ILLUMINATION5.5
0906-00-185VAApprovedNov 2018$1,293,0741CULVERT/STRUCTURE REPAIR8.0
1717-01-010FM 1787ApprovedDec 2018$16,640,7091REHABILITATION OF EXISTING ROADWAY0.0

Martin County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
1842-01-016FM 26ApprovedFeb 2019$1,250,0001CHANNEL EXCAV, PLACEMENT OF CONCRETE RIP RAP, REPLACEMENT OF0.0

Midland County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0380-09-093BS 349CTentativeApr 2019$2,587,3618IMPROVE TRAFFIC SIGNALS, INSTALL FLASHING YELLOW ARROW,0.0
0005-14-089IH 20ActualSep 2018$810,57411IH 20 AT MIDKIFF RD JOINT UTILITY DUCT BANK BORE0.0
1188-02-087SL 250ApprovedJan 2019$21,828,9792UCONSTRUCT NEW INTERCHANGE0.0
0906-32-057CSTentativeJun 2019$545,2503CONSTRUCT BICYCLE LANES, CURB EXTENSIONS, AND MEDIAN AND0.0
1717-02-023FM 1787ApprovedDec 2018$12,575,0861REHABILITATION OF EXISTING ROADWAY0.0
0005-09-021BI 20-ETentativeAug 2019$4,000,0008CORRIDOR INTERCONNECT FOR PRE-EMPTION0.0
1188-02-107SL 250ActualOct 2018$5,732,3871WIDEN SOUTHBOUND SL 250 FRONTAGE ROAD APPROACH TO SH 1583.0

Pecos County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0075-03-021US 67TentativeApr 2019$821,0328SAFETY TREAT FIXED OBJECTS0.0
7106-03-003RL SOTentativeAug 2019$0RLREHABILITATION OF THE SOUTH ORIENT RAIL LINE INCLUDING RAIL,0.0
0441-07-071IH 10ActualSep 2018$7,492,2271FACILITY UPGRADES TO MEET FREEWAY STANDARDS3.0
0021-06-027US 90TentativeJun 2019$741,1468PROFILE EDGELINE MARKINGS, PROFILE CENTERLINE MARKINGS0.0
7106-03-001RL SOTentativeApr 2019$15,311,9493REHABILITATION OF SOUTH ORIENT RR TO 25 MPH TRACK SPEEDS0.0
0076-01-029US 67TentativeApr 2019$37,994,40011ROADWAY WIDENING TO A MODIFIED SUPER 20.0

Reeves County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0139-05-043US 285ApprovedJan 2019$15,000,00011ROADWAY REHABILITATION0.0
0003-05-050IH 20ActualSep 2018$9,676,6161SEAL COAT0.0
0441-09-045IH 10TentativeJun 2019$368,0006UPGRADE BRIDGE AND APPROACH RAILING0.0

Upton County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0076-06-037US 67TentativeJul 2019$29,946,00011ROADWAY WIDENING TO A MODIFIED SUPER 20.0

Ward County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
1370-01-021FM 1219TentativeAug 2019$204,0738INSTALL PROTECTIVE DEVICES FOR CROSSING DOT# 864588J0.0
0004-02-058IH 20ActualOct 2018$25,408,3661FACILITY UPGRADES TO MEET FREEWAY STANDARDS2.0
0354-02-027SH 115TentativeApr 2019$753,6518SAFETY LIGHTING AT INTERSECTION0.0

Winkler County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
1371-01-021FM 1232TentativeAug 2019$250,0008INSTALL LIGHTS AND GATES FOR DOT# 864 593F0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract