Detail Letting Schedule for Anderson County (FY 2020)
Bid Tabulations Dashboard
Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
Anderson County (FY 2020) |
CCSJ: 0058-01-019 |
|||
District: | TYLER | Let Date: | Dec 2019 |
Highway: | SH 294 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 0058-01-019 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | US 79, E | Fund Cat: | 1 |
Limits To: | FM 322 | ESTIMATE: | $1,751,307 |
Length: | 0.0 | Actual | $1,641,261 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | SH 294 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 0058-02-021 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 322, E | Fund Cat: | 1 |
Limits To: | US 287 IN ELKHART | ESTIMATE: | $210,620 |
Length: | 0.0 | Actual | $188,024 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | SH 294 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 0058-03-023 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | US 287, E | Fund Cat: | 1 |
Limits To: | CHEROKEE C/L | ESTIMATE: | $624,889 |
Length: | 0.0 | Actual | $558,094 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | US 80 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 0095-06-075 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | EDGEWOOD W C/L | Fund Cat: | 1 |
Limits To: | SH 19 | ESTIMATE: | $491,232 |
Length: | 0.0 | Actual | $438,800 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | SH 19 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 0108-02-036 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | SH 243 IN CANTON, S | Fund Cat: | 1 |
Limits To: | HENDERSON C/L | ESTIMATE: | $779,635 |
Length: | 0.0 | Actual | $794,760 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | BS 19-J | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 0108-03-043 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | N SL7/US175 IN ATHENS, S | Fund Cat: | 1 |
Limits To: | TYLER ST, 0.1 MI N OF BU 175 (C-S BREAK) | ESTIMATE: | $140,558 |
Length: | 1.5 | Actual | $126,090 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | BS 19-J | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 0108-04-038 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | .1 MI N OF BU 175 (TYLER ST), S | Fund Cat: | 1 |
Limits To: | SL 7 IN ATHENS | ESTIMATE: | $251,402 |
Length: | 0.0 | Actual | $223,476 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | SH 19 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 0108-04-039 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | SL 7 (S) IN ATHENS, S | Fund Cat: | 1 |
Limits To: | FM 1615 | ESTIMATE: | $72,413 |
Length: | 0.0 | Actual | $64,082 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | US 84 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 0123-01-038 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | SL 256 IN PALESTINE, E | Fund Cat: | 1 |
Limits To: | 3 MI E OF FM 3266 E OF CR391 | ESTIMATE: | $400,217 |
Length: | 0.0 | Actual | $415,546 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | US 84 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 0123-02-046 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | ANDERSON C/L, E | Fund Cat: | 1 |
Limits To: | FM 343 IN RUSK | ESTIMATE: | $737,773 |
Length: | 0.0 | Actual | $765,681 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | US 84 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 0123-05-016 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | W OF US 259 IN MT. ENTERPRISE, W | Fund Cat: | 1 |
Limits To: | CR 3155 | ESTIMATE: | $111,266 |
Length: | 0.0 | Actual | $99,208 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | FM 3310 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 0138-09-005 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | US 79 IN HENDERSON, SE | Fund Cat: | 1 |
Limits To: | US 259 | ESTIMATE: | $132,239 |
Length: | 0.0 | Actual | $118,077 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | SH 31 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 0163-04-060 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | .6 MI E OF SH 198 IN MALAKOFF, E | Fund Cat: | 1 |
Limits To: | SL 7 IN ATHENS | ESTIMATE: | $614,106 |
Length: | 0.0 | Actual | $624,238 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | SH 31 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 0164-01-074 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | 0.3 MI W OF FM 773 IN MURCHISON, E | Fund Cat: | 1 |
Limits To: | 0.95 MI W OF FM 1803 (C-S BREAK) | ESTIMATE: | $131,603 |
Length: | 0.0 | Actual | $116,617 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | SH 31 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 0164-02-043 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | 0.95 MI W OF FM 1803 (C-S BREAK), E | Fund Cat: | 1 |
Limits To: | E OF FM 314 IN BROWNSBORO (PFC JOINT) | ESTIMATE: | $679,975 |
Length: | 0.0 | Actual | $605,295 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | SH 31 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 0164-03-055 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | 0.5 MI W OF FM 315 IN CHANDLER, E | Fund Cat: | 1 |
Limits To: | SMITH C/L | ESTIMATE: | $202,391 |
Length: | 0.0 | Actual | $180,092 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | SH 37 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 0190-02-039 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 515 IN WINNSBORO, S | Fund Cat: | 1 |
Limits To: | SH 154 IN QUITMAN | ESTIMATE: | $713,808 |
Length: | 0.0 | Actual | $743,973 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | SH 37 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 0190-03-086 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | SH 154, IN QUITMAN, S | Fund Cat: | 1 |
Limits To: | 0.4 MI N OF SL 564 | ESTIMATE: | $458,181 |
Length: | 0.0 | Actual | $465,497 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | FM 1253 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 0203-08-018 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 1805, S | Fund Cat: | 1 |
Limits To: | SH 110 | ESTIMATE: | $217,640 |
Length: | 0.0 | Actual | $188,445 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | FM 1253 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 0203-08-019 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | US 80, S | Fund Cat: | 1 |
Limits To: | CR462 (SOUTH) | ESTIMATE: | $96,220 |
Length: | 0.0 | Actual | $83,929 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | SH 64 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 0245-06-083 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 3326, E OF TYLER, E | Fund Cat: | 1 |
Limits To: | 1.2 MI W OF SH 135 | ESTIMATE: | $294,527 |
Length: | 0.0 | Actual | $262,776 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | SH 135 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 0377-01-051 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | US 271 AT COUNTRY CLUB RD, S | Fund Cat: | 1 |
Limits To: | BEGIN 4-LN SECTION/MERIDIAN | ESTIMATE: | $185,831 |
Length: | 0.0 | Actual | $166,089 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | SH 135 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 0378-06-021 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | SMITH C/L, S | Fund Cat: | 1 |
Limits To: | BEGIN C&G IN JACKSONVILLE | ESTIMATE: | $707,662 |
Length: | 0.0 | Actual | $617,382 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | SH 154 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 0401-03-028 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | 1.4 MI E OF SH 37, QUITMAN CL, E | Fund Cat: | 1 |
Limits To: | UPSHUR C/L | ESTIMATE: | $664,684 |
Length: | 0.0 | Actual | $587,981 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | SH 198 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 0443-01-032 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | SH 243 IN CANTON, S | Fund Cat: | 1 |
Limits To: | FM 1651 | ESTIMATE: | $216,860 |
Length: | 0.0 | Actual | $193,779 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | FM 59 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 0458-02-009 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | HENDERSON C/L, S | Fund Cat: | 1 |
Limits To: | US 259 | ESTIMATE: | $185,349 |
Length: | 0.0 | Actual | $165,519 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | FM 14 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 0492-01-047 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | 0.25 MI S OF IH 20, S | Fund Cat: | 1 |
Limits To: | 1.5 MI S OF SL 323 (MLK) IN TYLER | ESTIMATE: | $261,341 |
Length: | 0.0 | Actual | $233,380 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | FM 346 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 0492-05-031 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | 0.4 MI S OF HAGAN RD AT JOINT, S | Fund Cat: | 1 |
Limits To: | MELTON, 0.3 MI N OF SH 110 IN TROUP | ESTIMATE: | $245,907 |
Length: | 0.0 | Actual | $219,356 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | FM 345 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 0492-08-013 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | SH 135, S OF ARP, W | Fund Cat: | 1 |
Limits To: | END OF STATE MAINT. NEAR LAKE TYLER EAST | ESTIMATE: | $72,292 |
Length: | 0.0 | Actual | $64,724 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | SH 155 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 0520-06-044 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | .4 MI S OF US 69, SUNNYBROOK, S | Fund Cat: | 1 |
Limits To: | SL 323 IN TYLER | ESTIMATE: | $146,843 |
Length: | 0.0 | Actual | $129,796 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | FM 47 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 0646-02-032 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | US 80 IN WILLS POINT, S | Fund Cat: | 1 |
Limits To: | IH 20 | ESTIMATE: | $261,525 |
Length: | 0.0 | Actual | $228,341 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | FM 515 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 0657-01-020 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 69 (E), E | Fund Cat: | 1 |
Limits To: | SH 11 | ESTIMATE: | $552,996 |
Length: | 0.0 | Actual | $486,165 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | FM 95 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 0706-02-024 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | US 84, S | Fund Cat: | 1 |
Limits To: | NACOGDOCHES C/L | ESTIMATE: | $224,495 |
Length: | 0.0 | Actual | $199,686 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | FM 241 | Let Status: | Actual |
Project ID: | C 1124-3-13 | CSJ: | 1124-03-013 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 752, S OF RUSK, S | Fund Cat: | 1 |
Limits To: | US 69 | ESTIMATE: | $155,057 |
Length: | 0.0 | Actual | $138,435 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | FM 1911 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 1150-05-010 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | US 69 IN ALTO, S | Fund Cat: | 1 |
Limits To: | FM 1247 | ESTIMATE: | $300,423 |
Length: | 0.0 | Actual | $267,642 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | FM 1252 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 1389-01-010 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 757, E 4.9 MI | Fund Cat: | 1 |
Limits To: | NEAR PRAIRIE CREEK | ESTIMATE: | $161,990 |
Length: | 0.0 | Actual | $144,525 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | FM 1252 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 1389-02-013 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | SMITH C/L, E | Fund Cat: | 1 |
Limits To: | 0.5 MI W OF SH 135 IN LIBERTY CITY | ESTIMATE: | $136,746 |
Length: | 0.0 | Actual | $121,738 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | FM 14 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 1390-01-011 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | SH 37, S | Fund Cat: | 1 |
Limits To: | SH 154 | ESTIMATE: | $193,572 |
Length: | 0.0 | Actual | $172,830 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | FM 1513 | Let Status: | Actual |
Project ID: | C 1450-1-2 | CSJ: | 1450-01-002 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | SH 323, E & N | Fund Cat: | 1 |
Limits To: | FM 850 IN NEW LONDON | ESTIMATE: | $111,730 |
Length: | 0.0 | Actual | $99,704 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | FM 3053 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 1608-02-014 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 1639, S | Fund Cat: | 1 |
Limits To: | FM 850 IN OVERTON | ESTIMATE: | $221,712 |
Length: | 0.0 | Actual | $197,992 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | FM 1798 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 1669-03-009 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | FM 225, E | Fund Cat: | 1 |
Limits To: | W OF US 259 | ESTIMATE: | $214,691 |
Length: | 0.0 | Actual | $191,044 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | FM 2064 | Let Status: | Actual |
Project ID: | C 1930-1-5 | CSJ: | 1930-01-005 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | SH 135, S & W | Fund Cat: | 1 |
Limits To: | SH 135 | ESTIMATE: | $288,477 |
Length: | 0.0 | Actual | $256,988 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | FM 2011 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 1932-02-006 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | SH 322 AT GREGG C/L, S | Fund Cat: | 1 |
Limits To: | FM 1716 | ESTIMATE: | $145,575 |
Length: | 0.0 | Actual | $129,687 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | SS 364 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 2833-01-014 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | SH 31, S & E | Fund Cat: | 1 |
Limits To: | SL 323 IN TYLER | ESTIMATE: | $216,991 |
Length: | 0.0 | Actual | $193,359 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | FM 3053 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 3082-02-008 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | GREGG C/L, S | Fund Cat: | 1 |
Limits To: | FM 1639 | ESTIMATE: | $45,210 |
Length: | 0.0 | Actual | $40,296 |
District: | TYLER | Let Date: | Dec 2019 |
Highway: | FM 3055 | Let Status: | Actual |
Project ID: | STP 2020(404) | CSJ: | 3084-01-004 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | US 84 IN MT. ENTERPRISE, S | Fund Cat: | 1 |
Limits To: | END OF STATE MAINTENANCE | ESTIMATE: | $112,733 |
Length: | 0.0 | Actual | $100,397 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0058-01-019 | ||
---|---|---|---|
Length: | 1.5 | ||
Estimate: | $15,142,691 | ||
Actual: | $14,050,797 | ||
CCSJ: 0122-04-039 |
|||
District: | TYLER | Let Date: | Apr 2020 |
Highway: | US 287 | Let Status: | Actual |
Project ID: | STP 2020(691) | CSJ: | 0122-04-039 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | FREESTONE/ANDERSON CL, E | Fund Cat: | 8 |
Limits To: | FM 321 | ESTIMATE: | $178,004 |
Length: | 0.0 | Actual | $155,616 |
District: | TYLER | Let Date: | Apr 2020 |
Highway: | US 287 | Let Status: | Actual |
Project ID: | STP 2020(691) | CSJ: | 0122-05-017 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | FM 321, E | Fund Cat: | 8 |
Limits To: | SH 19 | ESTIMATE: | $106,674 |
Length: | 0.0 | Actual | $94,642 |
District: | TYLER | Let Date: | Apr 2020 |
Highway: | SH 315 | Let Status: | Actual |
Project ID: | STP 2020(691) | CSJ: | 0462-01-024 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | US 259, E | Fund Cat: | 8 |
Limits To: | RUSK/PANOLA CL | ESTIMATE: | $89,268 |
Length: | 0.0 | Actual | $78,252 |
District: | TYLER | Let Date: | Apr 2020 |
Highway: | FM 756 | Let Status: | Actual |
Project ID: | STP 2020(691) | CSJ: | 0492-04-042 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | JEFF DAVIS RD, S | Fund Cat: | 8 |
Limits To: | FM 346 | ESTIMATE: | $58,302 |
Length: | 0.0 | Actual | $50,602 |
District: | TYLER | Let Date: | Apr 2020 |
Highway: | SH 155 | Let Status: | Actual |
Project ID: | NH 2020(744) | CSJ: | 0520-06-046 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | FM 2868, S | Fund Cat: | 8 |
Limits To: | SMITH/HENDERSON CL | ESTIMATE: | $147,836 |
Length: | 0.0 | Actual | $133,900 |
District: | TYLER | Let Date: | Apr 2020 |
Highway: | SH 155 | Let Status: | Actual |
Project ID: | NH 2020(744) | CSJ: | 0520-07-021 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | SMITH C/L | Fund Cat: | 8 |
Limits To: | ANDERSON C/L | ESTIMATE: | $111,325 |
Length: | 0.0 | Actual | $97,963 |
District: | TYLER | Let Date: | Apr 2020 |
Highway: | SH 155 | Let Status: | Actual |
Project ID: | STP 2020(691) | CSJ: | 0520-08-069 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | HENDERSON/ANDERSON C/L | Fund Cat: | 8 |
Limits To: | LP 256 | ESTIMATE: | $418,872 |
Length: | 0.0 | Actual | $397,683 |
District: | TYLER | Let Date: | Apr 2020 |
Highway: | FM 850 | Let Status: | Actual |
Project ID: | STP 2020(691) | CSJ: | 1163-02-032 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | SMITH/RUSK C/L | Fund Cat: | 8 |
Limits To: | US 259 | ESTIMATE: | $101,960 |
Length: | 0.0 | Actual | $89,120 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0122-04-039 | ||
Length: | 0 | ||
Estimate: | $1,212,241 | ||
Actual: | $1,097,778 | ||
CCSJ: 0205-07-078 |
|||
District: | TYLER | Let Date: | Jun 2020 |
Highway: | US 79 | Let Status: | Actual |
Project ID: | STP 2020(878)HES | CSJ: | 0205-07-078 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | US 79 AT SOUTH LP 256 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $293,848 |
Length: | 0.2 | Actual | $320,892 |
District: | TYLER | Let Date: | Jun 2020 |
Highway: | SL 256 | Let Status: | Actual |
Project ID: | STP 2020(878)HES | CSJ: | 0520-09-052 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | AT FM 322 | Fund Cat: | 8 |
Limits To: | IN PALESTINE | ESTIMATE: | $82,837 |
Length: | 0.2 | Actual | $85,525 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0205-07-078 | ||
Length: | 0.4 | ||
Estimate: | $376,685 | ||
Actual: | $406,417 | ||
CCSJ: 0520-08-068 |
|||
District: | TYLER | Let Date: | Feb 2020 |
Highway: | SH 155 | Let Status: | Actual |
Project ID: | STP 2020(561) | CSJ: | 0520-08-068 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | 0.145 MI. N OF FM 315, S | Fund Cat: | 1 |
Limits To: | TO 0.190 MI S OF SL 256 | ESTIMATE: | $2,280,343 |
Length: | 0.0 | Actual | $1,534,653 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0520-08-068 | ||
Length: | 0 | ||
Estimate: | $2,280,343 | ||
Actual: | $1,534,653 | ||
CCSJ: 0910-08-076 |
|||
District: | TYLER | Let Date: | Mar 2020 |
Highway: | CR | Let Status: | Actual |
Project ID: | BR 2018(262) | CSJ: | 0910-08-076 |
Description: | BRIDGE REPLACEMENT | Handling Code: | |
Limits From: | CR 370 AT WELLS CREEK | Fund Cat: | 6 |
Limits To: | STR#AA0370101 1.90 MI SE OF US 79 | ESTIMATE: | $395,456 |
Length: | 0.0 | Actual | $383,418 |
District: | TYLER | Let Date: | Mar 2020 |
Highway: | CR | Let Status: | Actual |
Project ID: | BR 2018(263) | CSJ: | 0910-08-077 |
Description: | BRIDGE REPLACEMENT | Handling Code: | |
Limits From: | CR 458 @ OTTER CREEK | Fund Cat: | 6 |
Limits To: | STR#AA0458101, 3.4 MI N OF FM 2330 | ESTIMATE: | $351,251 |
Length: | 0.0 | Actual | $362,580 |
District: | TYLER | Let Date: | Mar 2020 |
Highway: | CR | Let Status: | Actual |
Project ID: | BR 2018(264) | CSJ: | 0910-08-078 |
Description: | BRIDGE REPLACEMENT | Handling Code: | |
Limits From: | CR 468 AT BOX CREEK | Fund Cat: | 6 |
Limits To: | STR#AA0468101, .4 MI S OF FM 837 | ESTIMATE: | $299,463 |
Length: | 0.0 | Actual | $307,684 |
District: | TYLER | Let Date: | Mar 2020 |
Highway: | CS | Let Status: | Actual |
Project ID: | BR 2018(260) | CSJ: | 0910-08-079 |
Description: | BRIDGE REPLACEMENT | Handling Code: | |
Limits From: | SALT WORKS DR AT BASSETT CREEK | Fund Cat: | 6 |
Limits To: | STR#B01907001, 1.45 MI W OF US79 | ESTIMATE: | $391,675 |
Length: | 0.0 | Actual | $399,046 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0910-08-076 | ||
Length: | 0 | ||
Estimate: | $1,437,845 | ||
Actual: | $1,452,727 |
Handling Code | Definition |
---|---|
XX | Project not processed through statewide letting |
TR | Transfer of funds |
LC | Project let through local entity |
LC | Project not charged against district apportionment |
Let Status | Definition |
---|---|
Tentative | Estimated letting date for this project |
Approved | Project has administrative approval to be let |
Actual | Project was let to contract |