Detail Letting Schedule for Shelby County (FY 2019)
Bid Tabulations Dashboard
Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
Shelby County (FY 2019) |
CCSJ: 0059-05-045 |
|||
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | SH 7 | Let Status: | Actual |
Project ID: | STP 2019(181) | CSJ: | 0059-05-045 |
Description: | HIGHWAY IMPROVEMENT | Handling Code: | |
Limits From: | FLAT FORK CREEK | Fund Cat: | 1 |
Limits To: | US 84 | ESTIMATE: | $501,560 |
Length: | 6.4 | Actual | $458,327 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | SH 147 | Let Status: | Actual |
Project ID: | STP 2019(181) | CSJ: | 0064-02-019 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: | |
Limits From: | SH 87 | Fund Cat: | 1 |
Limits To: | SAN AUGUSTINE COUNTY LINE | ESTIMATE: | $257,504 |
Length: | 7.3 | Actual | $261,926 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | SH 19 | Let Status: | Actual |
Project ID: | STP 2019(181) | CSJ: | 0109-05-042 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: | |
Limits From: | SH 7 | Fund Cat: | 1 |
Limits To: | 0.18 MILES SOUTH OF CR 3365 | ESTIMATE: | $411,461 |
Length: | 7.0 | Actual | $427,622 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | SH 19 | Let Status: | Actual |
Project ID: | STP 2019(181) | CSJ: | 0109-06-042 |
Description: | HIGHWAY IMPROVEMENT | Handling Code: | |
Limits From: | 1.637 MILES N OF FM 231 | Fund Cat: | 1 |
Limits To: | LOVELADY CITY LIMITS SOUTH | ESTIMATE: | |
Length: | 7.4 | Actual | $515,505 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | SH 21 | Let Status: | Actual |
Project ID: | NH 2019(180) | CSJ: | 0117-06-051 |
Description: | RESURFACE ROADWAY | Handling Code: | CO |
Limits From: | 0.2 MILES WEST OF FM 1280 N | Fund Cat: | 1 |
Limits To: | CR 3045 | ESTIMATE: | $161,595 |
Length: | 7.1 | Actual | $1 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | SH 21 | Let Status: | Actual |
Project ID: | STP 2019(181) | CSJ: | 0118-06-073 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: | |
Limits From: | ANGELINA RIVER | Fund Cat: | 1 |
Limits To: | FM 225 | ESTIMATE: | $194,598 |
Length: | 4.5 | Actual | $197,452 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | NH 2019(180) | CSJ: | 0175-04-083 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: | |
Limits From: | 0.250 MI NORTH OF FM 2141 | Fund Cat: | 1 |
Limits To: | SH 87 | ESTIMATE: | $742,419 |
Length: | 9.2 | Actual | $768,800 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | NH 2019(180) | CSJ: | 0176-05-190 |
Description: | SEAL COAT SB LANES ONLY | Handling Code: | |
Limits From: | BU 59 N | Fund Cat: | 1 |
Limits To: | US 190 | ESTIMATE: | $120,721 |
Length: | 2.0 | Actual | $122,318 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | NH 2019(180) | CSJ: | 0176-05-194 |
Description: | RESURFACE ROADWAY | Handling Code: | CO |
Limits From: | 1.75 MILES NORTH OF OLD HWY 35 N NB | Fund Cat: | 1 |
Limits To: | 6.35 MILES NORTH OF OLD HWY 35 N NB | ESTIMATE: | $175,000 |
Length: | 4.6 | Actual | $1 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | NH 2019(180) | CSJ: | 0176-05-195 |
Description: | RESURFACE ROADWAY | Handling Code: | CO |
Limits From: | 0.92 MILES NORTH OF OLD HWY 35 N NB | Fund Cat: | 1 |
Limits To: | 1.75 MILES NORTH OF OLD HWY 35 N NB | ESTIMATE: | $32,000 |
Length: | 0.8 | Actual | $1 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | NH 2019(180) | CSJ: | 0177-01-110 |
Description: | SEAL COAT SB LANES ONLY | Handling Code: | |
Limits From: | US 190 | Fund Cat: | 1 |
Limits To: | 1.6 MILES S. US 190 | ESTIMATE: | $89,652 |
Length: | 1.6 | Actual | $92,170 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | US 69 | Let Status: | Actual |
Project ID: | NH 2019(180) | CSJ: | 0199-04-072 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: | |
Limits From: | CHEROKEE COUNTY LINE | Fund Cat: | 1 |
Limits To: | 0.2 MILES S OF SH 7 | ESTIMATE: | $458,344 |
Length: | 4.0 | Actual | $477,572 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | US 190 | Let Status: | Actual |
Project ID: | STP 2019(181) | CSJ: | 0213-02-046 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: | |
Limits From: | WALKER COUNTY LINE | Fund Cat: | 1 |
Limits To: | SH 156 | ESTIMATE: | $587,920 |
Length: | 7.2 | Actual | $601,618 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | US 190 | Let Status: | Actual |
Project ID: | STP 2019(181) | CSJ: | 0213-03-100 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: | |
Limits From: | SAN JACINTO COUNTY LINE | Fund Cat: | 1 |
Limits To: | 1.29 MI E OF FM 3459(KICKAPOO CR BR | ESTIMATE: | $284,555 |
Length: | 3.9 | Actual | $289,300 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | US 190 | Let Status: | Actual |
Project ID: | STP 2019(181) | CSJ: | 0213-03-104 |
Description: | RESURFACE ROADWAY | Handling Code: | CO |
Limits From: | 1.29 MILES EAST OF FM 3459 | Fund Cat: | 1 |
Limits To: | 0.23 MILES WEST OF FM 2457 | ESTIMATE: | $128,520 |
Length: | 6.4 | Actual | $1 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | SH 87 | Let Status: | Actual |
Project ID: | STP 2019(181) | CSJ: | 0304-02-041 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: | |
Limits From: | FM 276 | Fund Cat: | 1 |
Limits To: | SH 21 | ESTIMATE: | $218,682 |
Length: | 5.2 | Actual | $226,779 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | SH 94 | Let Status: | Actual |
Project ID: | STP 2019(181) | CSJ: | 0319-01-067 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: | |
Limits From: | SH 19 | Fund Cat: | 1 |
Limits To: | US 287 | ESTIMATE: | $764,803 |
Length: | 16.5 | Actual | $737,224 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | SH 94 | Let Status: | Actual |
Project ID: | STP 2019(241) | CSJ: | 0319-04-086 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: | |
Limits From: | TRINITY COUNTY LINE | Fund Cat: | 1 |
Limits To: | FM 706 | ESTIMATE: | $447,413 |
Length: | 4.3 | Actual | $460,099 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | US 287 | Let Status: | Actual |
Project ID: | STP 2019(181) | CSJ: | 0341-03-039 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: | |
Limits From: | US 59 | Fund Cat: | 1 |
Limits To: | TYLER COUNTY LINE | ESTIMATE: | $494,855 |
Length: | 11.9 | Actual | $505,794 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | SH 150 | Let Status: | Actual |
Project ID: | STP 2019(181) | CSJ: | 0395-03-043 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: | |
Limits From: | SH 156 | Fund Cat: | 1 |
Limits To: | FM 222(N) | ESTIMATE: | $173,587 |
Length: | 2.2 | Actual | $179,741 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | SH 7 | Let Status: | Actual |
Project ID: | STP 2019(181) | CSJ: | 0553-03-035 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: | |
Limits From: | ANGELINA RIVER | Fund Cat: | 1 |
Limits To: | FM 2782 | ESTIMATE: | $295,747 |
Length: | 4.2 | Actual | $307,205 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | FM 414 | Let Status: | Actual |
Project ID: | STP 2019(181) | CSJ: | 0743-03-019 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: | |
Limits From: | SH 87 | Fund Cat: | 1 |
Limits To: | 6.11 MILES NORTH | ESTIMATE: | $220,987 |
Length: | 6.1 | Actual | $217,444 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | US 96 | Let Status: | Actual |
Project ID: | NH 2019(180) | CSJ: | 0809-03-041 |
Description: | RESURFACE ROADWAY | Handling Code: | CO |
Limits From: | FM 3451 | Fund Cat: | 1 |
Limits To: | SH 21 | ESTIMATE: | $71,145 |
Length: | 0.0 | Actual | $1 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | US 96 | Let Status: | Actual |
Project ID: | NH 2019(180) | CSJ: | 0809-04-056 |
Description: | RESURFACE ROADWAY | Handling Code: | CO |
Limits From: | SH 21 | Fund Cat: | 1 |
Limits To: | FM 2213 | ESTIMATE: | $56,700 |
Length: | 0.0 | Actual | $1 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | FM 355 | Let Status: | Actual |
Project ID: | STP 2019(181) | CSJ: | 0930-01-028 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: | |
Limits From: | US 287 | Fund Cat: | 1 |
Limits To: | FM 356 | ESTIMATE: | $546,935 |
Length: | 14.0 | Actual | $567,436 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | FM 705 | Let Status: | Actual |
Project ID: | STP 2019(181) | CSJ: | 1079-01-034 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: | |
Limits From: | SH 147 | Fund Cat: | 1 |
Limits To: | FM 83 | ESTIMATE: | $398,467 |
Length: | 10.4 | Actual | $402,383 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | FM 706 | Let Status: | Actual |
Project ID: | STP 2019(241) | CSJ: | 1080-01-015 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: | |
Limits From: | SH 103 | Fund Cat: | 1 |
Limits To: | SH 94 | ESTIMATE: | $197,502 |
Length: | 4.8 | Actual | $180,088 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | FM 1271 | Let Status: | Actual |
Project ID: | STP 2019(182)HES | CSJ: | 1406-01-036 |
Description: | RESURFACING | Handling Code: | |
Limits From: | FM 1194 | Fund Cat: | 1 |
Limits To: | SL 287 | ESTIMATE: | $154,881 |
Length: | 3.3 | Actual | $140,790 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | FM 2261 | Let Status: | Actual |
Project ID: | STP 2019(181) | CSJ: | 1409-03-019 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: | |
Limits From: | SH 87 | Fund Cat: | 1 |
Limits To: | 0.134 MILES W OF CR 2821 | ESTIMATE: | $132,573 |
Length: | 3.5 | Actual | $135,162 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | FM 1514 | Let Status: | Actual |
Project ID: | STP 2019(181) | CSJ: | 1459-01-013 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: | |
Limits From: | FM 3128 | Fund Cat: | 1 |
Limits To: | SH 150 | ESTIMATE: | $87,730 |
Length: | 2.3 | Actual | $87,716 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | FM 1592 | Let Status: | Actual |
Project ID: | STP 2019(181) | CSJ: | 1510-01-021 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: | |
Limits From: | FM 1 | Fund Cat: | 1 |
Limits To: | SH 184 | ESTIMATE: | $319,599 |
Length: | 8.7 | Actual | $325,276 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | FM 276 | Let Status: | Actual |
Project ID: | STP 2019(181) | CSJ: | 1679-01-014 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: | |
Limits From: | SH 87 | Fund Cat: | 1 |
Limits To: | END OF PAVEMENT | ESTIMATE: | $198,185 |
Length: | 4.9 | Actual | $201,092 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | SL 304 | Let Status: | Actual |
Project ID: | NH 2019(180) | CSJ: | 1854-01-046 |
Description: | SEAL COAT | Handling Code: | |
Limits From: | SH 7 WEST | Fund Cat: | 1 |
Limits To: | SH 7 EAST | ESTIMATE: | $335,825 |
Length: | 4.9 | Actual | $350,681 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | NH 2019(180) | CSJ: | 2560-01-080 |
Description: | RESURFACE WITH SEAL COAT (NB LANES ONLY) | Handling Code: | |
Limits From: | GRASS MEDIAN S OF US 259 | Fund Cat: | 1 |
Limits To: | SH 7 (NORTH BOUND ONLY) | ESTIMATE: | $434,132 |
Length: | 6.7 | Actual | $456,781 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | FM 1992 | Let Status: | Actual |
Project ID: | STP 2019(181) | CSJ: | 2810-01-013 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: | |
Limits From: | SH 147 | Fund Cat: | 1 |
Limits To: | SH 103 | ESTIMATE: | $194,107 |
Length: | 5.3 | Actual | $192,875 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | FM 2864 | Let Status: | Actual |
Project ID: | STP 2019(181) | CSJ: | 2891-01-017 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: | |
Limits From: | FM 2664 | Fund Cat: | 1 |
Limits To: | US 59 | ESTIMATE: | $170,110 |
Length: | 4.9 | Actual | $155,930 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | FM 3126 | Let Status: | Actual |
Project ID: | STP 2019(181) | CSJ: | 3160-01-024 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: | |
Limits From: | FM 2457 | Fund Cat: | 1 |
Limits To: | FM 1988 | ESTIMATE: | $298,640 |
Length: | 8.6 | Actual | $287,811 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | FM 3121 | Let Status: | Actual |
Project ID: | STP 2019(181) | CSJ: | 3170-01-014 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: | |
Limits From: | SH 21 | Fund Cat: | 1 |
Limits To: | FM 83 | ESTIMATE: | $173,098 |
Length: | 4.9 | Actual | $167,625 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | FM 2261 | Let Status: | Actual |
Project ID: | STP 2019(181) | CSJ: | 3268-01-011 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: | |
Limits From: | 0.134 MILES W. OF CR 2821 | Fund Cat: | 1 |
Limits To: | END OF PAVEMENT | ESTIMATE: | $213,811 |
Length: | 5.5 | Actual | $220,704 |
District: | LUFKIN | Let Date: | Nov 2018 |
Highway: | SL 500 | Let Status: | Actual |
Project ID: | STP 2019(241) | CSJ: | 3315-01-024 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: | |
Limits From: | US 96 NORTH | Fund Cat: | 1 |
Limits To: | SH 7 NORTH | ESTIMATE: | $242,688 |
Length: | 3.1 | Actual | $241,778 |
List Showing Order Proposal Request Addenda Bid List Bid Tabulations Award Status Back... | Totals for 0059-05-045 | ||
---|---|---|---|
Length: | 225.6 | ||
Estimate: | $10,988,049 | ||
Actual: | $10,961,031 | ||
CCSJ: 0063-06-099 |
|||
District: | LUFKIN | Let Date: | Aug 2019 |
Highway: | US 96 | Let Status: | Actual |
Project ID: | BR 1902(284) | CSJ: | 0063-06-099 |
Description: | BRIDGE MAINTENANCE | Handling Code: | |
Limits From: | AT FLAT FORK CREEK | Fund Cat: | 6 |
Limits To: | . | ESTIMATE: | $874,246 |
Length: | 0.2 | Actual | $693,166 |
District: | LUFKIN | Let Date: | Aug 2019 |
Highway: | SH 103 | Let Status: | Actual |
Project ID: | BR 1902(284) | CSJ: | 0336-07-072 |
Description: | BRIDGE MAINTENANCE | Handling Code: | |
Limits From: | AT CHINQUAPIN CREEK | Fund Cat: | 6 |
Limits To: | . | ESTIMATE: | $42,820 |
Length: | 0.0 | Actual | $51,408 |
District: | LUFKIN | Let Date: | Aug 2019 |
Highway: | SH 103 | Let Status: | Actual |
Project ID: | BR 1902(284) | CSJ: | 0336-07-073 |
Description: | BRIDGE MAINTENANCE | Handling Code: | |
Limits From: | AT AYISH BAYOU | Fund Cat: | 6 |
Limits To: | . | ESTIMATE: | $202,882 |
Length: | 0.1 | Actual | $171,585 |
District: | LUFKIN | Let Date: | Aug 2019 |
Highway: | SH 103 | Let Status: | Actual |
Project ID: | BR 1902(284) | CSJ: | 0336-08-027 |
Description: | BRIDGE MAINTENANCE | Handling Code: | |
Limits From: | AT PALO GAUCHO BAYOU | Fund Cat: | 6 |
Limits To: | . | ESTIMATE: | $137,160 |
Length: | 0.0 | Actual | $115,372 |
District: | LUFKIN | Let Date: | Aug 2019 |
Highway: | SH 147 | Let Status: | Actual |
Project ID: | BR 1902(285) | CSJ: | 0390-02-050 |
Description: | BRIDGE MAINTENANCE | Handling Code: | |
Limits From: | AT ANGELINA RIVER | Fund Cat: | 6 |
Limits To: | . | ESTIMATE: | $2,435,220 |
Length: | 0.2 | Actual | $2,332,678 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0063-06-099 | ||
Length: | 0.5 | ||
Estimate: | $3,692,328 | ||
Actual: | $3,364,209 | ||
CCSJ: 0175-02-093 |
|||
District: | LUFKIN | Let Date: | May 2019 |
Highway: | US 84 | Let Status: | Actual |
Project ID: | C 175-2-93 | CSJ: | 0175-02-093 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | 0.63 MI E OF LP 157 | Fund Cat: | 1 |
Limits To: | MORRIS CREEK | ESTIMATE: | $1,098,776 |
Length: | 9.4 | Actual | $1,078,268 |
District: | LUFKIN | Let Date: | May 2019 |
Highway: | SH 94 | Let Status: | Actual |
Project ID: | C 319-4-88 | CSJ: | 0319-04-088 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | HERNDON STREET | Fund Cat: | 1 |
Limits To: | US 59-G | ESTIMATE: | $292,105 |
Length: | 0.9 | Actual | $286,764 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0175-02-093 | ||
Length: | 10.3 | ||
Estimate: | $1,390,881 | ||
Actual: | $1,365,032 | ||
CCSJ: 1682-01-015 |
|||
District: | LUFKIN | Let Date: | Jun 2019 |
Highway: | FM 1645 | Let Status: | Actual |
Project ID: | STP 1902(029)HES | CSJ: | 1682-01-015 |
Description: | HIGHWAY IMPROVEMENT | Handling Code: | |
Limits From: | US 59 | Fund Cat: | 1 |
Limits To: | SH 87 | ESTIMATE: | $164,805 |
Length: | 7.1 | Actual | $143,672 |
District: | LUFKIN | Let Date: | Jun 2019 |
Highway: | FM 1645 | Let Status: | Actual |
Project ID: | C 1682-1-14 | CSJ: | 1682-01-014 |
Description: | HIGHWAY IMPROVEMENT | Handling Code: | |
Limits From: | US 59 | Fund Cat: | 1 |
Limits To: | SH 87 | ESTIMATE: | $5,633,384 |
Length: | 7.1 | Actual | $5,616,815 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 1682-01-015 | ||
Length: | 14.2 | ||
Estimate: | $5,798,189 | ||
Actual: | $5,760,486 |
Handling Code | Definition |
---|---|
XX | Project not processed through statewide letting |
TR | Transfer of funds |
LC | Project let through local entity |
LC | Project not charged against district apportionment |
Let Status | Definition |
---|---|
Tentative | Estimated letting date for this project |
Approved | Project has administrative approval to be let |
Actual | Project was let to contract |