Detail Letting Schedule for Denton County (FY 2020)
Bid Tabulations Dashboard
Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
Denton County (FY 2020) |
CCSJ: 0081-03-048 |
|||
District: | DALLAS | Let Date: | Nov 2019 |
Highway: | US 377 | Let Status: | Actual |
Project ID: | NH 2020(367) | CSJ: | 0081-03-048 |
Description: | WIDEN ROAD - ADD LANES | Handling Code: | |
Limits From: | HENRIETTA CREEK RD | Fund Cat: | 1 |
Limits To: | NORTH OF BS-114K | ESTIMATE: | $14,315,732 |
Length: | 0.0 | Actual | $18,803,011 |
District: | DALLAS | Let Date: | Nov 2019 |
Highway: | US 377 | Let Status: | Actual |
Project ID: | BR 2020(370) | CSJ: | 0081-03-046 |
Description: | BRIDGE REPLACEMENT | Handling Code: | |
Limits From: | BS-114K | Fund Cat: | 1 |
Limits To: | IN ROANOKE | ESTIMATE: | $2,627,102 |
Length: | 0.0 | Actual | $3,793,305 |
District: | DALLAS | Let Date: | Nov 2019 |
Highway: | BS 114K | Let Status: | Actual |
Project ID: | STP 2020(371)RGS | CSJ: | 0353-02-053 |
Description: | RAILROAD CROSSING IMPROVEMENTS | Handling Code: | |
Limits From: | AT UP RAILROAD UNDERPASS IN ROANOKE | Fund Cat: | 1 |
Limits To: | DOT NO 795 342V | ESTIMATE: | $8,894,168 |
Length: | 0.0 | Actual | $11,088,528 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0081-03-048 | ||
---|---|---|---|
Length: | 0 | ||
Estimate: | $25,837,002 | ||
Actual: | $33,684,844 | ||
CCSJ: 0081-05-046 |
|||
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 428 | Let Status: | Actual |
Project ID: | STP 2020(125) | CSJ: | 0081-05-046 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | NORTH OF SL 288 (LONG RD) | Fund Cat: | 1 |
Limits To: | FM 3524 | ESTIMATE: | $1,862,207 |
Length: | 8.1 | Actual | $1,217,723 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | BS 289C | Let Status: | Actual |
Project ID: | C 91-9-16 | CSJ: | 0091-09-016 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | SH 289N | Fund Cat: | 1 |
Limits To: | SH 289S | ESTIMATE: | $196,932 |
Length: | 5.5 | Actual | $211,940 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | NH 2020(126) | CSJ: | 0092-05-054 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | NAVARRO COUNTY LINE | Fund Cat: | 1 |
Limits To: | FM 85 | ESTIMATE: | $438,104 |
Length: | 6.0 | Actual | $464,400 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | BI 45-F | Let Status: | Actual |
Project ID: | NH 2020(127) | CSJ: | 0092-13-030 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | IH 45 | Fund Cat: | 1 |
Limits To: | 11TH AVE | ESTIMATE: | $139,488 |
Length: | 1.9 | Actual | $139,597 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | US 287 | Let Status: | Actual |
Project ID: | STP 2020(125) | CSJ: | 0122-01-042 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | IH 45 | Fund Cat: | 1 |
Limits To: | W OF GRANDVIEW DR | ESTIMATE: | $719,620 |
Length: | 14.0 | Actual | $714,723 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | US 287 | Let Status: | Actual |
Project ID: | STP 2020(125) | CSJ: | 0122-02-031 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | GRANDVIEW ST | Fund Cat: | 1 |
Limits To: | SS 294 | ESTIMATE: | $68,259 |
Length: | 0.6 | Actual | $72,756 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 709 | Let Status: | Actual |
Project ID: | STP 2020(125) | CSJ: | 0162-09-040 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 638 | Fund Cat: | 1 |
Limits To: | FM 2555 | ESTIMATE: | $850,675 |
Length: | 16.6 | Actual | $773,363 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | BU 287R | Let Status: | Actual |
Project ID: | STP 2020(125) | CSJ: | 0172-11-014 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | US 287 NORTH | Fund Cat: | 1 |
Limits To: | S OF ASH DR | ESTIMATE: | $295,842 |
Length: | 7.6 | Actual | $290,328 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | BU 175D | Let Status: | Actual |
Project ID: | STP 2020(125) | CSJ: | 0197-12-007 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | US 175S | Fund Cat: | 1 |
Limits To: | US 175N | ESTIMATE: | $172,318 |
Length: | 2.4 | Actual | $183,699 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | BU 175E | Let Status: | Actual |
Project ID: | STP 2020(125) | CSJ: | 0197-13-006 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | HENDERSON CL | Fund Cat: | 1 |
Limits To: | US 175 | ESTIMATE: | $158,291 |
Length: | 2.7 | Actual | $156,265 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | SH 309 | Let Status: | Actual |
Project ID: | STP 2020(125) | CSJ: | 0574-01-032 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | END OF MAINTENANCE | Fund Cat: | 1 |
Limits To: | SH 31 | ESTIMATE: | $624,867 |
Length: | 11.7 | Actual | $640,524 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 90 | Let Status: | Actual |
Project ID: | STP 2020(125) | CSJ: | 0697-04-018 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | SH 198 | Fund Cat: | 1 |
Limits To: | FM 1836 | ESTIMATE: | $315,536 |
Length: | 7.6 | Actual | $336,125 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 1493 | Let Status: | Actual |
Project ID: | C 712-5-14 | CSJ: | 0712-05-014 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | END OF MAINTENANCE | Fund Cat: | 1 |
Limits To: | FM 876 | ESTIMATE: | $66,563 |
Length: | 2.2 | Actual | $70,473 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 455 | Let Status: | Actual |
Project ID: | STP 2020(125) | CSJ: | 0816-03-022 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | US 377 | Fund Cat: | 1 |
Limits To: | DENTON COUNTY LINE | ESTIMATE: | $268,672 |
Length: | 6.9 | Actual | $287,167 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 1190 | Let Status: | Actual |
Project ID: | C 816-7-4 | CSJ: | 0816-07-004 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 455 | Fund Cat: | 1 |
Limits To: | END OF MAINTENANCE | ESTIMATE: | $46,218 |
Length: | 1.2 | Actual | $49,403 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2020(125) | CSJ: | 0918-00-294 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | VARIOUS HIGHWAYS | Fund Cat: | 1 |
Limits To: | IN DALLAS DISTRICT | ESTIMATE: | $1,744,395 |
Length: | 1.0 | Actual | $1,800,880 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 639 | Let Status: | Actual |
Project ID: | STP 2020(125) | CSJ: | 0997-01-045 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 744 | Fund Cat: | 1 |
Limits To: | SH 22 | ESTIMATE: | $238,746 |
Length: | 6.4 | Actual | $254,584 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 641 | Let Status: | Actual |
Project ID: | STP 2020(125) | CSJ: | 0999-01-046 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 1394 | Fund Cat: | 1 |
Limits To: | SH 14 | ESTIMATE: | $148,761 |
Length: | 3.2 | Actual | $141,509 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 545 | Let Status: | Actual |
Project ID: | STP 2020(125) | CSJ: | 1012-02-041 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | WEST OF FM 1827 | Fund Cat: | 1 |
Limits To: | WEST OF CR 475 | ESTIMATE: | $86,184 |
Length: | 1.4 | Actual | $92,206 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 3549 | Let Status: | Actual |
Project ID: | STP 2020(125) | CSJ: | 1015-01-079 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | NORTH OF SH 66 | Fund Cat: | 1 |
Limits To: | FM 552 | ESTIMATE: | $107,997 |
Length: | 2.2 | Actual | $115,122 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 1139 | Let Status: | Actual |
Project ID: | STP 2020(125) | CSJ: | 1015-02-016 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 550 | Fund Cat: | 1 |
Limits To: | FM 549 | ESTIMATE: | $111,863 |
Length: | 2.8 | Actual | $119,444 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 1138 | Let Status: | Actual |
Project ID: | C 1016-7-11 | CSJ: | 1016-07-011 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 6 | Fund Cat: | 1 |
Limits To: | FM 1778 | ESTIMATE: | $107,846 |
Length: | 2.6 | Actual | $115,870 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 661 | Let Status: | Actual |
Project ID: | STP 2020(125) | CSJ: | 1049-01-016 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | US 287 | Fund Cat: | 1 |
Limits To: | TARRANT COUNTY LINE | ESTIMATE: | $97,962 |
Length: | 2.7 | Actual | $104,804 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 876 | Let Status: | Actual |
Project ID: | C 1051-2-19 | CSJ: | 1051-02-019 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | NORTH OF EDMONSON | Fund Cat: | 1 |
Limits To: | IH 35E | ESTIMATE: | $195,387 |
Length: | 6.1 | Actual | $206,629 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 741 | Let Status: | Actual |
Project ID: | STP 2020(125) | CSJ: | 1092-01-020 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | US 175 | Fund Cat: | 1 |
Limits To: | FM 548 | ESTIMATE: | $340,053 |
Length: | 8.5 | Actual | $334,737 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 879 | Let Status: | Actual |
Project ID: | STP 2020(125) | CSJ: | 1159-02-036 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 878 | Fund Cat: | 1 |
Limits To: | WEST OF FM 1722 | ESTIMATE: | $350,551 |
Length: | 7.2 | Actual | $347,289 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 1446 | Let Status: | Actual |
Project ID: | STP 2020(125) | CSJ: | 1160-02-019 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | END OF MAINTENANCE | Fund Cat: | 1 |
Limits To: | IH 35E | ESTIMATE: | $311,151 |
Length: | 7.3 | Actual | $331,855 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 407 | Let Status: | Actual |
Project ID: | STP 2020(125) | CSJ: | 1310-01-047 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 156 | Fund Cat: | 1 |
Limits To: | FM 1830 | ESTIMATE: | $465,573 |
Length: | 9.7 | Actual | $458,548 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 1384 | Let Status: | Actual |
Project ID: | C 1310-2-10 | CSJ: | 1310-02-010 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | END OF MAINTENANCE | Fund Cat: | 1 |
Limits To: | FM 156 | ESTIMATE: | $218,431 |
Length: | 4.9 | Actual | $232,631 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 1385 | Let Status: | Actual |
Project ID: | STP 2020(125) | CSJ: | 1315-01-029 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | NORTH OF US 380 | Fund Cat: | 1 |
Limits To: | MUSTANG RD | ESTIMATE: | $342,497 |
Length: | 6.4 | Actual | $361,391 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 1181 | Let Status: | Actual |
Project ID: | C 1318-1-16 | CSJ: | 1318-01-016 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | IH 45G | Fund Cat: | 1 |
Limits To: | OIL FIELD RD | ESTIMATE: | $406,898 |
Length: | 10.2 | Actual | $404,605 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 1377 | Let Status: | Actual |
Project ID: | STP 2020(125) | CSJ: | 1391-01-020 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 75 | Fund Cat: | 1 |
Limits To: | FM 545 | ESTIMATE: | $456,917 |
Length: | 11.7 | Actual | $487,472 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 1387 | Let Status: | Actual |
Project ID: | STP 2020(125) | CSJ: | 1394-02-028 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | BU 287Q | Fund Cat: | 1 |
Limits To: | FM 664 | ESTIMATE: | $287,875 |
Length: | 6.6 | Actual | $303,901 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 1391 | Let Status: | Actual |
Project ID: | C 1396-1-12 | CSJ: | 1396-01-012 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | BUS 175D | Fund Cat: | 1 |
Limits To: | FM 90 | ESTIMATE: | $289,331 |
Length: | 6.9 | Actual | $308,563 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 90 | Let Status: | Actual |
Project ID: | C 1397-1-33 | CSJ: | 1397-01-033 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 1836 | Fund Cat: | 1 |
Limits To: | VAN ZANDT C/L | ESTIMATE: | $55,666 |
Length: | 1.6 | Actual | $59,435 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 1562 | Let Status: | Actual |
Project ID: | STP 2020(125) | CSJ: | 1492-01-011 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 981 | Fund Cat: | 1 |
Limits To: | COLLIN C/L | ESTIMATE: | $35,792 |
Length: | 0.9 | Actual | $38,177 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 407 | Let Status: | Actual |
Project ID: | STP 2020(125) | CSJ: | 1568-02-012 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | WISE C/L | Fund Cat: | 1 |
Limits To: | FM 156 | ESTIMATE: | $263,490 |
Length: | 6.4 | Actual | $280,949 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 1126 | Let Status: | Actual |
Project ID: | STP 2020(125) | CSJ: | 1724-01-017 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 744(W) | Fund Cat: | 1 |
Limits To: | FM 744(E) | ESTIMATE: | $20,202 |
Length: | 0.6 | Actual | $21,522 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 1181 | Let Status: | Actual |
Project ID: | C 1974-1-11 | CSJ: | 1974-01-011 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | OIL FIELD RD | Fund Cat: | 1 |
Limits To: | SH 34 | ESTIMATE: | $195,360 |
Length: | 4.9 | Actual | $191,099 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | Let Status: | Actual | |
Project ID: | STP 2020(125) | CSJ: | 2247-01-012 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | EAST OF CR 657 | Fund Cat: | 1 |
Limits To: | COLLIN C/L | ESTIMATE: | $115,937 |
Length: | 2.7 | Actual | $123,119 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 3194 | Let Status: | Actual |
Project ID: | C 2462-4-8 | CSJ: | 2462-04-008 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 1394 | Fund Cat: | 1 |
Limits To: | FM 709 | ESTIMATE: | $205,478 |
Length: | 5.4 | Actual | $219,167 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 2728 | Let Status: | Actual |
Project ID: | STP 2020(125) | CSJ: | 2512-01-015 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | US 80 | Fund Cat: | 1 |
Limits To: | FM 429 | ESTIMATE: | $373,810 |
Length: | 8.7 | Actual | $397,316 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 2728 | Let Status: | Actual |
Project ID: | STP 2020(125) | CSJ: | 2512-03-009 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | SH 34 | Fund Cat: | 1 |
Limits To: | FM 429 | ESTIMATE: | $298,860 |
Length: | 5.7 | Actual | $317,568 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 2622 | Let Status: | Actual |
Project ID: | C 2587-1-4 | CSJ: | 2587-01-004 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | END OF MAINTENANCE | Fund Cat: | 1 |
Limits To: | US 380 | ESTIMATE: | $46,389 |
Length: | 1.2 | Actual | $49,972 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | BU 287R | Let Status: | Actual |
Project ID: | STP 2020(125) | CSJ: | 2921-01-008 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | US 287 EBFR | Fund Cat: | 1 |
Limits To: | US 287 SOUTH | ESTIMATE: | $25,725 |
Length: | 0.3 | Actual | $27,226 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 1193 | Let Status: | Actual |
Project ID: | STP 2020(125) | CSJ: | 2978-01-007 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | BU 289D | Fund Cat: | 1 |
Limits To: | SH 289 | ESTIMATE: | $27,246 |
Length: | 0.7 | Actual | $29,005 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 876 | Let Status: | Actual |
Project ID: | C 2984-1-16 | CSJ: | 2984-01-016 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | END OF MAINTENANCE | Fund Cat: | 1 |
Limits To: | NORTH OF EDMONSON | ESTIMATE: | $116,963 |
Length: | 3.4 | Actual | $123,423 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | FM 3396 | Let Status: | Actual |
Project ID: | C 3426-1-4 | CSJ: | 3426-01-004 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 2613 | Fund Cat: | 1 |
Limits To: | SH 274 | ESTIMATE: | $191,305 |
Length: | 5.2 | Actual | $203,759 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0081-05-046 | ||
Length: | 250.5 | ||
Estimate: | $14,504,232 | ||
Actual: | $14,212,260 | ||
CCSJ: 0081-13-064 |
|||
District: | DALLAS | Let Date: | Nov 2019 |
Highway: | IH 35W | Let Status: | Actual |
Project ID: | BR 2020(350) | CSJ: | 0081-13-064 |
Description: | REMOVE/REPLACE BRIDGE RAIL | Handling Code: | |
Limits From: | AT W GRAHAM BR & KCS RR NB & SB | Fund Cat: | 6 |
Limits To: | . | ESTIMATE: | $1,243,937 |
Length: | 6.9 | Actual | $1,306,227 |
District: | DALLAS | Let Date: | Nov 2019 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | BR 2020(350) | CSJ: | 0195-02-075 |
Description: | REMOVE/REPLACE BRIDGE RAIL | Handling Code: | |
Limits From: | AT TRIETSCH BRANCH | Fund Cat: | 6 |
Limits To: | . | ESTIMATE: | $67,352 |
Length: | 0.0 | Actual | $92,363 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0081-13-064 | ||
Length: | 6.9 | ||
Estimate: | $1,311,289 | ||
Actual: | $1,398,590 | ||
CCSJ: 0081-13-066 |
|||
District: | DALLAS | Let Date: | Mar 2020 |
Highway: | IH 35W | Let Status: | Actual |
Project ID: | NH 2020(808) | CSJ: | 0081-13-066 |
Description: | REHABILITATE EXISTING ROADWAY | Handling Code: | |
Limits From: | TARRANT COUNTY LINE (NORTHBOUND) | Fund Cat: | 1 |
Limits To: | SOUTH OF SH 114 | ESTIMATE: | $2,125,041 |
Length: | 0.0 | Actual | $2,037,153 |
District: | DALLAS | Let Date: | Mar 2020 |
Highway: | FM 156 | Let Status: | Actual |
Project ID: | STP 2020(809) | CSJ: | 0718-01-069 |
Description: | REHABILITATE EXISTING ROADWAY | Handling Code: | |
Limits From: | TARRANT COUNTY LINE | Fund Cat: | 1 |
Limits To: | SOUTH OF SH 114 | ESTIMATE: | $3,912,983 |
Length: | 3.4 | Actual | $3,873,249 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0081-13-066 | ||
Length: | 3.4 | ||
Estimate: | $6,038,024 | ||
Actual: | $5,910,402 | ||
CCSJ: 0135-10-057 |
|||
District: | DALLAS | Let Date: | Jun 2020 |
Highway: | US 377 | Let Status: | Actual |
Project ID: | CM 2020(806) | CSJ: | 0135-10-057 |
Description: | INSTALL RAISED MEDIAN | Handling Code: | |
Limits From: | SL 288 | Fund Cat: | 11 |
Limits To: | US 377 / US 380 INTERSECTION | ESTIMATE: | $16,753,424 |
Length: | 4.5 | Actual | $20,616,737 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0135-10-057 | ||
Length: | 4.5 | ||
Estimate: | $16,753,424 | ||
Actual: | $20,616,737 | ||
CCSJ: 0195-02-071 |
|||
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | US 77 | Let Status: | Actual |
Project ID: | STP 2020(128) | CSJ: | 0195-02-071 |
Description: | REHABILITATE EXISTING ROADWAY | Handling Code: | |
Limits From: | US 380 | Fund Cat: | 1 |
Limits To: | FM 2164 | ESTIMATE: | $359,533 |
Length: | 0.7 | Actual | $365,763 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | US 77 | Let Status: | Actual |
Project ID: | STP 2020(129) | CSJ: | 0196-01-104 |
Description: | REHABILITATE EXISTING ROADWAY | Handling Code: | |
Limits From: | MCKINNEY STREET | Fund Cat: | 1 |
Limits To: | US 380 | ESTIMATE: | $847,806 |
Length: | 1.0 | Actual | $1,069,321 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0195-02-071 | ||
Length: | 1.7 | ||
Estimate: | $1,207,339 | ||
Actual: | $1,435,084 | ||
CCSJ: 0195-03-092 |
|||
District: | DALLAS | Let Date: | May 2020 |
Highway: | IH 35E | Let Status: | Actual |
Project ID: | STP 2B20(009)HES | CSJ: | 0195-03-092 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT FM 2181 (TEASLEY LN) | Fund Cat: | 8 |
Limits To: | IN THE CITY OF DENTON | ESTIMATE: | $396,346 |
Length: | 0.2 | Actual | $390,012 |
District: | DALLAS | Let Date: | May 2020 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2020(810)HES | CSJ: | 0918-24-243 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | E EXCHANGE PKWY AT RIVERCREST BLVD | Fund Cat: | 3 |
Limits To: | IN THE CITY OF ALLEN | ESTIMATE: | $15,859 |
Length: | 0.2 | Actual | $13,621 |
District: | DALLAS | Let Date: | May 2020 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2020(810)HES | CSJ: | 0918-24-244 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | GREENVILLE AVE FROM HIGHTRAIL DR | Fund Cat: | 3 |
Limits To: | E EXCHANGE PKWY CITY OF ALLEN | ESTIMATE: | $78,478 |
Length: | 2.4 | Actual | $68,132 |
District: | DALLAS | Let Date: | May 2020 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2020(810)HES | CSJ: | 0918-24-245 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | MCDERMOTT DR AT S WATTERS ST | Fund Cat: | 3 |
Limits To: | IN THE CITY OF ALLEN | ESTIMATE: | $16,194 |
Length: | 0.2 | Actual | $13,953 |
District: | DALLAS | Let Date: | May 2020 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2020(810)HES | CSJ: | 0918-24-246 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | MCDERMOTT DR AT TWINCREEK/SUNCREEK | Fund Cat: | 3 |
Limits To: | IN THE CITY OF ALLEN | ESTIMATE: | $18,541 |
Length: | 0.2 | Actual | $16,431 |
District: | DALLAS | Let Date: | May 2020 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2020(810)HES | CSJ: | 0918-24-247 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | E EXCHANGE PKWY AT N ALMA DR | Fund Cat: | 3 |
Limits To: | IN THE CITY OF ALLEN | ESTIMATE: | $19,738 |
Length: | 0.2 | Actual | $17,584 |
District: | DALLAS | Let Date: | May 2020 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2020(810)HES | CSJ: | 0918-24-248 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | E EXCHANGE PKWY AT N ALLEN HEIGHTS | Fund Cat: | 3 |
Limits To: | IN THE CITY OF ALLEN | ESTIMATE: | $15,951 |
Length: | 0.2 | Actual | $13,704 |
District: | DALLAS | Let Date: | May 2020 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2020(810)HES | CSJ: | 0918-46-310 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | E MCKINNEY ST FROM WOODROW LN | Fund Cat: | 3 |
Limits To: | AUDRA LN TO MOCKINGBIRD LN | ESTIMATE: | $592,134 |
Length: | 0.9 | Actual | $531,916 |
District: | DALLAS | Let Date: | May 2020 |
Highway: | FM 2478 | Let Status: | Actual |
Project ID: | STP 2020(811)HES | CSJ: | 2351-01-023 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | ELDORADO PKWY | Fund Cat: | 3 |
Limits To: | RIDGE CREEK PKWY | ESTIMATE: | $47,720 |
Length: | 2.9 | Actual | $39,658 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0195-03-092 | ||
Length: | 7.4 | ||
Estimate: | $1,200,960 | ||
Actual: | $1,105,009 | ||
CCSJ: 0196-01-110 |
|||
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | US 77 | Let Status: | Actual |
Project ID: | STP 2020(130) | CSJ: | 0196-01-110 |
Description: | REHABILITATE EXISTING ROADWAY | Handling Code: | |
Limits From: | IH 35E | Fund Cat: | 1 |
Limits To: | EAGLE DR | ESTIMATE: | $1,048,764 |
Length: | 1.6 | Actual | $1,081,078 |
District: | DALLAS | Let Date: | Oct 2019 |
Highway: | US 77 | Let Status: | Actual |
Project ID: | STP 2020(130) | CSJ: | 0195-02-078 |
Description: | REHABILITATE EXISTING ROADWAY | Handling Code: | |
Limits From: | US 380 | Fund Cat: | 1 |
Limits To: | IH 35 | ESTIMATE: | $405,904 |
Length: | 3.7 | Actual | $405,252 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0196-01-110 | ||
Length: | 5.3 | ||
Estimate: | $1,454,668 | ||
Actual: | $1,486,329 | ||
CCSJ: 0918-46-312 |
|||
District: | DALLAS | Let Date: | Jan 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2020(524)MM | CSJ: | 0918-46-312 |
Description: | TRANSPORTATION NON-ROADWAY | Handling Code: | TR |
Limits From: | DCTA VANPOOL PROGRAM | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $377,000 |
Length: | 0.0 | Actual | $377,000 |
Back... | Totals for 0918-46-312 | ||
Length: | 0 | ||
Estimate: | $377,000 | ||
Actual: | $377,000 | ||
CCSJ: 0918-46-315 |
|||
District: | DALLAS | Let Date: | Apr 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 918-46-315 | CSJ: | 0918-46-315 |
Description: | TRANSPORTATION NON-ROADWAY | Handling Code: | XX |
Limits From: | VARIOUS LOCATIONS ALONG US 377 | Fund Cat: | 3 |
Limits To: | FROM IH 35E TO FM 1830 | ESTIMATE: | $3,000,000 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0918-46-315 | ||
Length: | 0 | ||
Estimate: | $3,000,000 | ||
Actual: | |||
CCSJ: 0918-46-317 |
|||
District: | DALLAS | Let Date: | Apr 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | CSJ: | 0918-46-317 | |
Description: | RAILROAD CROSSING IMPROVEMENTS | Handling Code: | XX |
Limits From: | AT UPRR CROSSING | Fund Cat: | 3 |
Limits To: | AND CANYON FALLS | ESTIMATE: | $400,000 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0918-46-317 | ||
Length: | 0 | ||
Estimate: | $400,000 | ||
Actual: | |||
CCSJ: 2681-01-025 |
|||
District: | DALLAS | Let Date: | Mar 2020 |
Highway: | FM 2499 | Let Status: | Actual |
Project ID: | NH 2020(812) | CSJ: | 2681-01-025 |
Description: | REPAIR ROADWAY | Handling Code: | |
Limits From: | FM 1171 | Fund Cat: | 1 |
Limits To: | TARRANT COUNTY LINE | ESTIMATE: | $1,174,499 |
Length: | 3.3 | Actual | $997,921 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 2681-01-025 | ||
Length: | 3.3 | ||
Estimate: | $1,174,499 | ||
Actual: | $997,921 |
Handling Code | Definition |
---|---|
XX | Project not processed through statewide letting |
TR | Transfer of funds |
LC | Project let through local entity |
LC | Project not charged against district apportionment |
Let Status | Definition |
---|---|
Tentative | Estimated letting date for this project |
Approved | Project has administrative approval to be let |
Actual | Project was let to contract |