Letting Schedule for San Antonio District (FY 2019)

Last Update: Monday, January 14, 2019
San Antonio District (FY 2019)
Atascosa | Bandera | Bexar | Comal | Frio | Guadalupe | Kendall | Kerr | Mcmullen | Medina | Uvalde | Wilson |

Atascosa County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0017-04-042IH 35ApprovedMar 2019$14,432,8331BASE REPAIR, SEALCOAT, OVERLAY & PAVEMENT MARKINGS ON0.0
0915-13-028CRApprovedMar 2019$639,7966REPLACE BRIDGE AND APPROACHES0.0
0073-03-065US 281TentativeAug 2019$70,0001REMOVE CANTILEVERS AND INSTALL MEDIAN GATES AT0.0
0915-13-029CRApprovedMay 2019$467,0006REPLACE BRIDGE AND APPROACHES0.0
0748-05-040FM 140ActualOct 2018$5,322,8421REHAB AND WIDEN NARROW ROADWAY7.0
0017-13-010SH 132ActualSep 2018$3,407,9668IMPROVE TRAFFIC SIGNAL AND SAFETY LIGHTING AT INTERSECTION0.0

Bandera County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0291-07-034SH 16TentativeJun 2019$5,252,0858INSTALL PROTECTION, WIDEN PAVEMENT SHOULDER TO 5 FT OR LESS,0.0

Bexar County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0915-00-209VAApprovedMay 2019$1,427,9501INTERSECTION OPERATIONAL IMPROVEMENTS-NORTH PROJECT0.0
0915-00-200VATentativeMay 2019$2,000,0001DISTRICTWIDE ITS OPERATION AND MAINTENANCE FY 20190.0
0915-12-609CSTentativeJun 2019$1,000,0003MULTIMODAL PLANNING STUDY ON ONE ARTERIAL TO ACCOMMODATE0.0
0915-00-210VAApprovedMay 2019$4,323,7001INTERSECTION OPERATIONAL IMPROVEMENTS0.0
0915-00-211VAApprovedMay 2019$1,817,9507INSTALL ADVANCED SIGNAL CONTROLLERS, NETWORKING EQUIPMENT0.0
0915-12-601VATentativeJun 2019$1,500,0003INTELLIGENT TRANSPORTATION SYSTEMS - ENHANCEMENTS;0.0
0915-12-603VATentativeJun 2019$1,000,0003CONSTRUCT SIDEWALKS ALONG WEST SIDE OF JUDSON ROAD0.0
0915-00-199VATentativeAug 2019$2,000,0001DISTRICTWIDE ITS OPERATION AND MAINTENANCE FY 20180.0
0915-12-585CRTentativeJul 2019$14,661,2353EXPAND FROM 2 TO 4 LANE DIVIDED ROADWAY WITH RAISED MEDIAN,0.0
0253-04-158US 281TentativeJul 2019$4,000,0001INSTALL ITS0.0
0915-12-509CRTentativeJun 2019$8,097,4803RECONSTRUCT AND WIDEN TO 4 LANES WITH SHOULDER, PEDESTRIAN0.0
0521-04-204IH 410TentativeJul 2019$100,000,0001EXPAND FROM 6 & 8 TO 8 & 10 LANE EXPRESSWAY -ADD 20.0
0025-02-219IH 10TentativeAug 2019$55,000,0001EXPAND FROM 4 LANE TO 6 LANE EXPRESSWAY0.0
0915-00-195NRTentativeAug 2019$300,0003ALAMO AREA COMMUTE SOLUTION PGM-FY 2019-20210.0
0915-00-221VAApprovedApr 2019$1,506,4461DISTRICTWIDE NON-SITE SPECIFIC TRAFFIC SIGNALS-FY 20190.0
0915-12-610CSTentativeJul 2019$1,000,0003CONSTRUCT SIDEWALKS AND PEDESTRIAN INFASTRUCTURE0.0
0915-12-566CSApprovedMay 2019$1,869,0568IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTION0.0
0915-12-580VAApprovedMay 2019$1,500,0003INTELLIGENT TRANSPORTATION SYSTEMS - ENHANCEMENTS0.0
0915-12-605CSTentativeAug 2019$250,0008INSTALL RAILROAD SIGNAL WITH GATES ON FRATT RD AT UPRR DOT0.0
0915-12-606CSTentativeAug 2019$250,0008REPLACE RAILROAD SIGNAL AND CANTILEVER GATE ON EISENHAUER0.0
3544-04-002SH 211TentativeAug 2019$18,100,0013CONSTRUCT TWO LANE RURAL HIGHWAY ON NEW LOCATION0.0
0915-00-220VATentativeJun 2019$2,000,00010CONSTRUCT SIDEWALK, CURB RAMPS AND PEDESTRIAN IMPROVEMENTS0.0
0915-12-607CSTentativeAug 2019$250,0008RELOCATE RAIL SIGNALS ON STAHL AT UPRR DOT 432 491U0.0
0915-12-612VATentativeAug 2019$10,000,0003RAPID TRANSIT CORRIDOR STUDY0.0
0915-12-595VATentativeAug 2019$6,000,0003EXTEND THE ALAZAN CREEK SECTION OF THE GREENWAY TRAIL SYSTEM0.0
0915-12-543NRTentativeAug 2019$100,0007ALAMO AREA COMMUTE SOLUTION PGM-FY 20180.0
0915-00-223VAApprovedMay 2019$2,800,6501INTERSECTION OPERATIONAL IMPROVEMENTS-SOUTH PROJECT0.0
0915-00-222VAApprovedMay 2019$1,505,6001DISTRICTWIDE PAVEMENT MARKINGS- FY 20190.0
0915-00-212VATentativeAug 2019$2,500,0001SAFETY SERVICE PATROL ON CONTROLLED ACCESS HIGHWAYS IN0.0
0915-12-578CSTentativeAug 2019$8,632,5613WIDEN TO PROVIDE OPERATIONAL IMPROVEMENTS, BIKE LANES,0.0
0915-12-550CSApprovedMay 2019$17,177,0003CONSTRUCT ENTRANCE & EXIT RAMPS BETWEEN HARRY WURZBACH AND0.0
0915-12-520CSApprovedMay 2019$7,800,0003REHAB AND REALIGN ROADWAY, INTERSECTION AND FLOOD CONTROL0.0
0915-12-544CSTentativeAug 2019$7,323,3513EXPAND FROM 2 TO 4 LANES, INCLUDING DRAINAGE IMPROVEMENTS,0.0
0915-00-207VAActualNov 2018$441,8541IMPROVEMENTS TO PEDESTRIAN CROSSINGS0.0
1890-01-046FM 1976ActualOct 2018$18,587,5161REHAB & WIDEN NARROW ROADWAY TO ADD SHOULDERS7.5
0016-08-037SL 368ActualSep 2018$3,846,0418IMPROVE TRAFFIC SIGNALS & SAFETY LIGHTING AT INTERSECTION0.0
0024-09-024SS 371ApprovedFeb 2019$6,313,6301OVERLAY & PAVEMENT MARKINGS0.0
0073-02-071US 281ActualDec 2018$2,071,16611INTERSECTION OPERATIONAL IMPROVEMENTS7.0
0025-02-217IH 10ActualSep 2018$2,061,7276CLEAN AND PAINT STEEL TRUSS, BRIDGE REPAIR, MILL, OVERLAY0.0
0017-10-277IH 35ActualSep 2018$118,7048WRONG WAY DRIVER ADVANCED TECHNOLOGIES0.0
0143-01-055US 87ActualSep 2018$3,719,9741RESTORE EXISTING ROADWAY2.5
0291-11-021SS 421ActualOct 2018$208,5838INSTALL RAISED MEDIANS WITH ACTUATED PED SYMBOLS0.0
0073-08-195IH 37ActualOct 2018$2,815,1591REPAIR SLOPE FAILURE4.0
0291-10-110SH 16ApprovedFeb 2019$1,997,7411RECONSTRUCT EXISTING CULVERT7.0
2452-03-123SL 1604ApprovedMar 2019$3,954,7511BASE REPAIR, SEALCOAT, OVERLAY & PAVEMENT MARKINGS ON0.0
2452-04-016SL 1604ApprovedFeb 2019$22,108,3042MEXPAND FROM 2 LANES TO 4 LANE DIVIDED6.0
0915-12-547NRActualNov 2018$100,0003ALAMO AREA COMMUTE SOLUTION PGM-FY 20170.0
0915-00-192VAApprovedApr 2019$1,623,8951SCHOOL FLASHER UPGRADES0.0
0521-03-060SL 13ApprovedFeb 2019$3,388,7931BASE REPAIR, MILL, SEAL COAT, OVERLAY AND PAVEMENT MARKINGS0.0
0915-12-602VATentativeFeb 2019$4,000,0001UPGRADE TRANSGUIDE FACILITY0.0
0915-00-191VAApprovedFeb 2019$1,499,9711DISTRICTWIDE NON-SITE SPECIFIC TRAFFIC SIGNALS-FY 20190.0
0465-02-026FM 1518ApprovedFeb 2019$2,503,4201OVERLAY & PAVEMENT MARKINGS ON MAINLANES0.0

Comal County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0016-19-024FM 482ActualOct 2018$16,127,0341SEAL COAT AND PAVEMENT MARKINGS0.0
0915-17-067CSApprovedMay 2019$1,640,0006REPLACE BRIDGE AND APPROACHES0.0
0470-01-028FM 1863TentativeJun 2019$14,992,3111SPOT BASE REPAIR, MILL, PFC INLAY AND PAVEMENT MARKINGS0.0
1272-01-019FM 1101ActualSep 2018$262,9338PROFILE EDGELINE & CENTERLINE MARKINGS0.0
0016-04-117IH 35TentativeJun 2019$63,000,0001RAMP REVISIONS, INTERSECTION OPERATIONAL IMPROVEMENTS AND0.0
0016-05-119IH 35ApprovedFeb 2019$27,454,0892MRAMP REVISIONS, INTERSECTION AND FRONTAGE ROAD OPERATIONAL8.0
0915-17-066CSTentativeAug 2019$1,516,7113CONSTRUCT SIDEWALKS, RAMPS, & OTHER PEDESTRIAN RELATED0.0
0016-04-116IH 35ApprovedApr 2019$16,782,5441RAMP REVISIONS, INTERSECTION AND FRONTAGE ROAD OPERATIONAL0.0
8408-15-006MHApprovedMay 2019$4,493,1106REHABILITATE BRIDGE & APPROACHES0.0

Frio County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0915-18-024CRApprovedFeb 2019$560,1926REPLACE BRIDGE & APPROACHES0.0
0301-06-018SH 85TentativeJun 2019$25,000,0001REHAB AND WIDEN TO PROVIDE PASSING LANES & OPERATIONAL0.0
0301-03-026SH 85ActualJan 2019$1,388,9501REHABILITATE EXISTING ROADWAY0.0
0301-07-013SH 85TentativeJun 2019$28,720,00011REHAB AND WIDEN TO PROVIDE PASSING LANES & OPERATIONAL0.0
0017-06-085IH 35ApprovedMay 2019$27,165,5311BASE REPAIR, SEALCOAT, OVERLAY & PAVEMENT MARKINGS ON0.0
0301-03-027SH 85TentativeJun 2019$17,000,00011WIDEN TO PROVIDE PASSING LANES & OPERATIONAL IMPROVEMENTS0.0
0915-18-032CRTentativeAug 2019$250,0008INSTALL RAILROAD SIGNAL WITH GATES ON CR 4201 AT UPRR DOT0.0

Guadalupe County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0915-46-050CSTentativeJul 2019$03CONSTRUCT SIDEWALKS, BIKE LANES, AND OFF-ROAD TRAIL0.0
0366-12-030BS 123BApprovedMay 2019$1,097,7588IMPROVE TRAFFIC SIGNALS0.0
2021-02-018FM 1044TentativeAug 2019$450,0008INSTALL PREEMPTED TRAFFIC SIGNAL ON FM 1044 AT UPRR DOT 7420.0
0366-03-068SH 123TentativeJun 2019$20,500,0001REHABILITATE AND WIDEN TO ADD SHOULDERS0.0
0025-10-092FM 78ActualNov 2018$7,854,1301SPOT BASE REPAIR, OVERLAY & PAVEMENT MARKINGS6.0

Kendall County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0072-06-084IH 10ApprovedApr 2019$18,079,3011OVERLAY AND PAVEMENT MARKINGS ON MAIN LANES0.0
0142-15-026IH 10ApprovedMay 2019$7,930,2021COMPLETE EB/WB FRONTAGE RDS & CONVERT TO ONE WAY OPERATION,0.0
1899-01-018RM 1376ApprovedMay 2019$9,326,9991REHABILITATE AND WIDEN NARROW ROADWAY0.0
0072-14-030US 87ActualOct 2018$193,28810LANDSCAPE DEVELOPMENT0.0
0072-06-074IH 10ApprovedApr 2019$18,689,9061RECONFIGURE RAMPS AND WIDEN FRONTAGE ROAD TO CONVERT TO ONE0.0

Kerr County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0291-03-071SH 16TentativeJul 2019$4,013,0221BASE REPAIR, SEALCOAT, OVERLAY & PAVEMENT MARKINGS0.0
0142-02-029IH 10ApprovedMar 2019$21,208,5821BASE REPAIR, SEALCOAT, OVERLAY & PAVEMENT MARKINGS ON0.0

Mcmullen County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0517-02-042SH 16ActualDec 2018$21,552,06611REHAB AND WIDEN ROADWAY TO PROVIDE PASSING LANES AND4.0
0483-02-021SH 72ActualSep 2018$29,509,4021REHAB AND WIDEN ROADWAY TO PROVIDE PASSING LANES AND6.5

Medina County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0421-02-030SH 173TentativeAug 2019$010REPLACE AT-GRADE RAILROAD CROSSING SURFACE AT DOT 427 959N0.0
1547-01-048FM 471TentativeAug 2019$010REPLACE TWO AT-GRADE RAILROAD CROSSING SURFACES AT DOT0.0
0915-45-053CRActualJan 2019$455,7446REPLACE BRIDGE & APPROACHES0.0
0915-45-051CRActualSep 2018$427,2206REPLACE BRIDGE AND APPROACHES0.0

Uvalde County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0024-01-101US 90ActualDec 2018$278,86311INTERSECTION IMPROVEMENTS0.0
0037-01-042US 83ActualNov 2018$11,781,9231REHAB EXISTING ROADWAY0.0
0036-08-054US 83TentativeJul 2019$2,765,3098INST ADV SIGNALS/SIGNS CURVE, CHEVRONS, HFST CURVE,IMPRV0.0

Wilson County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0143-04-066US 87TentativeJul 2019$17,364,1711REHAB EXISTING ROADWAY0.0
0100-03-084US 181TentativeJul 2019$10,983,7371OVERLAY AND PAVEMENT MARKINGS0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract