Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
Hidalgo County (FY 2020) |
CCSJ: 0039-02-063 |
|||
District: | PHARR | Let Date: | Oct 2019 |
Highway: | US 83 | Let Status: | Actual |
Project ID: | NH 1902(056) | CSJ: | 0039-02-063 |
Description: | NEW ARTERIAL | Handling Code: | |
Limits From: | FM 2221(JARA CHINAS ROAD) | Fund Cat: | 1 |
Limits To: | 0.28 MI WEST OF SHOWERS ROAD | ESTIMATE: | 103,386,813 |
Length: | 5.1 | Actual | $95,910,808 |
District: | PHARR | Let Date: | Oct 2019 |
Highway: | US 83 | Let Status: | Actual |
Project ID: | NH 2020(112) | CSJ: | 0039-17-202 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | FM 1427 | Fund Cat: | 2M |
Limits To: | BUSINESS 83 S | ESTIMATE: | $97,823 |
Length: | 0.5 | Actual | $83,215 |
List Showing Order Proposal Request Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0039-02-063 | ||
---|---|---|---|
Length: | 5.6 | ||
Estimate: | $103,484,636 | ||
Actual: | $95,994,023 | ||
CCSJ: 0039-04-129 |
|||
District: | PHARR | Let Date: | Jul 2020 |
Highway: | BU 83-S | Let Status: | Actual |
Project ID: | STP 2020(986)HES | CSJ: | 0039-04-129 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT SS 433 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $296,407 |
Length: | 0.2 | Actual | $306,457 |
District: | PHARR | Let Date: | Jul 2020 |
Highway: | IH 69E | Let Status: | Actual |
Project ID: | C 39-8-104 | CSJ: | 0039-08-104 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | @ SH 550/FM 511 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $318,060 |
Length: | 0.0 | Actual | $298,887 |
District: | PHARR | Let Date: | Jul 2020 |
Highway: | UP 281 | Let Status: | Actual |
Project ID: | STP 2020(986)HES | CSJ: | 0255-09-101 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT MCCOLL RD. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $157,423 |
Length: | 0.0 | Actual | $90,952 |
District: | PHARR | Let Date: | Jul 2020 |
Highway: | BU 281W | Let Status: | Actual |
Project ID: | STP 2020(986)HES | CSJ: | 0255-11-022 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT FM 1925 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $123,043 |
Length: | 0.2 | Actual | $122,224 |
District: | PHARR | Let Date: | Jul 2020 |
Highway: | BU 77-X | Let Status: | Actual |
Project ID: | STP 2020(986)HES | CSJ: | 0327-08-101 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT SL 499 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $151,535 |
Length: | 0.2 | Actual | $127,126 |
District: | PHARR | Let Date: | Jul 2020 |
Highway: | FM 732 | Let Status: | Actual |
Project ID: | STP 2020(987)HES | CSJ: | 1057-02-033 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | @ BENT TREE AVE. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $139,454 |
Length: | 0.0 | Actual | $140,056 |
District: | PHARR | Let Date: | Jul 2020 |
Highway: | SL 499 | Let Status: | Actual |
Project ID: | STP 2020(986)HES | CSJ: | 1137-02-040 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT NEW COMBES HWY | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $107,799 |
Length: | 0.2 | Actual | $106,952 |
District: | PHARR | Let Date: | Jul 2020 |
Highway: | SL 499 | Let Status: | Actual |
Project ID: | STP 2020(986)HES | CSJ: | 1137-02-041 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT GRIMES RD. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $121,630 |
Length: | 0.2 | Actual | $121,636 |
District: | PHARR | Let Date: | Jul 2020 |
Highway: | SS 206 | Let Status: | Actual |
Project ID: | STP 2020(986)HES | CSJ: | 1425-03-069 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT EYE ST. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $157,493 |
Length: | 0.2 | Actual | $152,015 |
District: | PHARR | Let Date: | Jul 2020 |
Highway: | SS 206 | Let Status: | Actual |
Project ID: | STP 2020(986)HES | CSJ: | 1425-03-070 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT C ST. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $158,248 |
Length: | 0.2 | Actual | $152,759 |
District: | PHARR | Let Date: | Jul 2020 |
Highway: | SS 206 | Let Status: | Actual |
Project ID: | STP 2020(986)HES | CSJ: | 1425-03-071 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT 6TH ST. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $158,768 |
Length: | 0.2 | Actual | $153,247 |
District: | PHARR | Let Date: | Jul 2020 |
Highway: | FM 1426 | Let Status: | Actual |
Project ID: | STP 2020(986)HES | CSJ: | 1429-02-040 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT MINNESOTA RD. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $109,427 |
Length: | 0.2 | Actual | $107,957 |
District: | PHARR | Let Date: | Jul 2020 |
Highway: | FM 907 | Let Status: | Actual |
Project ID: | STP 2020(987)HES | CSJ: | 1586-01-080 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT CANTON RD. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $143,116 |
Length: | 0.2 | Actual | $79,940 |
District: | PHARR | Let Date: | Jul 2020 |
Highway: | FM 1925 | Let Status: | Actual |
Project ID: | STP 2020(986)HES | CSJ: | 1803-02-045 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT DOOLITTLE RD. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $145,286 |
Length: | 0.2 | Actual | $145,222 |
District: | PHARR | Let Date: | Jul 2020 |
Highway: | FM 3362 | Let Status: | Actual |
Project ID: | STP 2020(987)HES | CSJ: | 3468-01-022 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT ALBERTA RD. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $111,838 |
Length: | 0.2 | Actual | $110,795 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0039-04-129 | ||
Length: | 2.4 | ||
Estimate: | $2,399,526 | ||
Actual: | $2,216,224 | ||
CCSJ: 0039-17-198 |
|||
District: | PHARR | Let Date: | Feb 2020 |
Highway: | IH 2 | Let Status: | Actual |
Project ID: | NH 2020(562) | CSJ: | 0039-17-198 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | LOS EBANOS RD. UNDERPASS | Fund Cat: | 1 |
Limits To: | FM 2220 (WARE RD.) | ESTIMATE: | $8,058,510 |
Length: | 5.8 | Actual | $8,488,894 |
District: | PHARR | Let Date: | Feb 2020 |
Highway: | FM 2061 | Let Status: | Actual |
Project ID: | NH 2020(562) | CSJ: | 1939-01-055 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | TRENTON RD. | Fund Cat: | 1 |
Limits To: | FM 3461 | ESTIMATE: | $1,154,211 |
Length: | 2.1 | Actual | $1,440,510 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0039-17-198 | ||
Length: | 7.9 | ||
Estimate: | $9,212,721 | ||
Actual: | $9,929,405 | ||
CCSJ: 0342-01-099 |
|||
District: | PHARR | Let Date: | Jun 2020 |
Highway: | SH 107 | Let Status: | Actual |
Project ID: | BR 2020(913) | CSJ: | 0342-01-099 |
Description: | BRIDGE MAINTENANCE | Handling Code: | |
Limits From: | ON SH 107 @ DONNA DRAIN | Fund Cat: | 6 |
Limits To: | STR #:_0342-01-004 | ESTIMATE: | $154,944 |
Length: | 0.0 | Actual | $178,870 |
District: | PHARR | Let Date: | Jun 2020 |
Highway: | SH 107 | Let Status: | Actual |
Project ID: | BR 2020(913) | CSJ: | 0342-01-100 |
Description: | BRIDGE MAINTENANCE | Handling Code: | |
Limits From: | ON SH 107 @ DONNA DRAIN | Fund Cat: | 6 |
Limits To: | STR #:_0342-01-005 | ESTIMATE: | $100,253 |
Length: | 0.0 | Actual | $146,730 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0342-01-099 | ||
Length: | 0 | ||
Estimate: | $255,197 | ||
Actual: | $325,600 | ||
CCSJ: 0860-01-020 |
|||
District: | PHARR | Let Date: | Aug 2020 |
Highway: | FM 490 | Let Status: | Actual |
Project ID: | STP 2B20(156)HES | CSJ: | 0860-01-020 |
Description: | INSTALL/UPGRADE ROADWAY LIGHTING | Handling Code: | |
Limits From: | 750 FT W OF JESUS FLORES RD. | Fund Cat: | 8 |
Limits To: | 450 FT N OF JESUS FLORES RD. | ESTIMATE: | $349,751 |
Length: | 0.2 | Actual | $185,545 |
District: | PHARR | Let Date: | Aug 2020 |
Highway: | FM 649 | Let Status: | Actual |
Project ID: | STP 2B20(156)HES | CSJ: | 0329-02-037 |
Description: | INSTALL/UPGRADE ROADWAY LIGHTING | Handling Code: | |
Limits From: | 4880 FT N SAN ROMAN RD. | Fund Cat: | 8 |
Limits To: | 2430 FT N SAN ROMAN RD. | ESTIMATE: | $133,345 |
Length: | 0.5 | Actual | $96,340 |
District: | PHARR | Let Date: | Aug 2020 |
Highway: | SH 186 | Let Status: | Actual |
Project ID: | STP 2B20(158) | CSJ: | 0433-05-026 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | 0.165 MI WEST OF CR 465 | Fund Cat: | 8 |
Limits To: | 2.626 MI EAST OF FM 3142 | ESTIMATE: | $667,465 |
Length: | 0.0 | Actual | $458,100 |
District: | PHARR | Let Date: | Aug 2020 |
Highway: | FM 2925 | Let Status: | Actual |
Project ID: | STP 2B20(156)HES | CSJ: | 0630-03-026 |
Description: | INSTALL FLASHING BEACON | Handling Code: | |
Limits From: | 0.1 MI N OF TAUBERT RD. | Fund Cat: | 8 |
Limits To: | 0.1 MI S OF TAUBERT RD. | ESTIMATE: | $31,018 |
Length: | 0.2 | Actual | $32,493 |
District: | PHARR | Let Date: | Aug 2020 |
Highway: | FM 88 | Let Status: | Actual |
Project ID: | STP 2B20(159) | CSJ: | 0698-02-058 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | 1200' NORTH OF MILE 21 N. RD. | Fund Cat: | 8 |
Limits To: | 1500 ' SOUTH OF MILE 21 N. RD. | ESTIMATE: | $136,902 |
Length: | 0.0 | Actual | $102,140 |
District: | PHARR | Let Date: | Aug 2020 |
Highway: | FM 755 | Let Status: | Actual |
Project ID: | STP 2B20(156)HES | CSJ: | 1103-04-042 |
Description: | INSTALL FLASHING BEACON | Handling Code: | |
Limits From: | 0.1 MI N OF COUNTY ESTATES DR. | Fund Cat: | 8 |
Limits To: | 0.1 MI S OF COUNTY ESTATES DR. | ESTIMATE: | $30,891 |
Length: | 0.2 | Actual | $32,280 |
District: | PHARR | Let Date: | Aug 2020 |
Highway: | FM 1015 | Let Status: | Actual |
Project ID: | STP 2B20(156)HES | CSJ: | 1228-03-048 |
Description: | INSTALL FLASHING BEACON | Handling Code: | |
Limits From: | 0.1 MI N OF MILE 14 1/2 N RD. | Fund Cat: | 8 |
Limits To: | 0.1 MI S OF MILE 14 1/2 N RD. | ESTIMATE: | $31,087 |
Length: | 0.2 | Actual | $32,254 |
District: | PHARR | Let Date: | Aug 2020 |
Highway: | FM 1762 | Let Status: | Actual |
Project ID: | STP 2B20(156)HES | CSJ: | 1588-03-027 |
Description: | INSTALL FLASHING BEACON | Handling Code: | |
Limits From: | 0.1 MI W OF SIMON GOMEZ RD. | Fund Cat: | 8 |
Limits To: | 0.1 MI E O SIMON GOMEZ RD. | ESTIMATE: | $31,373 |
Length: | 0.2 | Actual | $33,186 |
District: | PHARR | Let Date: | Aug 2020 |
Highway: | FM 1925 | Let Status: | Actual |
Project ID: | STP 2B20(156)HES | CSJ: | 1803-02-048 |
Description: | INSTALL FLASHING BEACON | Handling Code: | |
Limits From: | 0.1 MI W OF VAL VERDE RD. | Fund Cat: | 8 |
Limits To: | 0.1 MI E OF VAL VERDE RD. | ESTIMATE: | $34,119 |
Length: | 0.2 | Actual | $34,627 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0860-01-020 | ||
Length: | 1.7 | ||
Estimate: | $1,445,951 | ||
Actual: | $1,006,965 | ||
CCSJ: 0865-01-112 |
|||
District: | PHARR | Let Date: | Nov 2019 |
Highway: | SH 495 | Let Status: | Actual |
Project ID: | NH 2020(111) | CSJ: | 0865-01-112 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 3362 | Fund Cat: | 1 |
Limits To: | FM 1426 | ESTIMATE: | $2,933,125 |
Length: | 3.2 | Actual | $3,311,214 |
District: | PHARR | Let Date: | Nov 2019 |
Highway: | BU 83-S | Let Status: | Actual |
Project ID: | NH 2020(111) | CSJ: | 0039-03-106 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 3362 | Fund Cat: | 1 |
Limits To: | US 281 | ESTIMATE: | $766,204 |
Length: | 0.0 | Actual | $904,204 |
District: | PHARR | Let Date: | Nov 2019 |
Highway: | BU 83-S | Let Status: | Actual |
Project ID: | NH 2020(111) | CSJ: | 0039-04-128 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | US 281 | Fund Cat: | 1 |
Limits To: | FM 1426 | ESTIMATE: | $1,016,840 |
Length: | 1.9 | Actual | $1,200,542 |
District: | PHARR | Let Date: | Nov 2019 |
Highway: | FM 1426 | Let Status: | Actual |
Project ID: | NH 2020(111) | CSJ: | 1429-02-039 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 3461 | Fund Cat: | 1 |
Limits To: | BUS 83 | ESTIMATE: | $1,382,286 |
Length: | 2.8 | Actual | $1,635,447 |
District: | PHARR | Let Date: | Nov 2019 |
Highway: | FM 3461 | Let Status: | Actual |
Project ID: | NH 2020(111) | CSJ: | 1802-02-016 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 2061 | Fund Cat: | 1 |
Limits To: | IH-69C | ESTIMATE: | $1,045,918 |
Length: | 1.9 | Actual | $1,229,334 |
District: | PHARR | Let Date: | Nov 2019 |
Highway: | FM 3362 | Let Status: | Actual |
Project ID: | STP 2020(113) | CSJ: | 3468-01-020 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 3461 | Fund Cat: | 1 |
Limits To: | BUS 83 | ESTIMATE: | $1,393,534 |
Length: | 2.7 | Actual | $1,614,857 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0865-01-112 | ||
Length: | 12.5 | ||
Estimate: | $8,537,907 | ||
Actual: | $9,895,598 | ||
CCSJ: 0921-02-312 |
|||
District: | PHARR | Let Date: | Oct 2019 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 1902(383)MM | CSJ: | 0921-02-312 |
Description: | WIDEN ROAD - ADD LANES | Handling Code: | LC |
Limits From: | ON DICKER RD., FROM SP 115 | Fund Cat: | 3 |
Limits To: | FM 2061 | ESTIMATE: | $15,498,000 |
Length: | 0.0 | Actual | $16,519,063 |
Back... | Totals for 0921-02-312 | ||
Length: | 0 | ||
Estimate: | $15,498,000 | ||
Actual: | $16,519,063 | ||
CCSJ: 0921-02-352 |
|||
District: | PHARR | Let Date: | Oct 2019 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 1902(313)MM | CSJ: | 0921-02-352 |
Description: | CONSTRUCT NEW ROAD | Handling Code: | LC |
Limits From: | ON BICENTENNIAL BLVD., FROM SH 107 | Fund Cat: | 3 |
Limits To: | TRENTON RD. | ESTIMATE: | $18,432,046 |
Length: | 2.9 | Actual | $12,563,651 |
Back... | Totals for 0921-02-352 | ||
Length: | 2.9 | ||
Estimate: | $18,432,046 | ||
Actual: | $12,563,651 | ||
CCSJ: 0921-02-385 |
|||
District: | PHARR | Let Date: | Apr 2020 |
Highway: | CS | Let Status: | Actual |
Project ID: | CBI 2019(320) | CSJ: | 0921-02-385 |
Description: | TRANSPORTATION NON-ROADWAY | Handling Code: | LC |
Limits From: | @ PHARR/REYNOSA INT. BRIDGE | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $3,356,379 |
Length: | 0.2 | Actual | $3,393,237 |
District: | PHARR | Let Date: | Apr 2020 |
Highway: | TL | Let Status: | Actual |
Project ID: | CBI 2019(277) | CSJ: | 0921-02-383 |
Description: | TRANSPORTATION NON-ROADWAY | Handling Code: | LC |
Limits From: | @ PHARR/REYNOSA INT. BRIDGE | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $3,909,584 |
Length: | 0.0 | Actual | $4,070,697 |
Back... | Totals for 0921-02-385 | ||
Length: | 0.2 | ||
Estimate: | $7,265,963 | ||
Actual: | $7,463,934 | ||
CCSJ: 0921-02-402 |
|||
District: | PHARR | Let Date: | Aug 2020 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2B20(316)FRS4 | CSJ: | 0921-02-402 |
Description: | RAILROAD CROSSING IMPROVEMENTS | Handling Code: | XX |
Limits From: | RIO VALLEY SWITCHING CO,DOT 448774P | Fund Cat: | 8 |
Limits To: | @ S. BENSTON RD. | ESTIMATE: | $250,000 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0921-02-402 | ||
Length: | 0 | ||
Estimate: | $250,000 | ||
Actual: | |||
CCSJ: 0921-02-420 |
|||
District: | PHARR | Let Date: | Feb 2020 |
Highway: | CR | Let Status: | Actual |
Project ID: | HP 2020(441) | CSJ: | 0921-02-420 |
Description: | WIDEN ROAD - ADD LANES | Handling Code: | LC |
Limits From: | ON MILE 6 W_FROM MILE 9 | Fund Cat: | 3 |
Limits To: | MILE 11 | ESTIMATE: | $11,403,689 |
Length: | 2.0 | Actual | $12,069,057 |
Back... | Totals for 0921-02-420 | ||
Length: | 2 | ||
Estimate: | $11,403,689 | ||
Actual: | $12,069,057 | ||
CCSJ: 1428-01-029 |
|||
District: | PHARR | Let Date: | Aug 2020 |
Highway: | FM 1425 | Let Status: | Actual |
Project ID: | STP 2B20(316)FRS4 | CSJ: | 1428-01-029 |
Description: | RAILROAD CROSSING IMPROVEMENTS | Handling Code: | XX |
Limits From: | RIO VALLEY SWITCHING CO,DOT 427240P | Fund Cat: | 8 |
Limits To: | @ FM 1425 (KIKA DE LA GARZA BLVD) | ESTIMATE: | $250,000 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 1428-01-029 | ||
Length: | 0 | ||
Estimate: | $250,000 | ||
Actual: | |||
CCSJ: 1804-01-078 |
|||
District: | PHARR | Let Date: | Aug 2020 |
Highway: | SS 115 | Let Status: | Actual |
Project ID: | C 1804-1-78 | CSJ: | 1804-01-078 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | LUCILLE RD. | Fund Cat: | 10 |
Limits To: | FM 3072 (DICKER RD.) | ESTIMATE: | $290,764 |
Length: | 0.0 | Actual | $338,038 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 1804-01-078 | ||
Length: | 0 | ||
Estimate: | $290,764 | ||
Actual: | $338,038 | ||
CCSJ: 1939-01-064 |
|||
District: | PHARR | Let Date: | Jul 2020 |
Highway: | FM 2061 | Let Status: | Actual |
Project ID: | STP 2B20(182)FRS3 | CSJ: | 1939-01-064 |
Description: | RAILROAD CROSSING IMPROVEMENTS | Handling Code: | XX |
Limits From: | @ MCCOLL & WISCONSIN | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $300,000 |
Length: | 0.1 | Actual | $75,266 |
Back... | Totals for 1939-01-064 | ||
Length: | 0.1 | ||
Estimate: | $300,000 | ||
Actual: | $75,266 | ||
CCSJ: 3097-02-016 |
|||
District: | PHARR | Let Date: | Sep 2019 |
Highway: | FM 396 | Let Status: | Actual |
Project ID: | NH 2020(077) | CSJ: | 3097-02-016 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | IH-2 | Fund Cat: | 1 |
Limits To: | 0.71 MI SOUTH OF FM 1016 | ESTIMATE: | $1,228,581 |
Length: | 3.6 | Actual | $894,358 |
District: | PHARR | Let Date: | Sep 2019 |
Highway: | BU 83-S | Let Status: | Actual |
Project ID: | STP 2020(078) | CSJ: | 0039-02-067 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | IH-2 | Fund Cat: | 1 |
Limits To: | INSPIRATION RD. | ESTIMATE: | $494,729 |
Length: | 0.0 | Actual | $410,605 |
District: | PHARR | Let Date: | Sep 2019 |
Highway: | BU 83-S | Let Status: | Actual |
Project ID: | NH 2020(077) | CSJ: | 0039-04-125 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 1426 | Fund Cat: | 1 |
Limits To: | FLOODWAY (MERCEDES) | ESTIMATE: | $1,288,599 |
Length: | 14.2 | Actual | $1,090,303 |
District: | PHARR | Let Date: | Sep 2019 |
Highway: | FM 491 | Let Status: | Actual |
Project ID: | STP 2020(078) | CSJ: | 0861-05-025 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FLOODWAY BRIDGE | Fund Cat: | 1 |
Limits To: | US 281 | ESTIMATE: | $175,774 |
Length: | 3.0 | Actual | $152,036 |
District: | PHARR | Let Date: | Sep 2019 |
Highway: | FM 1925 | Let Status: | Actual |
Project ID: | STP 2020(078) | CSJ: | 1803-02-040 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 907 | Fund Cat: | 1 |
Limits To: | FM 493 | ESTIMATE: | $255,180 |
Length: | 4.1 | Actual | $227,438 |
District: | PHARR | Let Date: | Sep 2019 |
Highway: | FM 2128 | Let Status: | Actual |
Project ID: | STP 2020(078) | CSJ: | 2450-01-024 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | BUS 281 | Fund Cat: | 1 |
Limits To: | SH 107 | ESTIMATE: | $435,678 |
Length: | 4.4 | Actual | $376,157 |
District: | PHARR | Let Date: | Sep 2019 |
Highway: | FM 2812 | Let Status: | Actual |
Project ID: | STP 2020(078) | CSJ: | 2831-01-011 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | IH-69C | Fund Cat: | 1 |
Limits To: | FM 493 | ESTIMATE: | $452,595 |
Length: | 7.3 | Actual | $403,277 |
District: | PHARR | Let Date: | Sep 2019 |
Highway: | FM 2812 | Let Status: | Actual |
Project ID: | STP 2020(078) | CSJ: | 2831-02-007 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 493 | Fund Cat: | 1 |
Limits To: | FM 88 | ESTIMATE: | $199,818 |
Length: | 3.5 | Actual | $172,627 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 3097-02-016 | ||
Length: | 40.1 | ||
Estimate: | $4,530,954 | ||
Actual: | $3,726,802 |
Handling Code | Definition |
---|---|
XX | Project not processed through statewide letting |
TR | Transfer of funds |
LC | Project let through local entity |
LC | Project not charged against district apportionment |
Let Status | Definition |
---|---|
Tentative | Estimated letting date for this project |
Approved | Project has administrative approval to be let |
Actual | Project was let to contract |