Letting Schedule for Odessa District (FY 2019)

Last Update: Monday, January 14, 2019
Odessa District (FY 2019)
Andrews | Crane | Crockett | Ector | Martin | Midland | Pecos | Reeves | Upton | Ward | Winkler |

Andrews County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0548-01-034SH 176ApprovedMay 2019$11,457,4118CONSTRUCT OVERPASS0.0
0228-05-068US 385TentativeJun 2019$388,5368INSTALL INTERSECTION FLASHING BEACON, INSTALL ADVANCED0.0

Crane County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0229-03-037US 385ApprovedMay 2019$30,000,00011WIDENING TO AN ULTIMATE 4-LANE DIVIDED HIGHWAY0.0

Crockett County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0556-02-017SH 349ApprovedFeb 2019$80,9538PROFILE EDGELINE AND CENTERLINE MARKINGS0.0

Ector County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0005-01-114BI 20-ETentativeAug 2019$14,284,8008INSTALL MEDIAN BARRIER0.0
0906-00-177VAApprovedMar 2019$5,023,1041PAVEMENT MARKINGS0.0
0906-00-184VATentativeJul 2019$1,000,0001GUARDRAIL UPGRADE0.0
1717-01-010FM 1787ActualDec 2018$17,000,6191REHABILITATION OF EXISTING ROADWAY0.0
0906-00-186VAActualNov 2018$2,792,8981INSTALL OVER-HEIGHT BRIDGE DETECTION SYSTEMS0.0
2224-01-100SL 338ActualNov 2018$1,663,7251RECONSTRUCT INTERSECTION WITH TRAFFIC SIGNALS & ILLUMINATION5.5
0906-00-185VAActualNov 2018$1,293,0741CULVERT/STRUCTURE REPAIR8.0
0228-06-087US 385ApprovedMay 2019$602,0378IMPROVE TRAFFIC SIGNALS0.0
0906-00-176VAApprovedMar 2019$505,8501PAVEMENT MARKINGS0.0
0228-06-081US 385TentativeAug 2019$17,700,00011CONSTRUCT NEW INTERCHANGE0.0

Martin County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
1842-01-016FM 26ApprovedFeb 2019$1,241,3241CHANNEL EXCAV, PLACEMENT OF CONCRETE RIP RAP, REPLACEMENT OF0.0

Midland County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0005-09-021BI 20-ETentativeAug 2019$4,000,0008CORRIDOR INTERCONNECT FOR PRE-EMPTION0.0
0906-32-057CSTentativeJun 2019$545,2503CONSTRUCT BICYCLE LANES, CURB EXTENSIONS, AND MEDIAN AND0.0
1188-02-107SL 250ActualOct 2018$5,732,3871WIDEN SOUTHBOUND SL 250 FRONTAGE ROAD APPROACH TO SH 1583.0
0005-14-089IH 20ActualSep 2018$810,57411IH 20 AT MIDKIFF RD JOINT UTILITY DUCT BANK BORE0.0
1717-02-023FM 1787ActualDec 2018$12,849,6381REHABILITATION OF EXISTING ROADWAY0.0
0380-09-093BS 349CApprovedApr 2019$2,587,3618IMPROVE TRAFFIC SIGNALS, INSTALL FLASHING YELLOW ARROW,0.0
1188-02-087SL 250ActualJan 2019$22,542,7102UCONSTRUCT NEW INTERCHANGE7.0

Pecos County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
7106-03-001RL SOTentativeApr 2019$15,311,9493REHABILITATION OF SOUTH ORIENT RR TO 25 MPH TRACK SPEEDS0.0
0075-03-021US 67ApprovedApr 2019$489,8738SAFETY TREAT FIXED OBJECTS0.0
0076-01-029US 67ApprovedApr 2019$37,994,40011ROADWAY WIDENING TO A MODIFIED SUPER 20.0
7106-03-003RL SOTentativeAug 2019$0RLREHABILITATION OF THE SOUTH ORIENT RAIL LINE INCLUDING RAIL,0.0
0021-06-027US 90TentativeJun 2019$741,1468PROFILE EDGELINE MARKINGS, PROFILE CENTERLINE MARKINGS0.0
0441-07-071IH 10ActualSep 2018$7,492,2271FACILITY UPGRADES TO MEET FREEWAY STANDARDS3.0

Reeves County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0139-05-043US 285ActualJan 2019$23,870,07211ROADWAY REHABILITATION2.0
0139-04-050US 285TentativeAug 2019$010INSTALL RR CROSSING REPLANKING FOR CROSSING DOT#796 245N0.0
0003-05-054IH 20TentativeAug 2019$18,151,9048INSTALL MEDIAN BARRIER0.0
0441-09-045IH 10TentativeJun 2019$368,0006UPGRADE BRIDGE AND APPROACH RAILING0.0
0003-05-050IH 20ActualSep 2018$9,676,6161SEAL COAT0.0

Upton County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0076-06-037US 67TentativeJul 2019$29,946,00011ROADWAY WIDENING TO A MODIFIED SUPER 20.0

Ward County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0004-02-058IH 20ActualOct 2018$25,408,3661FACILITY UPGRADES TO MEET FREEWAY STANDARDS2.0
0004-02-060IH 20TentativeAug 2019$18,877,1818INSTALL MEDIAN BARRIER0.0
1370-01-021FM 1219TentativeAug 2019$204,0738INSTALL PROTECTIVE DEVICES FOR CROSSING DOT# 864588J0.0
0354-02-029SH 115TentativeAug 2019$010INSTALL RR CROSSING REPLANKING FOR DOT# 796 265B0.0
0354-02-027SH 115ApprovedApr 2019$665,7868SAFETY LIGHTING AT INTERSECTION0.0

Winkler County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
1371-01-021FM 1232TentativeAug 2019$250,0008INSTALL LIGHTS AND GATES FOR DOT# 864 593F0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract