Letting Schedule for San Antonio District (FY 2019)

Last Update: Monday, October 15, 2018
San Antonio District (FY 2019)
Atascosa | Bexar | Comal | Frio | Guadalupe | Kendall | Kerr | Mcmullen | Medina | Uvalde |

Atascosa County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0073-03-065US 281TentativeAug 2019$70,0001REMOVE CANTILEVERS AND INSTALL MEDIAN GATES AT0.0
0017-04-042IH 35TentativeMar 2019$18,325,5371BASE REPAIR, SEALCOAT, OVERLAY & PAVEMENT MARKINGS ON0.0
0748-05-040FM 140ActualOct 2018$5,322,8421REHAB AND WIDEN NARROW ROADWAY7.0
0915-13-029CRTentativeMay 2019$124,0326REPLACE BRIDGE AND APPROACHES0.0
0017-13-010SH 132ActualSep 2018$3,407,9668IMPROVE TRAFFIC SIGNAL AND SAFETY LIGHTING AT INTERSECTION0.0

Bexar County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0291-11-021SS 421ActualOct 2018$208,5838INSTALL RAISED MEDIANS WITH ACTUATED PED SYMBOLS0.0
0915-12-602VATentativeFeb 2019$4,000,0001UPGRADE TRANSGUIDE FACILITY0.0
0915-00-212VATentativeNov 2018$2,500,0001SAFETY SERVICE PATROL ON CONTROLLED ACCESS HIGHWAYS IN0.0
0915-00-207VAApprovedNov 2018$441,8541IMPROVEMENTS TO PEDESTRIAN CROSSINGS0.0
1890-01-046FM 1976ActualOct 2018$18,587,5161REHAB & WIDEN NARROW ROADWAY TO ADD SHOULDERS7.5
0073-08-195IH 37ActualOct 2018$2,815,1591REPAIR SLOPE FAILURE4.0
0915-12-585CRTentativeJul 2019$14,661,2353EXPAND FROM 2 TO 4 LANE DIVIDED ROADWAY WITH RAISED MEDIAN,0.0
0521-04-204IH 410TentativeJul 2019$100,000,0001EXPAND FROM 8 TO 10 LANE EXPRESSWAY0.0
0253-04-158US 281TentativeJul 2019$4,000,0001INSTALL ITS0.0
2452-04-016SL 1604ApprovedFeb 2019$20,000,0002MEXPAND FROM 2 LANES TO 4 LANE DIVIDED0.0
0915-12-610CSTentativeJul 2019$1,000,0003CONSTRUCT SIDEWALKS AND PEDESTRIAN INFASTRUCTURE0.0
2452-03-123SL 1604TentativeMar 2019$3,637,5131BASE REPAIR, SEALCOAT, OVERLAY & PAVEMENT MARKINGS ON0.0
0915-12-607CSTentativeAug 2019$250,0008RELOCATE RAIL SIGNALS ON STAHL AT UPRR DOT 432 491U0.0
0073-02-071US 281ApprovedDec 2018$2,096,53411INTERSECTION OPERATIONAL IMPROVEMENTS0.0
0915-12-606CSTentativeAug 2019$250,0008REPLACE RAILROAD SIGNAL AND CANTILEVER GATE ON EISENHAUER0.0
0024-09-024SS 371ApprovedFeb 2019$6,209,9061OVERLAY & PAVEMENT MARKINGS0.0
0291-10-110SH 16ApprovedFeb 2019$1,871,8521RECONSTRUCT EXISTING CULVERT0.0
0465-02-026FM 1518ApprovedFeb 2019$5,722,2901OVERLAY & PAVEMENT MARKINGS ON MAINLANES0.0
0915-12-605CSTentativeAug 2019$250,0008INSTALL RAILROAD SIGNAL WITH GATES ON FRATT RD AT UPRR DOT0.0
0915-12-543NRTentativeAug 2019$100,0007ALAMO AREA COMMUTE SOLUTION PGM-FY 20180.0
0915-00-199VATentativeAug 2019$2,000,0001DISTRICTWIDE ITS OPERATION AND MAINTENANCE FY 20180.0
0915-00-195NRTentativeAug 2019$300,0003ALAMO AREA COMMUTE SOLUTION PGM-FY 2019-20210.0
0521-03-060SL 13ApprovedFeb 2019$3,389,8101BASE REPAIR, MILL, SEAL COAT, OVERLAY AND PAVEMENT MARKINGS0.0
0915-12-547NRTentativeAug 2019$100,0003ALAMO AREA COMMUTE SOLUTION PGM-FY 20170.0
0915-00-191VAApprovedFeb 2019$1,500,0001DISTRICTWIDE NON-SITE SPECIFIC TRAFFIC SIGNALS-FY 20190.0
0143-01-055US 87ActualSep 2018$3,719,9741RESTORE EXISTING ROADWAY2.5
0025-02-217IH 10ActualSep 2018$2,061,7276CLEAN AND PAINT STEEL TRUSS, BRIDGE REPAIR, MILL, OVERLAY0.0
0017-10-277IH 35ActualSep 2018$118,7048WRONG WAY DRIVER ADVANCED TECHNOLOGIES0.0
0915-12-578CSTentativeMay 2019$8,632,5613WIDEN TO PROVIDE OPERATIONAL IMPROVEMENTS, BIKE LANES,0.0
0915-00-211VATentativeMay 2019$1,817,9507INSTALL ADVANCED SIGNAL CONTROLLERS, NETWORKING EQUIPMENT0.0
0915-12-520CSTentativeMay 2019$7,800,0003REHAB AND REALIGN ROADWAY, INTERSECTION AND FLOOD CONTROL0.0
0915-12-544CSTentativeMay 2019$7,323,3513EXPAND FROM 2 TO 4 LANES, INCLUDING DRAINAGE IMPROVEMENTS,0.0
0016-08-037SL 368ActualSep 2018$3,846,0418IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTION0.0
0915-00-200VATentativeMay 2019$2,000,0001DISTRICTWIDE ITS OPERATION AND MAINTENANCE FY 20190.0
0915-12-566CSTentativeMay 2019$1,816,6258IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTION0.0
0915-12-562CRTentativeMay 2019$4,886,1163EXPAND FROM 2 TO 4 LANES, INCLUDING DRAINAGE IMPROVEMENTS,0.0
0915-12-550CSTentativeMay 2019$17,177,0003CONSTRUCT ENTRANCE & EXIT RAMPS BETWEEN HARRY WURZBACH AND0.0
0915-12-579VATentativeMay 2019$2,000,0003CONSTRUCT CITYWIDE PEDESTRIAN AND BICYCLE IMPROVEMENTS0.0
0915-00-192VATentativeApr 2019$2,500,0001DISTRICTWIDE GUIDESIGNS FY190.0
0915-12-601VATentativeJun 2019$1,500,0003INTELLIGENT TRANSPORTATION SYSTEMS - ENHANCEMENTS;0.0
0915-12-509CRTentativeJun 2019$8,097,4803RECONSTRUCT AND WIDEN TO 4 LANES WITH SHOULDER, PEDESTRIAN0.0
0915-12-612VATentativeAug 2019$10,000,0003RAPID TRANSIT CORRIDOR STUDY0.0
0915-12-609CSTentativeJun 2019$1,000,0003MULTIMODAL PLANNING STUDY ON ONE ARTERIAL TO ACCOMMODATE0.0
0915-12-603VATentativeJun 2019$1,000,0003CONSTRUCT SIDEWALKS ALONG WEST SIDE OF JUDSON ROAD0.0
0915-12-580VATentativeMay 2019$1,500,0003INTELLIGENT TRANSPORTATION SYSTEMS - ENHANCEMENTS0.0
0915-00-209VATentativeMay 2019$3,000,0001INTERSECTION OPERATIONAL IMPROVEMENTS0.0
0915-00-210VATentativeMay 2019$7,000,0001INTERSECTION OPERATIONAL IMPROVEMENTS0.0
3544-04-002SH 211TentativeMay 2019$18,100,0013CONSTRUCT TWO LANE RURAL HIGHWAY ON NEW LOCATION0.0
0915-00-208VATentativeApr 2019$5,000,0001UPGRADE MBGF/RAIL0.0
0915-12-595VATentativeMay 2019$6,000,0003EXTEND THE ALAZAN CREEK SECTION OF THE GREENWAY TRAIL SYSTEM0.0

Comal County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
2021-01-013FM 1044TentativeJul 2019$3,279,3281OVERLAY & PAVEMENT MARKINGS0.0
0016-19-024FM 482ActualOct 2018$16,127,0341SEAL COAT AND PAVEMENT MARKINGS0.0
1272-01-019FM 1101ActualSep 2018$262,9338PROFILE EDGELINE & CENTERLINE MARKINGS0.0
0915-17-066CSTentativeMay 2019$1,516,7113CONSTRUCT SIDEWALKS, RAMPS, & OTHER PEDESTRIAN RELATED0.0
0016-04-116IH 35TentativeApr 2019$17,123,9271RAMP REVISIONS, INTERSECTION AND FRONTAGE ROAD OPERATIONAL0.0
0915-17-067CSTentativeMay 2019$357,0006REPLACE BRIDGE AND APPROACHES0.0
8408-15-006MHTentativeMay 2019$4,493,1106REHABILITATE BRIDGE & APPROACHES0.0
0016-04-117IH 35TentativeJun 2019$63,000,0001RAMP REVISIONS, INTERSECTION OPERATIONAL IMPROVEMENTS AND0.0
0915-17-068VATentativeJan 2019$200,0007PURCHASE OF CONTROL SOFTWARE FOR TRAFFIC SIGNALS0.0
0016-05-119IH 35ApprovedFeb 2019$25,000,0002MRAMP REVISIONS, INTERSECTION AND FRONTAGE ROAD OPERATIONAL0.0

Frio County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0915-18-024CRApprovedFeb 2019$700,0006REPLACE BRIDGE & APPROACHES0.0
0915-18-032CRTentativeAug 2019$250,0008INSTALL RAILROAD SIGNAL WITH GATES ON CR 4201 AT UPRR DOT0.0
0301-03-026SH 85ApprovedJan 2019$1,284,0001REHABILITATE EXISTING ROADWAY0.0

Guadalupe County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0915-46-050CSTentativeJul 2019$03CONSTRUCT SIDEWALKS, BIKE LANES, AND OFF-ROAD TRAIL0.0
0366-12-030BS 123BTentativeMay 2019$1,090,8208IMPROVE TRAFFIC SIGNALS0.0
0025-03-098US 90ATentativeJul 2019$2,824,3138OVERHEAD FLASHING BEACON0.0
2021-02-018FM 1044TentativeAug 2019$450,0008INSTALL PREEMPTED TRAFFIC SIGNAL ON FM 1044 AT UPRR DOT 7420.0
0915-46-046VATentativeMay 2019$2,801,2463EXTEND WALNUT SPRINGS MULTI USE TRAIL, INCLUDING RETAINING0.0
0025-10-092FM 78ApprovedNov 2018$7,854,1301SPOT BASE REPAIR, OVERLAY & PAVEMENT MARKINGS6.0

Kendall County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0072-06-074IH 10TentativeApr 2019$20,000,0001RECONFIGURE RAMPS AND WIDEN FRONTAGE ROAD TO CONVERT TO ONE0.0
0072-14-030US 87ActualOct 2018$193,28810LANDSCAPE DEVELOPMENT0.0
1042-01-035RM 474TentativeApr 2019$1,243,1871BASE REPAIR, SEALCOAT, OVERLAY & PAVEMENT MARKINGS0.0
0142-15-026IH 10TentativeMay 2019$5,500,0001COMPLETE EB/WB FRONTAGE RDS & CONVERT TO ONE WAY OPERATION,0.0

Kerr County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0142-02-029IH 10TentativeMar 2019$16,340,8151BASE REPAIR, SEALCOAT, OVERLAY & PAVEMENT MARKINGS ON0.0
0291-03-071SH 16TentativeApr 2019$2,230,5001BASE REPAIR, SEALCOAT, OVERLAY & PAVEMENT MARKINGS0.0
3362-01-016SL 534TentativeJul 2019$1,782,5221OVERLAY & PAVEMENT MARKINGS0.0

Mcmullen County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0483-02-021SH 72ActualSep 2018$29,509,4021REHAB AND WIDEN ROADWAY TO PROVIDE PASSING LANES AND6.5
0517-02-042SH 16ApprovedDec 2018$21,450,15111REHAB AND WIDEN ROADWAY TO PROVIDE PASSING LANES AND0.0

Medina County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0421-02-030SH 173TentativeAug 2019$010REPLACE AT-GRADE RAILROAD CROSSING SURFACE AT DOT 427 959N0.0
0915-45-051CRActualSep 2018$427,2206REPLACE BRIDGE AND APPROACHES0.0
0915-45-053CRApprovedJan 2019$469,1956REPLACE BRIDGE & APPROACHES0.0
1547-01-048FM 471TentativeAug 2019$010REPLACE TWO AT-GRADE RAILROAD CROSSING SURFACES AT DOT0.0

Uvalde County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0037-01-042US 83ApprovedNov 2018$12,095,1041REHAB EXISTING ROADWAY0.0
0024-01-101US 90ApprovedDec 2018$281,34611INTERSECTION IMPROVEMENTS0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract