Detail Letting Schedule for El Paso County (FY 2020)
Bid Tabulations Dashboard
Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
El Paso County (FY 2020) |
CCSJ: 0001-02-055 |
|||
District: | EL PASO | Let Date: | Nov 2019 |
Highway: | SH 20 | Let Status: | Actual |
Project ID: | NH 2019(781) | CSJ: | 0001-02-055 |
Description: | SURFACING/ROADWAY RESTORATION | Handling Code: | |
Limits From: | SUNLAND PARK DRIVE | Fund Cat: | 1 |
Limits To: | BALTIMORE DRIVE | ESTIMATE: | $12,975,300 |
Length: | 4.0 | Actual | $11,138,603 |
District: | EL PASO | Let Date: | Nov 2019 |
Highway: | SH 20 | Let Status: | Actual |
Project ID: | ROW 1-2-65 | CSJ: | 0001-02-065 |
Description: | RIGHT OF WAY | Handling Code: | |
Limits From: | SUNLAND PARK DRIVE | Fund Cat: | ROW |
Limits To: | BALTIMORE DRIVE | ESTIMATE: | $272,855 |
Length: | 4.0 | Actual | $318,645 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0001-02-055 | ||
---|---|---|---|
Length: | 8 | ||
Estimate: | $13,248,155 | ||
Actual: | $11,457,248 | ||
CCSJ: 0001-02-069 |
|||
District: | EL PASO | Let Date: | Aug 2020 |
Highway: | SH 20 | Let Status: | Actual |
Project ID: | C 1-2-69 | CSJ: | 0001-02-069 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | 0.1 MI W OF BALTIMORE DR | Fund Cat: | 8 |
Limits To: | CINCINNATI AVE | ESTIMATE: | $400,910 |
Length: | 0.2 | Actual | $359,987 |
District: | EL PASO | Let Date: | Aug 2020 |
Highway: | SH 20 | Let Status: | Actual |
Project ID: | C 1-3-61 | CSJ: | 0001-03-061 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | CINCINNATI AVE | Fund Cat: | 8 |
Limits To: | RIVER AVE | ESTIMATE: | $375,589 |
Length: | 0.8 | Actual | $382,440 |
District: | EL PASO | Let Date: | Aug 2020 |
Highway: | SL 478 | Let Status: | Actual |
Project ID: | C 167-2-73 | CSJ: | 0167-02-073 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | HARRISON AVE | Fund Cat: | 8 |
Limits To: | FLORY AVE | ESTIMATE: | $916,284 |
Length: | 1.3 | Actual | $922,712 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0001-02-069 | ||
Length: | 2.3 | ||
Estimate: | $1,692,784 | ||
Actual: | $1,665,139 | ||
CCSJ: 0167-01-120 |
|||
District: | EL PASO | Let Date: | Apr 2020 |
Highway: | US 54 | Let Status: | Actual |
Project ID: | NH 2020(874) | CSJ: | 0167-01-120 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | 0.085 MI N OF IH 10 | Fund Cat: | 1 |
Limits To: | 1.683 MI N OF IH 10 | ESTIMATE: | $1,029,343 |
Length: | 0.0 | Actual | $719,532 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0167-01-120 | ||
Length: | 0 | ||
Estimate: | $1,029,343 | ||
Actual: | $719,532 | ||
CCSJ: 0167-01-127 |
|||
District: | EL PASO | Let Date: | Apr 2020 |
Highway: | US 54 | Let Status: | Actual |
Project ID: | CM 2020(778) | CSJ: | 0167-01-127 |
Description: | INSTALL INTELLIGENT VEHICLE HIGHWAY SYSTEM | Handling Code: | |
Limits From: | FM 2529 (MCCOMBS ST) | Fund Cat: | 1 |
Limits To: | NEW MEXICO STATE LINE | ESTIMATE: | $699,747 |
Length: | 6.4 | Actual | $587,855 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0167-01-127 | ||
Length: | 6.4 | ||
Estimate: | $699,747 | ||
Actual: | $587,855 | ||
CCSJ: 0167-01-128 |
|||
District: | EL PASO | Let Date: | Feb 2020 |
Highway: | US 54 | Let Status: | Actual |
Project ID: | NH 2020(602) | CSJ: | 0167-01-128 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | MCCOMBS | Fund Cat: | 1 |
Limits To: | TEXAS/NEW MEXICO STATE LINE | ESTIMATE: | $9,234,847 |
Length: | 0.0 | Actual | $7,012,064 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0167-01-128 | ||
Length: | 0 | ||
Estimate: | $9,234,847 | ||
Actual: | $7,012,064 | ||
CCSJ: 0167-02-063 |
|||
District: | EL PASO | Let Date: | Dec 2019 |
Highway: | BU 54-A | Let Status: | Actual |
Project ID: | NH 2020(444) | CSJ: | 0167-02-063 |
Description: | SURFACING/ROADWAY RESTORATION | Handling Code: | |
Limits From: | SANDERS | Fund Cat: | 1 |
Limits To: | S ANGORA LOOP | ESTIMATE: | $3,063,331 |
Length: | 0.0 | Actual | $2,497,617 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0167-02-063 | ||
Length: | 0 | ||
Estimate: | $3,063,331 | ||
Actual: | $2,497,617 | ||
CCSJ: 0665-01-009 |
|||
District: | EL PASO | Let Date: | Jan 2020 |
Highway: | FM 3255 | Let Status: | Actual |
Project ID: | NH 2020(424) | CSJ: | 0665-01-009 |
Description: | SURFACING/ROADWAY RESTORATION | Handling Code: | |
Limits From: | NEW MEXICO STATE LINE | Fund Cat: | 1 |
Limits To: | 0.208 MI N OF US 54 | ESTIMATE: | $3,260,367 |
Length: | 0.0 | Actual | $1,983,140 |
District: | EL PASO | Let Date: | Jan 2020 |
Highway: | FM 2529 | Let Status: | Actual |
Project ID: | STP 2020(471) | CSJ: | 2326-01-027 |
Description: | SURFACING/ROADWAY RESTORATION | Handling Code: | |
Limits From: | US 54 | Fund Cat: | 1 |
Limits To: | FM 3255 (KENWORTHY) | ESTIMATE: | $1,641,736 |
Length: | 5.2 | Actual | $1,237,824 |
Proposal Request Bid List List Showing Order Addenda Bid Tabulations Award Status Back... | Totals for 0665-01-009 | ||
Length: | 5.2 | ||
Estimate: | $4,902,103 | ||
Actual: | $3,220,965 | ||
CCSJ: 0924-00-142 |
|||
District: | EL PASO | Let Date: | Feb 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2020(535) | CSJ: | 0924-00-142 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $2,915,660 |
Length: | 567.5 | Actual | $2,676,577 |
District: | EL PASO | Let Date: | Feb 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 924-00-146 | CSJ: | 0924-00-146 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | DISTRICTWIDE (FC 6 ROADS) | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $88,021 |
Length: | 0.0 | Actual | $68,344 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0924-00-142 | ||
Length: | 567.5 | ||
Estimate: | $3,003,681 | ||
Actual: | $2,744,921 | ||
CCSJ: 0924-06-419 |
|||
District: | EL PASO | Let Date: | Aug 2020 |
Highway: | CS | Let Status: | Approved |
Project ID: | BR 1902(135) | CSJ: | 0924-06-419 |
Description: | BRIDGE REPLACEMENT | Handling Code: | LC |
Limits From: | (ON DAVIS DR) WINCHESTER ST | Fund Cat: | 3 |
Limits To: | KILBURN WAY | ESTIMATE: | $443,208 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0924-06-419 | ||
Length: | 0 | ||
Estimate: | $443,208 | ||
Actual: | |||
CCSJ: 0924-06-421 |
|||
District: | EL PASO | Let Date: | Aug 2020 |
Highway: | CS | Let Status: | Approved |
Project ID: | BR 1902(132) | CSJ: | 0924-06-421 |
Description: | BRIDGE REPLACEMENT | Handling Code: | LC |
Limits From: | (DELTA DR) NRE THOMASON LOOP | Fund Cat: | 3 |
Limits To: | SH 20 (ALAMEDA AVE) | ESTIMATE: | $1,752,015 |
Length: | 0.1 | Actual | $0 |
Back... | Totals for 0924-06-421 | ||
Length: | 0.1 | ||
Estimate: | $1,752,015 | ||
Actual: | |||
CCSJ: 0924-06-422 |
|||
District: | EL PASO | Let Date: | Aug 2020 |
Highway: | CS | Let Status: | Approved |
Project ID: | BR 1902(131) | CSJ: | 0924-06-422 |
Description: | BRIDGE REPLACEMENT | Handling Code: | LC |
Limits From: | (ON YARBROUGH DR) ARVIN CIRCLE | Fund Cat: | 3 |
Limits To: | INDEPENDENCE DR | ESTIMATE: | $1,898,899 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0924-06-422 | ||
Length: | 0 | ||
Estimate: | $1,898,899 | ||
Actual: | |||
CCSJ: 0924-06-425 |
|||
District: | EL PASO | Let Date: | Aug 2020 |
Highway: | CS | Let Status: | Approved |
Project ID: | BR 1902(133) | CSJ: | 0924-06-425 |
Description: | BRIDGE REPLACEMENT | Handling Code: | LC |
Limits From: | (ON ALABAMA ST) 200' WEST OF BRIDGE | Fund Cat: | 3 |
Limits To: | 200' EAST OF BRIDGE | ESTIMATE: | $984,989 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0924-06-425 | ||
Length: | 0 | ||
Estimate: | $984,989 | ||
Actual: | |||
CCSJ: 0924-06-534 |
|||
District: | EL PASO | Let Date: | Feb 2020 |
Highway: | CS | Let Status: | Actual |
Project ID: | CBI 2020(432) | CSJ: | 0924-06-534 |
Description: | CONSTRUCT NEW ROAD | Handling Code: | LC |
Limits From: | (ON PELLICANO DR) JOE BATTLE BLVD | Fund Cat: | 3 |
Limits To: | DARRINGTON (BERRYVILLE ST) | ESTIMATE: | $23,000,000 |
Length: | 3.0 | Actual | $21,655,646 |
Back... | Totals for 0924-06-534 | ||
Length: | 3 | ||
Estimate: | $23,000,000 | ||
Actual: | $21,655,646 | ||
CCSJ: 0924-06-539 |
|||
District: | EL PASO | Let Date: | Jun 2020 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 1802(731) | CSJ: | 0924-06-539 |
Description: | INFRASTRUCTURE IMPROVEMENTS | Handling Code: | LC |
Limits From: | AT EL PASO ST/6TH AVE | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $1,297,000 |
Length: | 0.0 | Actual | $2,394,925 |
Back... | Totals for 0924-06-539 | ||
Length: | 0 | ||
Estimate: | $1,297,000 | ||
Actual: | $2,394,925 | ||
CCSJ: 0924-06-540 |
|||
District: | EL PASO | Let Date: | Jan 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2020(713) | CSJ: | 0924-06-540 |
Description: | TRANSPORTATION SERVICE OPERATIONS | Handling Code: | TR |
Limits From: | DWT TERMINAL SANTA FE/FOURTH | Fund Cat: | 5 |
Limits To: | NORTHGATE TERMINAL DYER/WREN | ESTIMATE: | $1,000,000 |
Length: | 1.0 | Actual | $1,000,000 |
Back... | Totals for 0924-06-540 | ||
Length: | 1 | ||
Estimate: | $1,000,000 | ||
Actual: | $1,000,000 | ||
CCSJ: 0924-06-551 |
|||
District: | EL PASO | Let Date: | Jan 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2020(712) | CSJ: | 0924-06-551 |
Description: | TRANSPORTATION SERVICE OPERATIONS | Handling Code: | TR |
Limits From: | DWT TERMINAL SANTA FE/FOURTH | Fund Cat: | 5 |
Limits To: | MV TERMINAL ALAMEDA/ZARAGOZA | ESTIMATE: | $1,000,000 |
Length: | 1.0 | Actual | $1,000,000 |
Back... | Totals for 0924-06-551 | ||
Length: | 1 | ||
Estimate: | $1,000,000 | ||
Actual: | $1,000,000 | ||
CCSJ: 0924-06-553 |
|||
District: | EL PASO | Let Date: | Jan 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2020(711) | CSJ: | 0924-06-553 |
Description: | TRANSPORTATION SERVICE OPERATIONS | Handling Code: | TR |
Limits From: | FATHER RAHM AVENUE | Fund Cat: | 5 |
Limits To: | GLORY ROAD | ESTIMATE: | $1,000,000 |
Length: | 1.0 | Actual | $1,000,000 |
Back... | Totals for 0924-06-553 | ||
Length: | 1 | ||
Estimate: | $1,000,000 | ||
Actual: | $1,000,000 | ||
CCSJ: 0924-06-560 |
|||
District: | EL PASO | Let Date: | Jun 2020 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2019(961)TAPS | CSJ: | 0924-06-560 |
Description: | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | Handling Code: | LC |
Limits From: | ON O.T. SMITH RD/SH 20(ALAMEDA AVE) | Fund Cat: | 3 |
Limits To: | IH 10 | ESTIMATE: | $2,143,913 |
Length: | 2.5 | Actual | $2,201,527 |
Back... | Totals for 0924-06-560 | ||
Length: | 2.5 | ||
Estimate: | $2,143,913 | ||
Actual: | $2,201,527 | ||
CCSJ: 0924-06-601 |
|||
District: | EL PASO | Let Date: | May 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 924-6-601 | CSJ: | 0924-06-601 |
Description: | BRIDGE MAINTENANCE | Handling Code: | |
Limits From: | COUNTY WIDE | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $2,966,650 |
Length: | 1.0 | Actual | $2,570,503 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0924-06-601 | ||
Length: | 1 | ||
Estimate: | $2,966,650 | ||
Actual: | $2,570,503 | ||
CCSJ: 0924-06-603 |
|||
District: | EL PASO | Let Date: | Apr 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | NH 2020(773) | CSJ: | 0924-06-603 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | COUNTYWIDE | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $1,929,431 |
Length: | 45.0 | Actual | $1,766,831 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0924-06-603 | ||
Length: | 45 | ||
Estimate: | $1,929,431 | ||
Actual: | $1,766,831 | ||
CCSJ: 2121-02-171 |
|||
District: | EL PASO | Let Date: | Jul 2020 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 2121-2-171 | CSJ: | 2121-02-171 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | 0.20 MI W OF MESA STREET | Fund Cat: | 10 |
Limits To: | 0.70 MI E OF SUNLAND PARK DR | ESTIMATE: | $653,428 |
Length: | 0.0 | Actual | $507,007 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 2121-02-171 | ||
Length: | 0 | ||
Estimate: | $653,428 | ||
Actual: | $507,007 | ||
CCSJ: 2121-03-060 |
|||
District: | EL PASO | Let Date: | Jun 2020 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 2121-3-60 | CSJ: | 2121-03-060 |
Description: | SURFACING/ROADWAY RESTORATION | Handling Code: | |
Limits From: | FM 2316 (MCRAE BLVD.) | Fund Cat: | 1 |
Limits To: | LOMALAND DR. | ESTIMATE: | $10,118,234 |
Length: | 0.0 | Actual | $8,716,784 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 2121-03-060 | ||
Length: | 0 | ||
Estimate: | $10,118,234 | ||
Actual: | $8,716,784 | ||
CCSJ: 2121-05-051 |
|||
District: | EL PASO | Let Date: | Jul 2020 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 2121-5-51 | CSJ: | 2121-05-051 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | OT SMITH RD | Fund Cat: | 8 |
Limits To: | EL PASO/HUDSPETH COUNTY LINE | ESTIMATE: | $963,270 |
Length: | 0.0 | Actual | $739,295 |
District: | EL PASO | Let Date: | Jul 2020 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 2-11-60 | CSJ: | 0002-11-060 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | 0.5 MI W OF GOLF COURSE DR | Fund Cat: | 8 |
Limits To: | US 90 | ESTIMATE: | $314,372 |
Length: | 0.0 | Actual | $228,209 |
District: | EL PASO | Let Date: | Jul 2020 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 3-1-62 | CSJ: | 0003-01-062 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | US 90 | Fund Cat: | 8 |
Limits To: | 1 MI E OF BI 10D | ESTIMATE: | $288,711 |
Length: | 1.9 | Actual | $216,396 |
District: | EL PASO | Let Date: | Jul 2020 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 3-1-63 | CSJ: | 0003-01-063 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | 0.6 MI W OF EVERGREEN RD | Fund Cat: | 8 |
Limits To: | EVERGREEN ROAD | ESTIMATE: | $75,521 |
Length: | 0.6 | Actual | $57,299 |
District: | EL PASO | Let Date: | Jul 2020 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 3-2-47 | CSJ: | 0003-02-047 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | EVERGREEN RD | Fund Cat: | 8 |
Limits To: | 0.2 MI W OF BORACHO STATION | ESTIMATE: | $1,623,686 |
Length: | 12.9 | Actual | $1,219,369 |
District: | EL PASO | Let Date: | Jul 2020 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 3-3-48 | CSJ: | 0003-03-048 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | 0.2 MI W OF BORACHO STATION | Fund Cat: | 8 |
Limits To: | CULBERSON/JEFF DAVIS COUNTY LINE | ESTIMATE: | $488,967 |
Length: | 12.6 | Actual | $336,247 |
District: | EL PASO | Let Date: | Jul 2020 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 3-4-55 | CSJ: | 0003-04-055 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | CULBERSON/JEFF DAVIS COUNTY LINE | Fund Cat: | 8 |
Limits To: | JEFF DAVIS/REEVES COUNTY LINE | ESTIMATE: | $86,507 |
Length: | 7.0 | Actual | $52,170 |
District: | EL PASO | Let Date: | Jul 2020 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 2121-6-50 | CSJ: | 2121-06-050 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | EL PASO/HUDSPETH COUNTY LINE | Fund Cat: | 8 |
Limits To: | 0.5 MI W OF SS 148 | ESTIMATE: | $1,556,191 |
Length: | 10.2 | Actual | $1,171,496 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 2121-05-051 | ||
Length: | 45.2 | ||
Estimate: | $5,397,225 | ||
Actual: | $4,020,480 | ||
CCSJ: 2552-02-034 |
|||
District: | EL PASO | Let Date: | Jun 2020 |
Highway: | SL 375 | Let Status: | Actual |
Project ID: | C 2552-2-34 | CSJ: | 2552-02-034 |
Description: | SURFACING/ROADWAY RESTORATION | Handling Code: | |
Limits From: | LP 375/MCCOMBS | Fund Cat: | 1 |
Limits To: | 0.21 E OF RAILROAD DR | ESTIMATE: | $994,374 |
Length: | 1.4 | Actual | $714,608 |
District: | EL PASO | Let Date: | Jun 2020 |
Highway: | SL 375 | Let Status: | Actual |
Project ID: | C 2552-1-60 | CSJ: | 2552-01-060 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | 0.15 MI W OF LP 375/MCOMBS | Fund Cat: | 1 |
Limits To: | LP 375/MCCOMBS | ESTIMATE: | $81,419 |
Length: | 0.0 | Actual | $63,078 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 2552-02-034 | ||
Length: | 1.4 | ||
Estimate: | $1,075,793 | ||
Actual: | $777,686 | ||
CCSJ: 2552-03-049 |
|||
District: | EL PASO | Let Date: | Jul 2020 |
Highway: | SL 375 | Let Status: | Actual |
Project ID: | NH 2013(875) | CSJ: | 2552-03-049 |
Description: | CONSTRUCT NEW ROAD | Handling Code: | |
Limits From: | BOB HOPE DR | Fund Cat: | 11 |
Limits To: | ZARAGOZA RD | ESTIMATE: | $31,102,584 |
Length: | 0.0 | Actual | $32,453,490 |
District: | EL PASO | Let Date: | Jul 2020 |
Highway: | SL 375 | Let Status: | Actual |
Project ID: | STP 2020(872)HES | CSJ: | 2552-03-061 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | PELLICANO | Fund Cat: | 8 |
Limits To: | ROJAS | ESTIMATE: | $1,160,777 |
Length: | 1.7 | Actual | $1,582,865 |
District: | EL PASO | Let Date: | Jul 2020 |
Highway: | SL 375 | Let Status: | Actual |
Project ID: | CBI 2B20(010) | CSJ: | 2552-03-066 |
Description: | INFRASTRUCTURE IMPROVEMENTS | Handling Code: | |
Limits From: | FM 76 (NORTH LOOP) | Fund Cat: | 11 |
Limits To: | ZARAGOZA INTERNATIONAL PORT OF ENTRY | ESTIMATE: | $36,028,328 |
Length: | 2.4 | Actual | $37,911,390 |
District: | EL PASO | Let Date: | Jul 2020 |
Highway: | SL 375 | Let Status: | Actual |
Project ID: | NH 2020(873) | CSJ: | 2552-04-047 |
Description: | CONSTRUCT NEW ROAD | Handling Code: | |
Limits From: | ZARAGOZA RD | Fund Cat: | 11 |
Limits To: | 0.33 MI SW OF ZARAGOZA RD | ESTIMATE: | $4,271,113 |
Length: | 0.4 | Actual | $3,480,625 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 2552-03-049 | ||
Length: | 4.5 | ||
Estimate: | $72,562,802 | ||
Actual: | $75,428,369 |
Handling Code | Definition |
---|---|
XX | Project not processed through statewide letting |
TR | Transfer of funds |
LC | Project let through local entity |
LC | Project not charged against district apportionment |
Let Status | Definition |
---|---|
Tentative | Estimated letting date for this project |
Approved | Project has administrative approval to be let |
Actual | Project was let to contract |