***** OFFICIAL NOTICE ***** *** STATE LET CONSTRUCTION CONTRACT *** COUNTY: HARRIS HIGHWAY: US 90A LENGTH: 2.762 MI CONTROL NUMBER: 0027-10-069 DBE GOAL: 4.0 % PROJECT NUMBER: NH 2013(061) TYPE: RECONSTRUCT, FULL DEPTH, MILL TIME FOR COMPLETION: 132 WORKING DAYS GUARANTY: 28,000.00 BIDS RECEIVED UNTIL: 1:00 PM December 4, 2012 * EST.COST: 1,467,678.85 BIDS WILL BE OPENED: 1:00 PM December 4, 2012 MAIL OR DELIVER BIDS TO: FOR QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATION VOLK, JEFF AUSTIN HQ - RIVERSIDE ANNEX 702 FM 1959 200 E RIVERSIDE ROOM 1B.1 HOUSTON TX 77034 AUSTIN TX 78704-1204 (281)454-5500 (512)416-2498 LIMITS FROM: IH 45 LIMITS TO: AVENUE W ------------------------------------------------------------------------------ ITEM DES S.P APPROXIMATE ALT NO. CD. NO. ITEM DESCRIPTION UNIT QUANTITIES ------------------------------------------------------------------------------ 104 2001 REMOVING CONC (PAV) SY 9,569.000 104 2009 REMOVING CONC (RIPRAP) SY 158.000 104 2021 REMOVING CONC (CURB) LF 1,705.000 104 2040 REMOVING CONC (PAVERS) SY 143.000 105 2041 REMOVING STAB BASE AND ASPH PAV(8") SY 8,999.000 105 2044 REMOVING STAB BASE AND ASPH PAV (10") SY 972.000 110 2001 EXCAVATION (ROADWAY) CY 433.000 132 2006 EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 262.000 162 2002 BLOCK SODDING SY 156.000 166 2001 001 FERTILIZER AC .040 168 2001 VEGETATIVE WATERING MG 5.000 292 2007 ASPHALT STAB BASE (GR 2)(PG 64) TON 3,078.000 305 2003 SALV, HAUL & STKPL RCL APH PV (2 TO 4") SY 1,242.000 340 2063 003 D-GR HMA(METH) TY-C SAC-A PG76-22 TON 137.000 340 2066 003 D-GR HMA(METH) TY-C PG76-22 TON 137.000 361 2024 001 FULL-DEPTH REPAIR CRCP (7") SY 236.000 432 2001 RIPRAP (CONC)(4 IN) CY 13.000 432 2002 RIPRAP (CONC)(5 IN) CY 12.000 465 2165 001 INLET (STAGE II)(TY B) EA 1.000 479 2001 ADJ MANHS EA 1.000 496 2002 REMOV STR (INLET) EA 1.000 500 2001 011 MOBILIZATION LS 1.000 502 2001 033 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 5.000 529 2006 CONC CURB (MONO) (TY II) LF 1,600.000 529 2007 CONC CURB (DOWEL) LF 1,705.000 529 2013 CONC CURB (TY A)(BARRIER) LF 172.000 529 2070 CONCRETE CURB (TYPE U-TURN)(SPECIAL) LF 1,036.000 531 2005 CURB RAMPS (TY 1) EA 6.000 531 2010 CURB RAMPS (TY 7) EA 4.000 531 2014 CURB RAMPS (TY 22) EA 2.000 668 2106 PREFAB PAV MRK TY C (W) (ARROW) EA 5.000 668 2107 PREFAB PAV MRK TY C (W) (DBL ARROW) EA 8.000 668 2115 PREFAB PAV MRK TY C (W) (UTURN ARROW) EA 2.000 668 2116 PREFAB PAV MRK TY C (W) (WORD) EA 5.000 672 2012 034 REFL PAV MRKR TY I-C EA 48.000 672 2015 034 REFL PAV MRKR TY II-A-A EA 67.000 672 2017 034 REFL PAV MRKR TY II-C-R EA 46.000 677 2008 ELIM EXT PAV MRK & MRKS (ARROW) EA 1.000 677 2009 ELIM EXT PAV MRK & MRKS (DBL ARROW) EA 1.000 677 2016 ELIM EXT PAV MRK & MRKS (UTURN ARR) EA 1.000 678 2002 PAV SURF PREP FOR MRK ( 6") LF 1,928.000 678 2003 PAV SURF PREP FOR MRK ( 8") LF 894.000 678 2004 PAV SURF PREP FOR MRK (12") LF 679.000 678 2006 PAV SURF PREP FOR MRK (24") LF 180.000 678 2007 PAV SURF PREP FOR MRK (ARROW) EA 5.000 678 2008 PAV SURF PREP FOR MRK (DBL ARROW) EA 8.000 678 2018 PAV SURF PREP FOR MRK (WORD) EA 5.000 1122 2048 001 BIOGRD EROSN CONT LOGS (12" DIA)INSTALL LF 240.000 1122 2056 001 BIODEGRADBLE EROSION CONTROL LOGS REMOV LF 240.000 3061 2001 FAST TRK CONC (CNT RNF HY STL)(12") SY 9,854.000 6007 2001 REMOVING TRAFFIC SIGNALS EA 1.000 6473 2004 001 MULTIPOLYMER PAV MRK (W)(6")(SLD) LF 240.000 6473 2005 001 MULTIPOLYMER PAV MRK (W)(6")(BRK) LF 460.000 6473 2006 001 MULTIPOLYMER PAV MRK (W)(6")(DOT) LF 168.000 6473 2007 001 MULTIPOLYMER PAV MRK (W)(8")(SLD) LF 894.000 6473 2009 001 MULTIPOLYMER PAV MRK (W)(12")(SLD) LF 679.000 6473 2014 001 MULTIPOLYMER PAV MRK (Y)(6")(SLD) LF 1,300.000 6473 2021 001 MULTIPOLYMER PAV MRK (W)(24")(SLD) LF 180.000 6834 2002 001 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 8317 2001 BBU SYSTEM (EXTERNAL BATT CABINET) EA 1.000 8835 2001 ACCESSIBLE PEDESTRIAN SIGNAL UNITS EA 12.000 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $ 1,000.00 CONTRACTOR FORCE ACT OR AGR UNIT PRICE (PART) $ 50,000.00