Letting Schedule for Odessa District (FY 2019)

Last Update: Monday, May 20, 2019

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Odessa District (FY 2019)
Andrews | Crockett | Ector | Martin | Midland | Miscoded | Pecos | Reeves | Ward | Winkler |

Andrews County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0548-01-034SH 176ApprovedJul 2019$12,740,0138CONSTRUCT BRIDGE0.0
0548-01-042SH 176ApprovedJul 2019$0ROWCONSTRUCT BRIDGE0.0
0228-05-068US 385ApprovedJun 2019$501,9401HAZARD ELIMINATION & SAFETY0.0

Crockett County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0556-02-017SH 349ActualFeb 2019$80,9538PROFILE EDGELINE AND CENTERLINE MARKINGS0.0

Ector County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0906-00-176VAActualMar 2019$505,8501PAVEMENT MARKINGS0.0
1717-01-010FM 1787ActualDec 2018$17,000,6191REHABILITATION OF EXISTING ROADWAY0.0
0228-06-087US 385ApprovedJul 2019$660,9778TRAFFIC SIGNAL IMPROVEMENTS0.0
0906-00-177VAActualMar 2019$5,023,1041PAVEMENT MARKINGS0.0
0005-01-114BI 20--ApprovedAug 2019$14,284,8008HAZARD ELIMINATION & SAFETY0.0
2224-01-100SL 338ActualNov 2018$1,663,7251RECONSTRUCT INTERSECTION WITH TRAFFIC SIGNALS & ILLUMINATION5.5
0906-00-185VAActualNov 2018$1,293,0741CULVERT/STRUCTURE REPAIR8.0
0906-00-186VAActualNov 2018$2,792,8981INSTALL OVER-HEIGHT BRIDGE DETECTION SYSTEMS0.0

Martin County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
1842-01-016FM 26ActualFeb 2019$1,241,3241CHANNEL EXCAV, PLACEMENT OF CONCRETE RIP RAP, REPLACEMENT OF0.0

Midland County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0906-32-057CSApprovedJun 2019$780,8083HIKE AND/OR BIKE5.0
1188-02-107SL 250ActualOct 2018$5,732,3871WIDEN SOUTHBOUND SL 250 FRONTAGE ROAD APPROACH TO SH 1583.0
0005-14-089IH 20ActualSep 2018$810,57411IH 20 AT MIDKIFF RD JOINT UTILITY DUCT BANK BORE0.0
1717-02-023FM 1787ActualDec 2018$12,849,6381REHABILITATION OF EXISTING ROADWAY0.0
1188-02-087SL 250ActualJan 2019$22,542,7102UCONSTRUCT NEW INTERCHANGE7.0
0380-09-093BS 349-ApprovedJul 2019$2,383,3838TRAFFIC SIGNAL IMPROVEMENTS0.0
0005-09-021BI 20-ETentativeAug 2019$4,000,0008CORRIDOR INTERCONNECT FOR PRE-EMPTION0.0

Miscoded County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0906-00-184VAApprovedJul 2019$1,000,0001HIGHWAY IMPROVEMENT0.0

Pecos County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0441-07-071IH 10ActualSep 2018$7,492,2271FACILITY UPGRADES TO MEET FREEWAY STANDARDS3.0
7106-03-003RL SOTentativeAug 2019$0RLREHABILITATION OF THE SOUTH ORIENT RAIL LINE INCLUDING RAIL,0.0
0076-01-029US 67ActualApr 2019$46,907,97911ROADWAY WIDENING TO A MODIFIED SUPER 25.5
0075-03-021US 67ActualApr 2019$433,8678SAFETY TREAT FIXED OBJECTS0.0
7106-03-001RL SOTentativeAug 2019$15,311,9493REHABILITATION OF SOUTH ORIENT RR TO 25 MPH TRACK SPEEDS0.0
0021-06-027US 90ApprovedJun 2019$1,831,9171HAZARD ELIMINATION & SAFETY0.0

Reeves County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0441-09-045IH 10ApprovedJun 2019$309,0356BRIDGE MAINTENANCE0.0
0139-04-050US 285TentativeAug 2019$010INSTALL RR CROSSING REPLANKING FOR CROSSING DOT#796 245N0.0
0139-05-043US 285ActualJan 2019$23,870,07211ROADWAY REHABILITATION2.0
0003-05-050IH 20ActualSep 2018$9,676,6161SEAL COAT0.0
0003-05-054IH 20ApprovedAug 2019$18,151,9048HAZARD ELIMINATION & SAFETY0.0

Ward County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0354-02-027SH 115ActualApr 2019$717,7798SAFETY LIGHTING AT INTERSECTION0.0
0004-02-058IH 20ActualOct 2018$25,408,3661FACILITY UPGRADES TO MEET FREEWAY STANDARDS2.0
1370-01-021FM 1219TentativeAug 2019$204,0738INSTALL PROTECTIVE DEVICES FOR CROSSING DOT# 864588J0.0
0354-02-029SH 115TentativeAug 2019$010INSTALL RR CROSSING REPLANKING FOR DOT# 796 265B0.0
0004-02-060IH 20ApprovedAug 2019$18,877,1818HAZARD ELIMINATION & SAFETY0.0

Winkler County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
1371-01-021FM 1232TentativeAug 2019$250,0008INSTALL LIGHTS AND GATES FOR DOT# 864 593F0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract