Detail Letting Schedule for Grayson County (FY 2020)
Bid Tabulations Dashboard
Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
Grayson County (FY 2020) |
CCSJ: 0045-02-039 |
|||
District: | PARIS | Let Date: | Aug 2020 |
Highway: | SH 56 | Let Status: | Actual |
Project ID: | STP 2B20(143) | CSJ: | 0045-02-039 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | WHITESBORO CITY LIMITS | Fund Cat: | 8 |
Limits To: | WEST OF DAGNAN RD | ESTIMATE: | $250,907 |
Length: | 7.8 | Actual | $55,251 |
District: | PARIS | Let Date: | Aug 2020 |
Highway: | SH 56 | Let Status: | Actual |
Project ID: | STP 2B20(143) | CSJ: | 0045-03-054 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | WEST OF DAGNAN RD | Fund Cat: | 8 |
Limits To: | SHERMAN CITY LIMITS | ESTIMATE: | $45,174 |
Length: | 0.0 | Actual | $33,996 |
District: | PARIS | Let Date: | Aug 2020 |
Highway: | SH 56 | Let Status: | Actual |
Project ID: | STP 2B20(143) | CSJ: | 0045-05-050 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | GRAYSON COUNTY LINE | Fund Cat: | 8 |
Limits To: | SH 78 | ESTIMATE: | $91,606 |
Length: | 0.0 | Actual | $69,331 |
District: | PARIS | Let Date: | Aug 2020 |
Highway: | SH 56 | Let Status: | Actual |
Project ID: | STP 2B20(143) | CSJ: | 0045-06-054 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | SH 78 | Fund Cat: | 8 |
Limits To: | US 82 | ESTIMATE: | $137,035 |
Length: | 0.0 | Actual | $103,715 |
District: | PARIS | Let Date: | Aug 2020 |
Highway: | US 82 | Let Status: | Actual |
Project ID: | STP 2B20(143) | CSJ: | 0045-11-043 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | FM 194 (BOIS D'ARC ST) | Fund Cat: | 8 |
Limits To: | RED RIVER COUNTY LINE | ESTIMATE: | $30,150 |
Length: | 0.0 | Actual | $22,768 |
District: | PARIS | Let Date: | Aug 2020 |
Highway: | SH 34 | Let Status: | Actual |
Project ID: | STP 2B20(143) | CSJ: | 0173-06-053 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | CR 2241 | Fund Cat: | 8 |
Limits To: | KAUFMAN COUNTY LINE | ESTIMATE: | $92,185 |
Length: | 0.0 | Actual | $69,466 |
District: | PARIS | Let Date: | Aug 2020 |
Highway: | SH 34 | Let Status: | Actual |
Project ID: | STP 2B20(143) | CSJ: | 0173-07-060 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | FM 1564 | Fund Cat: | 8 |
Limits To: | CR 2241 | ESTIMATE: | $9,761 |
Length: | 0.0 | Actual | $7,483 |
District: | PARIS | Let Date: | Aug 2020 |
Highway: | SH 34 | Let Status: | Actual |
Project ID: | STP 2B20(143) | CSJ: | 0174-03-041 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | FM 1550 | Fund Cat: | 8 |
Limits To: | SH 56 | ESTIMATE: | $61,242 |
Length: | 0.0 | Actual | $57,503 |
District: | PARIS | Let Date: | Aug 2020 |
Highway: | SH 37 | Let Status: | Actual |
Project ID: | STP 2B20(143) | CSJ: | 0189-02-053 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | US 82 | Fund Cat: | 8 |
Limits To: | OKLAHOMA STATE LINE | ESTIMATE: | $48,323 |
Length: | 0.0 | Actual | $43,319 |
District: | PARIS | Let Date: | Aug 2020 |
Highway: | FM 909 | Let Status: | Actual |
Project ID: | STP 2B20(143) | CSJ: | 0189-03-035 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | BU 82J | Fund Cat: | 8 |
Limits To: | US 271 | ESTIMATE: | $140,032 |
Length: | 0.0 | Actual | $131,391 |
District: | PARIS | Let Date: | Aug 2020 |
Highway: | FM 697 | Let Status: | Actual |
Project ID: | STP 2B20(143) | CSJ: | 0202-09-032 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | SH 11 | Fund Cat: | 8 |
Limits To: | US 69 | ESTIMATE: | $64,987 |
Length: | 0.0 | Actual | $58,688 |
District: | PARIS | Let Date: | Aug 2020 |
Highway: | US 69 | Let Status: | Actual |
Project ID: | STP 2B20(143) | CSJ: | 0203-01-064 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | US 69D | Fund Cat: | 8 |
Limits To: | CR 3124 | ESTIMATE: | $14,830 |
Length: | 0.0 | Actual | $11,172 |
District: | PARIS | Let Date: | Aug 2020 |
Highway: | US 69 | Let Status: | Actual |
Project ID: | STP 2B20(143) | CSJ: | 0203-02-049 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | CR 3124 | Fund Cat: | 8 |
Limits To: | RAINS COUNTY LINE | ESTIMATE: | $70,480 |
Length: | 0.0 | Actual | $53,023 |
District: | PARIS | Let Date: | Aug 2020 |
Highway: | FM 902 | Let Status: | Actual |
Project ID: | STP 2B20(143) | CSJ: | 0510-01-030 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | US 377 | Fund Cat: | 8 |
Limits To: | US 75 | ESTIMATE: | $203,488 |
Length: | 0.0 | Actual | $190,762 |
District: | PARIS | Let Date: | Aug 2020 |
Highway: | FM 1497 | Let Status: | Actual |
Project ID: | STP 2B20(143) | CSJ: | 0688-03-029 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | LOOP 286 | Fund Cat: | 8 |
Limits To: | FM 1184 | ESTIMATE: | $25,377 |
Length: | 0.0 | Actual | $22,866 |
District: | PARIS | Let Date: | Aug 2020 |
Highway: | FM 114 | Let Status: | Actual |
Project ID: | STP 2B20(143) | CSJ: | 0722-01-026 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | US 82 | Fund Cat: | 8 |
Limits To: | FM 1699 | ESTIMATE: | $87,734 |
Length: | 0.0 | Actual | $82,358 |
District: | PARIS | Let Date: | Aug 2020 |
Highway: | FM 120 | Let Status: | Actual |
Project ID: | STP 2B20(143) | CSJ: | 0728-02-033 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | FM 1753 | Fund Cat: | 8 |
Limits To: | OKLAHOMA STATE LINE | ESTIMATE: | $51,223 |
Length: | 0.0 | Actual | $48,035 |
District: | PARIS | Let Date: | Aug 2020 |
Highway: | FM 1897 | Let Status: | Actual |
Project ID: | STP 2B20(143) | CSJ: | 0728-03-014 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | END OF MAINTENANCE | Fund Cat: | 8 |
Limits To: | US 82 | ESTIMATE: | $30,698 |
Length: | 0.0 | Actual | $28,840 |
District: | PARIS | Let Date: | Aug 2020 |
Highway: | FM 120 | Let Status: | Actual |
Project ID: | STP 2B20(143) | CSJ: | 0728-04-012 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | SH 289 | Fund Cat: | 8 |
Limits To: | END OF MAINTENANCE | ESTIMATE: | $35,304 |
Length: | 0.0 | Actual | $33,131 |
District: | PARIS | Let Date: | Aug 2020 |
Highway: | FM 121 | Let Status: | Actual |
Project ID: | STP 2B20(143) | CSJ: | 0729-01-047 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | US 377 | Fund Cat: | 8 |
Limits To: | SH 5 | ESTIMATE: | $85,870 |
Length: | 0.0 | Actual | $77,551 |
District: | PARIS | Let Date: | Aug 2020 |
Highway: | FM 121 | Let Status: | Actual |
Project ID: | STP 2B20(143) | CSJ: | 0729-02-033 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | SH 5 | Fund Cat: | 8 |
Limits To: | SH 160 | ESTIMATE: | $42,346 |
Length: | 0.0 | Actual | $38,243 |
District: | PARIS | Let Date: | Aug 2020 |
Highway: | FM 195 | Let Status: | Actual |
Project ID: | STP 2B20(143) | CSJ: | 0730-02-056 |
Description: | REHAB OF TRAFFIC MANAGEMENT | Handling Code: | |
Limits From: | 3.2 MILES NE OF SPUR 139 | Fund Cat: | 8 |
Limits To: | RED RIVER COUNTY LINE | ESTIMATE: | $61,247 |
Length: | 0.0 | Actual | $55,376 |
District: | PARIS | Let Date: | Aug 2020 |
Highway: | FM 905 | Let Status: | Actual |
Project ID: | STP 2B20(143) | CSJ: | 0730-03-030 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | LOOP 286 | Fund Cat: | 8 |
Limits To: | FM 3426 | ESTIMATE: | $34,304 |
Length: | 0.0 | Actual | $31,001 |
District: | PARIS | Let Date: | Aug 2020 |
Highway: | FM 195 | Let Status: | Actual |
Project ID: | STP 2B20(143) | CSJ: | 0730-04-018 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | LAMAR COUNTY LINE | Fund Cat: | 8 |
Limits To: | SH 37 | ESTIMATE: | $65,164 |
Length: | 0.0 | Actual | $58,621 |
District: | PARIS | Let Date: | Aug 2020 |
Highway: | FM 128 | Let Status: | Actual |
Project ID: | STP 2B20(143) | CSJ: | 0735-01-018 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | FM 64 | Fund Cat: | 8 |
Limits To: | SH 24 | ESTIMATE: | $95,627 |
Length: | 0.0 | Actual | $87,830 |
District: | PARIS | Let Date: | Aug 2020 |
Highway: | FM 137 | Let Status: | Actual |
Project ID: | STP 2B20(143) | CSJ: | 0749-01-059 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | FM 2122 | Fund Cat: | 8 |
Limits To: | FM 1184 | ESTIMATE: | $42,768 |
Length: | 0.0 | Actual | $40,104 |
District: | PARIS | Let Date: | Aug 2020 |
Highway: | FM 1533 | Let Status: | Actual |
Project ID: | STP 2B20(143) | CSJ: | 0749-04-012 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | FM 128 | Fund Cat: | 8 |
Limits To: | FM 1530 | ESTIMATE: | $35,824 |
Length: | 0.0 | Actual | $33,558 |
District: | PARIS | Let Date: | Aug 2020 |
Highway: | FM 1159 | Let Status: | Actual |
Project ID: | STP 2B20(143) | CSJ: | 0773-02-018 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | US 82 | Fund Cat: | 8 |
Limits To: | SH 37 | ESTIMATE: | $116,116 |
Length: | 0.0 | Actual | $106,302 |
District: | PARIS | Let Date: | Aug 2020 |
Highway: | SH 11 | Let Status: | Actual |
Project ID: | STP 2B20(143) | CSJ: | 2139-02-011 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | US 69 | Fund Cat: | 8 |
Limits To: | SH 121 | ESTIMATE: | $65,585 |
Length: | 0.0 | Actual | $49,387 |
District: | PARIS | Let Date: | Aug 2020 |
Highway: | FM 902 | Let Status: | Actual |
Project ID: | STP 2B20(143) | CSJ: | 2459-02-013 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | COOK COUNTY LINE | Fund Cat: | 8 |
Limits To: | US 377 | ESTIMATE: | $18,044 |
Length: | 0.0 | Actual | $16,915 |
District: | PARIS | Let Date: | Aug 2020 |
Highway: | FM 114 | Let Status: | Actual |
Project ID: | STP 2B20(143) | CSJ: | 2730-01-010 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | FM 1699 | Fund Cat: | 8 |
Limits To: | BOWIE COUNTY LINE | ESTIMATE: | $55,274 |
Length: | 0.0 | Actual | $51,887 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0045-02-039 | ||
---|---|---|---|
Length: | 7.8 | ||
Estimate: | $2,208,704 | ||
Actual: | $1,769,871 | ||
CCSJ: 0047-02-150 |
|||
District: | PARIS | Let Date: | Sep 2019 |
Highway: | US 75 | Let Status: | Actual |
Project ID: | NH 2020(008) | CSJ: | 0047-02-150 |
Description: | WIDEN ROAD - ADD LANES | Handling Code: | |
Limits From: | SH 91 | Fund Cat: | 1 |
Limits To: | 0.651 MI S OF CENTER STREET | ESTIMATE: | $92,864,094 |
Length: | 2.1 | Actual | $84,308,516 |
District: | PARIS | Let Date: | Sep 2019 |
Highway: | US 75 | Let Status: | Actual |
Project ID: | STP 2020(007)HES | CSJ: | 0047-02-148 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | AT FM 131 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $191,933 |
Length: | 0.2 | Actual | $329,182 |
District: | PARIS | Let Date: | Sep 2019 |
Highway: | US 75 | Let Status: | Actual |
Project ID: | STP 2020(007)HES | CSJ: | 0047-02-149 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | AT SH 56 | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $460,169 |
Length: | 0.2 | Actual | $516,136 |
District: | PARIS | Let Date: | Sep 2019 |
Highway: | US 75 | Let Status: | Actual |
Project ID: | NH 2020(008) | CSJ: | 0047-03-087 |
Description: | WIDEN ROAD - ADD LANES | Handling Code: | |
Limits From: | 0.651 MI S OF CENTER STREET | Fund Cat: | 1 |
Limits To: | FM 1417 | ESTIMATE: | $52,868,548 |
Length: | 2.1 | Actual | $50,574,095 |
District: | PARIS | Let Date: | Sep 2019 |
Highway: | US 75 | Let Status: | Actual |
Project ID: | NH 2020(008) | CSJ: | 0047-18-083 |
Description: | INTERCHANGE IMPROVEMENT | Handling Code: | |
Limits From: | AT US 82 | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $20,616,333 |
Length: | 0.2 | Actual | $18,955,227 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0047-02-150 | ||
Length: | 4.8 | ||
Estimate: | $167,001,077 | ||
Actual: | $154,683,155 | ||
CCSJ: 0081-10-048 |
|||
District: | PARIS | Let Date: | Aug 2020 |
Highway: | US 377 | Let Status: | Actual |
Project ID: | STP 2B20(148)HES | CSJ: | 0081-10-048 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | FM 901 E | Fund Cat: | 8 |
Limits To: | US 82 | ESTIMATE: | $1,727,392 |
Length: | 9.2 | Actual | $1,740,801 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0081-10-048 | ||
Length: | 9.2 | ||
Estimate: | $1,727,392 | ||
Actual: | $1,740,801 | ||
CCSJ: 0091-01-054 |
|||
District: | PARIS | Let Date: | Apr 2020 |
Highway: | SH 289 | Let Status: | Actual |
Project ID: | STP 2020(740) | CSJ: | 0091-01-054 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | 0.185 MI N OF SS 316 | Fund Cat: | 1 |
Limits To: | FM 120 | ESTIMATE: | $874,873 |
Length: | 0.8 | Actual | $678,990 |
District: | PARIS | Let Date: | Apr 2020 |
Highway: | SH 289 | Let Status: | Actual |
Project ID: | STP 2020(740) | CSJ: | 0202-08-071 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | END OF STATE MNT | Fund Cat: | 1 |
Limits To: | 0.185 MI N OF SS 316 | ESTIMATE: | $1,775,785 |
Length: | 6.1 | Actual | $1,540,140 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0091-01-054 | ||
Length: | 6.9 | ||
Estimate: | $2,650,658 | ||
Actual: | $2,219,130 | ||
CCSJ: 0901-19-193 |
|||
District: | PARIS | Let Date: | Sep 2019 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2019(786)TAPS | CSJ: | 0901-19-193 |
Description: | HIKE AND/OR BIKE | Handling Code: | |
Limits From: | DAY ST (ON ABANDONED U.P. RAILWAY) | Fund Cat: | 3 |
Limits To: | LOY LAKE ROAD | ESTIMATE: | $900,680 |
Length: | 1.0 | Actual | $1,074,743 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0901-19-193 | ||
Length: | 1 | ||
Estimate: | $900,680 | ||
Actual: | $1,074,743 | ||
CCSJ: 0901-19-197 |
|||
District: | PARIS | Let Date: | Jan 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | NH 2020(470) | CSJ: | 0901-19-197 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | VARIOUS LOCATIONS ON US 75 | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $1,499,900 |
Length: | 30.0 | Actual | $1,246,711 |
Proposal Request Bid List List Showing Order Bid Tabulations Award Status Back... | Totals for 0901-19-197 | ||
Length: | 30 | ||
Estimate: | $1,499,900 | ||
Actual: | $1,246,711 | ||
CCSJ: 2455-01-031 |
|||
District: | PARIS | Let Date: | Nov 2019 |
Highway: | FM 1417 | Let Status: | Actual |
Project ID: | STP 1902(268) | CSJ: | 2455-01-031 |
Description: | WIDEN ROAD - ADD LANES | Handling Code: | |
Limits From: | US 82 | Fund Cat: | 1 |
Limits To: | TAYLOR STREET | ESTIMATE: | $14,148,371 |
Length: | 1.4 | Actual | $12,944,763 |
District: | PARIS | Let Date: | Nov 2019 |
Highway: | FM 1417 | Let Status: | Actual |
Project ID: | STP 1902(268) | CSJ: | 2455-01-034 |
Description: | WIDEN ROAD - ADD LANES | Handling Code: | |
Limits From: | TAYLOR STREET | Fund Cat: | 1 |
Limits To: | SH 56 | ESTIMATE: | $19,228,929 |
Length: | 1.6 | Actual | $18,445,061 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 2455-01-031 | ||
Length: | 3 | ||
Estimate: | $33,377,300 | ||
Actual: | $31,389,823 | ||
CCSJ: 2455-01-041 |
|||
District: | PARIS | Let Date: | Jan 2020 |
Highway: | FM 1417 | Let Status: | Actual |
Project ID: | CC 2455-1-41 | CSJ: | 2455-01-041 |
Description: | INTERCHANGE IMPROVEMENT | Handling Code: | |
Limits From: | AT OB GRONER ROAD | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $1,029,183 |
Length: | 0.4 | Actual | $1,159,235 |
Proposal Request Bid List List Showing Order Bid Tabulations Award Status Back... | Totals for 2455-01-041 | ||
Length: | 0.4 | ||
Estimate: | $1,029,183 | ||
Actual: | $1,159,235 |
Handling Code | Definition |
---|---|
XX | Project not processed through statewide letting |
TR | Transfer of funds |
LC | Project let through local entity |
LC | Project not charged against district apportionment |
Let Status | Definition |
---|---|
Tentative | Estimated letting date for this project |
Approved | Project has administrative approval to be let |
Actual | Project was let to contract |