Detail Letting Schedule for Trinity County (FY 2021)
Bid Tabulations Dashboard
Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
Trinity County (FY 2021) |
CCSJ: 0109-07-053 |
|||
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | SH 19 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 0109-07-053 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | HOUSTON COUNTY LINE | Fund Cat: | 1 |
Limits To: | 0.129 MILES SOUTH OF FM 1617 | ESTIMATE: | $508,748 |
Length: | 0.0 | Actual | $550,874 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | US 287 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 0109-03-040 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | BU 287-V | Fund Cat: | 1 |
Limits To: | 2.193 MI N OF FM 2663 | ESTIMATE: | $229,985 |
Length: | 4.1 | Actual | $146,516 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | US 287 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 0109-04-033 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | 2.193 MI N OF FM 2663 | Fund Cat: | 1 |
Limits To: | SL 304 | ESTIMATE: | $361,434 |
Length: | 6.3 | Actual | $228,411 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | SH 19 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 0109-08-049 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | 0.128 MILES S FM 1617 | Fund Cat: | 1 |
Limits To: | TRINITY RIVER BRIDGE | ESTIMATE: | $378,289 |
Length: | 0.0 | Actual | $285,815 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | SH 21 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 0118-02-041 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 1733 | Fund Cat: | 1 |
Limits To: | FM 227 NORTH | ESTIMATE: | $211,337 |
Length: | 0.0 | Actual | $132,017 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | SH 21 | Let Status: | Actual |
Project ID: | NH 2021(096) | CSJ: | 0119-04-034 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | SH 87 | Fund Cat: | 1 |
Limits To: | 1.9 MI NE OF FM 3121 | ESTIMATE: | $332,179 |
Length: | 6.0 | Actual | $247,563 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | SH 21 | Let Status: | Actual |
Project ID: | NH 2021(096) | CSJ: | 0119-05-002 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | 1.9 MI NE OF FM 3121 | Fund Cat: | 1 |
Limits To: | SABINE RIVER BRIDGE | ESTIMATE: | $81,906 |
Length: | 0.0 | Actual | $62,260 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | US 84 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 0123-07-021 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | RUSK COUNTY LINE | Fund Cat: | 1 |
Limits To: | US 59 | ESTIMATE: | $398,445 |
Length: | 0.0 | Actual | $310,318 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | FM 2913 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 0123-09-005 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | END OF STATE MAINTENANCE | Fund Cat: | 1 |
Limits To: | SH 7 | ESTIMATE: | $108,787 |
Length: | 3.2 | Actual | $84,072 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | NH 2021(096) | CSJ: | 0175-05-045 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | 2.861 MILES S OF SH 87 | Fund Cat: | 1 |
Limits To: | SH 87 IN TIMPSON | ESTIMATE: | $293,974 |
Length: | 0.0 | Actual | $184,887 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | NH 2021(096) | CSJ: | 0176-05-200 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | BU 59 N | Fund Cat: | 1 |
Limits To: | US 190 | ESTIMATE: | $367,946 |
Length: | 2.0 | Actual | $303,658 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | NH 2021(096) | CSJ: | 0177-01-116 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | US 190 | Fund Cat: | 1 |
Limits To: | 1.6 MILES S. US 190 | ESTIMATE: | $233,348 |
Length: | 1.6 | Actual | $192,185 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | NH 2021(096) | CSJ: | 0177-02-106 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | 2.6 MI N OF FM 1127 | Fund Cat: | 1 |
Limits To: | CONCRETE PVT N OF FM 223 | ESTIMATE: | $293,255 |
Length: | 0.0 | Actual | $237,987 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | SL 393 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 0177-12-003 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | US 59 NORTH INTERSECTION | Fund Cat: | 1 |
Limits To: | US 59 SOUTH INTERSECTION | ESTIMATE: | $67,804 |
Length: | 0.0 | Actual | $54,290 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | US 190 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 0213-04-047 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | 3.2 MILES WEST OF FM 1276 | Fund Cat: | 1 |
Limits To: | 0.6 MI SOUTH WEST OF FM 1276 | ESTIMATE: | $163,259 |
Length: | 0.0 | Actual | $130,590 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | US 190 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 0213-05-043 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | 0.126 MI W OF FM 1276 | Fund Cat: | 1 |
Limits To: | TYLER COUNTY LINE | ESTIMATE: | $646,465 |
Length: | 10.2 | Actual | $516,253 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | SH 63 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 0244-01-046 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | US 69 | Fund Cat: | 1 |
Limits To: | JASPER COUNTY LINE | ESTIMATE: | $937,472 |
Length: | 0.0 | Actual | $769,191 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | SH 87 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 0304-01-031 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | SH 147 | Fund Cat: | 1 |
Limits To: | SABINE COUNTY LINE | ESTIMATE: | $566,176 |
Length: | 13.5 | Actual | $421,541 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | SH 7 | Let Status: | Actual |
Project ID: | NH 2021(096) | CSJ: | 0336-01-068 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | SL 304 | Fund Cat: | 1 |
Limits To: | 3.6 MILES EAST OF SL 304 | ESTIMATE: | $170,892 |
Length: | 0.0 | Actual | $137,827 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | SH 7 | Let Status: | Actual |
Project ID: | NH 2021(096) | CSJ: | 0336-01-069 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | 0.2 MILES EAST OF FM 232 | Fund Cat: | 1 |
Limits To: | KENNARD | ESTIMATE: | $309,257 |
Length: | 0.0 | Actual | $246,627 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | FM 223 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 0395-05-024 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | SL 424 | Fund Cat: | 1 |
Limits To: | LIBERTY COUNTY LINE | ESTIMATE: | $295,794 |
Length: | 6.3 | Actual | $220,332 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | FM 224 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 0403-02-022 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | SH 156 NORTH | Fund Cat: | 1 |
Limits To: | SH 156 SOUTH | ESTIMATE: | $322,797 |
Length: | 0.0 | Actual | $238,976 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | SH 204 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 0450-04-048 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | CHEROKEE COUNTY LINE | Fund Cat: | 1 |
Limits To: | US 259 | ESTIMATE: | $867,982 |
Length: | 17.3 | Actual | $655,481 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | FM 1818 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 0576-02-067 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | US 59 | Fund Cat: | 1 |
Limits To: | FM 58 | ESTIMATE: | $408,528 |
Length: | 0.0 | Actual | $303,478 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | FM 83 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 0694-01-030 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 1 | Fund Cat: | 1 |
Limits To: | SH 87 | ESTIMATE: | $424,242 |
Length: | 0.0 | Actual | $315,555 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | FM 95 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 0706-04-021 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | SH 7 | Fund Cat: | 1 |
Limits To: | SH 21 | ESTIMATE: | $391,845 |
Length: | 10.8 | Actual | $296,501 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | FM 139 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 0742-01-055 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 2694 | Fund Cat: | 1 |
Limits To: | SH 87 | ESTIMATE: | $459,964 |
Length: | 0.0 | Actual | $342,013 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | US 96 | Let Status: | Actual |
Project ID: | NH 2021(096) | CSJ: | 0809-04-053 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | SH 103 | Fund Cat: | 1 |
Limits To: | SABINE COUNTY LINE | ESTIMATE: | $246,792 |
Length: | 3.4 | Actual | $199,147 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | US 96 | Let Status: | Actual |
Project ID: | NH 2021(096) | CSJ: | 0809-05-022 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | SAN AUGUSTINE COUNTY LINE | Fund Cat: | 1 |
Limits To: | SH 184 | ESTIMATE: | $90,867 |
Length: | 0.0 | Actual | $74,518 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | FM 711 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 0895-01-017 |
Description: | RESURFACE ROADWAY | Handling Code: | CO |
Limits From: | SH 7 | Fund Cat: | 1 |
Limits To: | SAN AUGUSTINE COUNTY LINE | ESTIMATE: | $214,198 |
Length: | 0.0 | Actual | $1 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | FM 330 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 0896-01-006 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | SH 87 | Fund Cat: | 1 |
Limits To: | SH 21 | ESTIMATE: | $255,828 |
Length: | 0.0 | Actual | $193,440 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | FM 1280 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 0931-02-024 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | SH 19 | Fund Cat: | 1 |
Limits To: | FM 2781 | ESTIMATE: | $285,017 |
Length: | 0.0 | Actual | $210,142 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | FM 843 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 1164-01-012 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | US 69 | Fund Cat: | 1 |
Limits To: | US 59 | ESTIMATE: | $261,382 |
Length: | 6.7 | Actual | $198,578 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | FM 947 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 1195-01-033 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | TIMPSON | Fund Cat: | 1 |
Limits To: | TENEHA | ESTIMATE: | $361,896 |
Length: | 0.0 | Actual | $278,338 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | FM 225 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 1810-02-025 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | 0.07 MI WEST OF CR 715 | Fund Cat: | 1 |
Limits To: | US 59/SL 224 | ESTIMATE: | $174,326 |
Length: | 0.0 | Actual | $132,331 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | SL 304 | Let Status: | Actual |
Project ID: | NH 2021(096) | CSJ: | 1854-01-045 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | SH 7 EAST | Fund Cat: | 1 |
Limits To: | SH 19 | ESTIMATE: | $121,132 |
Length: | 0.0 | Actual | $98,371 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | SL 304 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 1854-01-049 |
Description: | RESURFACE ROADWAY | Handling Code: | CO |
Limits From: | SH 7/SH 21 | Fund Cat: | 1 |
Limits To: | SH 7 | ESTIMATE: | $100,590 |
Length: | 0.0 | Actual | $1 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | FM 1988 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 1876-01-041 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | US 59 | Fund Cat: | 1 |
Limits To: | 0.44 MILES SOUTH OF FM 3278 | ESTIMATE: | $111,755 |
Length: | 0.0 | Actual | $58,667 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | FM 2262 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 2117-01-022 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | US 287 | Fund Cat: | 1 |
Limits To: | FM 357 | ESTIMATE: | $759,998 |
Length: | 12.2 | Actual | $588,245 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | FM 357 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 2117-03-014 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | TRINITY COUNTY LINE | Fund Cat: | 1 |
Limits To: | US 59 | ESTIMATE: | $121,969 |
Length: | 3.5 | Actual | $91,934 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | FM 2663 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 2663-01-008 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | US 287 | Fund Cat: | 1 |
Limits To: | FM 2022 | ESTIMATE: | $172,031 |
Length: | 4.4 | Actual | $128,986 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | FM 2666 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 2668-01-011 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | SH 150 | Fund Cat: | 1 |
Limits To: | FM 2025 | ESTIMATE: | $254,607 |
Length: | 0.0 | Actual | $195,277 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | FM 2974 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 3039-01-005 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | END OF STATE MAINTENANCE | Fund Cat: | 1 |
Limits To: | FM 138 | ESTIMATE: | $65,258 |
Length: | 2.0 | Actual | $50,256 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | FM 3278 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 3198-03-006 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | FM 1988 | Fund Cat: | 1 |
Limits To: | TRINITY RIVER BRIDGE | ESTIMATE: | $27,844 |
Length: | 0.0 | Actual | $20,933 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | FM 3152 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 3220-01-014 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | US 190 | Fund Cat: | 1 |
Limits To: | FM 350 | ESTIMATE: | $275,191 |
Length: | 0.0 | Actual | $206,583 |
District: | LUFKIN | Let Date: | Nov 2020 |
Highway: | FM 3460 | Let Status: | Actual |
Project ID: | STP 2021(095) | CSJ: | 3437-01-009 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | SL 424 (END OF CONC PVMT) | Fund Cat: | 1 |
Limits To: | FM 2914 | ESTIMATE: | $82,373 |
Length: | 2.3 | Actual | $61,458 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0109-07-053 | ||
---|---|---|---|
Length: | 115.8 | ||
Estimate: | $13,815,162 | ||
Actual: | $10,402,425 |
Handling Code | Definition |
---|---|
XX | Project not processed through statewide letting |
TR | Transfer of funds |
LC | Project let through local entity |
LC | Project not charged against district apportionment |
Let Status | Definition |
---|---|
Tentative | Estimated letting date for this project |
Approved | Project has administrative approval to be let |
Actual | Project was let to contract |