Detail Letting Schedule for Atascosa County (FY 2020)
Bid Tabulations Dashboard
Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
Atascosa County (FY 2020) |
CCSJ: 0017-04-043 |
|||
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | NH 2020(104) | CSJ: | 0017-04-043 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | MEDINA COUNTY LINE (WFR) | Fund Cat: | 1 |
Limits To: | ATASCOSA RIVER (NORTH PRONG) | ESTIMATE: | $1,244,555 |
Length: | 0.9 | Actual | $922,102 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | SH 132 | Let Status: | Actual |
Project ID: | STP 2020(106) | CSJ: | 0017-13-011 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | MEDINA COUNTY LINE | Fund Cat: | 1 |
Limits To: | BEXAR COUNTY LINE | ESTIMATE: | $98,807 |
Length: | 1.9 | Actual | $92,318 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | NH 2020(105) | CSJ: | 0024-02-073 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | 0.7 W OF FM 1049 (KNIPPA) | Fund Cat: | 1 |
Limits To: | UVALDE/MEDINA COUNTY LINE | ESTIMATE: | $842,903 |
Length: | 14.9 | Actual | $772,281 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | STP 2B20(240)HES | CSJ: | 0024-07-065 |
Description: | RESURFACE ROADWAY | Handling Code: | CO |
Limits From: | MEDINA/BEXAR C/L | Fund Cat: | 8 |
Limits To: | SL 1604 | ESTIMATE: | $1,123,678 |
Length: | 6.4 | Actual | $1 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | NH 2020(104) | CSJ: | 0025-02-220 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | LOOP 1604 | Fund Cat: | 1 |
Limits To: | GUADALUPE COUNTY LINE | ESTIMATE: | $430,105 |
Length: | 4.9 | Actual | $401,308 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | NH 2020(105) | CSJ: | 0029-01-028 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | US 90 | Fund Cat: | 1 |
Limits To: | PR'EXY ST | ESTIMATE: | $69,979 |
Length: | 1.3 | Actual | $64,796 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | NH 2020(105) | CSJ: | 0029-02-050 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | SH 123 | Fund Cat: | 1 |
Limits To: | CALDWELL COUNTY LINE | ESTIMATE: | $696,096 |
Length: | 16.2 | Actual | $662,137 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | US 281A | Let Status: | Actual |
Project ID: | STP 2020(106) | CSJ: | 0073-13-011 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | IH 37 | Fund Cat: | 1 |
Limits To: | LIVE OAK COUNTY LINE | ESTIMATE: | $445,017 |
Length: | 9.6 | Actual | $424,566 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | US 87 | Let Status: | Actual |
Project ID: | NH 2020(105) | CSJ: | 0143-01-058 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 1516 | Fund Cat: | 1 |
Limits To: | FM 1628 | ESTIMATE: | $345,486 |
Length: | 5.8 | Actual | $325,836 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | US 87 | Let Status: | Actual |
Project ID: | NH 2020(105) | CSJ: | 0143-02-026 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 1628 | Fund Cat: | 1 |
Limits To: | WILSON COUNTY LINE | ESTIMATE: | $484,860 |
Length: | 5.3 | Actual | $460,885 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | SH 46 | Let Status: | Actual |
Project ID: | STP 2B20(240)HES | CSJ: | 0215-06-044 |
Description: | RESURFACE ROADWAY | Handling Code: | CO |
Limits From: | AMMANN RD. | Fund Cat: | 8 |
Limits To: | KENDALL/COMAL CL | ESTIMATE: | $705,393 |
Length: | 9.1 | Actual | $1 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | US 57 | Let Status: | Actual |
Project ID: | STP 2020(106) | CSJ: | 0276-07-031 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | ZAVALA/FRIO COUNTY LINE | Fund Cat: | 1 |
Limits To: | FM 140 | ESTIMATE: | $595,138 |
Length: | 11.1 | Actual | $537,237 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | SH 16 | Let Status: | Actual |
Project ID: | STP 2020(106) | CSJ: | 0291-05-049 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | WINAN CREEK | Fund Cat: | 1 |
Limits To: | SH 173 | ESTIMATE: | $265,936 |
Length: | 5.3 | Actual | $237,952 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | SS 242 | Let Status: | Actual |
Project ID: | STP 2020(106) | CSJ: | 0328-10-021 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 476 | Fund Cat: | 1 |
Limits To: | SH 97 | ESTIMATE: | $50,147 |
Length: | 1.3 | Actual | $48,136 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | FM 541 | Let Status: | Actual |
Project ID: | STP 2020(106) | CSJ: | 0366-09-031 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | US 181 | Fund Cat: | 1 |
Limits To: | MARCELINE CREEK | ESTIMATE: | $124,147 |
Length: | 3.4 | Actual | $114,988 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | BS 123B | Let Status: | Actual |
Project ID: | STP 2020(106) | CSJ: | 0366-12-031 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | GUADALUPE RIVER | Fund Cat: | 1 |
Limits To: | SH 123 SOUTH | ESTIMATE: | $84,924 |
Length: | 2.0 | Actual | $78,612 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | SH 127 | Let Status: | Actual |
Project ID: | STP 2020(106) | CSJ: | 0369-01-039 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | RM 187 | Fund Cat: | 1 |
Limits To: | US 90 | ESTIMATE: | $54,284 |
Length: | 1.1 | Actual | $50,059 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | SH 173 | Let Status: | Actual |
Project ID: | STP 2020(106) | CSJ: | 0421-05-032 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 2771 | Fund Cat: | 1 |
Limits To: | KERR/BANDERA COUNTY LINE | ESTIMATE: | $392,623 |
Length: | 7.2 | Actual | $366,387 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | FM 1518 | Let Status: | Actual |
Project ID: | STP 2020(106) | CSJ: | 0465-02-029 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 1346 | Fund Cat: | 1 |
Limits To: | LOOP 1604 | ESTIMATE: | $122,963 |
Length: | 2.6 | Actual | $113,928 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | SH 72 | Let Status: | Actual |
Project ID: | STP 2020(106) | CSJ: | 0483-03-035 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | SH 16 | Fund Cat: | 1 |
Limits To: | LIVE OAK/MCMULLEN COUNTY LINE | ESTIMATE: | $652,697 |
Length: | 9.9 | Actual | $606,466 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | NH 2020(104) | CSJ: | 0521-05-149 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | 0.2 MI W OF US 281 | Fund Cat: | 1 |
Limits To: | SH 16 | ESTIMATE: | $186,495 |
Length: | 4.4 | Actual | $176,634 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | NH 2020(104) | CSJ: | 0521-06-145 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | IH 37 | Fund Cat: | 1 |
Limits To: | 0.2 MI W OF 281 | ESTIMATE: | $309,801 |
Length: | 3.9 | Actual | $295,122 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | SS 422 | Let Status: | Actual |
Project ID: | STP 2020(106) | CSJ: | 0613-01-063 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | IH 35 | Fund Cat: | 1 |
Limits To: | IH 410 | ESTIMATE: | $159,452 |
Length: | 1.6 | Actual | $152,956 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | SL 282 | Let Status: | Actual |
Project ID: | STP 2020(106) | CSJ: | 0613-03-009 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | SH 16 N | Fund Cat: | 1 |
Limits To: | SH 16 S | ESTIMATE: | $69,852 |
Length: | 1.7 | Actual | $66,014 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | FM 470 | Let Status: | Actual |
Project ID: | STP 2020(106) | CSJ: | 0792-04-049 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 462 | Fund Cat: | 1 |
Limits To: | SH 16 | ESTIMATE: | $391,374 |
Length: | 11.8 | Actual | $354,549 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | FM 462 | Let Status: | Actual |
Project ID: | STP 2020(106) | CSJ: | 0848-02-009 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | MEDINA/FRIO COUNTY LINE | Fund Cat: | 1 |
Limits To: | STA 0+15 IN MOORE | ESTIMATE: | $178,536 |
Length: | 4.8 | Actual | $163,570 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | FM 3432 | Let Status: | Actual |
Project ID: | STP 2020(106) | CSJ: | 0850-05-006 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 1628 | Fund Cat: | 1 |
Limits To: | WILSON COUNTY LINE | ESTIMATE: | $186,709 |
Length: | 4.2 | Actual | $172,105 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | FM 476 | Let Status: | Actual |
Project ID: | STP 2020(106) | CSJ: | 0853-01-017 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 1333 | Fund Cat: | 1 |
Limits To: | SH 16 | ESTIMATE: | $163,667 |
Length: | 3.3 | Actual | $152,147 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | FM 476 | Let Status: | Actual |
Project ID: | STP 2020(106) | CSJ: | 0853-02-032 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | LP 282 | Fund Cat: | 1 |
Limits To: | SS 242 | ESTIMATE: | $290,365 |
Length: | 7.0 | Actual | $271,643 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | RM 337 | Let Status: | Actual |
Project ID: | STP 2020(106) | CSJ: | 0855-04-031 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | RM 187 | Fund Cat: | 1 |
Limits To: | SH 16 | ESTIMATE: | $759,427 |
Length: | 20.2 | Actual | $688,724 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | FM 2771 | Let Status: | Actual |
Project ID: | STP 2020(106) | CSJ: | 0856-02-012 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | SH 16 | Fund Cat: | 1 |
Limits To: | SH 173 | ESTIMATE: | $225,700 |
Length: | 6.3 | Actual | $204,148 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | RM 484 | Let Status: | Actual |
Project ID: | STP 2020(106) | CSJ: | 0857-01-034 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | INTERSECTION AT N CRANES MILL RD | Fund Cat: | 1 |
Limits To: | FM 306 | ESTIMATE: | $187,521 |
Length: | 3.0 | Actual | $164,161 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | FM 306 | Let Status: | Actual |
Project ID: | NH 2020(105) | CSJ: | 0857-01-035 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 484 | Fund Cat: | 1 |
Limits To: | FM 3424 | ESTIMATE: | $251,051 |
Length: | 3.2 | Actual | $223,467 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | FM 306 | Let Status: | Actual |
Project ID: | STP 2B20(240)HES | CSJ: | 0857-01-039 |
Description: | RESURFACE ROADWAY | Handling Code: | CO |
Limits From: | RM 484 | Fund Cat: | 8 |
Limits To: | GRAND PASS RD. | ESTIMATE: | $388,564 |
Length: | 4.3 | Actual | $1 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | FM 538 | Let Status: | Actual |
Project ID: | C 1010-1-16 | CSJ: | 1010-01-016 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | US 87 | Fund Cat: | 1 |
Limits To: | FM 1347 | ESTIMATE: | $67,933 |
Length: | 3.3 | Actual | $65,075 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | PR 37 | Let Status: | Actual |
Project ID: | STP 2020(106) | CSJ: | 1066-01-025 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | BANDERA COUNTY PARK | Fund Cat: | 1 |
Limits To: | BANDERA/MEDINA COUNTY LINE | ESTIMATE: | $298,741 |
Length: | 9.9 | Actual | $275,831 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | FM 1339 | Let Status: | Actual |
Project ID: | C 1434-1-15 | CSJ: | 1434-01-015 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | SH 123 | Fund Cat: | 1 |
Limits To: | FM 621 | ESTIMATE: | $302,289 |
Length: | 8.9 | Actual | $273,464 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | FM 1346 | Let Status: | Actual |
Project ID: | STP 2020(106) | CSJ: | 1437-01-038 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | LP 1604 | Fund Cat: | 1 |
Limits To: | WILSON COUNTY LINE | ESTIMATE: | $311,670 |
Length: | 7.0 | Actual | $287,820 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | FM 1346 | Let Status: | Actual |
Project ID: | STP 2020(106) | CSJ: | 1437-02-015 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | BEXAR COUNTY LINE | Fund Cat: | 1 |
Limits To: | US 87 | ESTIMATE: | $160,272 |
Length: | 3.6 | Actual | $147,259 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | FM 1516 | Let Status: | Actual |
Project ID: | STP 2020(106) | CSJ: | 1477-01-045 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | IH 10 | Fund Cat: | 1 |
Limits To: | US 87 | ESTIMATE: | $183,706 |
Length: | 5.4 | Actual | $172,196 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | FM 1582 | Let Status: | Actual |
Project ID: | STP 2020(106) | CSJ: | 1500-01-025 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | SH 85 | Fund Cat: | 1 |
Limits To: | LASALLE COUNTY | ESTIMATE: | $735,989 |
Length: | 12.9 | Actual | $1,238,474 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | FM 1582 | Let Status: | Actual |
Project ID: | STP 2020(106) | CSJ: | 1500-03-011 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | LASALLE COUNTY LINE | Fund Cat: | 1 |
Limits To: | SH 97 | ESTIMATE: | $67,674 |
Length: | 1.2 | Actual | $113,236 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | FM 471 | Let Status: | Actual |
Project ID: | STP 2020(106) | CSJ: | 1547-01-047 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 2790 | Fund Cat: | 1 |
Limits To: | SH 132 | ESTIMATE: | $434,633 |
Length: | 10.5 | Actual | $402,374 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | FM 462 | Let Status: | Actual |
Project ID: | STP 2020(106) | CSJ: | 1729-01-019 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | MOORE (STA 0+15) | Fund Cat: | 1 |
Limits To: | FM 472 IN BIG FOOT | ESTIMATE: | $361,397 |
Length: | 8.4 | Actual | $333,859 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | FM 2504 | Let Status: | Actual |
Project ID: | C 1738-2-14 | CSJ: | 1738-02-014 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | SH 173 | Fund Cat: | 1 |
Limits To: | 1.84 MI S OF FM 476 | ESTIMATE: | $310,486 |
Length: | 7.8 | Actual | $285,494 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | FM 791 | Let Status: | Actual |
Project ID: | STP 2020(106) | CSJ: | 1739-03-011 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | MCMULLEN/ATASCOSA COUNTY LINE | Fund Cat: | 1 |
Limits To: | US 281A | ESTIMATE: | $355,507 |
Length: | 11.7 | Actual | $334,161 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | FM 2504 | Let Status: | Actual |
Project ID: | C 1740-2-34 | CSJ: | 1740-02-034 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | 1.84 MI S OF FM 476 | Fund Cat: | 1 |
Limits To: | FM 476 | ESTIMATE: | $63,164 |
Length: | 1.8 | Actual | $58,686 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | FM 2790 | Let Status: | Actual |
Project ID: | STP 2020(106) | CSJ: | 1741-02-035 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | LP 1604 | Fund Cat: | 1 |
Limits To: | IH 410 | ESTIMATE: | $322,630 |
Length: | 6.9 | Actual | $290,573 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | FM 1922 | Let Status: | Actual |
Project ID: | C 1826-1-10 | CSJ: | 1826-01-010 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | SH 97 | Fund Cat: | 1 |
Limits To: | FM 537 | ESTIMATE: | $113,013 |
Length: | 5.1 | Actual | $108,434 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | FM 1574 | Let Status: | Actual |
Project ID: | STP 2020(106) | CSJ: | 2175-03-008 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | US 90 | Fund Cat: | 1 |
Limits To: | FM 1023 | ESTIMATE: | $29,116 |
Length: | 0.9 | Actual | $26,636 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | SL 1604 | Let Status: | Actual |
Project ID: | STP 2020(106) | CSJ: | 2452-04-018 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | IH 10 | Fund Cat: | 1 |
Limits To: | US 87 | ESTIMATE: | $400,303 |
Length: | 7.8 | Actual | $372,784 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | FM 306 | Let Status: | Actual |
Project ID: | NH 2020(105) | CSJ: | 3106-01-017 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | US 281 | Fund Cat: | 1 |
Limits To: | FM 484 | ESTIMATE: | $647,992 |
Length: | 9.3 | Actual | $567,470 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | FM 306 | Let Status: | Actual |
Project ID: | STP 2B20(240)HES | CSJ: | 3106-01-020 |
Description: | RESURFACE ROADWAY | Handling Code: | CO |
Limits From: | CRANES MILL RD. | Fund Cat: | 8 |
Limits To: | RM 484 | ESTIMATE: | $166,527 |
Length: | 1.9 | Actual | $1 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | FM 3159 | Let Status: | Actual |
Project ID: | STP 2B20(240)HES | CSJ: | 3213-01-010 |
Description: | RESURFACE ROADWAY | Handling Code: | CO |
Limits From: | FM 2673 | Fund Cat: | 8 |
Limits To: | SH 46 | ESTIMATE: | $613,841 |
Length: | 6.4 | Actual | $1 |
District: | SAN ANTONIO | Let Date: | Oct 2019 |
Highway: | FM 3240 | Let Status: | Actual |
Project ID: | C 3352-1-8 | CSJ: | 3352-01-008 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 2828 | Fund Cat: | 1 |
Limits To: | SH 173 | ESTIMATE: | $304,739 |
Length: | 7.2 | Actual | $280,940 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0017-04-043 | ||
---|---|---|---|
Length: | 337.8 | ||
Estimate: | $18,829,874 | ||
Actual: | $15,000,003 | ||
CCSJ: 0915-13-030 |
|||
District: | SAN ANTONIO | Let Date: | May 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2020(791) | CSJ: | 0915-13-030 |
Description: | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | Handling Code: | |
Limits From: | IN PLEASANTON ON DOWNEY DR AND | Fund Cat: | 10 |
Limits To: | SP 242/FM 476 (BENSDALE RD) | ESTIMATE: | $665,047 |
Length: | 0.8 | Actual | $584,272 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0915-13-030 | ||
Length: | 0.8 | ||
Estimate: | $665,047 | ||
Actual: | $584,272 |
Handling Code | Definition |
---|---|
XX | Project not processed through statewide letting |
TR | Transfer of funds |
LC | Project let through local entity |
LC | Project not charged against district apportionment |
Let Status | Definition |
---|---|
Tentative | Estimated letting date for this project |
Approved | Project has administrative approval to be let |
Actual | Project was let to contract |